DRAFT FOR

DISCUSSION
GOVERNMENT OF NEPAL
MINISTRY OF PHYSICAL INFRASTRUCTURE AND TRANSPORT
DEPARTMENT OF ROADS

NORMS
for
RATE ANALYSIS
for Road and Bridge Works

2072
TABLE OF CONTENTS

S.N. Contents Page No.


1 Activity Group : 1 General (Blank)
2 Activity Group : 2 Site clearance 2-1
3 Activity Group : 3 Blank
4 Activity Group : 4 Fencing 4-1
5 Activity Group : 5 Quality control 5-1
6 Activity Group : 6 Materials and testing of materials 6-1
7 Activity Group : 7 Pipe drains, pipe culverts and concrete channels
7-1
8 Activity Group : 8 Quarries, borrow pits, stockpile and spoil8-1
areas
9 Activity Group : 9 Earthworks 9-1
10 Activity Group : 10 Subgrade 10-1
11 Activity Group : 11 Road works overall requirements (Blank)11-1
12 Activity Group : 12 Subbase, base, hard shoulder and gravel 12-1
wearing course
13 Activity Group : 13 Bituminous surface and base course 13-1
14 Activity Group : 14 Kerb and footpath 14-1
15 Activity Group : 15 Traffic sign, road marking etc. 15-1
16 Activity Group : 16 Piling for structures 16-1
17 Activity Group : 17 Well foundation 17-1
18 Activity Group : 18 False work, form work & surface finish for18-1
concrete structures
19 Activity Group : 19 Bearings and expansion joints 19-1
20 Activity Group : 20 Concrete for structures 20-1
21 Activity Group : 21 Prestressed concrete 21-1
22 Activity Group : 22 Structural steelwork 22-1
23 Activity Group : 23 Timber construction 23-1
24 Activity Group : 24 Miscellaneous structures 24-1
25 Activity Group : 25 Brickwork for structures 25-1
26 Activity Group : 26 Masonry for structures 26-1
27 Activity Group : 27 Repair of structures 27-1
28 Activity Group : 28 Bio-engineering works 28-1
29 Activity Group : 29 Maintenance works 29-1
30 Activity Group : 30 Sub-surface geo-technical investigations 30-1
31 Activity Group : 31 Miscellaneous works 31-1
32 Reference
33 Appendix

ABBREVIATIONS


micron = m x 10 – 6
mm millimeter
m meter
km kilometer
sq. mm., mm2 square millimeter
sq. m., m2 square meter
sq. km. square kilometer
ha hectare
cu. m., m3 cubic meter
lit. liter
rad radian
C degree Celsius
kg kilogram = kg x 10 - 3
g milligram = kg x 10 – 6
mg/l milligram per liter
t tonne= kg x 10 3
kg/m3 kilogram per cubic meter
t/m3 tonne per cubic meter
N newton
N/m_ newton per square meter
Lin.m Linear meter
Max. Maximum
Min. Minimum
Page No.
Norms for Rate Analysis
Activity Group:- 2 : Site Clearance
Spec. Resources
Activity Clause Description of works Labour Materials Equipment Remarks
Nos No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
2.01 201 Clearing and grubbing of forest
including uprooting, carrying and
disposing of vegetation, grass,
bush, sapling and trees of girth
upto 300mm (measured at a
height of 1m above the ground
level). lead 10m.

(a) Trees & sapling less than 15


numbers per 100 sq.m m2 unskilled md 0.030 Add 3% for T& P
(b) Trees & sapling more than 15
numbers per 100 sq.m m2 unskilled md 0.040 Add 3% for T& P
2.02 201 Clearing of grass, removing roots
breaking sods, levelling the
surface and disposal to 10m. m2 unskilled md Add 3% for T& P
0.023
2.03 201 Felling and uprooting of bamboo,
clearing the area, stacking of
bamboo and disposing of wastes
to 10m. (Volume of the excavated
m3 unskilled md 2.800 Add 3% for T& P
area should be measured.)

2.04 201 Felling trees (the girth measured


at a height of 1 m above ground
level) including cuttting of trunks
and branches, removing the roots,
stacking serviceable materials and
disposal of unserviceable
materials to 10m distance and
back filling the depressions/pits

7
Felling trees (the girth measured
at a height of 1 m above ground
level) including cuttting of trunks
and branches, removing the roots,
stacking serviceable materials and
disposal of unserviceable
materials to 10m distance and
back filling the depressions/pits

a) above 300mm to 600mm no unskilled md 0.920 Add 3% for T& P

b) above 600mm to 900mm no unskilled md 3.500 Add 3% for T& P

c) above 900mm to 1800mm no unskilled md 9.750 Add 3% for T& P

d) above 1800mm to 2400mm no unskilled md 16.000 Add 3% for T& P

e) above2400mm to 3000mm no unskilled md 40.000 Add 3% for T& P

f) above 3000mm no unskilled md 78.710 Add 3% for T& P

2.05 201, Dressing and levelling of the


909 construction surface including
cutting and filling of small
undulation.
m2 unskilled md 0.010 Add 3% for T& P

2.06 201, Excavation of top soil (sub grade)


1003 and carrying away from
construction site lead 10m.
Thickness upto 100mm m2 unskilled md 0.160 Add 3% for T& P
2.07 201, Spreading,Shaping and light
2800 compacting of top soil on slopes. m2 unskilled md 0.050 Add 3% for T& P

2.08 202 Dismantling Bridge, culvert and


other structures including
stockpiling the reusable materials
and disposal of unusable
materials within 50m. Lead.

8
Dismantling Bridge, culvert and
other structures including
stockpiling the reusable materials
and disposal of unusable
materials within 50m. Lead.

2.08.01 Plain cement concrete; 1:4:8 or m3 skilled md 0.050 Add 3% for T& P
leaner mix unskilled md 1.400
.
plain cement concrete; 1:3:6 or
2.08.02 m3 skilled md 0.050 Add 3% for T& P
richer mix
unskilled md 2.300
Reinforced cement concrete work
2.08.03 m3 skilled md 0.050

unskilled md 3.250 Add 3% for T& P


2.08.04 Brick work
(i) in mud mortar m3 skilled md 0.050 Add 3% for T& P
unskilled md 0.650
(ii)in lime mortar m3 skilled md 0.050 Add 3% for T& P
unskilled md 0.770
3
(iii)in cement mortar m skilled md 0.100 Add 3% for T& P
unskilled md 1.900
(iv)Reinforced Brick work m3 skilled md 0.050 Add 3% for T& P
unskilled md 2.900
2.08.05 Random rubble stone masonry
(i) in dry masonry m3 skilled md 0.100 Add 3% for T& P
unskilled md 0.800
(ii) in lime mortar m3 skilled md 0.100 Add 3% for T& P
unskilled md 1.100
(iii) in cement mortar m3 skilled md 0.100 Add 3% for T& P
unskilled md 2.250

2.08.06 Cutting reinforcement in


dismantling R.C.C or R.B work. (
to be calculated on the basis of
cross-sectional area i.e length x
thickness)

9
Cutting reinforcement in
dismantling R.C.C or R.B work. ( Add 15% for tools like chisels,
to be calculated on the basis of 2 Hackshaw or gas cutters,gas etc.
m skilled md 0.100
cross-sectional area i.e length x
unskilled md 1.200
thickness)
2.08.07 202 Scrapping, cleaning and
straightening reinforcement from t skilled md 0.400 Add 3% for T& P
R.C.C or R.B dismantling work unskilled md 6.300
(to be calculated on the basis of
wt. of reinforcement)

2.08.08 202 Removing mortar from bricks and 1000


cleaning bricks and stacking nos
within 20m .
(i) in mud mortar skilled md 0.040 Add 3% for T& P
unskilled md 3.900

(ii) in lime mortar skilled md 0.750 Add 3% for T& P


unskilled md 4.100
(iii) in cement mortar skilled md 1.200 Add 3% for T& P
unskilled md 4.850
2.09 Dismantling of dressed stone
works, and precast concrete work
including stockpiling the reusable
materials and disposal of
unusable materials within 50m
(i) in lime mortar m3 skilled md 0.100 Add 3% for T& P
unskilled md 1.400
(ii)in cement mortar m3 skilled md 0.100 Add 3% for T& P
unskilled md 2.700
2.09.01 202 Removing and cleaning mortar
from stones and concrete articles
and stacking. Net quantity will be
90% of stack measurement of
cleaned materials.

10
Removing and cleaning mortar
from stones and concrete articles
and stacking. Net quantity will be
90% of stack measurement of
cleaned materials.

(i) in lime mortar m3 skilled md 0.180 Add 3% for T& P


unskilled md 1.050
(ii)in cement mortar m3 skilled md 0.220 Add 3% for T& P
unskilled md 1.150
2.10 202 Dismantling and stacking of wood
work in frames, trusses, purlins
and rafters upto 10 m span and
5m height.
(I) Sectional area below 40 sq.cm. m
skilled md 0.010
Add 10% for pulleys, ropes, ladder,
unskilled md 0.020 sledge and hammer etc.

(ii) sectional area 40sq.cm and


skilled md 1.250
above m3 Add 10% for pulleys, ropes, ladder,
unskilled md 2.600 sledge and hammer etc.

2.10.01 202 Dismantling trusses, rafters,


purlins, for every additional span
of 1m or part there-of beyond 10
m.
(i) sectional area below 40sq.cm m skilled md 0.0005
unskilled md 0.0020
(ii) sectional area 40 sq.cm and m3 skilled md 0.100
above unskilled md 0.450

2.11 202 Dismantling steel work into


individual sections including dis-
membering and stacking.

11
Dismantling steel work into
individual sections including dis-
membering and stacking.

(I) Rolled steel Joists t skilled md 0.5 Add 10% for pulleys, ropes, gas,
unskilled md 3.40 gas-cuttter etc.

(II) Channels,angles,tees and flats t skilled md 0.5 Add 10% for pulleys, ropes, gas,
unskilled md 3.00 gas-cuttter etc.

2.12 202 Dismantling steel work in built up


sections in angles, tees, flats and
channels including all gusset
plates, bolts, nuts, cutting rivets,
weldings etc. including dis-
t skilled md 1.500 Add 5% for pulleys, ropes, gas-
membering and stacking.
unskilled md 7.000 cuttter, gas & supporting
arrangement. etc.
2.13 202 Dismantling steel work in built up
section without dismembering but t skilled md 1 Add 5% for pulleys, ropes, ladder,
with stacking. unskilled md 6 gas, gas-cuttter & supporting
arrangement etc.

2.14 202 Dismantling fencing posts, struts


with concrete surrounding
stockpiling within 50m lead
including earth work for
excavation & refilling.
(I) R.C.C post/strut no unskilled md 0.450 Add 3% for T& P

(ii) Iron angles or pipe post/strut no unskilled md 0.420 Add 3% for T& P

2.15 202 Excavation of metalled road and


removal of all materials including
soling and screening and
disposing unusable materials upto
20m. Lead.

12
Excavation of metalled road and
removal of all materials including
soling and screening and
disposing unusable materials upto
20m. Lead.

(a) water bound Macadam m3 skilled md 0.010 Add 3% for T& P


materials including soling/sub- unskilled md 0.890
base.
(b)Bitumenous materials m3 skilled md 0.010 Add 3% for T& P
unskilled md 2.420
2.16 202 Dismantling pitching/rip-rap
including stockpiling the reusable
materials within 50m lead.
(i) Dry stone pitching/rip-rap (15- sq.m skilled md 0.020 Add 3% for T& P
25cm.thick) unskilled md 0.160
(ii) Grouted stone pitching (15- sq.m skilled md 0.025 Add 3% for T& P
25cm.thick) unskilled md 0.23
2.17 202 Dismantling R.C.C pipes
(excluding excavation & refilling) Add 3% for ballies,ropes pulleys, Excavation &
tripod etc. refilling
I) upto 600mm dia. shall be
skilled md 0.010
m calculated
seperately
unskilled md 0.400
considering
ii) above 600mm dia. the dia. of
skilled md 0.010 pipe, height
m
of filling etc.
unskilled md 0.800

2.18 202 Dismantling gabion works including m3 skilled md 0.100 Add 3% for T& P
stockpiling the reusable materials unskilled md 1.000
and disposal of reusable materials

13
within 50m lead

14
Norms for Rate Analysis
Activity Group:- 4 Fencing
Resources
Activity Spec.
Description of works Labour Materials Equipment Remarks
Nos Clause no Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
4.01 400 Providing and installing Barbed 100 m Skilled md 1.1 Barbed wire m 1100 Handpull winch/ hr 1.5 Add 3% of
wire fencing. Unskilled md 5.5 Hooks no 360 tirfor labour cost for
T&P
Note-: For other activites, like supply and installation of Posts, Gates, painting and other requirements necessary to complete the job shall be estimated on the
basis of drawings /contract documents and excavation using the norms of related items.This analysis is done for 8 rows and 2 diagonals of barbed wire fencing.

15
Norms for Rate Analysis
Activity Group:-5 Quality Control
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
5.01 511 Laboratory Setup including supply no To be estimated on lump-sum basis as per the requirements mentioned in the contract / under special
of electricity, water, gas and Provisions.
heating etc.

5.02 511 Providing, installing and


maintaining laboratory equipment. set To be estimated on lump-sum basis as per the list of equipments and requirements mentioned in the
contract / under Special Provisions.

5.03 511 Assignment of laboratory staff man To be estimated for each personnel assigned to the laboratory as per the list & requirements
month mentioned in the contract / under Special Provisions.

Sign for traffic


Add 25 % of
Md
Unskilled 6 Fuel (forred
Flag jeep Ltr 20 control day 1
Axle load Survey ( with in 15 km 36 Semiskilled Md 2 cloth) Mtr. 2 Jeep day 1 labour cost for
506, 507, distance test/da Skilled Md 1 Clip board No 2 Weigh bridge day 2 Documentation
5.04.1 508 y Engineer Md 1 Mask NO 6 &
Whistle No 2 Report
Glove pair 2

Benkelmen's
Add 25 % of
Unskilled Md 14 Fuel for Truck/ Jeep
Lit 55 Beam day 1
506, 507, Benkelman Beam Deflection Test Heavy Truck with
labour cost for
508 ( with in 15 km distance) Semiskilled Md 4 Mobil Lit 4 driver day 1
15test
5.04.2 /day

16
506, 507, Benkelman Beam Deflection Test
508 ( with in 15 km distance)
15test Skilled Md 2 Stone/ boulder ton 11 Pick up with driverday 1 Documentation
5.04.2 /day Engineer Md 1 Enamel paint Ltr 0.5 Measuring Tape (5m, day 50m) 2 &
Glycerin Ltr. 0.5 Straight edge barsday 1 Report
Gloves pair 2 Thermometer day 1
Brush NO 2 Traffic Control signday
board 2
Battery NO 12 Traffic cone day 8
Flag/ clothes mtr 2 Tyre pressure gauge day 1
Mask NO 3 crow bar day 1
umbrella No 3
Clip board No 1
Loading,
Weighing, air
pressure of
tyres 33 % of cost of stones

506, 507, Field density of sub grade/ Unskilled Md 4 Standard sand Kg 15 Field Density Jar day 1 Add 25 % of
508 subbase/ base test by sand Semiskilled Md 2 Baseplate day 1 labour cost for
5
Replacement method( with in 15 Skilled Md 1 Jute bag NO 5 Balance ( 20 Kg) day 1 Documentation
test/da
Km, hole size 165.1 to 200 mm)
5.04.3 y Engineer Md 1 Sticker NO 5 Oven/ Rapid maisture
day meter 1 &
Marker pen NO 2 Balance ( 1 Kg) day 1 Report
Gloves pair 4 Air tight bottle day 5
Mask NO 4 Can day 5
Flag/ clothes mtr 2 Digging Tools day
Jute clothes piece 2 Shovel day 1
Fuel for pick up Lit 30 Spade day 1
Mobil Lit 1 Crow bars day 1
Clip board No 1 Scoup day 1
Electricity unit 10 Picks day 1
Measuring Tape (3m)
day 1
Tray day 2

17
Hammer day 1
Chisel day 1
Measuring Cylinderday 1
Traffic Control signday
board 2
Pick up with driverday 1
506, 507, Sampling from sub grade, sub Unskilled Md 4 Jute bag No 4 Shovel day 1 Add 25 % of
508 base, base, and wearing course Semiskilled Md 2 Jute rope m 6 Spade day 1 labour cost for
4
( within 15 km upto 80 cm depth Skilled Md 1 Tags NO 12 Crow bars day 2 Documentation
test/da
1m *1m size)
5.04.4 y Engineer Md 1 Brush No 1 Scoup day 2 &
Field book No 1 Picks day 2 Report
Marker pen No 2 Measuring Tape (3day m) 1
Gloves pair 4 Pick up day 1
Mask No 4 Traffic cone day 6
Flag/ clothes mtr 2 Traffic Control signday
board 2
Fuel for pick up Lit 30 Pick up with driverday 1
Mobil Lit 1
Clip board No 1

506, 507, Rapid determination of CBR by Unskilled Md 3 Jute bag No 6 Shovel day 1 Add 25 % of
508 dynamic core penetrometer Spade
6 Semiskilled Md 1 Jute rope m 10 day 1 labour cost for
test/da Skilled Md 1 Tags NO 15 Crow bars day 2 Documentation
5.04. 5 y Engineer Md 1 Pen No 1 Scoup day 2 &
Paint Enamel gm 100 Picks day 2 Report
Brush No 1 Measuring Tape (3day m) 1
Field book No 1 Traffic cone day 6
Marker pen No 2 Traffic Control signday
board 2
Gloves pair 4 Pick up with driverday 1
Mask No 4
Flag/ clothes mtr 2
Fuel for pick up Lit 30

18
Mobil Lit 1
Clip board No 1

506, 507, Measurement of Pavement Unskilled Md 4 Marker pen No 2 Shovel day 1 Add 25 % of
508 Thickness Semiskilled Md 2 Gloves pair 4 Spade day 1 labour cost for
6
test/da Skilled Md 1 Mask No 4 Crow bars day 2 Documentation
5.04.6 y Engineer Md 1 Flag/ clothes mtr 2 Scoup day 2 &
Fuel for pick up Lit 30 Picks day 2 Report
Mobil Lit 1 Measuring Tape (3day m) 1
Clip board No 1 Traffic cone day 6
Traffic Control signday
board 2
Pick up with driverday 1

506, 507, Auger boring for clayey or silty clay Md


Unskilled 7 Marker pen No 1 Tripod set day 1 Add 25 % of
508 type sample with SPT 1.5 m interval Semiskilled Md 2 Gloves pair 6 Auger set day 1 labour cost for
including 1 undisturbed sample,
Skilled Md 1 Mask No 6 Drilll rod set day 2 Documentation
(Maxium depth upto 6m with in 25 3m per
5.04. 7 km travelling distance excluding day Engineer Md 1 Flag/ clothes mtr 2 Wrench set day 1 &
mobilization/ demobilization) Jute bag No 12 Hammer day 1 Report
candle No 5 Rope ( thick) day 1
Tag No 12 SPT Hammer day 2
Fuel for pick up Lit 30 SPT Tube No 1
Mobil Lit 1 Collar jar
Clip board No 1 Moisture can 6 nosday 12
Measuring Tape (30 daym) 1
Traffic cone 6 nosday 6
Traffic Control signday
board 2
Pick up with driverday 1

506, 507, Field Vane shear test in cohesive Vane Appartatus


508 soil ( with in 15 km distance, Add 25 % of
Unskilled Md 15 Marker pen No 1 set day 1
excluding mobilization and
Demobilization
1 test
5.04. 8 /day

19
506, 507, Field Vane shear test in cohesive
508 soil ( with in 15 km distance,
excluding mobilization and Semiskilled Md 2 Gloves pair 5 Dial gauge 2 nos day 2 labour cost for
Demobilization
1 test Skilled Md 1 Mask No 5 Crow bar day 1 Documentation
5.04. 8 /day Engineer Md 1 Flag/ clothes Mtr 2 Stand day 1 &
Flatine cloth Mtr 6 Shovel 6 nos day 6 Report
Jute cloth Piece 6 Picks day 1
Tag No 12
Fuel for pick up Lit 30 Traffic Control signday
board 2
Mobil Lit 3 Pick up with driverday 1
Kerosine Lit 10

