Sie sind auf Seite 1von 7

ERIC H.

MORADA
No.22 Brgy. .Motherlode , Jose Panganiban, Camarines Norte
PHILIPPINES
Cell Phone No. +639994107826 / +639203003744
E-mail Add: moradaeric@yahoo.com
Skype I D : eric.morada2

DISCIPLINE : Instrument Technician

EDUCATIONAL BACKGROUND:
B.S. in Electrical Engineering
Bicol University College of Engineering
Legazpi City, Philippines / Graduated – March 1993

SUMMARY OF EXPERIENCE :
Experience in instrumentation and control, safety system (ESD/F&G) industrial and
process control system. Supervised / Perform actual calibration, loop checking,
functional testing of process instruments,, repair, trouble shooting, commissioning and
start-up. Able to read and interpret analog/digital logic diagram, schematic, relay ladder
diagram and process P&ID. Experience as instrument technician maintenance in OIL /
GAS industry. Experience in instrument inspection [ installation ] as per company
standard.

Training Attended:

COMPETENCY TRAINING

Conducted by : Competency Training Pty Ltd.


ABN32 113 051 139
Certificate Number : CR14364
Dated :20/02/2014
INSTRUMENT COMMISSIONING TECHNICIAN

Conducted by : TESDA Training & Testing Center


Certificate No, 2013 – TC – 0258 – E
Dated : April 27 2013

PROFESSIONAL EXPERIENCE:

Self Employed
June 2014 to Present
Philippines
Electrical ( building )

Duties and Responsibilities :

Do the daily tool box meeting, supervised the activity of electrical team, check the
material used as client standard / installation was as per plan.
Prepare weekly accomplishment report ,
Prepare documents / as built drawings ( if needed ) for hand over to client.

HIDES GAS CONDITIONING PLANT


July 2013 to May 2014
Papua New Guinea
Company : KENTZ
Position : Instrument Technician / Supervisor
[ sub con side ]

Duties and Responsibilities :

Start Up / Operation :Instrument Commissioning Supervisor

Prepare as built drawing / technical documents for hand over to operation.


Assist Operation Team to do fault finding / re range and recalibration of instruments in
Well Pad B , Well Pad C and Process Area.
Supervised commissioning activity at Well Pad D
Do the final setting ( range ) of instruments at Well Pad B and C and Hydraulic Power
Unit ( HPU ) prior to hand over to operation.
Prepare daily work permit / daily activity report
Perform commissioning activities such as loop test, troubleshooting / cause and effect
As per Cause and Effect matrix. For 3 units of Air Compressor / Air Drier skid , Potable /
Demin Water skid , HVAC at LER, Gas Incinerator, Process area and Well Pad area.
YEMEN LNG
April 28,2009 to March 22,2011
Balhaf , Republic of Yemen
Company: TOTAL YEMEN
Position: Instrument Technician[ client side ]

Duties and Responsibilities:

Operation ; Maintenance

Do maintenance activities such as trouble shooting ,calibration and function test of


shutdown valves /control valves , fire and gas and process instrument as per request of
operation team.

Start – up : Assign in Maintenance Department

Do the trouble shooting / recalibration of process instruments / fire and gas


Area of responsibility :
Train 1&2 , Offsite , Utility and Tank Farm area
Assist operation team for function test of loading arm in Jetty area

During Commissioning ; Assign in ICSS Department

Attended walk down activity for RFC ( ready for commissioning ) and RFSU ( ready for
start - up ) as per RFI of main contractor.
Do inspection for punch list / punch clearing
Witness for loop checking of process instrument and fire and gas
Witness the calibration of PSV , TSV , PRV as per company standard API 527

During Construction : Assign in ICSS Department

Do inspection for the installation of process instruments , fire and gas as per RFI of main
contractor, check if as per hook up drawing as per company standard and do the punch
listing if needed.

TECHNIP RAS LAFFAN OLEFINS PROJECT


Jan 23, 2009 to April 23, 2009
Ras Laffan Industrial City, State of Qatar
Company: TECHNIP QATAR
Position: Instrument Technician[ main contractor side ]

Duties and Responsibilities:

Walk down inspection of different kinds of field instruments, verify that all terminations are
correct as per ILD and location of field instruments as per P&ID and location drawings.
Perform Loop checking, troubleshoot, calibration, function integrated test, of different kinds of
process instruments such as transmitters, control valves, thermocouples, rtd, fire and gas detectors
as witness by the RLOC maintenance. Pre comm / Commissioning and start up.

SEPAM SPECIALIST Ltd.


