Public Health and Municipal Engineering Department - Nellore

L&T Construction

Decentralized STPand Sewer Network in Nellore Municipal Corporation


Public Health and Municipal Engineering Department - Nellore

L&T Construction
Decentralized STPand Sewer Network in Nellore Municipal Corporation
CONTRACTOR - L&T Construction
PROJECT NAME - Decentralized STPand Sewer Network in Nellore Municipal Corporation

QUALITY ASSURANCE PLAN CLIENT:Public Health and Municipal Engineering Department - Nellore
P.O. No.: EPEPL/PO/2016-17/L&T/NELLORE/023,
DT. 20.01.2017
ITEM : HORIZONTAL PROGRESSIVE CAVITY PUMP O.A. NO.: SP 16 99093, DT. 17.02.2017
QAP No. ROTO/EPEPL/SP/16/99093
M/s. ROTO PUMPS LIMITED REV. NO. : 00
DATE: 20.02.2017
SL. COMPONENT & CHARACTERISTICS TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
OF
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD ROTO CLIENT/
TPIA
A. RAW MATERIALS:
A.1 Pump Casing Physical Test Phy. 1 Sample Per Technical Data Sheet ./ Technical Data Sheet ./ MTC R R
Heat Relative Specification Relative Specification
Chemical Test Chem. 1 Sample Per Technical Data Sheet ./ Technical Data Sheet ./ MTC R R Chemical is not applicable for CI
Heat Relative Specification Relative Specification castings.
A.2 Rotor & Shaft Chemical Test Chem. 1 Sample Per Technical Data Sheet ./ Technical Data Sheet ./ MTC/ Lab R R
Heat Relative Specification Relative Specification Test Report
Internal Defects for bar dia UT 100% ASME SEC V ASME SEC VIII DIV. 2 Test Report P R
above 50mm
B. IN PROCESS:

B.1 Pump Casing Pressure Test Hydro Pr. 100% 1.5 Times of Duty No Leakage Test Report P R
pressure for 30 Minutes

C. FINAL INSPECTION:
C.1 *Performance(Capacity, Head Meas. 100% Technical Data Sheet/ VDMA 24284 CLASS II Test Report P W *1 No. Pump per model will be
& Input Power) Roto Performance offered for witness along with Job
Procedure Motor/ Shop Motor.
C.2 *Vibration Meas. 100% Technical Data Sheet 100 Micron Max. Test Report P W

C.3 *Noise Level Meas. 100% Technical Data Sheet 85 dBA Max. Test Report P W

C.4 *Temp.Rise Temp. 100% Technical Data Sheet 39°C Max. above Test Report P W
ambient
C.5 *Overall Dimension Meas. 100% Pump G.A. Drawing Pump G.A. Drawing Inspection P R
Report
Note : After 1 Hour Mechanical run test, Pump performance test will be done with water at test bed condition & data will be interpolated at
required duty condition.

Lengends:-
MTC = Manufacturer's Test Certificate, P = Test activity need to be perofmed
R = Review of documents, W = Test activity to be witnessed by Client/TPIA
Approved By :
Signature:
(Roto Pumps Ltd) Name & Signature of Approving Authority & Seal