Month: November
Group: EEI
Number of Resources:
N/A
8 Bhatkunda & Revertmix project Hemant Parnerkar
N/A
9 Elect. & Inst. package-Dual Fuel Burners, Pellet PHemant Parnerkar
N/A
10 Power System projects Hemant Parnerkar
N/A
11 14MTPA study Hemant Parnerkar
N/A
12 Standardization Hemant Parnerkar
N/A
13 3.3KV BIECCO Sub-station Hemant Parnerkar
N/A
14 CDQ-10,11 Power Plant Hemant Parnerkar
N/A
15 Standardization of Tech Specs Hemant Parnerkar
N/A
16 Genaral Hemant Parnerkar
EP163 I BF Reduction in Nitrogen consumption-
17 Installation of Air compressor system DGBERA
EP027
18 C_F Fire-fighting system DGBERA
EP066
19 H BF - INBA DGBERA
EP170 I BF Provision of one additional bypass
20 arrangement for secondary cooling circuit DGBERA
NA
21 Interconnection of PCI Silos of all PCI Mills DGBERA
N/A Enhancing PCI capacity for I BF to achieve 250
22 kg/thm DGBERA
23 N/A Axial Cyclone for H & I Furnace DGBERA
N/A PCI coal transfer from Power House 4 Ball Mill
24 to C_F BF DGBERA
EP 216 Dust Extraction system in I BF at MB#1&2
25 Junction House and top charging platform DGBERA
26 EP215 Pneumatic sample transfer DGBERA
N/A
67
68 N/A
N/A
69
N/A
70
71 N/A
72 N/A
N/A
77
N/A
78
79 N/A
80 N/A
N/A
81
82 N/A Uttam Dutta
83 N/A
84 N/A
85 N/A
86 N/A
87 N/A
88 N/A
89 N/A
90 N/A
N/A LD-1 Secondry Emission Upgradation TSJ Subodh Kumar
91
N/A
92
93 N/A
94 N/A
95 N/A Merchant Mill Upgradation Subodh Kumar
96
98 N/A WRM & Merchant Mill water system UpgradationSubodh Kumar
99 N/A
N/A
123
124 N/A
N/A
134
135 N/A
136 N/A
N/A
137
N/A
138
N/A
139
N/A LD#1 & LD#2 Capacity Enhancement Ananda Mandal
190
N/A Presentation for Steel Making Projects Ananda Mandal
191
N/A Travel to DasturCo, Kolkata Ananda Mandal
192
N/A AutoCad Installation Ananda Mandal
193
N/A LD2 GAS Holder Subir Chakraborty
194
N/A
195
N/A
196
N/A
197
N/A
198
N/A
199
N/A
200
N/A
201
N/A
202
N/A
203
N/A
204
N/A Merchant Mill Upgradation:- Use Induction HeateChandan Sinha
205
N/A
206
207 N/A
214 N/A Merchant Mill Upgradation Chandan Sinha
223 N/A WRM & Merchant Mill water system UpgradationChandan Sinha
224 N/A
BU-PRG and Technical question answer PULASTYA BARMAN
sesssion for FDA system in cable tunnel project
N/A
225
226 N/A Coke Plant - Rebuilding battery 7 PULASTYA BARMAN
227 N/A MLCP and PARC Building PULASTYA BARMAN
Torch cutting facility for heavy scraps at PULASTYA BARMAN
N/A Gurudwara yard.
228
Self Development PULASTYA BARMAN
N/A
229
AET Training PULASTYA BARMAN
N/A
230
N/A Mitigating fugitive dust emission post
231 CDQ#10&11 commissioning Joydeep Kumar Chakraborty
N/A
232 Coke Plant Batt 10-11 to Batt 5-6-7 connectivity Joydeep Kumar Chakraborty
N/A
233 MLCP and PARC Building Joydeep Kumar Chakraborty
N/A
234 SP1 - SP2 Connectivity Joydeep Kumar Chakraborty
N/A
236 Cooler WHR based power generation at SP3&4 Joydeep Kumar Chakraborty
N/A
237 Self Development Joydeep Kumar Chakraborty
N/A
238 AET Training Joydeep Kumar Chakraborty
239 N/A CETP Ph#2 Atanu Mandal
240 N/A _do_ Atanu Mandal
241 N/A _do_ Atanu Mandal
242 N/A TGS AAQMS Atanu Mandal
243 N/A _do_ Atanu Mandal
244 N/A _do_ Atanu Mandal
245 N/A HBF FE System Upgradation Atanu Mandal
246 N/A _do_ Atanu Mandal
247 N/A DE System at JCK#5,6,7 Atanu Mandal
248 N/A _do_ Atanu Mandal
249 N/A AET Training for Pressure Measurement Atanu Mandal
250 N/A Self Development Atanu Mandal
Replacement of Coal tar burner with dual fuel
burners in Pellet Plant
N/A
251 V Vara Kumar
252 N/A SP1 - SP2 Connectivity V Vara Kumar
Enabling production increase of pellet plant to
N/A 8 MTPA
253 V Vara Kumar
Tubes_ proposal for new mills
N/A
254 V Vara Kumar
LP- Proposal for New Mills
N/A
255 V Vara Kumar
Cooler WHR based power generation at SP3&4
N/A
256 V Vara Kumar
257 N/A I&C training to AET-2017 V Vara Kumar
Others (Site visit with BU, Meeting, Preparation
of reports Status, AIC meeting etc.,)
N/A
258 V Vara Kumar
259 N/A Rebuilding of Battery#7 Suman Datta
260 N/A FDA System in cable tunnel project Suman Datta
261 N/A Training for AET-17 batch Suman Datta
262 N/A Coke Plant Fire Fighting & Fire Protection SystemSuman Datta
263 N/A KPO Phase-2 Coke Oven Suman Datta
Weekly Time Sheet
Study of Techncial offer of ACRE for the battery proper. Engineer Concept Note
Study and commenting of technical offer of Paul wurth Engineer Concept Note
for the battery proper.