506, 507, Static plate load test up to 25 Plate load


508 tonnes per sq m ( excluding Appartatus set ( Add 25 % of
mobilization, demobilization, Unskilled Md 80 600 mm dia ) day 4
camping, Vehicle hire charge)
Semiskilled Md 8 Gloves pair 4 Spirit level day 4 labour cost for
1 test Skilled Md 4 Mask No 4 Dial gauge 4 nos day 4 Documentation
5.04. 9 /4 day Engineer Md 2 Flag/ clothes Mtr 2 Crow bar day 4 &
Flatine cloth Mtr 5 Shovel 6 nos day 6 Report
Jute cloth Piece 6 Picks day 4
Jute bag no 625
sand cum 62 Traffic Control signday
board 2
Wooden beam ( 45*75*300
day cm) 6
Accessories for fixing
Lit beam25% of A

506, 507, Static plate load test up to 10 Plate load


508 tonnes per sq m ( excluding Appartatus set ( Add 25 % of
mobilization, demobilization, Unskilled Md 40 600 mm dia ) day 4
camping, Vehicle hire charge)
Semiskilled Md 8 Gloves pair 4 Spirit level day 4 labour cost for
1 test Skilled Md 4 Mask No 4 Dial gauge 4 nos day 4 Documentation
5.04.10 /4 day Engineer Md 2 Flag/ clothes Mtr 2 Crow bar day 4 &
Flatine cloth Mtr 5 Shovel 6 nos day 6 Report

20
tonnes per sq m ( excluding
mobilization, demobilization,
camping, Vehicle hire charge)

Jute cloth Piece 6 Picks day 4


Jute bag no 250
sand cum 62 Traffic Control signday
board 2
Wooden beam ( 45*75*300
day cm) 6
Accessories for fixing
Lit beam25% of A

506, 507, Coring of Asphat concrete Core cutting


508 sample by pavement coring Add 25 % of
Unskilled Md 6 Marker pen No 2 machine day 1
10
machine upto 15 km travel Semiskilled Md 2 Gloves pair 6 Bit day 1 labour cost for
sample
distance ( dia = 100mm and depth
per Skilled Md 1 Mask No 6 Crow bar 2 nos day 2 Documentation
= 250 mm)
5.04.11 day Engineer Md 1 Flag/ clothes mtr 5 Sample extractor day 1 &
Jute bag No 10 Measuring tape ( 5m)day 1 Report
Rope ( 10 m, thick) day 1
Tag No 10 Wheel meter day 1
Fuel for pick up Ltr 30 Vernier calliper day 1
water Ltr 100 Measuring Tape (30 daym) 1
Mobil Ltr 1 Traffic cone 6 nosday 6
Kerosine Ltr 7 Traffic Control signday
board 2
Clip board No 1 Pick up with driverday 1
Enamel paint Ltr 1 Plastic Jarkin (10 lit)
day 1
Paint brush No 1

506, 507, Schmidth


508 Add 25 % of
UnskilledMd 1 Gloves pair 4 Hammer day 1
Semiskilled Md 1 Mask No 4 Clip board day 1 labour cost for
Schmidth hammer Test ( Skilled Md 1 Clip board No 1 Documentation
5.04.11 excluding Transportation charge) 40 test Engineer Md 1

Sample Preparation for Unskilled md 1 Electricity unit 5 Crusher machine Hr 4


inappropriate sample by crushing Semiskilled md 0.5 Gloves pair 2 Tray Hr 8
for LAA, ACV, AIV test
506, 507,
5.04.12 508 3 test

21
Sample Preparation for
inappropriate sample by crushing
for LAA, ACV, AIV test Skilled md 0.1 Mask No 2
506, 507,
5.04.12 508 3 test Engineer md Markerr No 1

Grain size Analysis (Dry/ wet Unskilled md 2 Electricity unit 25 Sieves set Hr 4 Add 25 % of
Sieve Analysis) Semiskilled md 0.5 Gloves pair 1 Sieve Shaker Hr 4 labour cost for
506, 507, Skilled md 0.25 Mask No 2 Oven Hr 48 Documentation
5.04.13 508 4 test Engineer md 0.1 Jute cloth Piece 2 Can Hr 48 &
Tray Hr 12 Report
Rubber Mallet Hr 4
Balance(20 kg) Hr 4
Balance(1kg) Hr 4

Particle size analysis of soil by Unskilled md 1.5 Electricity unit 15 Sieves set Hr 1 Add 25 % of
Hydrometer method Semiskilled md 1 Distilled watr Ltr 12 Sieve Shaker Hr 0.5 labour cost for
506, 507, Skilled md 0.75 Sodium Hexametaphosphate
gm 120 Tray Hr 2 Documentation
5.04.14 508 4 test Engineer md 0.3 Filter paper sq ft 2 Can Hr 48 &
Gloves pair 2 Hydrometer 72 Report
Mask No 2 Measuring CylinderHr( 2 nos) 144
Jute cloth Piece 2 Thermometer Hr 72
Constant water bath
Hr 72
Balance ( 1kg) 0.5
Pycnometer Hr 1
Stop watch Hr 72
Vernier Calliper Hr 1
Mixture Hr 0.75
Beaker Hr 72

California Bearing Ratio(Soaked) Unskilled md 2 Electricity unit 15 Sieves Hr 2 Add 25 % of


Semiskilled md 1 Oil ltr 0.25 Oven Hr 24 labour cost for
506, 507, Skilled md 0.75 Filter Paper Sq.ft 3 Cans 3 nos Hr 72 Documentation
5.04.15 508 1 test

22
California Bearing Ratio(Soaked)

506, 507,
5.04.15 508 1 test Engineer md 0.5 Tray Hr 4 &
Glove Pair 2 Rammer 4.5 kg/ 2.6Hrkg 4 Report
Mask No 2 Balance(20 kg) Hr 6
Jute cloth piece 2 Balance(1kg) Hr 2
Filter paper sq ft 3 Mould for 4 days Hr 96
Extruder/ mallet Hr 1
Measuring CylinderHr 1
CBR Testing Machine
Hr 1
Water Bath Hr 96
Surcharge
weight for 4 days Hr 96
Swell Measuring
device with dial
gauge for 4 day Hr 96

Unskilled md 1 Electricity unit 15 Sieves Hr 2 Add 25 % of


California Bearing Semiskilled md 1 Oil ltr 0.25 Oven Hr 24 labour cost for
506, 507, Ratio(UnSoaked) Skilled md 0.5 Filter Paper Sq.ft 3 Cans 3 nos Hr 24 Documentation
5.04.16 508 1 test Engineer md 0.25 Glove Pair 2 Tray Hr 4 &
Mask No 2 Rammer 4.5 kg/ 2.6
Hrkg 4 Report
Jute cloth piece 2 Balance(20 kg) Hr 6
Balance(1kg) Hr 2
Mould Hr 4
Extruder/ mallet Hr 1
Measuring CylinderHr 1
CBR Testing Machine
Hr 1

California Bearing Ratio test on Unskilled md 0.75 Electricity unit 3 CBR Testing Machine
Hr 2.5 Add 25 % of
compacted sample brought from Semiskilled md 0.5 Oil ltr 0.25 Balance(20 kg) Hr 0.5 labour cost for
outside ( mould dia 15.1 cm, ht Skilled md 0.25 Extruder/ mallet Hr 1 Documentation
506, 507,
12.7 cm)
5.04.17 508 5test

23
California Bearing Ratio test on
compacted sample brought from
outside ( mould dia 15.1 cm, ht
506, 507,
12.7 cm)
5.04.17 508 5test Engineer md 0.1 Glove Pair 2 &
Mask No 2 Report
Jute cloth piece 2

Moisture Density Relationship by Unskilled md 2 Electricity unit 15 Sieve Hr 4 Add 25 % of


Procter Method Semiskilled md 0.75 Oil ltr 0.25 Oven Hr 24 labour cost for
506, 507, Skilled md 0.5 Glove Pair 2 Cans 9 nos Hr 216 Documentation
5.04.18 508 1 test Engineer md 0.25 Mask No 2 Tray ( 75 *75 cm) 3Hrnos 36 &
Jute cloth piece 2 Tray ( 30*30 cm) 12nos
Hr 96 Report
Rammer 4.5 kg Hr 6
Balance(20 kg) Hr 4
Balance(1kg) Hr 4
Mould Hr 8
Extruder Hr 1
Measuring CylinderHr 4
Rubber Mallet Hr 2

Unskilled md 2 Electricity unit 10 Oven Hr 24 Add 25 % of


Permeability Test of Clayey soil ( Semiskilled md 1 Filter Paper Sq. ft 1 Cans 3 nos Hr 72 labour cost for
506, 507, Constant head, Disturbed Skilled md 0.5 Glove Pair 2 Tray ( 75 *75 cm) 6Hrnos 12 Documentation
5.04.19 508 sample) 1 test Engineer md 0.25 Mask No 2 Mould Hr 8 &
Jute cloth piece 2 Rammer 4.5 kg Hr 6 Report
Extruder Hr 1
Balance(20 kg) Hr 1
Balance(2kg) Hr 1
Measuring CylinderHr 4
Rubber Mallet Hr 2
Straight edge Hr 1
Stop watch Hr 72

24
Permeability
App. Set ( for 3
days) Hr 72

Permeability Test of Clayey soil ( Unskilled md 1 Electricity unit 10 Tray ( 75 *75 cm) 1Hrnos 1 Add 25 % of
Constant head, Undisturbed Semiskilled md 1 Filter Paper Sq. ft 1 Rammer 4.5 kg Hr 6 labour cost for
sample) Skilled md 0.5 Glove Pair 2 Extruder Hr 1 Documentation
506, 507,
5.04.20 508 1 test Engineer md 0.25 Mask No 2 Balance(2kg) Hr 1 &
Jute cloth piece 2 Measuring CylinderHr 1 Report
Stop watch
Permeability Hr 72
App. Set ( for 3
days) Hr 72

Permeability Test of sandy soil ( Unskilled md 2 Electricity unit 10 Oven Hr 24 Add 25 % of


Constant head, Disturbed Semiskilled md 1 Filter Paper Sq. ft 1 Cans 3 nos Hr 72 labour cost for
sample) Skilled md 0.5 Glove Pair 2 Tray ( 75 *75 cm) 6Hrnos 12 Documentation
506, 507,
5.04.21 508 1 test Engineer md 0.25 Mask No 2 compaction MouldHr 8 &
Jute cloth piece 2 Rammer 4.5 kg Hr 6 Report
Extruder Hr 1
Balance(20 kg) Hr 1
Balance(2kg) Hr 1
Measuring CylinderHr 4
Rubber Mallet Hr 2
Straight edge Hr 1
Stop watch Hr 24
Permeability
App. Set Hr 24
Permeability Test of Sandy soil ( Unskilled md 1 Electricity unit 10 Tray ( 75 *75 cm) 1Hrnos 1 Add 25 % of
Constant head, Undisturbed Semiskilled md 1 Filter Paper Sq. ft 1 Rammer 4.5 kg Hr 6 labour cost for
sample) Skilled md 0.5 Glove Pair 2 Extruder Hr 1 Documentation
506, 507,
5.04.22 508 1 test Engineer md 0.25 Mask No 2 Balance(2kg) Hr 1 &

25
Jute cloth piece 2 Measuring CylinderHr 1 Report
Stop watch
Permeability Hr 24
Documentation App. Set ( for 3
& Report 25% of A days) Hr 24

Unconfined compressive strength Unskilled md 1 Electricity unit 15 Compressive strength


Hr device with 8spring and%chart
Add 25 of
of undisturbed cohesive soil Semiskilled md 0.75 Mobil Ltr 0.5 Oven Hr 24 labour cost for
506, 507, Skilled md 0.5 Glove Pair 2 Can 6 nos Hr 144 Documentation
5.04.23 508 2 test Engineer md 0.25 Mask No 2 Vernier Caliper Hr 8 &
Jute cloth piece 2 Tray Hr 4 Report
Flatin cloth Mtr 2 Stop watch Hr 8
Sample
Extredure Hr 2

Shear test of disturbed soil Unskilled md 1 Electricity unit 10 Shear test equipment
Hr 4 Add 25 % of
sample Semiskilled md 1 Mobil Ltr 0.25 Oven Hr 24 labour cost for
506, 507, Skilled md 0.75 Glove Pair 2 Can 6 nos Hr 144 Documentation
5.04.24 508 1 test Engineer md 0.5 Mask No 2 Vernier Caliper Hr 8 &
Jute cloth piece 2 Tray ( 75 cm * 75 cm)
Hr 4 Report
Flatin cloth Mtr 2 Stop watch Hr 4
Spatula Hr 2
Straight edge Hr 4
Balance ( 0.1 gramHraccuracy) 1
Balance ( 1 gram accuracy)
Hr 2
Mould Hr 4
Rammer Hr 4
Mallet Hr 2
Sample
Extredure Hr 2

26
Determination of Liquid limit and Unskilled md 1 Electricity unit 50 Sieves set Hr 2 Add 25 % of
Plastic Limit Semiskilled md 1 Glove Pair 2 Oven Hr 24 labour cost for
506, 507, Skilled md 1 Mask No 2 Can ( 6 nos) Hr 144 Documentation
5.04.25 508 3 test Engineer md 0.5 Jute cloth piece 2 Balance(1kg) Hr 2 &
Flatin cloth Mtr 1 Glass plate Hr 2 Report
LL appratus Hr 2
spatula Hr 2

Los Angeless Abrasion Test Unskilledmd 1 Electricity unit 24 Sieves set Hr 3 Add 25 % of
Semiskilled md 1 Glove Pair 2 labour cost for
506, 507, Skilled md 1 Mask No 2 Documentation
5.04.26 508 2test Engineer md 0.3 Jute cloth piece 2 Balance( 20 kg) Hr 2 &
Flatin cloth Mtr 1 LAA machine Hr 3 Report

Aggregate Impact value Test Unskilledmd 1 Electricity unit 4 Sieves set Hr 2 Add 25 % of
Semiskilled md 1 Glove Pair 2 labour cost for
506, 507, Skilled md 1 Mask No 2 Tray 3 nos Hr 6 Documentation
5.04.27 508 2test Engineer md 0.25 Jute cloth piece 2 Balance( 5 kg) Hr 2 &
Flatin cloth Mtr 1 Impact Test machine
Hr 2 Report

Determination of Flakiness Index Unskilledmd 1 Electricity unit 4 Sieves set Hr 2 Add 25 % of


of Aggregate Semiskilled md 1 Glove Pair 2 Tray 3 nos Hr 6 labour cost for
506, 507, Skilled md 1 Mask No 2 Balance( 20 kg) Hr 2 Documentation
5.04.28 508 2test Engineer md 0.2 Jute cloth piece 2 Flakiness Gauge Hr 2 &
Flatin cloth Mtr 1 Report

Determination of Specific Gravity Unskilled md 1 Electricity unit 4 Sieves Hr 3 Add 25 % of


of Soil, fine aggregate and Mineral
filler
5.04.29 4 test

27
Determination of Specific Gravity
of Soil, fine aggregate and Mineral Semiskilled md 1 Glove Pair 2 Oven Hr 24 labour cost for
filler Skilled md 1 Mask No 2 Tray Hr 8 Documentation
506, 507,
5.04.29 508 4 test Engineer md 0.25 Jute cloth piece 2 Balance( 2 kg) Hr 1 &
Flatin cloth Mtr 1 Thermometer Hr 24 Report
Pycnometer Hr 12
Hot plate Hr 1

Aggregate Crushing Value Test Unskilled md 1 Electricity unit 4 Sieves set Hr 3 Add 25 % of
Semiskilled md 1 Hydraulic oil Ltr 0.5 Tray( 6 nos) Hr 12 labour cost for
Skilled md 1 Glove Pair 2 Balance( 20 kg) Hr 3 Documentation
Compressive
506, 507, Strength test &
5.04.30 508 3 test Engineer md 0.25 Mask No 2 machine Hr 2
Mould with
Plunger and Report
Jute cloth piece 2 Base plate Hr 1
Flatin cloth Mtr 1 Measuring CylinderHr 2

Determination of Organic Unskilled md 1 Electricity unit 4 Add 25 % of


Impurities of Fine aggregate Sodium
labour cost for
Semiskilled md 1 Hydroxide Gm 100 Tray Hr 6
Potassium
Documentation
506, 507, Skilled md 1 Dichromate Gm 2 Balance( 2 kg) Hr 3
5.04.31 508 6 test Engineer md 0.3 Sulphuric Acid Ltr. 0.7 Container Hr 144 &
Glass bottle (
Report
Distilled water Ltr. 3 500 ml, 12 nos) Hr 288
Glove Pair 2 Oven Hr 24
Mask No 2
Jute cloth piece 2

28
Flatin cloth Mtr 1

Determination of Specific Gravity Unskilled md 1 Electricity unit 50 Sieves set Hr 3 Add 25 % of


of Coarse aggregate ( including Semiskilled md 1 Glove Pair 2 Oven Hr 24 labour cost for
water absorption)and Mineral filler Skilled md 1 Mask No 2 Tray ( 3 Nos) Hr 9 Documentation
506, 507,
5.04.32 508 3 test Engineer md 0.25 Jute cloth piece 2 Balance( 5 kg) Hr 2 &
Flatin cloth Mtr 1 Wire basket Hr 2 Report
Water Tank Hr 2
Pan Hr 72

Stripping Value of Aggregates Unskilled md 1 Electricity unit 20 Oven set 1 Add 25 % of


Trichloroethyle
labour cost for
Semiskilled md 1 ne Ltr 1 Balance ( 5 Kg) NO 1
506, 507, Skilled md 1 Distilled water No 1 Tray NO 3 Documentation
5.04.33 508 6 test Engineer md 0.3 Kerosene Ltr 1 Steel Bowl NO 3 &
Glove Pair 2 Mixing Pan NO 1 Report
Mask No 2 Spatula NO 1
Sieve (
19,12.5,9.5,6.3
Jute cloth piece 2 mm) NO 4
Flatin cloth Mtr 1 Beaker NO 9
Glass plate NO 6
Hot plate NO 1
Thermometer NO 2

Mica content of sand (manually) Unskilled md 1 Electricity unit 1 Sieve Hr 1 Add 25 % of


Semiskilled md 0.5 Glove Pair 2 Oven Hr 6 labour cost for
506, 507, Skilled md 0.25 Mask No 2 Balance ( 1 Kg) Hr 6 Documentation
5.04.34 508 2 test Engineer md 0.1 Jute cloth piece 2 Tray Hr 12 &

29
Flatin cloth Mtr 1 Can Hr 12 Report
Rubber Mallet Hr 1

Sodium sulphate Soundness ( 5 Unskilled No 1 Electricity Unit 50 Sieve set Hr 2 Add 25 % of


cycle) Sodium Water bath for 6
labour cost for
Semiskilled No 1.5 Sulphate Kg 3 days Hr 144
506, 507, Skilled No 1 Barium Chloride Kg 0.5 Documentation
5.04.35 508 2 test Engineer No 0.5 Distilled Water Ltr. 5 Thermometer Hr 288 &
Glove Pair 2 Can 4 nos Hr 96 Report
Mask No 2 Container (4 nos) Hr 24
Jute cloth piece 2 oven Hr 24
Flatin cloth Mtr 1 Tray 4 nos Hr 8
Stop watch Hr 1
Balance ( 2 Kg.) Hr 24

Sand Equivalent Test Sand equivalent


Add 25 % of
Unskilled No 1 Electricity Unit 8 shaker Hr 3
Anhydrous Graduated
calcium measuring labour cost for
Semiskilled No 1 chloride Kg 0.75 cylinder (2 nos) Hr 6
506, 507, Skilled No 1 Glycerene Ltr. 0.2 Washing tube Hr 3 Documentation
5.04.36 508 3 test Engineer No 0.5 Formedehyde Kg 0.15 Flask Hr 3 &
Distilled Water Ltr. 6 Rubberr tube Hr 3 Report
Filter paper Sq ft 1 Funnel Hr 3
Glove Pair 2 Graduated bottlesHr 3
Mask No 2 Syphon assembly Hr 3
Jute cloth piece 2 Stop watch Hr 3
Flatin cloth Mtr 1 Can bottle (2 nos)Hr 6
Measuring Tube Hr 1

