Personnel Contacted:
Name: Title: Phone: Email:
Jesse Massengill General Manager 11l65-567-1 ij~7 IlmaSSenQllllwConeu.com
Paul Meengs •Vi"' OT uperauons Itilti-Z4;J-U'1 III lQ..aUl.m@,Slaleneanreatln
Auditors/Assessors:
Name: Company: Phone: Email:
jBrad BuKowsKI IAmerlcan Systems Registar 616-942-6273 IIlUjleJ,gLasrwonaWlae. com
Assessment
2
AlAG=--»
Autornotive Industry Action Group
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Assessment
Question
Question Requirements and Guidance Objective Evidence
. N/A Satisfactory
Not Needs Immediate
Number Satisfactory Action
3
AJAG=>
Automotive Industry Action Group
CQI-9
Special Process: Heat Treat System Assessment
Version
Version 3, Issue 10/ 11
Assessment
4
AlAG=>
Automotive Industry Action Group
Automolive G roup
CQI·9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
10/11
Assessment
Question
.- Not Needs Immediate
Question Requirements and Guidance Objective Evidence N/A Satisfactory
Number Satisfactory Action
• The heat treater shall submit for approval by the OEM customers are notified of
OEM customer the reprocessing procedure and reprocessing on a case by case basis.
this procedure shall be referenced in the heat During any PPAP if it is determined that
Is the OEM customer notified treater's FMEA and process control plan
1.11 no reprocessing will be allowed that will X
reprocessed?? • The procedure shall describe product
when parts are reprocessed
be forwarded to any process for that
characteristics for which reprocessing is customer. See WI-8-002 Disposition of
permissible as well as those characteristics for nonconforming
which reprocessing is not permissible.
• Any reprocessing activity shall require a new
processing control sheet issued by qualified
technical personnel denoting the necessary heat
process modifications.
treat process
• Records shall clearly indicate when and how any
material has been reprocessed.
• The Quality Manager or a deSignee
designee shall
authorize the release or reprocessed product.
5
AlAG=>e
Autanotive Industry Action Group
Aut(XTlotive G roup
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
6
AlAG=>
Alltomotive Industry Action Group
Alitomotive
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/ 11
Assessment
7
CQI·9
Special Process: Heat Treat System Assessment
Automotive Industry Action Group Version 3, Issue 10/11
Assessment
8
AJAG=>
AlAG=> Action
Automotive Industry Actio n Group
G roup
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
10/ 11
Assessment
Is material from different steel Different steel mill heats or metals which require
mill heats or metals which different heat treat parameters, such as but not All incoming product is entered order for
may preclude achieving the limited to, austentizing, quenching, or tempering order as the customer has them listed. all
1.20 X
specified metallurgical times and/or temperatures shall be processed different lots are kept seperate per the
properties prevented from separately in order to achieve specified customers request.
being processed together? metallurgical properties. .
9
AlAG=>
Automotive Industry Action Group
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
Not
Question Requirements and Guidance Objective Evidence
10
AlAG~
CQI-9
Special Process: Heat Treat System Assessment
Automotive Industry Ac tion Group Version 3, Issue 10/11
. Assessme'ht
Assessm<!ht
11
AlAG=>
Automotive Industry Action Group
Automolive G roup
CQI·9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
10111
12
CQI·9
Special Process: Heat Treat System Assessment
Automotive Industry Action
A ction Group Version 3, Issue 10/1 1
Assessment
13
AlAG=>t
Automotive
Autcmotive Industry Action Group
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/ 11
11
Assessment
Are In-Process / Final Test In-Process / Final Test Frequencies shall be all product is inspected per our Inspection
2.15 Frequencies performed as performed as specified in Process Tables. Refer sampleing plan of which matches or X
X
specified in Process Tables? to Process Tables, Section 4.0.
4.0. surpasses section 4 tables.
