performance.

A formal plan is established to


identify the overall program goals and timeline.
Most companies develop a long-term plan that
outlines the move from current performance
levels to Six Sigma performance levels, with
tangible, short-term goals in between.
An Excerpt From TAB # 31
Once an organization decides to begin a
Six Sigma program, one requirement for success
Taking the Mystery out is the organization's ability to effectively deploy
information about the concepts and company
of the Methodology target goals to employees. Involvement of top
management and alignment of company
Six Sigma is an information- leadership are critical. Ideally, training is
driven methodology for reducing provided to all employees at all levels to ensure
waste, increasing customer- that a common language and standard approach
satisfaction, and improving exist throughout the organization. A common set
processes, with a focus on of tools and techniques is internalized and
financially-measurable results. First everyone must be working toward the same
developed at Motorola Corporation objectives. Some companies establish a reward
in the 1980's Six Sigma is now and recognition system for all employees that are
considered to be a world-class based on meeting target goals and an
measure of excellence and infrastructure that supports the plan. Company
efficiency. leadership must be willing to give teams the
tools and the authority to apply Six Sigma
In statistics, 'sigma' refers to variation. concepts to their day-to-day activities.
Six Sigma methodology focuses on reducing Employees assess how they can contribute to the
variation as a way to improve processes. In organization through improvements made with
particular, it uses sigma to measure the respect to their own jobs. Individual quality
performance of a process to produce defect-free goals are set to tie in with the overall company
results. A defect is anything that causes quality-improvement goals.
customer dissatisfaction, such as a product that
doesn't meet the customer's specifications, poor Projects are selected that support the
service, or a price tag that's too high. company's overall plan. The size of the project is
evaluated carefully so as to provide meaningful
A Company operating at Six Sigma benefits to the company while also staying
quality produces 3.4 defects per million confined to a manageable size and reasonable
opportunities; that is, the work is 99.99966 % time frame. The focus is usually tied to a
defect free. Today most organizations operate tangible organizational performance measure
between 2 and 3 sigma. Operating at a higher such as reduction in the number of defects or
level of quality not only results in happier cycle time. Many companies prefer to select
customers, but also saves money by reducing projects that will save at least $100,000. The
waste and rework and by decreasing cycle time. resources and tools to accomplish the goal must
be provided. These include manpower, training
Six Sigma methodology does not apply and endorsement by a member of management.
only to manufacturing or technical processes. In
order to successfully implement Six Sigma, Once a process is selected as a candidate
virtually every facet of an organization, from for improvement, a problem statement is
administration to finance, is examined for developed and the objective or desired outcome
opportunities to optimize output and improve
is defined. Progress measures are established and analysis of the planned action. Control charts can
a cost/benefit analysis is performed. Next, a map be used to show sustainability of the process.
or flowchart of the entire process is created. The MINITAB has a wide variety of attribute and
purpose of this is to clarify the sequence of steps control charts from which to choose.
in the process as it currently exists and to Specification limits are set and process stability
identify all of the response variables within each is monitored. A process control plan is
step. This process "dissection' provides developed that summarizes all of the elements
documentation of the process and an opportunity used to control variation within the process.
to resolve any misunderstandings of the process.
Each step is then classified as critical, major, or Once the process is considered stable, a
minor – and ranked with respect to its impact on capability analysis study (Cpk) is performed to
the output. A schedule is developed that outlines determine the process capability. Advanced
the strategy to take the process from its current problem-solving techniques and tools such as
state to one that is within statistical control and DOE, ANOVA, and Regression Analysis are
in line with the company's Six Sigma goals. used to improve processes.

Data are then collected related to the Process changes are documented along
process from many sources including scrap and with benefits realized. A cost/ benefit analysis is
defect reports, yield charts, product returns, etc. conducted to determine impact of the project on
A (MINITAB) Gage R & R functions may be the organization. Opportunities for further
used to help to determine the precision and improvement are identified and the cycle
accuracy of the measuring system. The data are continues.
then categorized and studied for trends. Potential
sources of variation are identified [using Business has recognized the importance
MINITAB tools including Pareto Charts, Cause of incorporating quality improvement practices
and Effect Diagrams, Regression and Analysis of in their strategy to remain competitive in a global
Variance (ANOVA)]. marketplace. Colleges and universities around
the world are also recognizing the importance of
When potential key characteristics are exposing students to the basic tools and
identified, the use of control charts may be techniques used in quality improvement
incorporated to monitor these input variables. programs such as Six Sigma. The road to
Statistical evaluation of the data identifies key perfection requires time and commitment.
areas to focus process improvement efforts on,
which can have an adverse effect on product A Six Sigma program will not change the
quality if not controlled. Special cause variation business overnight. In fact, it is an initiative that
can also be documented at this stage. requires long-term investment of time and effort
from the organization, particularly from
To prove causation, (MINITAB) Design management. Effective implementation of the
of Experiments (DOE) is used to generate and tools and techniques equals rewards for both the
analyze experimental designs. Designs can customers and the bottom line.
include both controllable and environmental
factors, which allows the user to choose the best An Excerpt From TAB # 31
settings for individual environmental or client
conditions.

Once the potential causes for variation


are identified, an action plan must be selected
and implemented to bring the process into
control. This step usually involves a cost/ benefit