30
Bulk Density ( unit weight ) of soil Unskilled No 1 Electricity Unit 6 Balance ( 20 KG) Hr 6 Add 25 % of
Semiskilled No 1 Glove Pair 1 Tamping rod Hr 6 labour cost for
506, 507, Skilled No 0.75 Mask No 2 Tray 4 nos Hr 8 Documentation
5.04.37 508 5 test Engineer No 0.25 Jute cloth piece 2 Shovel Hr 6 &
Flatin cloth Mtr 2 Scoop Hr 6 Report
Oven Hr 6
Glass plate Hr 6
Measuring Tube Hr 6

Determination of moisture content Unskilled No 1 Calcium carbide Kg 2 Balance ( 1 KG) Hr 3 Add 25 % of


by speedy moisture meter Speedy moisture
labour cost for
Semiskilled No 1 Glove Pair 2 meter Hr 3
506, 507, Skilled No 1 Mask No 2 M/C can ( 3 nos) Hr 20 Documentation
5.04.38 508 10 test Engineer No 0.15 Jute cloth piece 2 Scoop Hr 2 &
Flatin cloth Mtr 1 Report

Determination of moisture Unskilled No 1 Electricity Unit 30 Balance ( 1 KG) Hr 3 Add 25 % of


content by oven dry method Semiskilled No 0.75 Glove Pair 2 Oven Hr 24 labour cost for
506, 507, Skilled No 0.5 Mask No 2 M/C can (20 nos) Hr 480 Documentation
5.04.39 508 10 test Engineer No 0.25 Jute cloth piece 2 Scoop Hr 2 &
Flatin cloth Mtr 2 Tray ( 50 * 50 cm)Hr 40 Report

Consolidation test ( Undisturbed Unskilled No 1 Electricity Unit 18 Balance ( 1 KG) Hr 1 Add 25 % of


sample clayey or silty type) Semiskilled No 1 Glove Pair 1 Oven Hr 24 labour cost for
506, 507, 2 test/ Skilled No 1 Mask No 1 M/C can Hr 48 Documentation
5.04.40 508 6 day Engineer No 1 Jute cloth piece 2 Consolidation testing
Hr machine set
144 &
Flatin cloth Mtr 2 Tray ( 50 * 50 cm)Hr 2 Report
Mobil Ltr 0.5 Stop watch Hr 144

31
Documentation
& Report 25% of A Core cutting deviceHr 2

Consolidation test ( Undisturbed Unskilled No 1 Electricity Unit 21 Balance ( 1 KG) Hr 1 Add 25 % of


sample clayey type) Semiskilled No 1 Glove Pair 1 Oven Hr 24 labour cost for
506, 507, 2 test/ Skilled No 1 Mask No 1 M/C can Hr 48 Documentation
5.04.41 508 7 day Engineer No 1 Jute cloth piece 2 Consolidation testing
Hr machine set
175 &
Flatin cloth Mtr 2 Tray ( 50 * 50 cm)Hr 2 Report
Mobil Ltr 0.5 Stop watch Hr 175
Core cutting deviceHr 2

Consolidation test ( Disturbed Unskilled No 1 Electricity Unit 18 Balance ( 1 KG) Hr 1 Add 25 % of


sample clayey or silty type type) Semiskilled No 1 Moulding oil Ltr 0.1 Balance ( 20 KG) Hr 20 labour cost for
506, 507, 2 test/ Skilled No 0.5 Oven Hr 24 Documentation
5.04.42 508 6 day Engineer No 0.25 Scoop Hr 5 &
Compaction
Report
mould Hr 4
Glove Pair 1 M/C can Hr 108
Consolidation
testing machine
Mask No 1 set Hr 144
Jute cloth piece 2 Tray ( 75 * 75 cm)Hr 64
Flatin cloth Mtr 2 Stop watch Hr 144
Mobil Ltr 0.5 Core cutting deviceHr 2
Rammer Hr 4
Straigt edge Hr 4
Shovel Hr 4
Mallet Hammer Hr 2
Measuring CylinderHr 4
Sample Extruder Hr 1

32
Consolidation test ( Disturbed No
Unskilled 1.5 Electricity Unit 24 Balance ( 1 KG) Hr 1 Add 25 % of
sample clayey type) 0.1 Balance ( 20 KG) Hr
2 Semiskilled No 0.75 Moulding oil Ltr 4 labour cost for
506, 507, test/8d Skilled No 0.5 Oven Hr 24 Documentation
5.04.43 508 ay Engineer No 0.25 Scoop Hr 5 &
Compaction
Report
mould Hr 4
Glove Pair 2 M/C can Hr 108
Consolidation
testing machine
Mask No 2 set Hr 192
Jute cloth piece 4 Tray ( 75 * 75 cm)Hr 32
Flatin cloth Mtr 4 Stop watch Hr 192
Mobil Ltr 0.5 Core cutting deviceHr 2
Rammer Hr 4
Straigt edge Hr 4
Shovel Hr 4
Mallet Hammer Hr 2
Measuring CylinderHr 4
Sample Extruder Hr 1

Spec
Activity
Clause no Description of Works Labour (A) Material (B) Equipment ( C ) Remarks
No Unit Type unit Qtty Type unit Qtty Type unit Qtty
Normal Consistency of Cement Unskilled md 1 Electricity unit 8 Vicat appratus withHrneedle set 6 Add 25 % of
Semiskilled md 1 Distilled water No 1.5 Balance( 1 kg) Hr 3 labour cost for
Skilled md 0.5 Glove Pair 2 Stop watch Hr 6 Documentation

506, 507,
5.04.44 508 3 test

33
Normal Consistency of Cement

Electric mixture
506, 507, with fan and &
5.04.44 508 3 test Engineer md 0.2 Mask No 2 Bowl set Hr 3
Jute cloth piece 2 Measuring CylinderHr 3 Report
Thermometer Hr 6
Tray Hr 3
Can 9 nos Hr 18

Vicat appratus
Setting time Cement ( Initial and
Final Setting time) Unskilled md 1 Electricity unit 8 with needle set Hr 8 Add 25 % of
Semiskilled md 1 Distilled water No 1.5 Balance( 1 kg) Hr 2 labour cost for
Skilled md 1 Glove Pair 2 Stop watch Hr 8 Documentation
Electric mixture
506, 507, with fan and &
5.04.45 508 2 test Engineer md 0.2 Mask No 2 Bowl Hr 2
Jute cloth piece 2 Measuring CylinderHr 2 Report
Thermometer Hr 8
Tray Hr 8
Can( 2 nos) Hr 8

Making Mortar cubes ( 50 mm X Unskilled md 1 Electricity unit 12 Electric Nixture Hr 1 Add 25 % of


50 mm X 50 mm) and testing Semiskilled md 1 Distilled water No 3.5 Mould ( 9 nos ) Hr 912 labour cost for
Skilled md 1 Standard Sand Kg 2.5 Stop watch Hr 1 Documentation
506, 507, Compression
&
5.04.46 508 9 test Engineer md 0.2 Glove Pair 2 test machine Hr 4.5
Mask No 2 Balance(5 kg) Hr 4.5 Report
Jute cloth piece 2 Curing tank Hr 912
Thermometer Hr 912
Tray ( 75 * 75 cm)Hr 4.5
Measuring CylinderHr 4.5

34
Unskilled md 1 Electricity unit 12 Electric Nixture Hr 1 Add 25 % of
Semiskilled md 1 Distilled water No 4.5 Mould ( 9 nos ) Hr 912 labour cost for
Skilled md 1 Standard Sand Kg 3.5 Stop watch Hr 1 Documentation
506, 507, Making Mortar cubes ( 70.7 mm X Compression
&
5.04.47 508 70.7 mm X 70.7 mm) and testing 9 test Engineer md 0 Glove Pair 2 test machine Hr 4.5
Mask No 2 Balance(5 kg) Hr 4.5 Report
Jute cloth piece 2 Curing tank Hr 912
Thermometer Hr 912
Tray Hr 4.5
Measuring CylinderHr 4.5
Vibrator Hr 1

Slump test Unskilled md 1 Slump Appratus Hr 7 Add 25 % of


Semiskilled md 1 Mobil Ltr. 0.3 Leveler Hr 7 labour cost for
506, 507, Skilled md 1 Glove Pair 2 Stop watch Hr 7 Documentation
5.04.48 508 9 test Engineer md 0.4 Mask No 2 Shovel Hr 7 &
Jute cloth piece 2 Tamping rod Hr 7 Report
Tray Hr 7
Trowel Hr 7
Scale Hr 7

Finess of cement by blaines air Blainess


permeability Add 25 % of
Unskilled md 1 Electricity Unit 8 Appratus Hr 8
Manometer
labour cost for
Semiskilled md 1 liquid Ml 20 Stop watch Hr 8
506, 507, Skilled md 0.5 Filter paper Sq ft 1 Balance Hr 1 Documentation
5.04.49 508 3 test Engineer md 0.2 Glove Pair 1 Electrical mixture Hr 3 &
Mask No 2 Measuring cylinderHr 3 Report

35
Jute cloth piece 2 Thermometer 8
Falatine cloth Ml 2 can Hr 24
Tray ( 50 cm * 50 cm)
Hr 24
Spatula Hr 3

Compression test of Concrete Compression


cube and Cylinder ( without Add 25 % of
Unskilled md 1 Electricity unit 40 test machind Hr 7
capping ( 15 cm X 15 cm X 15cm Semiskilled md 1 Hydraulic oil Ltr. 0.45 Balance(20 kg) Hr 7 labour cost for
mould) Glove
506, 507, Skilled md 1 Pair 2 Curing tank Hr Documentation
5.04.50 508 20 test Engineer md 0.1 Mask No 2 &
Jute cloth piece 2 Report

Unskilled md 1 Electricity unit 50 Vibrator Machine Hr 3 Add 25 % of


Semiskilled md 1 Mobil Ltr 1 Mould( 15 X 15 X 15
Hr cm) 12 nos
1248 labour cost for
Making Concrete cubes ( 150 mm Skilled md 1 Brush No 1 Tamping rod Hr 4 Documentation
506, 507, X 150 mm X 150 mm) including 12 Steel plate
&
5.04.51 508 sample prepartion for mix design cube Engineer md 0.5 Marker pen No 1 leveller Hr 4
Gloves pair 3 Sample tray Hr 6 Report
Masks No 3 Curing tank Hr 1248
Flatin cloth Mtr 2 Balance ( 20 Kg) Hr 3
Thermometer Hr 1248
Concrete mixture Hr 3
Shovel Hr 4
Trowel Hr 4
Plyer Hr 4
Screw driverr Hr 4
Spanner Hr 4

Three edge bearing hume pipe Hume pipe


test ( upto 900 mm dia and 2.5 m Add 25 % of
Unskilled md 4 Electricity unit 5 testing Machine Hr 3
length)

36
Three edge bearing hume pipe
test ( upto 900 mm dia and 2.5 m
length) Wooden beam (
labour cost for
Semiskilled md 1 Hydraulic oil Ltr 0.5 50 mm * 40 mm) Hr 3
Wooden beam (
150 mm * 150 Documentation
Skilled md 1 Kerosine Ltr 2 mm) Hr 3
506, 507, Iron plate ( 2.5 m
&
5.04.52 508 2 test Engineer md 0.5 * 05 m) Hr 22
Chain Pulley Hr 3 Report
Glove Pair 5 Measuring tape ( 5m)
Hr 1
Mask No 5 Craw bar Hr 2
Jute cloth piece 4 Tripod with metal rope
Hr ( 7.5 m) 3
Flatin cloth Mtr 4 scale for crack mesurement
Hr 1
Making test beam & flexural Flexural strength
strength of concrete beam ( upto Add 25 % of
Unskilled md 4 Electricity unit 24 testing Machine Hr 2
15 cm * 15 cm * 60 cm) Semiskilled md 1 Moulding oil Ltr 0.5Mould Hr 144 labour cost for
506, 507, Skilled md 1 Distilled water Ltr 10 Scoop Hr 3 Documentation
5.04.53 508 2 test Engineer md 0.5 Glove Pair 2Concrete mixture Hr 6 &
Mask No 2 Balance ( 20 kg) Hr 6 Report
Jute cloth piece 4 Vibrator Hr 6
Flatin cloth Mtr 2 Measuring cylinderHr 6
Stop watch Hr 8
Tray ( 75 cm * 75 cm)
Hr 96
Curing tank Hr 840

Spec
Clause no Description of Works Labour (A) Material (B) Equipment ( C ) Remarks
Activity
No Unit Type unit Qtty Type unit Qtty Type unit Qtty
Determination of Zinc Coating of Unskilled No 0.4 Electricity Unit 2 Beaker Hr 6 Add 25 % of
GI wire 7 Gauge or less dia Hydrochloric
labour cost for
Semiskilled No 1 Acid Ltr 1 Balance ( 1 kg) Hr 6
506, 507,
5.04.54 508 6 test

37
Determination of Zinc Coating of
GI wire 7 Gauge or less dia

506, 507, Skilled No 1 Antimony chloride


gm 1 Screw gauge Hr 6 Documentation
5.04.54 508 6 test Engineer No 0.1 Gloves pair 2 Tongs Hr 6 &
Masks No 2 Wire cutter Hr 6 Report
Cloths Mtr 2 Exhaust fan Hr 6
Measuring
Jute cloth piece 2 Cylinder Hr 6
Glass basin Hr 6

Adhesion test of Zinc Coating Unskilled No 0.5 Gloves pair 2 Manderal Hr 6 Add 25 % of
Semiskilled No 1 Masks No 2 Wire cutter Hr 6 labour cost for
506, 507, Skilled No 0.5 Cloths Mtr 2 Documentation
5.04.55 508 15 test Engineer No 0.1 Jute cloth piece 2

Uniformity test of Zinc Coating Cupper


Add 25 % of
Unskilled No 0.5 Sulphate Kg 0.75 Glass container Hr 6
Semiskilled No 1 Distilled Water Ltr. 1.5 Glass rod Hr 6 labour cost for
506, 507, Skilled No 0.5 Cupric Hydro oxide
gm 1 Stop watch Hr 6 Documentation
5.04.56 508 9 test Engineer No 0.1 TrichloroethyleneLtr. 0.3 Tongs Hr 6 &
Gloves pair 2 Thermometer Hr 6 Report
Masks No 2 Wire cutter Hr 2
Cloths Mtr 2 Knife Hr 2
Jute cloth piece 2 Measuring CylinderHr 6
Balance ( 1 Kg) Hr 2

Determination of tensile strength Tensile testing


of G.I. wire upto 7 gauge Add 25 % of
Unskilled No 1 Electricity Unit 8 machine Hr 3
Semiskilled No 1 oil Ltr. 0.2 Screw gauge Hr 1 labour cost for
506, 507, Skilled No 0.5 Glove Pair 2 Wire cutter Hr 1 Documentation
5.04.57 508 9 test Engineer No 0.2 Mask No 2 &
Jute cloth piece 1 Report

38
Determination of tensile strength Universal testing
rope/ reinforcing steel bar & Add 25 % of
Unskilled No Electricity Unit 30 machine Hr 3
sheets Semiskilled No 1 oil Ltr. 0.2 Screw gauge Hr 1 labour cost for
506, 507, Skilled No 1 Glove Pair 2 Hacksaw Hr 1 Documentation
5.04.58 508 6 test Engineer No 1 Mask No 2 Balance ( 5 Kg) Hr 1 &
Jute cloth piece 1 Wire cutter Hr 1 Report

Spec
Activity
Clause no Description of Works Labour (A) Material (B) Equipment ( C )
No Unit Type unit Qtty Type unit Qtty Type unit Qtty
Marshal Stability test of of Stability testing
prepared bitumenous samples ( Add 25 % of
Unskilled No 1 Electricity unit 5 machine Hr 3
crushing only ) Semiskilled No 1 Kerosene Ltr 6 Tray ( 75 * 75 cm)Hr4 nos 12 labour cost for
506, 507, Skilled No 0.5 Glycerine Ltr 0.25 Thermometer Hr 2 Documentation
5.04.59 508 12 test Engineer No 0.2 Gloves pair 2 &
Masks No 2 Blance (5 Kg) Hr 1 Report
Falatin Cloths Mtr 2 Extruder Hr 2

Resistence to Plastic flow & Sieve ( below 37


stability of Bitumenous mixture Add 25 % of
Unskilled No 2 Electricity unit 60 mm) set Hr 3
using Marshal Apparatus incl. mix Trichloroethyle
design labour cost for
Semiskilled No 2 ne Ltr 0.75 Bowl or Pan Hr 3
506, 507, Skilled No 2 Kerosene Ltr 2 Tray Hr 3 Documentation
5.04.60 508 3 test Engineer No 1 Cooking gas Kg 3 Beaker Hr 3 &
Filter Paper Sq ft 2 Mixing machine Hr 2 Report
Glecerene Ltr 0.1 Balance ( 5 kg) Hr 2
Glove Pair 2 Spatula Hr 2
Mask No 2 Scoop Hr 2

39
Jute cloth piece 2 Mould set Hr 2
Compactor Hr 2
Extruder Hr 2
Flow and
Stability testing
Machine Hr 1
Water Bath Hr 2
Thermometer Hr 6
Gass stove/ Cylinder
Hr 2
volumetric Flask Hr 6
Oven Hr 1
Sunction Pump Hr 3
pycnometer Hr 6

Loss on Heating of asphaltic Oven with


compound Mix ( Thin film oven Add 25 % of
Unskilled No 1 Electricity unit 20 revolving shelf Hr 1
test 3 * 3 nos) Trichloroethyle
labour cost for
Semiskilled No 1 ne Ltr 0.5 Can ( aluminium 9Hr
nos) 45
506, 507, Skilled No 0.5 Thermometer Hr 8 Documentation
5.04.61 508 9 test Engineer No 0.2 Kerosene Ltr 2 Heater Hr 1 &
Glove Pair 2 Blance ( 2 kg) Hr 2 Report
Mask No 2 Beaker Hr 4
Jute cloth piece 2

Determination of Bitumen content Centrifuge


of Pavement Mix ( Big bowl about Add 25 % of
Unskilled No 1 Electricity unit 30 Machine Hr 6
2 kg) Trichloroethyle
labour cost for
Semiskilled No 1 ne Ltr 11 Beaker Hr 2
506, 507, Skilled No 1 Kerosene Ltr 2 Oven Hr 6 Documentation
5.04.62 508 3 test

40
Determination of Bitumen content
of Pavement Mix ( Big bowl about
2 kg)

506, 507,
5.04.62 508 3 test Engineer No 0.2 Cooking gas Kg 3 Tray ( 75 * 75 cm)Hr 3 &
Filter Paper Sq ft 3 Balance ( 2 kg) Hr 1 Report
Glecerene Ltr 0.1 Exhust Fan Hr 6
Gloves pair 1 Pan Hr 3
Mask No 1 Bucket Hr 1
Jute cloth piece 2 Straight edge Hr 1
Scoop Hr 2

Determination of Bitumen content Centrifuge


of Pavement Mix ( small bowl Add 25 % of
Unskilled No 1 Electricity unit 30 Machine Hr 6
about 1 kg) Trichloroethyle
labour cost for
Semiskilled No 1 ne Ltr 8 Beaker Hr 2
506, 507, Skilled No 1 Kerosene Ltr 2 Oven Hr 6 Documentation
5.04.63 508 4 test Engineer No 0.2 Cooking gas Kg 1.5 Tray Hr 3 &
Filter Paper Sq ft 3 Balance ( 2 kg) Hr 1 Report
Glecerene Ltr 0.1 Exhust Fan Hr 6
Gloves pair 1 Pan Hr 3
Mask No 1 Bucket Hr 1
Jute cloth piece 2 Straight edge Hr 1
Scoop Hr 2

Determination of Flash point and Trichloroethyle Cleveland open


Fire point of Asphalt ( cloveland Add 25 % of
Unskilled No 1 ne Ltr 0.25 cup Hr 4
open cup ) Semiskilled No 1 Cooking gas Kg 1 Thermometer Hr 16 labour cost for
Gas cylinder with
Documentation
506, 507, Skilled No 1 Glecerene Ltr 0.1 regulator Hr 4
5.04.64 508 4 test Engineer No 0.2 Gloves pair 1 Heater with regulator
Hr 3 &
Mask No 1 Oven Hr 4 Report
Jute cloth piece 2

41
Determination of Flash point ( Pensky -
Pensky - Martens closed tester) Martens closed Add 25 % of
Unskilled No 1 Electricity Unit 9 flash tester Hr 6
Trichloroethyle
labour cost for
Semiskilled No 1 ne Ltr 0.25 Thermometer Hr 16
Gas cylinder with
Documentation
506, 507, Skilled No 0.5 Cooking gas Kg 1 regulator Hr 4
5.04.65 508 3 test Engineer No 0.2 Glecerene Ltr 0.25 Heater with regulator
Hr 3 &
Gloves pair 1 Oven Hr 4 Report
Mask No 1
Jute cloth piece 3