14
AJAG=>
AlAG~
Aulcrnotive
Automotive Industry Action G roup
CQI·9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/ 11
Is the
Is the variation
variation of
of the
the furnace
furnace The variation between the furnace .
controlled thermocouple
controlled thermocouple fromfrom thermocouple value and the set pOint .
t . t "th" th shall be within the limits defined In the applicable all controlers are calibrated and alarmed
3.5 set point
n within the
se POit Within P e Process Tables, Section 2.0. For Ion nitriding to run within the CQI-9 requirements.
xX
requirementss In
reqUiremen in thee Process
rocess ..
Table? refer to Process Table H Item # H2.5 for speCifiC
Table?
requirements.
15
CQI-9
Special Process: Heat Treat System Assessment
Automotive Indus1ry Ar.tion Group Version 3, Issue 10/11
Assessment
16
AlAG~
CQI-9
Special Process: Heat Treat System Assessment
Automotive Industry Action G roup
Group Version 3, Issue 10/11
Assessment
17
CQI-9
Special Process: Heat Treat System Assessment
Automotive Indl.J
Industry
stry Action Group Version 3,
3, Issue 10/11
10/ 11
Assessment
In absence of a rigorous fail- The infrared temperature pyrometers are required all processes have loading requirments
3.12 X
safe,
safe. are all continuous belt at the exit end of continuous belt furnaces to on the work order.
order.
furnaces equipped with sight monitor for under temperature parts. The
glass inspection ports and temperature alarm shall be within 28 °c°C (50 o
(50°F)
F) of
infrared temperature the furnace set point temperature. Results shall
pyrometers at discharge end be strip charted or continuously data logged
logged..
of the hardening furnace? Infrared
Infrared temperature pyrometers shall be
calibrated annually at a minimum and certified.
All sight glasses shall be cleaned per the
preventive maintenance schedule.
18
CQI-9
Special Process: Heat Treat System Assessment
Automotive Industry Action Group Version 3, Issue 10/11
Assessment
19
AlAG=>
Automotive Industry
Ir)dustry Action G roup
CQI-9
Special Process: Heat Treat System Assessment
Version 3. Issue 10/ 11
10111
A method to detect proper part position, such as Either a scanner with optical sensors or
Is the positioning of each part
3.15 the use of proximity switches, optical sensors, specific fixtures are used to assure that X
being controlled?
I probes, etc., is required for each part. located.
parts are properly located.
The heal treater shall control the energy or power
for each part.
part .
• A signature monitor for each machine is
preferred. A signature monitor gives the energy
Does the heat treater control
unit (voltage. kilowatt, etc.) vs.
vs. time or distance Each machine has a power setting
3.16 energy or power for each X
(for scanning systems).
systems). control.
part?
• An energy monitor or equivalent is acceptable if
approved by the authorized customer
representative.
20
AlAG=>
Automotive Industry Action Group
CQI-9
Special Process: Heat Treat System Assessment
Version 3, Issue 10/11
...
Assessment
21
CQI-9
Special Processes: Heat Treat Systems Assessment
Version 3, Issued 10111
I
Section 4 - Job Audit
Job Identity:
~~S
Are the Loading I Racking
~)~<t11
2.7
requirements identified?
2.9
4.7 Is the proper recipe or process 1.5
specification (cycle times, 1.6 , ~)o\
temperature, atmosphere, etc.) 2.1
ct <60 D\"'<' U
used? Refer to Process Tables,
Section 3.0, for specific parameters.
2.14
2.15 ~
~~v
/..;D~
P
~-}'~
List parameters that were verified in
this audit in the spaces provided
below.
