Beruflich Dokumente
Kultur Dokumente
Contents
1 Elasto-plastic method 1
1.1 Right w design 1
1.1.1 1th excavation stage 1
1.1.2 2th excavation stage 3
1.1.3 Final Exc. 5
- 1 -
1 Elasto-plastic method
1.1 Right w design
1.1.1 1th excavation stage
1)1th excavation stage analysis result ( member force, displacement)
Mmax = 0.0kN.m/m (working pos G.L. -2.50m) Mmin = -169.0kN.m/m (working pos G.L. -9.00m)
Smax = 26.6kN/m (working pos G.L. -14.00m) Smin = -53.1kN/m (working pos G.L. -5.75m)
Del.max= 3.45mm (working pos G.L. -18.50m) Del.min= -14.43mm (working pos G.L. -2.50m)
FORUM8
- 2 -
Moment~10^0 kN.m Shear force~10^-1 kN Disp.~10^-1 mm
-200 0.0 200 -600 0.0 600 -200 0.0 200
-2.5 -2.5 -14.43
-2.5
-53.06
-6.0 -6.0 -6.0
-168.99
FORUM8
- 3 -
1.1.2 2th excavation stage
1)2th excavation stage analysis result ( member force, displacement)
Mmax = 723.8kN.m/m (working pos G.L. -8.00m) Mmin = -0.5kN.m/m (working pos G.L. -2.85m)
Smax = 226.9kN/m (working pos G.L. -2.85m) Smin = -129.7kN/m (working pos G.L. -11.00m)
Del.max=--------mm (working pos G.L.--------m) Del.min= -21.77mm (working pos G.L. -9.00m)
FORUM8
- 4 -
Moment~10^0 kN.m Shear force~10^0 kN Disp.~10^-1 mm
-800 0.0 800 -300 0.0 300 -300 0.0 300
-2.5 -2.5 -2.5
229.99 229.99 226.86 229.99
723.85
-8.0 -8.0 -8.0
-21.77
FORUM8
- 5 -
1.1.3 Final Exc.
1)Final Exc. analysis result ( member force, displacement)
Mmax = 725.2kN.m/m (working pos G.L. -10.50m) Mmin = -0.5kN.m/m (working pos G.L. -2.85m)
Smax = 240.4kN/m (working pos G.L. -7.50m) Smin = -156.7kN/m (working pos G.L. -13.75m)
Del.max=--------mm (working pos G.L.--------m) Del.min= -27.61mm (working pos G.L. -12.25m)
FORUM8
- 6 -
Moment~10^0 kN.m Shear force~10^0 kN Disp.~10^-1 mm
-800 0.0 800 -300 0.0 300 -300 0.0 300
-2.5 -2.5 -2.5
145.82 145.82 145.82
FORUM8