Determination of Flash point ( Tag Tag open cup


open cup) Add 25 % of
Unskilled No 1 Electricity Unit 5 tester Hr 8
Semiskilled No 1 Kerosene Ltr 4 Thermometer Hr 16 labour cost for
Trichloroethyle Gas cylinder with
Documentation
506, 507, Skilled No 0.5 ne Ltr 0.25 regulator Hr 4
5.04.66 508 4 test Engineer No 0.2 Cooking gas Kg 1 Heater with regulator
Hr 3 &
Glecerene Ltr 0.25 Oven Hr 4 Report
Gloves pair 1
Mask No 1
Jute cloth piece 3

Trichloroethyle Solubility
Add 25 % of
Solubility Test of Bitumen Unskilled No 1 ne Ltr 1 Machine Hr 6
Semiskilled No 1 Balance ( 1 Kg) Hr 2 labour cost for
506, 507, Skilled No 1 Filter paper NO 2 Vaccum Pumo Hr 2 Documentation
5.04.66 508 3 test Engineer No 0.2 Glecerene Ltr 0.25 &
Gloves pair 1 Report
Mask No 1

42
Jute cloth piece 3

Trichloroethyle
Add 25 % of
Penetration test of Bitumen Unskilled No 1 ne Ltr 0.25 Penetrometer Hr 2
Semiskilled No 1 Electricity Unit 50 Thermometer Hr 16 labour cost for
Skilled No 1 Glecerene Ltr 0.25 Heater with Regulator
Hr 6 Documentation
506, 507, Constant Temp
&
5.04.67 508 4test Engineer No 0.2 Gloves pair 1 water bath Hr 2
Mask No 1 Report
Jute cloth piece 3

Penetration of Residue after loss Trichloroethyle


on heating test of Bitumen Add 25 % of
Unskilled No 1 ne Ltr 0.25 Penetrometer Hr 2
Semiskilled No 1 Electricity Unit 50 Thermometer Hr 16 labour cost for
Skilled No 1 Glecerene Ltr 0.25 Ovn wit revolving shelf
Hr 6 Documentation
506, 507, Constant Temp
&
5.04.68 508 4test Engineer No 0.2 Gloves pair 1 water bath Hr 2
Mask No 1 Beaker Hr 32 Report
Jute cloth piece 3 Can Hr 32

Softening point test of Bitumen Trichloroethyle Ring and Ball


Add 25 % of
Unskilled No 1 ne Ltr 0.25 Appratus hr 3
Semiskilled No 1 Electricity Unit 50 Thermometer Hr 6 labour cost for
506, 507, Skilled No 1 Glecerene Ltr 0.25 Heater Hr 6 Documentation
5.04.69 508 3 test Engineer No 0.2 Gloves pair 1 Pouring plate Hr 6 &
Mask No 1 Report
Jute cloth piece 3

43
Ductility test of Bitumen Ductility test
Machine with Add 25 % of
Unskilled No 1 Electricity Unit 20 water bath Hr 3
Trichloroethyle
labour cost for
Semiskilled No 1 ne Ltr 0.25 Mould Hr 9
506, 507, Skilled No 1 Glecerene Ltr 0.25 Brass Plate for Mould
Hr 9 Documentation
5.04.70 508 3 test Engineer No 0.2 Gloves pair 1 Heater with Regulator
Hr 4 &
Mask No 1 Thermometer Hr 8 Report
Jute cloth piece 3

Determination of Water content in Glass distillation


Asphalt Trichloroethyle flask with a liebig Add 25 % of
Unskilled No 1 ne Ltr 0.25 condenser set Hr 8
Semiskilled No 1 Cooking Gas Kg 1 Thermometer Hr 8 labour cost for
506, 507, Skilled No 1 Xylene Ltr. 0.3 Heater with Regulator
Hr 2 Documentation
5.04.71 508 4 test Engineer No 0.2 Glecerene Ltr 0.25 &
Gloves pair 1 Report
Mask No 1
Jute cloth piece 3

Determination of Specific Gravity Unskilled No 1 Electricity Unit 10 Pycnometer Hr 6 Add 25 % of


of Asphalt Trichloroethyle Balance (
labour cost for
Semiskilled No 1 ne Ltr 0.25 1kg)Scale Hr 2
506, 507, Skilled No 1 Kerosine Ltr. 1 Water bath Hr 6 Documentation
5.04.72 508 4 test Engineer No 0.2 Distilled water Ltr. 1 Oven Hr 1 &
Glecerene Ltr 0.25 Beaker Hr 4 Report
Gloves pair 1 Thermometer Hr 6
Mask No 1
Jute cloth piece 3

44
Determination of Viscosity of
Bitumen ( Absolute) Cannon-Manning
Add 25 % of
Vacuums
Unskilled No 1 Electricity Unit 10 Viscometer Hr 8
Trichloroethyle
labour cost for
Semiskilled No 0.5 ne Ltr 0.5 Thermometer Hr 8
Skilled No 0.5 Glecerene Ltr 0.5 Documentation
506, 507, Constant Temp
&
5.04.73 508 2 test Engineer No 0.2 Kerosene Ltr 4 water bath Hr 8
Sulphuric Acid Ltr 0.5 Stop watch Hr 8 Report
Sodium Dichromate
gm 250 Oven Hr 8
Distilled water Ltr 0.5 Beaker Hr 8
Gloves pair 2
Mask No 2
Jute cloth piece 4

BS U-Tube
Modifi ed
Determination of Viscosity of Re verse Flow Add 25 % of
Bitumen ( Kinematic) Unskilled No 1 Electricity Unit 10 Viscometers Hr 8
Trichloroethyle
labour cost for
Semiskilled No 0.75 ne Ltr 0.5 Thermometer Hr 8
Skilled No 0.5 Glecerene Ltr 0.5 Documentation
506, 507, Constant Temp
&
5.04.74 508 2 test Engineer No 0.2 Kerosene Ltr 4 water bath Hr 8
Sulphuric Acid Ltr 0.5 Stop watch Hr 8 Report
Sodium Dichromate
gm 250 Oven Hr 8
Distilled water Ltr 0.5 Beaker Hr 8
Gloves pair 2
Mask No 2
Jute cloth piece 4

45
Spec
Activity
Clause no Description of Works Labour (A) Material (B) Equipment ( C )
No Unit Type unit Qtty Type unit Qtty Type unit Qtty
Binder content of Emulsion Dean and Stark
Add 25 % of
Unskilled No 1 Electricity unit 10 Appparatus Hr 8
Semiskilled No 0.5 Kerosene Ltr 4 Hot plate with Regulator
Hr 8 labour cost for
506, 507, Skilled No 0.25 Xylene Ltr 0.5 Stiering rod Hr 2 Documentation
5.04.75 508 2 test Engineer No 0.2 Gloves pair 2 Thermometer Hr 2 &
Masks No 2 Blance (5 Kg) Hr 2 Report
Falatin Cloths Mtr 2 Beaker Hr 4

determination of Residue on Sieve ( 710


Seeiving of Emulsion Add 25 % of
Unskilled No 1 Electricity unit 3 micron ) Hr 8
Semiskilled No 0.5 Xylene Ltr 0.8 Oven Hr 3 labour cost for
506, 507, Skilled No 0.5 Hydrochloric acidLtr 0.2 Balance ( 1 kg) Hr 4 Documentation
5.04.76 508 5 test Engineer No 0.2 Centrimide Ltr 0.1 Beaker Hr 8 &
Acetone Ltr 0.6 container ( 4lit) Hr 8 Report
Measuring
Kerosene Ltr 1 cylinder Hr 4
Glove Pair 2
Mask No 2
Jute cloth piece 4

Englerr Viscosity emulsion Engler


Add 25 % of
Unskilled No 1 Electricity unit 5 Viscometer Hr 3
Trichloroethyle
labour cost for
Semiskilled No 0.5 ne Ltr 0.5 Receiving flask Hr 24
506, 507, Skilled No 0.5 Distilled water Ltr 1 Thermometer Hr 3 Documentation
5.04.77 508 3 test Engineer No 0.2 Kerosene Ltr 1,5 Stop watch Hr 3 &

46
Glove Pair 2 Sieve ( 0.71 mm) Hr 2 Report
Mask No 2 Pipette Hr 4
Jute cloth piece 3 Beaker Hr 24
Flatin cloth Mtr 3

47
Norms for Rate Analysis
Activity Group:- 6 Matrials and testing of Materials
Resources
Activity Spec.
Description of works Labour Materials Equipment Remarks
Nos Clause no Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
Providing, sampling and testing
6.01 600

of material, Trial and construction

control/ Process control testings


Refer Norms & Rates of Activity group 5
no
etc. complete as per contract
conditions.

48
Norms for Rate Analysis
Activity Group:- 7: Pipe Drains, Pipe Culverts and Concrete Channels.
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
7.01 701 Providing, jointing and laying HDP
pipes with or without collar etc.
complete in place as per
specification.
a) 110 mm/125mm outer diameter 50m Skilled md 3.0 HDP pipe m 50 Generator (<2kva) hr 8

Unskilled md 3.0 Petrol lit 0.5 Screw Jack hr 8


electric heating
hr 8
plate
Note: -
1. Excavation, backfilling, pipe bedding and ancillary works shall be estimated using the norms of related items.
2. For other diameter pipe derive Norms on the basis of ratio of pipe perimeter.
3. Generator and electric heating plate can be replaced by 5 numbers of blow lamps for rate analysis.
Providing and laying RCC pipes
7.02 701 .

with or without collars, jointed


with stiff mixture of cement
mortar in the prorportion of 1:2

(1cement : 2 fine sand), lead


upto 100m.
i) 300mm dia (Int.) Add 3% for ballies,
m Skilled md 0.200 RCC Pipe m 1.0
crow, bars, chain,
Unskilled md 0.700 Cement kg 2.600

49
Sand m3 0.004 pulley, blocks &

Jute kg 0.120 ropes etc.

ii) 450mm dia (Int.) m Skilled md 0.250 RCC Pipe m 1.0 Add 3% for ballies,
crow, bars, chain,
Unskilled md 0.940 Cement kg 4.470 pulley, blocks &
Sand m3 0.007 ropes etc.
Jute kg 0.170

iii) 600mm dia (Int.) Add 3% for ballies,


m Skilled md 0.281 RCC Pipe m 1.0
crow, bars, chain,
Unskilled md 1.094 Cement kg 6.813
Sand m3 0.009 pulley, blocks &

Jute kg 0.219 ropes etc.

iv) 750mm dia (Int.) m Skilled md 0.308 RCC Pipe m 1.0 Add 3% for ballies,
crow, bars, chain,
Unskilled md 1.328 Cement kg 7.937 pulley, blocks &
Sand m3 0.011 ropes etc.
Jute kg 0.297

ii) 900mm dia (Int.) m Skilled md 0.344 RCC Pipe m 1.0 Add 3% for ballies,
crow, bars, chain,
Unskilled md 1.562 Cement kg 9.062 pulley, blocks &
Sand m3 0.013 ropes etc.
Jute kg 0.375

ii) 1200mm dia (Int.) m Skilled md 0.380 RCC Pipe m 1.0 Add 3% for ballies,
crow, bars, chain,
Unskilled md 2.340 Cement kg 11.340 pulley, blocks &
Sand m3 0.016 ropes etc.
Jute kg 0.500

7.03 702 Providing and laying concrete


channeling

50
a) Cast- in -situ m skilled md Refer Concrete m3
Unskilled md related Form-Work m2 To be calculated
items Re-bar kg as per design
b)Precast m skilled md Refer Concrete m 3

Unskilled md related Form-Work m2 To be calculated


items Re-bar kg as per design

c)For Jointing in precast skilled md 0.281 Cement kg 6.813


3
Unskilled md 1.094 Sand m 0.009
Note -: Excavation,backfilling ,pipe bedding and ancillary works shall be estimated using the norms of related items.

51
Norms for Rate Analysis
Activity Group:- 8 : Quarries, Borrow Pits, Stock Pile and Spoil Areas.
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
8.01.01 Collection of stone, gravel
including selection, screening and
stacking within 10m. Hauling
distance.

a) Size 40mm - 70mm m3 Unskilled md 4.00


3
b) Size 70mm - 100mm m Unskilled md 3.20
8.01.02 Collection and seiving gravel
including stacking within 10m.
Hauling distance.
a) 5mm - 70mm m3 Unskilled md 2.00
3
b) 5mm - 40mm m Unskilled md 3.20
3
c) 5mm - 20mm m Unskilled md 4.70
3
d) 5mm - 8mm m Unskilled md 8.00
8.01.03 Collection of rubble of required
size, hauling distance10m. and
stacking. m3 Unskilled md 1.40
8.01.04 Collection and seiving sand
within 10m. hauling distance.
a) Quarry output less than 33% m3 Unskilled md 4.00
3
b) Quarry output 33 - 66% m Unskilled md 3.00
3
c) Quarry output more than 66% m Unskilled md 1.43
8.01.05 Collection, quarring and seiving
sand in hilly areas within 10m.
hauling distance.

52
Collection, quarring and seiving
sand in hilly areas within 10m.
hauling distance. m3 Unskilled md 1.50
8.01.06 Common material haulage - 50%
by basket and 50% by wheel
barrow for every aditional 10m
haul. m3 Unskilled md 0.12
8.01.07 Rock material haulage - 50% by
basket and 50% by wheel barrow
for every additional 10m haul. m3 Unskilled md 0.16
8.01.08 m3
Washing broken stone gravel and sand. Unskilled md 1.50
Washing rubble. m3 Unskilled md 0.40
8.02.01 Breaking stones including
Collection, seiving and stacking
within 10m.
a) 70mm - 100mm m3 Unskilled md 6.00
3
b) 40mm - 70mm m Unskilled md 8.00
3
c) 20m - 40mm m Unskilled md 12.00
3
d) 10mm - 20m m Unskilled md 18.00
3
e) 5mm - 10mm m Unskilled md 25.00
8.02.02 Making Blocks of required size out
of stratified rocks including
hammer dressing, hauling
distance 10m. and stacking.
m3 Unskilled md 5.88
8.02.03 Making rubbles of required size
including making hole, blasting
and breaking with chisel or m3
Gelatine kg 0.25
hammer, hauling distance 10m.
Unskilled md 4.50 Detonator no 2.00
and stacking.
Blaster md 0.10 Fuse wire m 2.00

53
Making rubbles of required size
8.02.04 including breaking with distance Unskilled md 5.50
10m. and stacking. m3
8.03. 800 Transportation of materials by
manpower including loading,
hauling, unloading and stacking.
8.03.01 1) Excavated earthwork.
3
m
a) First 10m.with load unload and haul Unskilled md 0.47
3
b) Every additional 10m. upto 100mm Unskilled md 0.12
8.03.02 2) Loose sand
3
m
a) First 10m.with load unload and haul Unskilled md 0.47
3
b) Every additional 10m. upto 100mm Unskilled md 0.12

8.03.03 3) Gravel, river shingle, broken stone


aggregates and bats.
m3
a) First 10m.with load unload and haul Unskilled md 0.30
3
b) Every additional 10m. upto 100mm Unskilled md 0.13

8.03.04 4) Boulder, Cobbles, quarry stone


3
m
a) First 10m.with load unload and haul Unskilled md 1.10
3
b) Every additional 10m. upto 100mm Unskilled md 0.19

8.03.05 5)Dressed Stone


3
m
a) First 10m.with load unload and haul Unskilled md 1.10
3
b) Every additional 10m. upto 100mm Unskilled md 0.19

8.03.06 6)Bricks
a) First 10m.with load unload and haul
1000 nos Unskilled md 1.10
b) Every additional 10m. upto 100m1000 nos Unskilled md 0.19

54
8.03.07 7)Cement
a) First 10m.with load unload and haul
t Unskilled md 0.50
b) Every additional 10m. upto 100mt Unskilled md 0.13

8.03.08 8)Reinforcement Steel and gabion wire


a) First 10m.with load unload and haul
t Unskilled md 1.11
b) Every additional 10m. upto 100mt Unskilled md 0.36

8.03.09 9) Bitumen
a) First 10m.with load unload and haul
100 lit Unskilled md 0.15
b) Every additional 10m. upto 100m100 lit Unskilled md 0.05

8.03.10 10) GI,CI,Pipe and fittings ,Black pipe


a) First 10m.with load unload and haul
t Unskilled md 0.50
b) Every additional 10m. upto 100mt Unskilled md 0.13

8.03.11 11)Timber for temporary works


3
m
a) First 10m.with load unload and haul Unskilled md 0.50
3
b) Every additional 10m. upto 100mm Unskilled md 0.08

8.03.12 12) Fabricated Structural Timber


3
m
a) First 10m.with load unload and haul Unskilled md 0.70
3
b) Every additional 10m. upto 100mm Unskilled md 0.12
8.03.13 13) Fabricated Structural Steel
a) First 10m.with load unload and haul
t Skilled md 0.40
Unskilled md 8.00
b) Every additional 10m. upto 100mt Skilled md 0.10
Unskilled md 2.00

55
8.03.14 14)RCC Precast Element t To be estimated on the basis of size & shape of the elements.
8.03.15 15) Equiptment & accessories etc.
requiring careful handling.
a) First 10m.with load unload and haul
t Skilled md 1.00
Unskilled md 10.00
b) Every additional 10m. upto 100mt Skilled md 0.20
Unskilled md 2.00
8.03.16 16) RCC hume pipe
8.03.16.01 i) 900mm dia
a) First 10m.with load unload and haul
m Skilled md 0.040
Unskilled md 0.400
b) Every additional 10m. upto 100mm Skilled md 0.010
Unskilled md 0.100
8.03.16.02 ii) 750mm dia
a) First 10m.with load unload and haul
m Skilled md 0.035
Unskilled md 0.330
b) Every additional 10m. upto 100mm Skilled md 0.010
Unskilled md 0.090
8.03.16.03 iii) 600mm dia
a) First 10m.with load unload and haul
m Skilled md 0.03
Unskilled md 0.25
b) Every additional 10m. upto 100mm Skilled md 0.01
Unskilled md 0.08
8.03.17 17) Water
a) First 10m.with load unload and haul
1000 lit Unskilled md 0.47
b) Every additional 10m. upto 100m1000 lit Unskilled md 0.12

56
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
8.04. 800 Transportation of materials by Travel time (T) for truck to be used for this activity shall be determined as follows:
truck, including loading, unloading T=2x{d1/v1+d2/v2+d3/v3+………………..dn/vn}, where d1,d2,d3………dn and v1,v2,v3……..vn are the
and stacking by manpower lead streches of distances to be travelled and corresponding average speeds on these streches.
upto 10m
D= total travel distance in Km ( d1+d2+d3 + ………dn )

8.04.01 Using 3 tonne capacity Truck


1) Excavated earth work 6 Km/lit
a) Soil Material m3 Unskilled md 0.40 Fuel lit DX0.07 Truck hr 0.4x(T+0.75) T=travel time for

truck
3
b) Rock/Material m Unskilled md 0.50 Fuel lit DX0.08 Truck hr 0.5x(T+0.75)

2) Sand m3 Unskilled md 0.30 Fuel lit DX0.02 Truck hr 0.37x(T+0.75) T=travel time for
truck

3) Gravel, river shingle, broken m3 Unskilled md 0.50 Fuel lit DX0.07 Truck hr 0.43x(T+0.75) T=travel time for
stone aggregates and bats. truck

4) Boulder, Cobbles, quarry stone m3 Unskilled md 0.50 Fuel lit DX0.1 Truck hr 0.57x(T+0.75) T=travel time for
truck

5)Dressed Stone m3 Unskilled md 0.60 Fuel lit DX0.09 Truck hr 0.53x(T+0.75) T=travel time for
truck

6)Bricks 1000 nos Unskilled md 0.60 Fuel lit DX0.14 Truck hr 0.83x(T+0.75) T=travel time for

57
truck

7)Cement t Unskilled md 0.40 Fuel lit DX0.06 Truck hr 0.33x(T+0.75) T=travel time for
truck
8)Reinforcement Steel and gabion t Unskilled md 0.60 Fuel lit DX0.06 Truck hr 0.33x(T+0.75) T=travel time for
wire truck
9) Bitumen 1000 lit Unskilled md 1.00 Fuel lit DX0.07 Truck hr 0.40x(T+0.75) T=travel time for
truck
10) GI, CI, Pipe and fittings t Unskilled md 1.00 Fuel lit DX0.06 Truck hr 0.33x(T+0.75) T=travel time for
truck