May 2008 to Aug 16, 2008
Shanghai Chemical Industrial Park Shanghai 201507, P.RChina
Project: Bayer polyurethane Shanghai Co.,Ltd
Position: Commissioning/ Start up technician[ client side ]

Duties & Responsibilities


 Assist function test / commissioning and start-up for MNB/ANILINE,MDI and
HCL plant.
 Worked for SIT ( Site Integration Test) of all instrument together with the
clients for the acceptance of the required systems.
 Participate in start up of plants and joins walk down activities in all areas.
Inspections installation of instruments refers to plot plan drawings, P&ID, and
data specifications.
 Performs loop checking together with the clients for the acceptance of the
required systems.
 Preparation and updating of technical documents, drawings for handover
projects.

KENTECH KSTS LLP


September 2006 to April 2008
Sakhalin Island, Russia
Project: LNG II (Liquefied Natural Gas)
Position: Instrument Technician( Commissioning)

Duties & Responsibilities


 Lead man on field side for function test and commissioning activity of loading
arm and ESD flat form at Jetty area
 Perform loop check and function test of Boilers
 Lead on trouble shooting and loop check for the following instruments :Control
valves, Temperature transmitter, Flow transmitter, Pressure transmitter and Level
transmitter.
Assist in function test/commissioning of fire and gas such as smoke/ flame/ gas
detectors in the ff. area.

Utility area
Offsite area
BOG area
Jetty area
Train 1/ Train 2
Oil Export Terminal

KENTECH KKTS LLP


January 2006 to June 2006
Tengiz, Kazakhstan
Project: SGP (Second Generation Project)
SGI (Sour Gas Injection)
Position: Instrument Technician( Commissioning / Start up )
SGP ( crude oil plant, gas plant and sulfur plant )
Duties & Responsibilities
 Performed field calibration using Hart Communicator Model 375, multi-loop
calibrator, and loop calibrator for various process instrumentation such as
temperature, flow, level, pressure transmitters, control valves, gas detectors,
pressure, temperature gauges, pressure switch and level switch.
 Assist commissioning / start up activity at SGI Plant

PRIMO OLEOCHEMICALS, INC


Position: Instrument Technician Maintenance
June 27, 1997 to December 19, 1999
Brgy.Osmena Jose Panganiban, Camarines Norte Philippines
Duties & Responsibilities
 Employed during commissioning and maintenance phase on client side.
 Responsible for all activities and function involved in the commissioning/start-up
and maintenance of instrumentation and control system of Oleochemical Refinery
plant; Area of responsibilities includes; Fatty acid, Fatty alcohol plant, Tank Farm
Area, Utility plant (Boiler, water treatment and compressors) logistic area, paging
system, fire fighting, telephone systems and laboratory analytical instruments.
Responsible for the maintenance of (DCS) Honeywell TDC 3000 Distributed
Control System.

 Supervised cable pulling and layout. Responsible for the installation of internal
for vessels in Fatty acid and Fatty alcohol Plant. Layout electrical system
according to plan and specifications.
Responsible for some modification as per request of the client (punch list activity)
Preparation / updating of technical documents /drawings for handover

INSTRUMENTATION INC.
March 05, 1996 to June 20, 1997
Project : Primo Oleochemicals
Jose PanganibanCamarines Norte
Position: Instrument Technician (Construction / Commissioning )

Duties & Responsibilities


 Employed in Instrumentation Contractor: Involved in the construction works
including bench and field calibration, installation of primary field instruments,
tube vending, wiring termination, junction boxes, local control panels, line/loop
checking and functional testing of individual control loops.

ROSS INDUSTRIAL CORPORATION


July 10,1994 to March 2, 1996
Project: Primo Oleochemicals Construction
Jose Panganiban, Camarines Norte
Position: Electrical/Instrument Supervisor ( construction )

Duties & Responsibilities


 Supervised installation of cable tray and supports, cable glanding, rigid steel
conduit pipe, electrical utility boxes, receptacles, lighting fixtures, switches and
over current protection devices.
 Supervised cable pulling and layout. Responsible for the installation of internal
for vessels in Fatty acid and Fatty alcohol Plant. Layout electrical system
according to plan and specifications.
Responsible for some modification as per request of the client (punch list activity)
Preparation and updating of technical documents / drawings for handover
.

.PERSONAL DATA:
Date of Birth : September 29,1970
Place of Birth : Camalig, Albay Philippines
Sex : Male
Nationality : Filipino
Civil Status : Married
Weight : 79kgs.
Height : 5’5”
Person to be contacted
in case of emergency : Mrs. Jonelee Vi P. Morada +639203003744
Her Address / Tel No. : #22 BrgyMotherlod, Jose Pang, Cam. Norte, Philippines

I hereby certify that all information stated above is true and correct.

___________________
Mr. Eric H. Morada

Das könnte Ihnen auch gefallen