CQI-9
The cara~Ys1 tor poa/r pertornxtf)oo Special Processes: Heat Treat Systems Assessment
Version 3, Issued 10/11
Section 4 - Job Audit
Job Identity:
Customer:
Shop Order Number: - - - - - - - - - - - - - - - - - - - - - - - - - -
Part Number:
Part Description: - - - - - - - - - - - - - - - - - - - - - - - - - -
Material:
Heat Treat Requirements: - - - - - - - - - - - - - - - - - - - - - - - - - -
2
CQI-9
rho cam.fym fo.r poak. perforrnance Special Processes: Heat Treat Systems Assessment
Version 3, Issued 10/11
Section 4 - Job Audit
Job Identity:
Customer: _________________________________________________
Shop Order Number: _________________________________________________
Part Number: _________________________________________________
. Part Description: ________________________________________________
Material: ________________________________________________
Heat Treat Requirements: _________________________________________________
~O
were they authorized? 1.4
1.6
1.11
1.17
4.13 Does the governing specification 1.11
rework?
4.14 If the order was certified, did the 2.14
certification accurately reflect the 2.15
?
4.15 Was the certification signed by an 1.17
authorized individual?
4.16 Are the parts and containers free of 2.6 I
inappropriate objects or
contamination?
2.11 "-[{'5 17
3
.Process Flow for Aluminum
So'ution and Age
R~.alpI of PariS.
El1lOfordetand
prock. r.e rotAcr.
InspooL
Proto Pre Launch Production CONTROL PLAN
Prototype Prelaunch X Production Key Contact/Phone
Control Plan Number SUE BOLL (616) 243-0178
Part Number/Latest Change Level ASTM B917 Coreleam BOLL, ME£NGS, JUAN, TUTTLE
Part Name/Description SOLUTION & AGE SupplierlPlant ApprovaUDate
Supplier STATE HEAT TREATING C Supplier Code Other ApprovaUDate (If Req'd)
Characteristics
Part!
Process
Process
Namel
Machine,
Device, Jig,
No. ...
"CD , ,A'.
. ": :"{
:
.,', I~ '"
cbit(.:,.~si'
.~ , ProductIPro Evaluation!
cess Measureme
Number Operation Tools, for Specificatio nt
Description Mfg. </:)·i·. nI Tolerance Technique
..•.
"
.... ; : . . ,";'.',""" .: .••.•.•.
--
'1.;
Send
Discrepency
1- 5 100% Sample Plan Report
Computer Forward to
100% 100% Database Engineering
Work Order
NlA 100% Log Sheet Rerack
N/A
NlA Cont. Work Order, Review
Log Sheets chart. Hold if
not in control
N/A
N/A Cont.
L 11
~ / / (I
( I T!
( '. - L'" V T .... v y
{}j~ ql 10 If 1lJ
J -- I U I
/
CIt I / {f {
Instructions: SOLUTION Instructions: AGE
DRAW: Enter the draw number TIME IN: Enter time the load went into aging
DATE: Enter the current date DRAW #: Enter the darw number
BASKET #: Enter the number of the basket TEMP: Enter the temperature for aging from the work order
PLACE - TIM I B: T = Top Basket; M = Middle Basket; B = Bottom Basket - put a mark in box CYCLE TIME: Enter the amount of time for aging from the work order
LOAD TIME: Enter the time parts went into the furnace INITIALS: Enter the operator's initials
LOAD INITIALS: Enter initials of operator loading the furnace
PIC - PARTIAL OR COMPLETE: Enter P = Partial; C = Complete job
JOB #: Enter the Work Order Number
TEMP: Enter the temperature for solution from the Work Order
CYCLE TIME: Enter the amount of time for solution from the Work Order
QUENCH TIME: Enter how long it takes to quench the load
INITIALS: Enter the operator's initials of who Quenches the load ·
WI-7-003-G
1 of 1 S-13 c ll
. CERTIFICATION
./'
PART NUMBER:
DESCRIPTION:
DESCRIPTION:
SPECIFICATION:
Load
. ,!-" ' .;
.
~ z '- f "
N~ 3309
Purchase Order to State Heat Treat
Due Date: ASAP or Date Requested
Comments:
Comments :
Shotblast:
Comments: _ __
Yes / t4Q)
Brinell Req: _ _ _ _ _ __
Container:_~ ,~'a
0..~
____tj
NFCA Signature: ~
Form: NFHT Form 178, Rev. A