11)Timber for temporary works m3 Unskilled md 0.30 Fuel lit DX0.05 Truck hr 0.3x(T+0.75) T=travel time for

truck
12) Fabricated Structural Timber m3 Unskilled md 0.50 Fuel lit DX0.07 Truck hr 0.4x(T+1.25) T=travel time for

truck
13) Fabricated Structural Steel t Skilled md 0.40 Fuel lit DX0.07 Truck hr 0.4x(T+1.25) T=travel time for
Unskilled md 4.00 truck

14)RCC Precast Element t Unskilled md 1.00 Fuel lit DX0.06 Truck hr 0.33x(T+0.75) T=travel time for
truck
15)Equiptment & accessories truck Skilled md 2.00 Fuel lit DX0.17 Truck hr 1x(T+1.75) T=travel time for
etc.requiring careful handling Unskilled md 10.00 truck
16) RCC hume pipe
a) 900mm dia m Skilled md 0.04 Fuel lit DX0.03 Truck hr 0.2x(T+1.75) T=travel time for
Unskilled md 0.40 truck

b) 750mm dia m Skilled md 0.03 Fuel lit DX0.03 Truck hr 0.16x(T+1.75) T=travel time for
Unskilled md 0.33 truck

c) 600mm dia m Skilled md 0.02 Fuel lit DX0.02 Truck hr 0.13x(T+1.75) T=travel time for

58
Unskilled md 0.25 truck
17) Water 1000 lit Skilled md 0.01 Fuel lit DX0.06 Truck hr 0.33x(T+0.25) T=travel time for
Unskilled md 0.10 Pump 10cmdia hr 0.05 truck
8.04.02 Using 5 tonne capacity Truck
1)Excavated earth work 4km /lit
3
a)Soil Material m Unskilled md 0.40 Fuel lit DX0.06 Truck hr 0.24x(T+0.75) T=travel time for
truck
b)Rock Material m3 Unskilled md 0.50 Fuel lit DX0.08 Truck hr 0.3x(T+0.75) T=travel time for

truck
3
2) Sand m Unskilled md 0.30 Fuel lit DX0.06 Truck hr 0.22x(T+0.75) T=travel time for
truck

3) Gravel, river shingle, broken stone m3 Unskilled md 0.50 Fuel lit DX0.07 Truck hr 0.26x(T+0.75) T=travel time for
aggregates, and bats. truck

4) Boulder, Cobbles, quarry stone m3 Unskilled md 0.50 Fuel lit DX0.09 Truck hr 0.34x(T+0.75) T=travel time for
truck

5)Dressed Stone m3 Unskilled md 0.60 Fuel lit DX0.08 Truck hr 0.32x(T+0.75) T=travel time for
truck

6)Bricks 1000 nos Unskilled md 0.60 Fuel lit DX0.13 Truck hr 0.5x(T+0.75) T=travel time for
truck
7)Cement t Unskilled md 0.40 Fuel lit DX0.05 Truck hr 0.2x(T+0.75) T=travel time for
truck
8)Reinforcement Steel and gabion t Unskilled md 0.60 Fuel lit DX0.05 Truck hr 0.2x(T+0.75) T=travel time for
wire truck

9) Bitumen 1000 lit Unskilled md 1.00 Fuel lit DX0.08 Truck hr 0.3x(T+0.75) T=travel time for

59
truck
10) GI, CI, Pipe and fittings t Unskilled md 1.00 Fuel lit DX0.05 Truck hr 0.2x(T+0.75) T=travel time for
truck
3
11)Timber for temporary works m Unskilled md 0.30 Fuel lit DX0.07 Truck hr 0.28x(T+0.75) T=travel time for

12) Fabricated Structural Timber m3 Unskilled md 0.50 Fuel lit DX0.06 Truck hr 0.24x(T+1.25) T=travel time for
truck
13) Fabricated Structural Steel t Skilled md 0.40 Fuel lit DX0.05 Truck hr 0.2x(T+1.25) T=travel time for
Unskilled md 4.00 truck
14)RCC Precast Element t Unskilled md 1.00 Fuel lit DX0.05 Truck hr 0.2x(T+0.75) T=travel time for
truck
15)Equiptment & accessories truck Skilled md 3.00 Fuel lit DX0.25 Truck hr 1x(T+1.75) T=travel time for
etc.requiring careful handling Unskilled md 15.00 truck
16) RCC hume pipe
a)900mm dia m Skilled md 0.04 Fuel lit DX0.03 Truck hr 0.13x(T+1.75) T=travel time for
Unskilled md 0.40 truck
b) 750 mm dia m Skilled md 0.03 Fuel lit DX0.03 Truck hr 0.11x(T+1.75) T=travel time for
Unskilled md 0.33 truck
c) 600mm dia m Skilled md 0.02 Fuel lit DX0.02 Truck hr 0.08x(T+1.75) T=travel time for
Unskilled md 0.25 truck
17) Water 1000 lit Skilled md 0.01 Fuel lit DX0.05 Truck hr 0.2x(T+0.5) T=travel time for
Unskilled md 0.10 Pump 10cmdia hr 0.05 truck
8.04.03 Using 8 tonne capacity Truck
1)Excavated earth work 3KM/Lit
a)Soil Material m3 Unskilled md 0.40 Fuel lit DX0.05 Truck hr 0.15x(T+0.75) T=travel time for
truck
b)Rock Material m3 Unskilled md 0.50 Fuel lit DX0.06 Truck hr 0.18x(T+0.75) T=travel time for
truck
3
2) Sand m Unskilled md 0.30 Fuel lit DX0.04 Truck hr 0.13x(T+0.75) T=travel time for

60
truck

3) Gravel, river shingle broken stone m3 Unskilled md 0.50 Fuel lit DX0.05 Truck hr 0.16x(T+0.75) T=travel time for
aggregates and bats. truck

4) Boulder Cobbles quarry stone m3 Unskilled md 0.50 Fuel lit DX0.07 Truck hr 0.21x(T+0.75) T=travel time for
truck

5)Dressed Stone m3 Unskilled md 0.60 Fuel lit DX0.07 Truck hr 0.2x(T+0.75) T=travel time for

truck

6)Bricks 1000 nos Unskilled md 0.60 Fuel lit DX0.10 Truck hr 0.31x(T+0.75) T=travel time for
truck

7)Cement t Unskilled md 0.40 Fuel lit DX0.04 Truck hr 0.12x(T+0.75) T=travel time for
truck

8)Reinforcement Steel and gabion t Unskilled md 0.60 Fuel lit DX0.04 Truck hr 0.12x(T+0.75) T=travel time for
wire truck

9) Bitumen 1000 lit Unskilled md 1.00 Fuel lit DX0.07 Truck hr 0.2x(T+0.75) T=travel time for
truck

10) GI, CI, Pipe and fittings t Unskilled md 1.00 Fuel lit DX0.04 Truck hr 0.12x(T+0.75) T=travel time for
truck

11)Timber for temporary works m3 Unskilled md 0.30 Fuel lit DX0.04 Truck hr 0.11x(T+0.75) T=travel time for
truck

61
12) Fabricated Structural Timber m3 Unskilled md 0.50 Fuel lit DX0.05 Truck hr 0.15x(T+1.25) T=travel time for
truck

13) Fabricated Structural Steel t Skilled md 0.40 Fuel lit DX0.04 Truck hr 0.12x(T+1.25) T=travel time for
Unskilled md 4.00 truck

14)RCC Precast Element t Unskilled md 1.00 Fuel lit DX0.04 Truck hr 0.12x(T+0.75) T=travel time for
truck
15)Equiptment & accessories truck Skilled md 4.00 Fuel lit DX0.33 Truck hr 1x(T+1.75) T=travel time for
etc.requiring careful handling Unskilled md 20.00 truck

16) RCC hume pipe


a) 900mm dia m Skilled md 0.04 Fuel lit DX0.02 Truck hr 0.06x(T+1.75) T=travel time for
Unskilled md 0.40 truck

b) 750mm dia m Skilled md 0.03 Fuel lit DX0.02 Truck hr 0.055x(T+1.75) T=travel time for
Unskilled md 0.33 truck

c) 600mm dia m Skilled md 0.02 Fuel lit DX0.02 Truck hr 0.054x(T+1.75) T=travel time for
Unskilled md 0.25 truck
17) Water 1000 lit Skilled md 0.01 Fuel lit DX0.04 Truck hr 0.12x(T+0.75) T=travel time for
Unskilled md 0.10 Pump 10cmdia hr 0.05 truck

Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
8.05. 800 Transportation of materials by Travel time (T) for truck to be used for this activity shall be determined as follows:
Dump truck, including loading by T=2x{d1/v1+d2/v2+d3/v3+………………..dn/vn}, where d1,d2,d3………dn and v1,v2,v3……..vn are the
loader streches of distances to be travelled and corresponding average speeds on these streches.
loading time 0.33 hour for Front end Loader 1 cum bucket capacity and 5.5 Tonne capacity Tipper.

62
D= total travel distance in Km ( d1+d2+d3 + ………dn )
8.05.01 Using 5.5 tonne capacity Truck
1) Excavated earth, sand, aggregate, Stone Boulder etc.
m3 Unskilled md 0.008 Fuel for Tipper lit DX0.06 Tipper hr 0.182T+0.06

D= 0ne way
Fuel for loader lit 0.71 Loader hr 0.0600
distance in Km

63
Norms for Rate Analysis
Activity Group:- 9 : Earthworks
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
No Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
9.01.01 905 Road way excavation ( manually) Add 3% of
including disposal upto 10m and Labour cost
lift upto 1.5 m etc. all complete as for T & P
per specification.
m3
Note:-
a)soil/Gravels/B.M.S. Unskilled md 1.00 B.M.S.=
b) ordinary Rock Unskilled md 2.75 Boulder mixed
c) Hard Rock witout blasting Unskilled md 12.00 soil
d) Hard rock with blasting
ii) with blasting
I) Manual drilling Unskilled md 3.50 Gelatin kg 0.25
blaster md 0.10 Detonator no 2
fusewire m 2
II) Mechanical Drilling Unskilled md 1.50 Gelatin kg 0.25 Compressor &
blaster md 0.10 Detonator no 2 drill hr 0.34
fusewire m 2 or Portable Rock
drill hr 1
iii)Using chemicals
I) Manual drilling skilled md 0.10 Chemicals Kg 5
Unskilled md 4.00
II) Mechanical Drilling skilled md 0.10 Chemicals Kg 5 Compressor &
Unskilled md 1.50 drill hr 0.34
or Portable Rock
9.01.02 905 Road way excavation ( using hydraulic excavator) including disposal upto 10m and lift upto 1.5 m etc. , trimming bottom and side slopes in accordance with
requirements of lines, grades and cross sections all complete as per specification.

64
Road way excavation ( using hydraulic excavator) including disposal upto 10m and lift upto 1.5 m etc. , trimming bottom and side slopes in accordance with
requirements of lines, grades and cross
m3 sections all complete as per specification.
m3
a)soil/Gravels/B.M.S. Unskilled md 0.006 fuel L 0.340 Excavator Hr 0.017
Hydraulic excavator
0.9 cum bucket
capacity @ 60 cum
per hour

a-1) for lead upto 1 Km fuel L 0.132 Tipper Hr 0.044 Tipper 5.5 cum
capacity, 4 trips per
hour

b) ordinary Rock Unskilled md 0.006 fuel L 0.500 Excavator Hr 0.025

Hydraulic
excavator 0.9
cum bucket
capacity @ 60
cum per hour
b-1) for lead upto 1 Km fuel L 0.135 Tipper Hr 0.045 Tipper 5.5 cum
capacity, 4 trips
per hour

c) Hard Rock witout blasting Unskilled md 0.300 fuel L 0.500 Excavator with Hr 0.170
rock breaker Hydraulic
excavator 0.9 cum
bucket capacity @
60 cum per hour

65
skill md 0.01 fuel L 0.130 Tipper Hr 0.180 Tipper 5.5 cum
capacity,
manualloading

9.02.1 905 Earth work excavation for drain Add 3% of


(manual) and trenches including Labour cost
shoring, struting, bracing, for T and P
sheeting and disposal upto 10m
and lift upto 1.5 m etc. all
complete as per specification.

m3
a) Soft soil Unskilled md 0.90
b)Hard soil/Gravels/B.M.S. Unskilled md 1.50
c) Soft Rock Unskilled md 3.00
d) Hard Rock
i) without blasting Unskilled md 16.00 Add 20 % of
total cost for
ii) with blasting
Dewatering
I) Manual drilling Unskilled md 4.50 Gelatin kg 0.25 and 10 % of
blaster md 0.12 Detonator no 2 total cost for
fusewire m 2 Shoring and
II) Mechanical Drilling Unskilled md 1.75 Gelatin kg 0.25 Compressor & shuttering.
blaster md 0.12 Detonator no 2 drill hr 0.4
fusewire m 2 or Portable Rock
drill hr 1.2
iii)Using chemicals Compressor &
I) Manual drilling skilled md 0.12 Chemicals Kg 5 drill hr 0.4
Unskilled md 5.00 or Portable Rock
II) Mechanical Drilling skilled md 0.15 Chemicals Kg 5 drill hr 1.2
Unskilled md 2.00

66
9.02.2 905 Earth work excavation for drain ( using hydraulic excavator) and trenches including shoring, struting, bracing, sheeting and disposal upto 10m and
lift , trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections all complete as per specification.

m3 As specified in item no 9.01.2


Add 20 % of total cost for Dewatering and 10 % of total cost for Shoring and shuttering.

9.03 905 Haulage of excavated material Add 3% of


beyond 10 m upto 50m. labour cost
a) Soil material m3 Unskilled md 0.27 for T & P
3
b) Rock material m Unskilled md 0.33

9.04 905 Vertical lift of excavated material Add 3% of


above 1.5 m for every Labour cost
additional1.5 meter. m3 for T & P
a) Soil material Unskilled md 0.12
b) Rock material Unskilled md 0.15

9.05 909 Formation of embankment


including compaction in layers not
exceeding 150mm. Compacted
depth, watering and haulage 10m.
Add 3% of
etc. all complete as per 3
specification. m Unskilled md 0.50 suitable materialcu.m 1.1 Roller 8-10t hr 0.017 Labour cost
fuel lit. 0.08 for T & P
water lit. 100

9.05.01 909 m3 Skilled md 0.002 suitable materialcu.m 1.1 Grader hr 0.005


Formation of embankment
including compaction in layers not
exceeding 150mm compacted
depth, watering and haulage 10m
etc. all complete as per
specification

67
Formation of embankment
including compaction in layers not
exceeding 150mm compacted
depth, watering and haulage 10m
etc. all complete as per
specification Unskilled md 0.008 deisel lit. 0.12 Roller
water lit. 100 (8-10t) hr 0.017

Note :i) Add 10 % of the total rate ( except for transporation of material) for necessary testing as per specifications.
ii) On contracts with the provision of lab. setup and operation as a separate BOQ item, the above mentioned addition of 10% is not applicable

9.05.02 909 m3 Un Skilled md 0.500 suitable materialcu.m 1.1


A)Formation of embankment (
Manually filling) including
compaction in layers not
exceeding 150mm compacted
depth, watering and haulage 10m
etc. all complete as per
specification water lit. 100 water lit. 100

B) Excluding water spray m3 Un Skilled md 0.250 suitable materialcu.m 1.1

Note :i) Add 10 % of the total rate ( except for transporation of material) for necessary testing as per specifications.
ii) On contracts with the provision of lab. setup and operation as a separate BOQ item, the above mentioned addition of 10% is not applicable

9.06 909 Formation of rockfilled


embankment including
compaction in layers not m3
Unskilled md 1.27 rock material Add 3% of
exceeding 450mm. watering and
including brokencu.m 1.1 Roller 8-10t hr 0.017 Labour cost
haulage 10m. etc. all complete as
per specification. fragments for T & P
fuel lit. 0.08

68
water lit. 50
Note : i) Add 5 % of the total rate ( except for transporation of material) for necessary testing as per specifications.
ii) On contracts with the provision of lab. setup and operation as a separate BOQ item, the above mentioned addition of 5 % is not applicable
9.07.01 907 Excavation for foundation through
all types of soil including relevant
lift and disposal upto 20m.
m3
a)Depth upto 1.5m Unskilled md 2.00 Add 3% of
b)Depth more than 1.5m upto 3m Unskilled md 3.00 Labour cost
c)Depth more than 3m upto 4.5m Unskilled md 4.00 for T & P
d)Depth more than 4.5upto 6m Unskilled md 4.75
e)Depth of foundation more than 6m Increase by 30% for every additional meter depth of foundation over the rate for the previous depth.

Excavation for foundation through


9.07.02 907 soft Add 3% of
rock including relevant lift and
disposal Labour cost
upto 20m. m3 Use roadway excavation for soft rock item with addition of applicable lift. for T & P

Excavation for foundation through


9.07.03 907 hard Add 3% of
rock including relevant lift and
disposal Labour cost
upto 20m. m3 Use roadway excavation for hard rock item with addition of applicable lift. for T & P

Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction
of shoring and bracing,removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavation
9.07.04 907 earth to the extent required
upto

69
a) soil up to 3 m depth

Hydraulic
excavator 0.9
cum bucket
capacity @ 60
m3 Skilled md 0.001 fuel L 0.5 Excavator Hr 0.025 cum per hour
Unskilled md 0.03
Cost of dewatering upto 5 per cent of total cost may be added, where required.

The excavated earth can be used partially for backfilling of foundation pit and partly for road work
except for marshy soil. Hence cost of disposal has not been added

Cost of shoring and shuttring upto 1 per cent of total cost may be added for open foundation , where required.
Hydraulic
excavator 0.9
cum bucket
b) Ordinary rock up to 3 m m3 Skilled md 0.001 fuel L 0.67 Excavator Hr 0.033 capacity
Unskilled md 0.03
Cost of dewatering upto 10 per cent of total cost may be added, where required.
Cost of shoring and shuttring upto 1 per cent of total cost may be added for open foundation , where required.

a) soil 3 m - 6 m depth Hydraulic


excavator 0.9
cum bucket
m3 Skilled md 0.002 fuel L 0.58 Excavator Hr 0.029 capacity
Unskilled md 0.038
Cost of dewatering upto 7.5 per cent of total cost may be added, where required.
The excavated earth can be used partially for backfilling of foundation pit and partly for road work
except for marshy soil. Hence cost of disposal has not been added
Cost of shoring and shuttring upto 1 per cent of total cost may be added for open foundation , where required.

70
a) soil above 6 m depth Hydraulic
excavator 0.9
cum bucket
m3 Skilled md 0.002 fuel L 0.68 Excavator Hr 0.034 capacity
Unskilled md 0.056
Cost of dewatering upto 10 per cent of total cost may be added, where required.
The excavated earth can be used partially for backfilling of foundation pit and partly for road work
except for marshy soil. Hence cost of disposal has not been added
Cost of shoring and shuttring upto 1 per cent of total cost may be added for open foundation , where required.

9.08 907 Addition to the rate of excavation Add the following percentage of unit rate of foundation excavation depending on the soil type & ratio of water table height to foundation
for foundation due to the presence depth.
of water during foundation m3
Unit refers to the unit of excavation for foundation
excavation and foundation works.
soil type Pervious Impervious
Gravelly sandy fine-grained soil
Hw:Df
<o 0 0 0 0
0~0.2 20% 14% 7% 4%
0.2~0.4 40% 28% 14% 7%
0.4~0.6 60% 40% 20% 10%
0.6~0.8 90% 60% 30% 15%
0.8~1.0 120% 80% 40% 20%
>1 150% 100% 50% 25%
Note:-i) Hw-Height of water table/ level from the bottom of foundation during working season.
ii) Df- Depth of the bottom of foundation from the ground.
iii) This is applicable where depth of water above ground level is less than 0.5m. For greater depth of water above ground level, separate
norms specific to site condition has to be developed.