Study and commetning of techncial specification of Engineer Concept Note
coke side machines of batt#7 upcomming.
Study of the existing powersystem of the RMM for Engineer Checking / Review
chekcing of suitability/feasibiltiy from SLD.
Senior Manager/
Technical discussions with Suppliers Checking/ Review
Manager
Senior Manager/
Comments on the Revised documents Comments
Manager
Senior Manager/
Study of Technical specifications Technical Specification
Manager
Senior Manager/
Generation of Comments on the Technical document Comments
Manager
Senior Manager/
Study of Technical specifications for CAL Technical Specification
Manager
Senior Manager/
Generation of comments on the Technical specification Comments
Manager
Senior Manager/
Technical discussions with Suppliers Checking/ Review
Manager
Study of Technical specifications for CAL Technical Specification
Preparation of AET Training Pack for Control Valve Engineer Training / Workshop
DE system in JCK#5,6,7 - Control and Automation
system finalised and signed off done with dept. Tech. Engineer
Spec. given to PEM. Report
Draft concept note, Automation Signoff Document Engineer
prepared. Apploval
Review of Feasibility report, validation of automation Engineer
cost estimation by TCE. Checking / Review
Engineer
I&C comments incorporated in draft TS. Concept Note
2 4
2 0
1 0
1 1
2
2
2
1
0 3 4 3 1
3 1 2 2 0
2 2 2 3 3
0 0 0 0 2
1 3 1 1 1
3 0 0 0 2
1 0 0 4 0
2 0 0 0 0
1 0 0 0 0
2.5 3 0 0 4
0 1 0 9 0
0 0 9 0 1
0 0 0 0 2
1.5 1 0 0 0
2 1 0 0 0
0 3 0 0 2
2 2
2 2 1 1 1
2 2 2 2 2
1 1 1 1 1
1 1 1 1 1
1
1 1 1 1
1 1 1 1
1
1 1 1
1 1 1 1
1 1 4 4 4
1 1 4 4 3.5
2 3 1 1 1.5
4 2 0 0 0
5
4 5
4 5
9 9
4
4 4 4 4 4
2 2 2
3 3 3 5 5
1 5 2
2
3 2
4 5 5
5 4 2 2
2 2
4 2 1 3 3
2 1 2 1
1 3 2
2 1
1 1
1
2 3 2 1
4 2 3 1
2 3 2 3
1 2 2 2
4 4 2
1
1
1
0.5
1
1.5
1
1.25
0.5
0.5 1
1.5 0.5
0.5 1
1 1
0.5 1.5
1 1
2 0.5
1 2
0.5 1
1 2
1
1.5 1
1 1
0.5
1 2 2 2 1
1 1 1 1 1
2 2 2 2 2
1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
6 4
2 1
L L 1 L
E E E
A A 1 A
V V V
E E E
1 4 5
1
4 1 1
1
2 3 1
3.5
8 8
1.5
2 1
2 1
1 2.5
2 2
3 3
1 1
1 1 1
2 2 1
2 2 2
1 1 1
1 1 1
1 1 1
2 0 0 2
1 1 2 2 1
2 2 1 2 2
1 1 2 1 1
1 1 1 1 1
1 1 1 1
1 2
2 2
2 1
1 1
1 1
3
1 1
2 2
2
3 2
2 1
2 3
2
2 2
2 2 1 2
2 2
2
2 3 2
2
3
1 2 2
4 3 3
2 2 1 1
2 2
2 1 1
2 2 1 1
2 1
2 5
2 6
5 2 1 3
2 3
2 2 2
Activity Type Resource