Prepaired BY Date
Project Amith pussella's hous
STG 3-Jan-18
Client
Location BS_4
Dimensions Material
Span(m) 6 Bw 225 fcu(N/mm2) 25
Breadth(mm) 225 bf 2080 fy(N/mm2) 460
h(mm) 450 hf 187 Density(KN/m2 24
Com. cover(mm) 30 link D 10 Material Factors
Tension cover (mm) 60 ꞅc= 1.5
Continiues or not S C,CA,S ꞅs= 1.05
Span/Support SP T Beam ßb 0.85
span fs 303
m(KNm) 239.0 m.f. for tensile R/F 1.38362875
Tension Ø mm 20 m.f. for COM. R/F 1
Compression Ø mm 16 Allovable L/D 27.67257501
d mm 370.0 Actual L/D 16.21621622
d` 38 Layer B1
k` 0.144 Deflection ok
K 0.0336 Compression Steal
z mm 351.5 x mm 41.11111111
As req mm2 1552 As` mm2 0.0
As min mm2 182.3 bars 2.0
As delection mm2 1552 As` provided 402.1238597
bars mm 5.0 M.F. 1
As provided mm2 1571
Tension Compression
5T20 2T16
Page Checked Revison DWG NO
11 UA GA REV 4
LOADING Factors
Self weight(KN/m2) 10.8 ꞅf= 1.35
S.Dead(KN/m2) 2.5 ꞅf= 1.5
Total Dead(KN/m2),gk 13.3
Imposed,qk(KN/m2) 3
SLS Load(KN/m2) 16.3 SP
Desig load(KN/m2) 22.455 su
bf 2080
F Flange
T Beam
C
-35.30833275 CA
k`>K 1552 S
k`<k 136
-588.5015766
BW/B= 0.108173077
minAS%= 0.0018
min AS= 182.25
Provided main steel
short 200 10
Long 200 10
1 200 10
2 200 10
3 200 10
4 200 10
Nd= 0
Ly/Lx #DIV/0!
r= `
T
@
r 0
T10@200 B2 Err:504
T10@200 T1 Err:504
T10@200 T2 Not ok
T10@200 T1 Not ok
T10@200 T2 Not ok
SHEAR CHEK
Edge 1
Edge 4 Edge 2
Lx= 2.4
T10@325 B2 T10@200 B2 ok
T10@325 T1 T10@200 T1 ok
T10@325 T2 T10@200 T2 ok
T10@325 T2 T10@200 T2 ok
T10@325 T1 T10@200 T1 ok
T10@325 T2 T10@200 T2 ok
Provided main steel
short 200 10
Long 200 10
1 200 10
2 200 10
3 200 10
4 200 10
Nd= 1
Ly/Lx 1.234167
r= 0.279646
T
@