71
9.09 907 Providing and fixing, sheeting, m3 unit refers to the unit of excavation for foundation
(3-7) struting, shoring, bracing, and
making coffer dam during Timber (planks, 3
skilled md 0.10 wailing, strut m 0.02
foundation excavation and 3
m unskilled md 0.10 etc).
foundation works and removing
after completion spike/nails Kg 0.12
Note:This may be added in the rate of relevant item of foundation excavation if required due to space restrictions, geo-environmental conditions etc.

9.10.01 908 Back filling in layers in foundation Add 3% of


pits, trenches , etc, including Labour cost
compaction and watering etc. for T & P
complete, lead 10m.
m3
a) Depth of foundation upto 1.5m unskilled md 1.14 suitable material vibrator roller
b) Depth more than 1.5upto 3m unskilled md 1.62 excavated for foundation 1-1.5 t capacity hr 0.11
c) Depth more than 3m upto 4.5m unskilled md 2.1 to be used.
d) Depth more than 4.5m upto 6m unskilled md 2.58 Diesel L 0.11
e) Depth more than 6m.
Increase by 30% for every additional meter depth of foundation over the rate for the previous depth.
Note : i) Add10% of the total rate ( except for transporation of material) for necessary testing as per specifications.
ii) On contracts with the provision of lab. Setup and operation as a separate BOQ item, the above mentioned addition of 10% is not applicable.

9.10.02 908 Back filling in layers in foundation Add 3% of


pits, trenches , etc, including Labour cost
compaction all complete, lead for T & P
10m.
m3
a)with out watering unskilled md 0.25 suitable material
b) with watering unskilled md 0.25 excavated for foundation
Note : i) Add10% of the total rate ( except for transporation of material) fortonecessary
be used. testing as per specifications.
ii) On contracts with the provision of lab. Setup and operation as a separate BOQ item, the above mentioned addition of 10% is not applicable.

72
9.11 905 Excavation and disposal of slides Add 3% of
manually haulage distance upto m3 Labour cost
50m
for T & P
a) Soft soil unskilled md 0.6
b) Hard soil unskilled md 0.8
c) Soft Rock unskilled md 1.6
d) Hard Rock Refer Road way excavation

9.12 905 Excavation and disposal of slides


by Loader haulage distance upto
50m
( assumption
fuel for slide Loader ( 1.5 cum
unskilled md 0.002 Lit 0.216 hr 0.0180 56 cum per
removal bucket)
m3 hour)
fuel for
movement of
Lit DX2.0 Loader hr DX0.2
loader upto site Add 3% of total
and return back cost for T & P
Hard Rock Refer Road way excavation

Norms for Rate Analysis


Activity Group:- 10: Sub grades
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.

73
Subgrade construction and Note:- Add 10%
preparation of formationin in of the total rate ,
cutting (other than rock ( except
10.01 1003 Skilled md 0.01 Diesel lit 0.122 Grader (75 Hp) hr 0.01 Transportation
excavation) including disposal of
material upto10m . cost for quality
control as perr
specification)
specification
m3 Unskilled md 0.10 Roller 8-10t hr 0.017
for
3
10.02 1003 Subgrade construction preparation Skilled md 0.01 Sub grade material m 1.10 Grader (75 Hp) hr 0.02 this activity
3
and formation of subgrade in rock m Unskilled md 0.10 Diesel lit 0.122 Roller 8-10t hr 0.017 group.
cutting with regulating course of Water lit 100.00
natural materials.

10.03 1003 Subgrade Construction with loose m3 Skilled md m3


0.01 Suitable material. 1.10 Grader (75 Hp) hr 0.02
untreated materials; preparation and Unskilled md 0.10 Diesel lit 0.122 Roller 8-10t hr 0.017
formation of subgrade in fill areas; Water lit 100.00
10.04 1004 Subgrade Construction with treated m3 Skilled md m3
0.01 Suitable material. 1.10 Grader (75 Hp) hr 0.02
materials formation of capping Unskilled md 0.10 Diesel lit 0.122 Roller 8-10t hr 0.017
layer as per specification Water lit 100.00
10.05 1003 Preparation of sub-grade for
rehabilitation or other similar works
(filling or cutting depth of 10 to 20
cm) in:
a)common soil m2 Unskilled md 0.15 add 3% for T&P
2
b)gravel & boulder mixed soil m Unskilled md 0.30 add 3% for T&P

10.06 1005 Sub-grade construction with m3 Skilled md 0.01 Stabiliser(Additive Grader (75 Hp) hr 0.040
mechanical stabilisation. Unskilled md 0.10 materials) m3 0.20 Roller 8-10t hr 0.017
Diesel lit 0.122
Water lit 100.00
10.07 1006 Sub-grade construction with lime m3 Skilled md 0.01 Lime t as speci- Mixer equipment hr 0.020

74
stabilisation. Unskilled md 0.50 fied Spreader hr 0.001
Grader (75 Hp) hr 0.040
Roller 8-10t hr 0.017

75
Norms for Rate Analysis
Activity Group:- 12 : Sub-base, Base
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
12.01 1201 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.2800 Grader hr 0.0220 Add 5 % of total
watering, levelling and Unskilled md 0.0400 Diesel lit 0.7920 Vibrator Rolller hr 0.0220 cost for quality
compaction of natural sand gravel Water bowser hr 0.0380
control as per
subbase grading as per table 12.1 specification.
Loader hr 0.0110 For all items
of standard specification lead upto
10m specified in
clause 1200
12.02 1201 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.2800 Road roller hr 0.0300 for manual works
watering, levelling and Unskilled md 1.0500 Diesel lit 0.6600
compaction of natural sand gravel
subbase grading as per table 12.1
of standard specification lead upto
10m (for manual works).

12.03 1202 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.3000 Grader hr 0.0220
watering, levelling and Unskilled md 0.0400 Diesel lit 0.7920 Vibrator Rolller hr 0.0220
compaction of crusher run Water bowser hr 0.0380
materials for sub-base course
Loader hr 0.0110
grading SB1* lead upto 10m.

12.04 1202 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.3000 Road roller hr 0.0300
watering, levelling and Unskilled md 1.4000 Diesel lit 0.6600
compaction of crusher run
materials for sub-base course
grading SB1* lead upto 10m. (for
manual works)

12.05 1202 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.3000 Grader hr 0.0220
watering, levelling and
compaction of crusher run
materials for subbase course
grading SB2*lead upto 10m.

76
Providing, laying, spreading,
watering, levelling and Unskilled md 0.0400 Diesel lit 0.7920 Vibrator Rolller hr 0.0220
compaction of crusher run Water Bowser hr 0.0380
materials for subbase course
Loader hr 0.0110
grading SB2*lead upto 10m.

12.06 1202 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.3000 Road roller hr 0.0300 for manual works
watering, levelling and Unskilled md 1.4000 Diesel lit 0.6600
compaction of crusher run
materials for subbase course
grading SB2*lead upto 10m. (for
manual works)

12.06 1202 Providing, laying, spreading, cu.m. Skilled md 0.0050 Base agg. cu.m. 1.2000 Grader hr 0.0330
watering, levelling and Unskilled md 0.0200 Diesel lit 0.9900 Vibrator Rolller hr 0.0330
compaction of crusher run Water Bowser hr 0.0330
materials for base course lead
Loader hr 0.0110
upto 10m.

12.07 1202 Providing, laying, spreading, cu.m. Skilled md 0.0050 Base agg. cu.m. 1.2000 Road roller hr 0.0400 for manual works
watering, levelling and Unskilled md 1.5000 Diesel lit 0.8800
compaction of crusher run
materials for base course lead
upto 10m (for manual works).

12.08 1203 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.2800 Grader hr 0.0240
watering, levelling and UnSkilled md 0.0200 Diesel lit 1.0500 Vibrator Rolller hr 0.0240
compaction of waterbound Stone dust cu.m. 0.2660 Water Bowser hr 0.0500
Macadam subbase course class
Loader hr 0.0110
E1* lead upto 10m

12.09 1203 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.2800 Road roller hr 0.0400 for manual works
watering, levelling and UnSkilled md 1.5000 Diesel lit 0.8800
compaction of waterbound Stone dust cu.m. 0.2660
Macadam subbase course class
E1* lead upto 10m (for manual
works).

77
Providing, laying, spreading,
watering, levelling and
compaction of waterbound
Macadam subbase course class
E1* lead upto 10m (for manual
works).

12.10 1203 Providing, laying, spreading, cu.m. Skilled md 0.0050 Base agg. cu.m. 1.2000 Grader hr 0.0360
watering, levelling and UnSkilled md 0.0200 Diesel lit 1.1970 Vibrator Rolller hr 0.0360
compaction of waterbound Stone dust cu.m. 0.2660 Water Bowser hr 0.0500
Macadam base course class D1*
Loader hr 0.0110
grading 1 or grading 2 lead upto

12.11 1203 Providing, laying, spreading, cu.m. Skilled md 0.0050 Base agg. cu.m. 1.2000 Road roller hr 0.0400 for manual works
watering, levelling and comp- UnSkilled md 1.5300 Diesel lit 0.8800
action of waterbound Macadam Stone dust cu.m. 0.2660
base course class D1* grading 1
or grading 2 lead upto 10m. (for
manual works)

12.12 1205 Providing, laying, spreading, cu.m. Skilled md 0.0050 Aggregates cu.m. 1.2200 Grader hr 0.0360
watering, levelling and UnSkilled md 0.0200 Diesel lit 1.1970 Vibrator Rolller hr 0.0360
compaction of natural sand gravel Water Bowser hr 0.0500
wearing course class -1/class -2
Loader hr 0.0110
lead upto 10m.

12.13 1205 Providing, laying, spreading, cu.m. Skilled md 0.0050 Aggregates cu.m. 1.2200 Road roller hr 0.0900 for manual works
watering, levelling and UnSkilled md 1.5000 Diesel lit 1.9800
compaction of natural sand gravel
wearing course class -1/class -2
lead upto 10m. (for manual works)

12.14 1206 Providing, laying, spreading, cu.m. Skilled md 0.8000 Block Stone cu.m. 1.0000 Road roller hr 0.0400
watering, levelling and UnSkilled md 1.6000 Sand or
compaction of Telford base (Block Quarry dust cu.m 0.3500
Pitching) lead upto 10m
Diesel lit 0.8800

78
12.15 1207 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.2800 Grader hr 0.0240
levelling and compaction of dry UnSkilled md 0.0180 Diesel lit 0.6500 Vibrator Rolller hr 0.0240
bound Macadam base course Stone dust cu.m. 0.2660 Loader hr 0.0110
class E1* lead upto 10m.

12.16 1207 Providing, laying, spreading, cu.m. Skilled md 0.0050 Subbase agg. cu.m. 1.2800 Road roller hr 0.0400
levelling and comp- action of dry UnSkilled md 1.5000 Diesel lit 0.8800
bound Macadam base course Stone dust cu.m. 0.2660
class E1* lead upto 10m. (for
manual works)

12.17 1207 Providing, laying, spreading, cu.m. Skilled md 0.0050 Base agg. cu.m. 1.2000 Grader hr 0.0360
levelling and compaction of dry UnSkilled md 0.0180 Diesel lit 0.7700 Vibrator Rolller hr 0.0360
bound Macadam base course Loader hr 0.0110
class D1* grading 1 or grading 2
Stone desert cu.m 0.2660
lead upto 10m.

12.18 1207 Providing, laying, spreading,


levelling and compaction of dry
bound Macadam base course
class D1* grading 1 or grading 2
lead upto 10m (for manual works)

cu.m Skilled md 0.0050 Base agg. cu.m 1.1200 Road roller hr 0.04
UnSkilled md 1.5000 Diesel lit 0.8800
Stone dust cu.m 0.2660

79
Norms for Rate Analysis
Activity Group:- 13 : Bituminous Surface and Base Course
Spec. Resources
Activity
Nos
Clause Description of works Labour Materials Equipment Remarks
Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
13.01 1301 Providing and spraying bituminious lit Skilled md 0.0030 Bitumen lit 1.05 Boiler hr 0.0025 Add 5 % of total
1302 tack coat MC30/MC70 including UnSkilled md 0.0460 MC30/MC70 Sprayer hr 0.0025 cost for quality
cleaning the road surface using wire, control as per
kerosene lit 0.10 Air compresser hr 0.0030
specification.
brushes, broom etc. before applying Diesel lit 0.28 For all items
tack coat. specified in
clause 1300
13.02 1301 Providing and spraying bituminious lit Skilled md 0.0030 Bitumen lit 1.05 Boiler hr 0.0140
1302 tack coat MC30/MC70 including UnSkilled md 0.0460 MC30/MC70 Hand Sprayer hr 0.0140
cleaning the road surface using wire, kerosene lit 0.10
brushes, broom etc. before applying
tack coat.
(for manual works)

13.03 1301 Providing and spraying bituminious lit Skilled md 0.0030 Bitumen lit 1.05 Boiler hr 0.0025
1302 prime coat MC30/MC70 including UnSkilled md 0.0460 MC30/MC70 Sprayer hr 0.0025
cleaning the road surface using wire, kerosene lit 0.10 Air compresser hr 0.0030
brushes, broom etc. before applying Diesel lit 0.28
prime coat.

13.04 1301 Providing and spraying bituminious lit Skilled md 0.0030 Bitumen lit 1.05 Boiler hr 0.0140
1302 prime coat MC30/MC70 including UnSkilled md 0.0460 MC30/MC70 Hand Sprayer hr 0.0140
cleaning the road surface using wire, kerosene lit 0.10

80
brushes, broom etc. before applying
prime coat.
(for manual works)
13.05 1301 Surface Dressing
13.05 1301 Laying of single/double /multiple
1303 bituminous coats for surface dressing
using river gravels ( grits) , shingles or
broken stone chips including
compactation
13.05.01 1301 Bitumen binder for surface dressing lit Skilled md 0.0020 Bitumen 80/100open lit 1.05 Boiler hr 0.0025
1303 (Mass Work) UnSkilled md 0.0140 Kerosene lit 0.10 Distributor hr 0.0025
Diesel lit 0.27 Air compresser hr 0.0025 Mass Work

13.05.02 1301 Bitumen binder for surface dressing lit Skilled md 0.0030 Bitumen 80/100 lit 1.05 Boiler hr 0.0040
1303 (Patch Work) UnSkilled md 0.0520 Kerosene lit 0.10 Distributor hr 0.0040
Diesel lit 0.11 Air compresser hr 0.0040 Patch Work

13.05.03 1301 Cutter for bitumen grade 80/100 lit Skilled md 0.00 Cutter(Diesel or Tools and plants 3%
1303 UnSkilled md 0.00 Kerosene) lit 1.00 labour Costs

13.05.04 1301 Chipping for surface dressing for t Skilled md 0.00 Chips t 1.05 Chips spreader hr 0.1000
1303 1st coat size or 2nd coat size UnSkilled md 0.21 Diesel lit 3.60 Tyred Roller hr 0.2000

13.05.05 1301 Production of precoated chipping cu.m. Skilled md 0.04 Bitumen MC30 lit 14.00 Wheel Loader hr 0.1000
1303 UnSkilled md 0.30 Kerosene lit 0.70 Tractor hr 0.2000
Chips t 1.73 Boiler hr 0.0350
13.06 1301 Penetration Mecadam
for item related
1304
to 13.06 If Qty of
13.06.01 1301 Providing and laying semi-grouting 10 Skilled md 0.21 Bitumen lit 35.00 Boiler hr 0.07 bitumen is
1304 with compaction 50mm thickness sq.m UnSkilled md 1.80 Kerosene lit 0.16 Roller hr 0.07 changed then
proportionally
modify the Qty
of kerosene

81
for item related
to 13.06 If Qty of
bitumen is
changed then
Diesel lit 2.52 Sprayer hr 0.07 proportionally
Coarse agg. cu.m 0.60 Agg. Spreader hr 0.07 modify the Qty
of kerosene
Key agg. cu.m 0.15
13.06.02 1304 Providing and laying semi-grouting 10 Skilled md 0.21 Bitumen lit 52.00 Boiler hr 0.07
with compaction 75mm thickness sq.m UnSkilled md 2.45 Kerosene lit 0.25 Roller hr 0.07
Diesel lit 2.52 Sprayer hr 0.07
Coarse agg. cu.m 0.90 Agg. Spreader hr 0.07
Key agg. cu.m 0.18

Providing and laying full-grouting


13.06.03 1301 with Skilled md 0.21 Bitumen lit 50.00 Boiler hr 0.07
10
1304 compaction 50mm thickness sq.m UnSkilled md 1.80 Kerosene lit 0.25 Roller hr 0.07
Diesel lit 2.52 Sprayer hr 0.07
Coarse agg. cu.m 0.60 Agg. Spreader hr 0.07
Key agg. cu.m 0.15

13.07 1301 Providing and laying sand Seal 10 Skilled md 0.10 Bitumen lit 6.60 Boiler hr 0.04
1305 sq.m UnSkilled md 0.14 Kerosene lit 0.10 Roller hr 0.04
Diesel lit 0.81 Sprayer hr 0.01
Fine aggregates cu.m 0.12
13.08 1301 Providing mixing and laying slurry
1306 seal

13.08.01 1301 Fine slurry mix 100 Skilled md 0.20 Aggregate cu.m 0.49 Mixer hr 0.07 Add 3% of
1306 sq.m UnSkilled md 3.00 Emulsion lit 122.00 Pneumatic Tyred hr 0.55 labour cost for
Cement Kg 8.30 Roller T& P.
water LS
Diesel lit 8.40

13.08.02 1301 Normal slurry mix 100 Skilled md 0.20 Aggregate cu.m 0.56 Mixer hr 0.08 Add 3% of

82
1306 sq.m UnSkilled md 3.00 Emulsion lit 139.00 Pneumatic hr 0.55 labour cost for
Cement Kg 9.40 Roller T& P.
water LS
Diesel lit 8.40
13.08.03 1301 Coarse slurry mix 100 Skilled md 0.20 Aggregate cu.m 0.67 Mixer hr 0.09 Add 3% of
1306 sq.m UnSkilled md 3.00 Emulsion lit 167.00 Pneumatic Tyred hr 0.55 labour cost for
Cement Kg 11.30 Roller T& P.
water LS
Diesel lit 8.4000

13.09 1307 Providing, mixing, laying and cu.m Skilled md 0.45 Bitumen lit 77.0000 Roller hr 0.50
1308 compaction of premixed carpet UnSkilled md 4.50 Kerosene lit 7.7000 Sprayer hr 0.50
Aggregates cu.m 1.2000

13.10 1307 Providing mixing and laying asphaltcu.m Skilled md 0.03 Bitumen lit 117.0000 Asphalt Mixing Plant hr 0.044
1308 concrete with compaction UnSkilled md 0.13 Cement t 0.0220 wheel Loader hr 0.66
Foreman md 0.01 Diesel lit 10.4500 Asphalt Paver hr 0.22
Aggregates cu.m 1.20 Steel tyred Roller hr 0.55
Pneumatic Roller hr 0.55
Tipper, Trucks hr 0.32

13.11 1307 Providing mixing and laying sand cu.m Skilled md 0.03 Bitumen lit 117.00 Asphalt Mixing Plant hr 0.025
1309 asphalt UnSkilled md 0.13 Cement t 0.02 wheel Loader hr 0.066
Foreman md 0.01 Diesel lit 10.45 Steel tyred Roller hr 0.022
Sand cu.m 0.95 Pneumatic Roller hr 0.025
Tipper, Trucks hr 0.025

13.12 1307 Providing mixing and laying emulsion


cu.m Skilled md 0.02 Emulsion lit 15.00 Asphalt Mixing Plant hr 0.110
1310 aggregates mix UnSkilled md 0.02 Diesel lit 10.45 wheel Loader hr 0.066

83
Aggregates cu.m 1.20 Asphalt Paver hr 0.220
Steel tyred Roller hr 0.055
Pneumatic Roller hr 0.055
Tipper, Trucks hr 0.352
13.13 1311 Providing mixing and laying cold cu.m Skilled md 0.05 Emulsion lit 13.00 Asphalt Mixing Plant hr 0.020
asphalt UnSkilled md 0.20 Agg. 10mm cu.m 0.09 wheel Loader hr 0.066
Agg. 6mm cu.m 0.03 Steel tyred Roller hr 0.220
Diesel lit 0.15 Pneumatic Roller hr 0.025
Kerosene lit 0.10 Tipper, Trucks hr 0.025

13.14 1312 Ottaseal


Providing and Laying of
single/double /multiple, bituminous
coats for ottaseal using river cut backBitumen
gravels ( grits) , shingles 10 Skilled md 0.10 lit 10.50 Boiler / heater tank hr 0.04 Add 3% of
MC 3000
including compaction sq.m UnSkilled md 0.14 Kerosene lit 0.10 Roller hr 0.08 labour cost for
Diesel lit 1.10 Sprayer hr 0.01 T& P.
Aggregates cu.m 0.16

Mobilization and Demobilization of


Platnts , Equipments and material In case of work area are scattered and located at least 100 m away from one location to
13.14 1300
other add 20 % of total cost to scattered locations work for item no 13.01-13.13

84
Norms for Rate Analysis
Activity Group:- 14 : Kerbs and footpath.
Spec. Resources
Activit
Clause Description of works Labour Materials Equipment Remarks
y No Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
14.01 1401 Providing and laying M 20/20
Precast or Cast in situ concrete in Nominal Kerb size
kerbs with 12mm thick 1:3 cement 38cmX20cmx25c
sand mortar bedding and joints m.(HXBXL)
Foundation
including foundation excavation
concrete or sand
levelling etc. but excluding
gravel to be
foundation concrete or sand gravel m skilled md 0.100 M 20 / 20 measured and
materials.
unskilled md 0.500 concrete m3 0.080 paid separately as
required from
Cement kg 1.300 respective clause
Sand m3 0.003 of specification.
Water l 0.500 Refer activity no.20.02
Form work m2 1.000 Refer activity no.18.07
14.02 1402 Providing and laying concrete or
natural stone footpath on 12mm
thick 1:3 cement sand mortar over
the prepared base:.
a) 50mm.thick Precast or cast in m2 skilled md 0.200 M 20 / 20 Nominal size of concrete
situ concrete unskilled md 0.600 concrete m3
0.055 block 60cmX60cmx5cm.
Cement kg 6.500 Refer activity no.20.02
Sand m3 0.013
Water l 2.000
b)25mm.thick natural stone slab m2 skilled md 0.150 Minimum size of stone slab
unskilled md 0.450 Stone slab m2 1.100 30cmX30cmx2.5cm.
Cement kg 6.500

85
Sand m3 0.013
Water l 2.000

Alternate base structure(Suitable base to be choosen)


i) 150mm thick granular base Refer norms
3
m 0.165 for base
or
ii) 30mm thick M 15/20 concrete base Refer norm for
m3 0.033 concrete
or
iii) Flat Brick soling as per spec. 1403 m2 1.000 Refer activity no.14.03
14.03 1403 a)Providing and laying bricks on
edge over 60mm thick sand bed
in footpath including excavation, m2
skilled md 0.100 Bricks no. 75.00
sand bedding etc. complete.
unskilled md 0.200 Sand m3 0.070
1403 b)Providing and laying flat bricks
over 60mm thick sand bed
including excavation, sand m2
skilled md 0.050 Bricks no. 40.00
bedding etc. complete.
unskilled md 0.100 Sand m3 0.070

Providing and laying bitumineous


14.04 1404

footpath as per specification and


design.
a) Providing and laying
subbase/base Refer relevant item under activity group 12 of this norms
b) Providing and laying bituminous
surfacing Refer relevant item under activity group 13 of this norms
Providing and constructing cycle
14.05 1405 tracks

86
as per specification and design.
Refer relevant items under activity group 10,12 and 13 of this norms

Norms for Rate Analysis


Activity Group:- 15 : Traffic signs and Road marking.
Spec. Resources
Activit
Clause Description of works Labour Materials Equipment Remarks
y No Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
15.01 1501 Supplying and erecting traffic sign
in place including 50mm dia. Steel
tube, 2mm. thick steel plate,
cement concrete, painting, writing
and supporting steel angle nut
and bolit etc. complete.
a) 60cm. Dia. Circular, 60cm.
equilateral traingle and 60cm.x no skilled md 0.033 Enamel paint lit 0.100
45cm. rectangular shaped sign m3
unskilled md 0.088 M10/40 PCC 0.030 Refer activity no.20.01
(single post). 2
Steel plate m 0.250
2
Formwork (F1) m 0.360 Refer activity no.18.01
Steel tube m 2.500
b) 1.2m.x 0.75m. Size bigger
traffic sign with back support and no skilled md 0.085 Enamel paint lit 0.400
two or more post. m3
unskilled md 0.300 M10/40 PCC 0.120 Refer activity no.20.01
Steel plate m2 1.000
2
Formwork (F1) m 1.000 Refer activity no.18.01
Steel tube m 5.000
15.02 1502 Supplying and applying paint for
Road marking including cleaning,
watering, brooming etc. all
complete (10cm. wide strip).

87
a) Two coats over old painted Road marking
surface m skilled md 0.003 paint
unskilled md 0.005 lit 0.042
b) More than two coats over new m skilled md 0.005 Road marking
bitumin surface unskilled md 0.007 paint lit 0.075
15.03 1503 Supplying and placing R.C.C.
kilometer post including
excavation, back filling, painting
and writing etc. all complete as
per specification.
a) Standard kilometer post no skilled md 0.200 M15/20 RCC m3 0.100
(placed at each km.) unskilled md 0.200 M10/40 PCC m3 0.170
2
Formwork (F3) m 1.370 Refer activity no.18.07
primer lit 0.140 for exposed face 0.95 sqm
Enamel paint lit 0.250
Reinforcement bar kg 5.920 Refer activity no.20.07

b) Bigger kilometer post (placed at no skilled md 0.410 M15/20 RCC m3 0.200


each 5 km.) unskilled md 0.440 M10/40 PCC m3 0.200
2
Formwork (F3) m 2.460 Refer activity no.18.07
primer lit 0.140 for exposed face 1.75 sqm
Enamel paint lit 0.430
Reinforcement bar kg 10.600 Refer activity no.20.07
15.04 1504 Supplying and fixing in place
R.C.C. delineator and guard post
including excavation, back filling,
painting and erection etc. all
complete as per drawing.
no skilled md 0.021 M20/20 RCC m3 0.034
2
unskilled md 0.055 Formwork (F3) m 0.900 Refer activity no.18.07

88
primer lit 0.030
Enamel paint lit 0.070
Reinforcement bar kg 3.76 Refer activity no.20.07

Lettering with approved brand


15.05 paint on Kilometer post and traffic Add 3 % for brush and
sign ( 15 cm height ) letter painter md 0.060 Enamel paint lit 0.006 other tools
unskill 0.020

Norms for Rate Analysis


Activity Group:-16: Piling for structures
Spec. Resources
Activity
Clause Description of works Labour materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
16.01 1605 Manufacturing and providing pre- Refer relevant
cast RCC pile of specified size activity numbers
and quality including for rate of
reinforcement and steel shoe as concrete,
m reinforcement
per specification and drawing etc.
and formwork.
all complete.
a)Pile size 300mm X 300mm m Skilled md 0.38 Concrete m3 0.10 Reinforcement
assumed @
Unskilled md 0.25 Reinforcement kg 20.00
2.5% of the
Steel shoe kg 7.60 concrete.
Form work m2 0.90
b)Pile size 350mm X 350mm m Skilled md 0.42 Concrete m3 0.13
Unskilled md 0.28 Reinforcement kg 26.00
Steel shoe kg 8.40
Form work m2 1.05
c)Pile size400mm X 400mm m Skilled md 0.46 Concrete m3 0.17
Unskilled md 0.31 Reinforcement kg 33.00

89
Steel shoe kg 9.20
Form work m2 1.20
Remarks:- 1.For determining the rate of concrete refer the norms for concrete.
2.For detemining the rate of reinforcement refer the norms for reinforcement.
3.For rate of formwork refer the norms of formwork for precast elements.
4. For other size of the piles, norms shall be derived by extrapolation.
5. Quantity of reinforcement shown is as per general practice. Actual quantity if needed may be calculated
as per design/drawings.
16.02 1607 Instaling and driving pre-cast
RCC pile of specified size and
quality as per specification and
1608 drawing etc. all complete. m

a) Pile size 300mm X 300mm m skilled md 0.10 Diesel lit 20


2.00 tonne
unskilled md 1.00 capacity pile hr 0.20
driver (with all
accessories)
b) Pile size 350mm X 350mm m skilled md 0.10 Diesel lit 2.30 20 tonne
unskilled md 1.00 capacity pile hr 0.23
driver (with all
accessories)
c) Pile size 400mm X 400mm m skilled md 0.10 Diesel lit 2.70 20 tonne
unskilled md 1.00 capacity pile hr 0.27
driver (with all
accessories)
Remarks:- 1. For other size of the piles, norms shall be derived by extrapolation of pile cross section.
16.03 1612 Boring , providing and Installing
bored cast-in-situ RCC pile of
specfied diameter including
Reinforcement
reinforcement and Bentonite as assumed @ of
per specification and drawing etc. 2.5% of the
m
all complete. concrete as per
general practice.
16.03.01 In soft soil. Actual quantity if
needed may be
calculated as per
design/drawing.

90
Reinforcement
assumed @ of
2.5% of the
concrete as per
general practice.
Actual quantity if
needed may be
a) Dia .500mm m skilled md 0.24 concrete m3 0.22 Boring calculated as per
semi-skilledmd 0.76 admixture kg 0.66 equipment with hr 0.33 design/drawing.
pump
Crane & all for
(rigger ) reinforcement kg 35.00
unskilled md 3.55 bentonite kg 20.00 handling
Diesel lit 5.30 reinforcement hr 0.20
3 cage and tremie
b) Dia .600mm skilled md 0.29 concrete m 0.31 Boring
semi-skilledmd 0.91 admixture kg 0.93 equipment with hr 0.40
pump & all for
m (rigger ) reinforcement kg 49.00 Crane
unskilled md 4.26 bentonite kg 24.00 handling
Diesel lit 6.60 reinforcement hr 0.26
cage and tremie

c) Dia .700mm m skilled md 0.35 concrete m3 0.42 Boring


semi-skilledmd 1.09 admixture kg 1.26 equipment with hr 0.50
pump
Crane & all for
(rigger ) reinforcement kg 66.00
unskilled md 5.11 bentonite kg 27.00 handling
Diesel lit 8.10 reinforcement hr 0.31
cage and tremie

d) Dia .800mm m skilled md 0.42 concrete m3 0.55 Boring


semi-skilledmd 1.31 admixture kg 1.65 equipment with hr 0.60
pump
Crane & all for
(rigger ) reinforcement kg 86.00
unskilled md 6.13 bentonite kg 30.00 handling
Diesel lit 9.70 reinforcement hr 0.37
3 cage and tremie
e) Dia . 900mm skilled md 0.50 concrete m 0.70 Boring
semi-skilledmd 1.50 admixture kg 2.10 equipment with hr 0.70
pump & all for
m (rigger ) reinforcement kg 105.00 Crane
unskilled md 7.00 bentonite kg 35.00 handling
Diesel lit 11.20 reinforcement hr 0.42
cage and tremie

f) Dia .1000mm m skilled md 0.60 concrete m3 0.87 Boring


equipment with
pump & all

91
Boring
semi-skilledmd 1.80 admixture kg 2.61 equipment with hr 0.80
pump & all for
(rigger ) reinforcement kg 130.00 Crane
unskilled md 8.40 bentonite kg 39.00 handling
Diesel lit 13.00 reinforcement hr 0.50
cage and tremie

g) Dia .1200mm m skilled md 0.80 concrete m3 1.24 Boring


semi-skilledmd 0.24 admixture kg 3.72 equipment with hr 1.00
pump & all for
(rigger ) reinforcement kg 186.00 Crane
unskilled md 11.20 bentonite kg 46.00 handling
Diesel lit 16.00 reinforcement hr 0.60
cage and tremie
Remarks:- 1.For determining the rate of concrete refer the norms for concrete
2.For detemining the rate of reinforcement refer the norms for reinforcement.
3. For other size of the piles, norms shall be derived by extrapolation of pile cross section.

16.03.02
In hard soil m
a) Dia .500mm skilled md 0.60 concrete m3 0.22 Boring hr 1.10
semi-skilledmd 1.90 admixture kg 0.66 equipment with
pump
Crane & all for
m (rigger ) reinforcement kg 35.00
unskilled md 8.80 bentonite kg 20.00 handling hr 0.20
Diesel lit 13.00 reinforcement
cage and tremie

b) Dia .600mm skilled md 0.70 concrete m3 0.31 Boring


semi-skilledmd 2.20 admixture kg 0.93 equipment with hr 1.30
pump
Crane & all for
m (rigger ) reinforcement kg 49.00
unskilled md 10.00 bentonite kg 24.00 handling
Diesel lit 15.60 reinforcement hr 0.26
cage and tremie

c) Dia .700mm m skilled md 0.80 concrete m3 0.42 Boring


semi-skilledmd 2.60 admixture kg 1.26 equipment with hr 1.60
pump & all

92
(rigger ) reinforcement kg 66.00 Crane for
unskilled md 12.00 bentonite kg 27.00 handling
Diesel lit 19.10 reinforcement hr 0.31
cage and tremie

d) Dia .800mm m skilled md 1.00 concrete m3 0.55 Boring


semi-skilledmd 3.20 admixture kg 1.65 equipment with hr 2.00
pump
Crane & all for
(rigger ) reinforcement kg 86.00
unskilled md 15.00 bentonite kg 30.00 handling
Diesel lit 23.70 reinforcement hr 0.37
cage and tremie

Remarks:- 1.For determining the rate of concrete refer the norms for concrete
2.For detemining the rate of reinforcement refer the norms for reinforcement.
3. For other size of the piles, norms shall be derived by extrapolation of pile cross section.
16.04 1613 Providing, driving and installing
driven cast-in situ RCC pile of Reinforcement
specified diameter etc. complete assumed @ of
as per specification and drawing. 2.5% of the
concrete as per
16.04.01 With permanent steel shell general practice.
a) Dia 300mm m Skilled md 0.40 concrete m3 0.08 20 t.- Capacity Actual quantity if
Un-skilled md 1.20 reinforcement kg 16.00 Pile driving needed may be
equipment with calculated as
steel shell kg 7.60 hr 0.50 per
all accessories.
Casing m 1.00 design/drawings
Diesel lit 5.00 .

b)Dia 400mm m Skilled md 0.50 concrete m3 0.14 20 t.- Capacity


Un-skilled md 1.60 reinforcement kg 28.00 Pile driving
equipment with
steel shell kg 9.20 hr 0.60
all accessories.
Casing m 1.00
Diesel lit 6.00

93
c)Dia 500mm m Skilled md 0.60 concrete m3 0.20 20 t.- Capacity
Un-skilled md 2.00 reinforcement kg 40.00 Pile driving
equipment with
steel shell kg 11.50 hr 0.70
all accessories.
Casing m 1.00
Diesel lit 7.00

Remarks:- 1.For determining the rate of concrete refer the norms for concrete
2.For detemining the rate of reinforcement refer the norms for reinforcement.
3. For other size of the piles, norms shall be derived by extrapolation of pile cross section.
16.04.02 Do- do - do as above 16.04.01
With temporary steel shell Do all as above except the rate of temporary casing which is determined by considering 20 times usage, i.e. the rate of
permanent casing shall be divided by 20
16.05 1600 Providing and driving steel piles m
20 t. Capacity Add 5% of
a) Section of pile: ISHB 250 Skilled md 0.20 Diesel lit 1.00 piling equipment hr 0.10 materials
with vibro- cost for
Un-skilled md 1.00 steel kg 58.00 hammer. consumables
Like electrodes,
cutting
gas etc.
20 t. Capacity Add 5% of
b)Section of pile: ISHB 300 m Skilled md 0.24 Diesel lit 1.20 piling equipment hr 0.12 materials
with vibro- cost for
Un-skilled md 1.20 steel kg 67.00 hammer. consumables
Like electrodes,
cutting
gas etc.
20 t. Capacity Add 5% of
c)Section of pile: ISHB 350 m Skilled md 0.30 Diesel lit 1.40 piling equipment hr 0.14 materials
with vibro- cost for
Un-skilled md 1.50 steel kg 77.00 hammer. consumables
Like electrodes,
cutting

94
gas etc.
16.06 1614 Loading tests on piles including Engineer md 12.00 Pile no 1 Plotter no 1
installation of platform,loading Technicianmd 24.00 Gunny bag no 1000 Loader hr 1
arrangements,etc. & necessary no Skilled md 24.00 sand m3 50
measurements & plotting Un-skilled md 48.00 Steel beam Steel beam
hiring t 5 required for
making pile
loading
plateform.

95
Norms for Rate Analysis
Activity Group:- 17: Well foundations
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
17.01 1700 Providing and laying reinforcement
including cutting,bending,binding,
etc. for well curb, steining t Refer the norms for reinforcement

Preparing well sinking site,


17.02 1703 opening road access, making Skilled md 15 Mild steel t 1.05 Gas cutter hr 1.000
island and providing and laying t Unskilled md 15 Nuts & bolts kg 17 welding machine hr 0.500
cutting edge of mild steel et. Electrodes,
complete.. gas etc. Ls 5% of above cost
17.03 1703 Providing and laying concrete in
well curb m3 Refer the norms for concrete
17.04 1704 Providing and laying concrete in
3
well steining m Refer the norms for concrete
17.05 1704 Providing,preparing and installing sqm Refer the norms for formwork for vertical walls with height upto 3m
formwork including necessary
supports , scaffolding,etc. for well
curb,steining
17.06 1705 Sinking of well through different
type of soil and rock including
clearance of obstructions,
correction of shift and tilts etc.
complete as per specification and
drawing.

96
17.06.01 Soil type: Sandy Add 10% of the
a)Dia of well :5m m 10t.-crane with
total cost for
i)Depth upto 3m skilled md 0.6 Diesel lit 23 grab & kentledges,
semi-skilledmd 1.2 accessories.
10t.-crane with
hr 2.300 removal of
ii)Depth from 3m-6m skilled md 0.7 Diesel lit 24.0 grab & obstruction and
semi-skilledmd 1.4 accessories. hr 2.400 correction against
shift, tilt ,etc.,
10t.-crane with
iii)Depth from 6m-9m skilled md 0.8 Diesel lit 26.0 grab & hr as required
semi-skilledmd 1.6 accessories. hr 2.600

iv)Depth from 9m-12m skilled md 0.9 Diesel lit 29.0 10t.-crane with grab hr
semi-skilledmd 1.8 & accessories. hr 2.900

v)Depth from 12m-15m skilled md 1.0 Diesel lit 33.0 10t.-crane with grab hr
semi-skilledmd 2.0 & accessories. hr 3.300
10t.-crane with
vi)Depth from 15m-18m skilled md 1.2 Diesel lit 39.0 grab &
semi-skilledmd 2.4 accessories. hr 3.900
vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
b)Dia of well :6m m

i)Depth upto 3m skilled md 0.8 Diesel lit 30.0 Add 10% of the
semi-skilledmd 1.6 hr 3.000 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 0.9 0 lit 32.0 grab & removal of
semi-skilledmd 1.8 accessories. hr 3.200 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.0 Diesel lit 35.0 grab & shift, tilt ,etc., as
semi-skilledmd 2.0 accessories. hr 3.500 required.

97
10t.-crane with
iv)Depth from 9m-12m skilled md 1.1 Diesel lit 39.0 grab &
semi-skilledmd 2.2 accessories. hr 3.900
10t.-crane with
v)Depth from 12m-15m skilled md 1.2 Diesel lit 45.0 grab &
semi-skilledmd 2.4 accessories. hr 4.500
10t.-crane with
vi)Depth from 15m-18m skilled md 1.4 Diesel lit 53.0 grab &
semi-skilledmd 2.8 accessories. hr 5.300

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
c)Dia of well :7m
m 10t.-crane with
i)Depth upto 3m skilled md 1.0 Diesel lit 40.0 grab & Add 10% of the
semi-skilledmd 2.0 accessories. hr 4.000 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.1 Diesel lit 42.0 grab & removal of
semi-skilledmd 2.2 accessories. hr 4.200 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.2 Diesel lit 46.0 grab & shift, tilt ,etc., as
semi-skilledmd 2.4 accessories. hr 4.600 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 1.3 Diesel lit 51.0 grab &
semi-skilledmd 2.6 accessories. hr 5.100
10t.-crane with
v)Depth from 12m-15m skilled md 1.5 Diesel lit 58.0 grab &
semi-skilledmd 3.0 accessories. hr 5.800
10t.-crane with
vi)Depth from 15m-18m skilled md 1.8 Diesel lit 68.0 grab &
semi-skilledmd 3.6 accessories. hr 6.800

98
vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
d)Dia of well :8m m 10t.-crane with
i)Depth upto 3m skilled md 1.2 Diesel lit 45.0 grab & Add 10% of the
semi-skilledmd 2.4 accessories. hr 4.500 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.3 Diesel lit 48.0 grab & removal of
semi-skilledmd 2.6 accessories. hr 4.800 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.4 Diesel lit 52.0 grab & shift, tilt ,etc., as
semi-skilledmd 2.8 accessories. hr 5.200 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 1.6 Diesel lit 58.0 grab &
semi-skilledmd 3.2 accessories. hr 5.800
10t.-crane with
v)Depth from 12m-15m skilled md 1.8 Diesel lit 67.0 grab &
semi-skilledmd 3.6 accessories. hr 6.700
10t.-crane with
vi)Depth from 15m-18m skilled md 2.1 Diesel lit 79.0 grab &
semi-skilledmd 4.2 accessories. hr 7.900

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

17.06.02 1705 soil type: clayey


a)Dia of well :5m
m 10t.-crane with
i)Depth upto 3m skilled md 1.3 Diesel lit 40.0 grab & Add 10% of the
semi-skilledmd 2.0 accessories. hr 4.000 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.4 Diesel lit 43.0 grab & removal of
accessories.

99
10t.-crane with
grab &
semi-skilledmd 2.1 accessories. hr 4.300 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.5 Diesel lit 47.0 grab & shift, tilt ,etc., as
semi-skilledmd 2.3 accessories. hr 4.700 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 1.6 Diesel lit 52.0 grab &
semi-skilledmd 2.6 accessories. hr 5.200
10t.-crane with
v)Depth from 12m-15m skilled md 1.9 Diesel lit 60.0 grab &
semi-skilledmd 3.0 accessories. hr 6.000
10t.-crane with
vi)Depth from 15m-18m skilled md 2.2 Diesel lit 70.0 grab &
semi-skilledmd 3.5 accessories. hr 7.000

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
b)Dia of well :6m
m 10t.-crane with
i)Depth upto 3m skilled md 1.7 Diesel lit 54.0 grab & Add 10% of the
semi-skilledmd 2.7 accessories. hr 5.400 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.8 Diesel lit 57.0 grab & removal of
semi-skilledmd 2.8 accessories. hr 5.700 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 2.0 Diesel lit 63.0 grab & shift, tilt ,etc., as
semi-skilledmd 3.1 accessories. hr 6.300 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 2.2 Diesel lit 70.0 grab &
semi-skilledmd 3.5 accessories. hr 7.000
10t.-crane with
v)Depth from 12m-15m skilled md 2.5 Diesel lit 81.0 grab &
accessories.

100
10t.-crane with
grab &
semi-skilledmd 4.1 accessories. hr 8.100
10t.-crane with
vi)Depth from 15m-18m skilled md 3.0 Diesel lit 95.0 grab &
semi-skilledmd 4.7 accessories. hr 9.500

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

c)Dia of well :7m m Add 10% of the


total cost for
10t.-crane with
i)Depth upto 3m skilled md 2.2 Diesel lit 72.0 grab & kentledges,
semi-skilledmd 3.6 accessories. hr 7.200 removal of
obstruction and
10t.-crane with
ii)Depth from 3m-6m skilled md 2.4 Diesel lit 76.0 grab & correction against
semi-skilledmd 3.8 accessories. hr 7.600 shift, tilt ,etc., as
required.
10t.-crane with
iii)Depth from 6m-9m skilled md 2.6 Diesel lit 84.0 grab &
semi-skilledmd 4.1 accessories. hr 8.400
10t.-crane with
iv)Depth from 9m-12m skilled md 2.9 Diesel lit 94.0 grab &
semi-skilledmd 4.7 accessories. hr 9.400
10t.-crane with
v)Depth from 12m-15m skilled md 3.3 Diesel lit 108 grab &
semi-skilledmd 5.4 accessories. hr 10.80
10t.-crane with
vi)Depth from 15m-18m skilled md 4.0 Diesel lit 126 grab &
semi-skilledmd 6.3 accessories. hr 12.60

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

d)Dia of well :8m m

101
10t.-crane with
i)Depth upto 3m skilled md 2.5 Diesel lit 80.0 grab & Add 10% of the
semi-skilledmd 4.0 accessories. hr 8.000 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 2.7 Diesel lit 85.0 grab & removal of
semi-skilledmd 4.2 accessories. hr 8.500 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 2.9 Diesel lit 93.0 grab & shift, tilt ,etc., as
semi-skilledmd 4.6 accessories. hr 9.300 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 3.2 Diesel lit 104 grab &
semi-skilledmd 5.2 accessories. hr 10.40
10t.-crane with
v)Depth from 12m-15m skilled md 3.7 Diesel lit 120 grab &
semi-skilledmd 6.0 accessories. hr 12.00
10t.-crane with
vi)Depth from 15m-18m skilled md 4.4 Diesel lit 140 grab &
semi-skilledmd 7.0 accessories. hr 14.00

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

17.06.03 1705 soil type: gravel / boulder


a)Dia of well :5m m
i)Depth upto 3m skilled md 1.0 Diesel lit 32.0 10t.-crane with 3.200 Add 10% of the
grab &
semi-skilledmd 1.8 accessories. hr total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.1 Diesel lit 34.0 grab & removal of
semi-skilledmd 1.9 accessories. hr 3.400 obstruction and
correction against

102
iii)Depth from 6m-9m skilled md 1.2 Diesel lit 36.0 10t.-crane with shift, tilt ,etc., as
grab &
0 semi-skilledmd 2.1 accessories. hr 3.600 required.

iv)Depth from 9m-12m skilled md 1.3 Diesel lit 41.0 10t.-crane with
grab &
semi-skilledmd 3.2 accessories. hr 4.100

v)Depth from 12m-15m skilled md 1.5 Diesel lit 47.0 10t.-crane with
grab &
semi-skilledmd 2.7 accessories. hr 4.700

vi)Depth from 15m-18m skilled md 1.8 Diesel lit 55.0 10t.-crane with
grab &
semi-skilledmd 3.2 accessories. hr 5.500
vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

b)Dia of well :6m m 10t.-crane with


i)Depth upto 3m skilled md 1.3 Diesel lit 42.0 grab & Add 10% of the
semi-skilledmd 2.4 accessories. hr 4.200 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.4 Diesel lit 45.0 grab & removal of
semi-skilledmd 2.6 accessories. hr 4.500 obstruction and
correction against
iii)Depth from 6m-9m skilled md 1.6 Diesel lit 49.0 10t.-crane with grab & accessories. shift, tilt ,etc., as
semi-skilledmd 2.8 hr 4.900 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 1.8 Diesel lit 55.0 grab &
semi-skilledmd 3.1 accessories. hr 5.500
10t.-crane with
v)Depth from 12m-15m skilled md 2.0 Diesel lit 63.0 grab &
accessories.

103
10t.-crane with
grab &
semi-skilledmd 3.6 accessories. hr 6.300
10t.-crane with
vi)Depth from 15m-18m skilled md 2.4 Diesel lit 74.0 grab &
semi-skilledmd 4.3 accessories. hr 7.400

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

c)Dia of well :7m m 10t.-crane with


i)Depth upto 3m skilled md 1.8 Diesel lit 57.0 grab & Add 10% of the
semi-skilledmd 3.2 accessories. hr 5.700 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.9 Diesel lit 60.0 grab & removal of
semi-skilledmd 3.4 accessories. hr 6.000 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 2.1 Diesel lit 66.0 grab & shift, tilt ,etc., as
semi-skilledmd 3.7 accessories. hr 6.600 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 2.3 Diesel lit 74.0 grab &
semi-skilledmd 4.1 accessories. hr 7.400
10t.-crane with
v)Depth from 12m-15m skilled md 2.7 Diesel lit 85.0 grab &
semi-skilledmd 4.8 accessories. hr 8.500
10t.-crane with
vi)Depth from 15m-18m skilled md 3.2 Diesel lit 100 grab &
semi-skilledmd 5.7 accessories. hr 10.00

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

104
d)Dia of well :8m m 10t.-crane with
i)Depth upto 3m skilled md 2.0 Diesel lit 63.0 grab & Add 10% of the
semi-skilledmd 3.5 accessories. hr 6.300 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 2.1 Diesel lit 67.0 grab & removal of
semi-skilledmd 3.8 accessories. hr 6.700 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 2.3 Diesel lit 73.0 grab & shift, tilt ,etc., as
semi-skilledmd 4.1 accessories. hr 7.300 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 2.6 Diesel lit 82.0 grab &
semi-skilledmd 4.6 accessories. hr 8.200
10t.-crane with
v)Depth from 12m-15m skilled md 3.0 Diesel lit 94.0 grab &
semi-skilledmd 5.3 accessories. hr 9.400
10t.-crane with
vi)Depth from 15m-18m skilled md 3.5 Diesel lit 110 grab &
semi-skilledmd 6.3 accessories. hr 11.00
vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

17.06.04 1705 soil type: Unclassified except rock


a)Dia of well :5m m 10t.-crane with
i)Depth upto 3m skilled md 1.0 Diesel lit 30.0 grab & Add 10% of the
semi-skilledmd 1.7 accessories. hr 3.000 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.1 Diesel lit 32.0 grab & removal of
semi-skilledmd 1.8 accessories. hr 3.200 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.2 Diesel lit 35.0 grab & shift, tilt ,etc., as
semi-skilledmd 2.0 accessories. hr 3.500 required.

105
10t.-crane with
iv)Depth from 9m-12m skilled md 1.3 Diesel lit 39.0 grab &
semi-skilledmd 2.2 accessories. hr 3.900
10t.-crane with
v)Depth from 12m-15m skilled md 1.5 Diesel lit 45.0 grab &
semi-skilledmd 2.5 accessories. hr 4.500
10t.-crane with
vi)Depth from 15m-18m skilled md 1.7 Diesel lit 53.0 grab &
semi-skilledmd 3.0 accessories. hr 5.300

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

b)Dia of well :6m m 10t.-crane with


i)Depth upto 3m skilled md 1.2 Diesel lit 40.0 grab & Add 10% of the
semi-skilledmd 2.3 accessories. hr 4.000 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.3 Diesel lit 43.0 grab & removal of
semi-skilledmd 2.4 accessories. hr 4.300 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.4 Diesel lit 47.0 grab & shift, tilt ,etc., as
semi-skilledmd 2.6 accessories. hr 4.700 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 1.6 Diesel lit 53.0 grab &
semi-skilledmd 3.0 accessories. hr 5.300
10t.-crane with
v)Depth from 12m-15m skilled md 1.9 Diesel lit 60.0 grab &
semi-skilledmd 3.4 accessories. hr 6.000

106
10t.-crane with
vi)Depth from 15m-18m skilled md 2.2 Diesel lit 70.0 grab &
semi-skilledmd 4.0 accessories. hr 7.000

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

c)Dia of well :7m m 10t.-crane with


i)Depth upto 3m skilled md 1.6 Diesel lit 54.0 grab & Add 10% of the
semi-skilledmd 3.0 accessories. hr 5.400 total cost for
kentledges,
10t.-crane with
ii)Depth from 3m-6m skilled md 1.7 Diesel lit 58.0 grab & removal of
semi-skilledmd 3.2 accessories. hr 5.800 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 1.9 Diesel lit 63.0 grab & shift, tilt ,etc., as
semi-skilledmd 3.5 accessories. hr 6.300 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 2.2 Diesel lit 70.0 grab &
semi-skilledmd 4.0 accessories. hr 7.000
10t.-crane with
v)Depth from 12m-15m skilled md 2.5 Diesel lit 80.0 grab &
semi-skilledmd 4.5 accessories. hr 8.000
10t.-crane with
vi)Depth from 15m-18m skilled md 3.0 Diesel lit 95.0 grab &
semi-skilledmd 5.3 accessories. hr 9.500

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

d)Dia of well :8m m 10t.-crane with


i)Depth upto 3m skilled md 1.8 Diesel lit 60.0 grab & Add 10% of the
semi-skilledmd 3.4 accessories. hr 6.000 total cost for
kentledges,

107
10t.-crane with
ii)Depth from 3m-6m skilled md 1.9 Diesel lit 64.0 grab & removal of
semi-skilledmd 3.6 accessories. hr 6.400 obstruction and
correction against
10t.-crane with
iii)Depth from 6m-9m skilled md 2.1 Diesel lit 70.0 grab & shift, tilt ,etc., as
semi-skilledmd 3.9 accessories. hr 7.000 required.
10t.-crane with
iv)Depth from 9m-12m skilled md 2.4 Diesel lit 78.0 grab &
semi-skilledmd 4.4 accessories. hr 7.800

10t.-crane with
v)Depth from 12m-15m skilled md 2.8 Diesel lit 90.0 grab &
semi-skilledmd 5.0 accessories. hr 9.000
10t.-crane with
vi)Depth from 15m-18m skilled md 3.3 Diesel lit 106 grab &
semi-skilledmd 5.9 accessories. hr 1.600

vii) Depth more than 18m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

10t.-crane with
17.06.05 1705 Soil type: soft rock grab &
skilled md 3.0 Diesel lit 83.0 accessories. hr 8.000
I) dia. of well : 5m m semiskilledmd 5.0 Air compressor
with drill. hr 3.000

10t.-crane with
ii) dia. of well : 6m m grab &
skilled md 4.0 Diesel lit 114 accessories. hr 11.00
semiskilledmd 7.0 Air compressor
with drill. hr 4.000

108
10t.-crane with
iii) dia. of well : 7m m grab &
skilled md 5.0 Diesel lit 145 accessories. hr 14.00
semiskilledmd 9.0 Air compressor
with drill. hr 5.000

10t.-crane with
iv) dia. of well : 8m m grab &
skilled md 6.0 Diesel lit 166 accessories. hr 16.00
semiskilledmd 10.0 Air compressor
with drill. hr 6.000
10t.-crane with
17.06.06 1705 Soil type: hard rock Blaster md 1.0 Diesel lit 251 grab &
skilled md 5.0 Gelatine kg 4.0 accessories. hr 20.00
I) Dia of well : 5m m semiskilledmd 10.0 Detonator no 32.0 Air compressor
unskilled md 20.0 fuse-wire m 640.0 with drill. hr 15.00
10t.-crane with
ii) Dia of well : 6m m Blaster md 1.4 Diesel lit 290 grab &
skilled md 6.8 Gelatine kg 6.0 accessories. hr 27.00
semiskilledmd 13.5 Detonator no 48.0 Air compressor
unskilled md 27.0 fuse-wire m 960 with drill. hr 20.00
10t.-crane with
iii) Dia of well : 7m m Blaster md 2 Diesel lit 387 grab &
skilled md 9 Gelatine kg 8.0 accessories. hr 36.00
semiskilledmd 18 Detonator no 64.0 Air compressor
unskilled md 36 fuse-wire m 1280 with drill. hr 27.00
10t.-crane with
iv) Dia of well : 8m m Blaster md 3 Diesel lit 430 grab &
skilled md 10 Gelatine kg 10.0 accessories. hr 40.00
semiskilledmd 20 Detonater no 80.0 Air compressor
with drill.

109
Air compressor
unskilled md 40 fuse-wire m 1800 with drill. hr 30.00

17.07 1706 Providing and laying plain cement Skilled md 0.5 Cement t 0.36 Concrete mixer
concrete in bottom plug (min. Unskilled md 3.50 Sand m3 0.45 (0.28 / 0.20 m3) hr 0.700
cement content 330 kg/m3) and 3
m aggregate20-40mm m3 0.36 10 t. crane with
slump 150mm.
aggregate 10-20mm m3 0.36 tremie pipe hr 0.400
aggregate 10mm & down m3 0.18
admixture kg 2
Diesel lit 7

17.08 1707 Providing and filling sand in well cum Skilled md 0.01 Sand m3 1.2

17.09 1708 Providing and laying concrete in m3 Refer the norms for concrete
top plugging.

Norms for Rate Analysis


Activity Group:- 18 : Falsework, Formwork & Surface finish for Concrete Structures
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
18.01 1804 Providing , Preparing and
1805 Installing form work including
necessary supports and removing
after completion for foundation
and footings.

(ClassF1Finish)
a) Using timber (soft wood ) 10m2 skilled md 1.50 Planks 38mm thick. m3 0.42 8 times usage
unskilled md m3
2.00 struts, ballies, etc. 0.18 12 times usage

110
Nails,spikes,etc. kg 1.00
b) Using steel 2
10m skilled md 1.25 MS sheet 14 gauge
unskilled md 2.50 & angle stiffners kg 530.00 60 times usage
MS pipes dia. 40mm m 36.00 90 times usage
Clamps no. 21 60 times usage
Nuts & bolts 6mmno.dia. 178 40 times usage
18.02 1804 Providing , Preparing and
1805 Installing form work including
necessary supports and removing
after completion for walls.

(Class F2 Finish)
18.02.01 Vertical plain surface
a) Using timber (soft wood )
i)Height upto 3m 10m2 skilled md m2
2.2 Ply wood 9mm. thick 11 8 times usage
3
unskilled md 2.2 struts, ballies, etc.
m 0.4 12 times usage
Nails,spikes,etc. kg 2.5
ii) Height more than 3m upto 6m 2
10m skilled md 2.6 Ply wood 9mm. thick
m 2
11 8 times usage
3
unskilled md 2.8 struts, ballies, etc.
m 0.5 12 times usage
Nails,spikes,etc. kg 3.5
iii) Height more than 6m upto 9m 10m2 skilled md m2
3.2 Ply wood 9mm. thick 11 8 times usage
3
unskilled md 4.0 struts, ballies, etc.
m 0.6 12 times usage
Nails,spikes,etc. kg 4.5
iv) Height more than 9m 10m2 Increase the rate by 10% for every additional meter height to the rate for the previous height
b) Using steel
i)Height upto 3m 10m2 skilled md 1.6 MS sheet 14 gauge
unskilled md 2.2 & angle stiffners kg 530 60 times usage
. MS pipes dia. 40mm m 70.0 90 times usage
Clamps no. 40 60 times usage

111
Nuts & bolts 6mmno.dia. 178 40 times usage
ii) Height more than 3m upto 6m 2
10m skilled md 1.9 MS sheet 14 gauge
unskilled md 2.8 & angle stiffners kg 530 60 times usage
MS pipes dia. 40mm m 88.0 90 times usage
Clamps no. 50 60 times usage
Nuts & bolts 6mmno.dia. 178 40 times usage
iii) Height more than 6m upto 9m 10m2 skilled md 2.3 MS sheet 14 gauge
unskilled md 4.0 & angle stiffners kg 530 60 times usage
MS pipes dia. 40mm m 112 90 times usage
Clamps no. 64 60 times usage
Nuts & bolts 6mmno.dia. 178 40 times usage
iv) Height more than 9m 10m2
Increase the rate by 10% for every additional meter height to the rate for the previous height
18.02.02 Vertical curve surface

a) Using timber
i)Height upto 3m 10m2 skilled md m2
3.0 Ply wood 9mm. thick 11 8 times usage
3
unskilled md 3.0 timber m 0.6 12 times usage
Nails kg 4.0
ii) Height more than 3m upto 6m 10m2 skilled md m2
3.5 Ply wood 9mm. thick 11 8 times usage
3
unskilled md 3.8 timber m 0.72 12 times usage
Nails kg 5.0
iii) Height more than 6m upto 9m 2
10m skilled md 4.3 Ply wood 9mm. thick
m 2
11 8 times usage
3
unskilled md 5.4 timber m 0.9 12 times usage
Nails kg 6.0
iv) Height more than 9m 10m Increase the rate by 10% for every additional meter height to the rate for the previous height
2

b) Using steel

i)Height upto 3m 10m2 skilled md 2.0 MS sheet 14 gauge

112
unskilled md 3.0 & angle stiffners kg 530 60 times usage
MS pipes dia. 40mm m 105 90 times usage
Clamps no. 60 60 times usage
Nuts & Bolts 6mm no.dia. 178 40 times usage
ii) Height more than 3m upto 6m 10m2 skilled md 2.4 MS sheet 14 gauge
unskilled md 3.8 & angle stiffners kg 530 60 times usage
MS pipes dia. 40mm m 126 90 times usage
Clamps no. 72 60 times usage
Nuts & bolts 6mmno.dia. 178 40 times usage
iii) Height more than 6m upto 9m 10m2 skilled md 3.0 MS sheet 14 gauge
unskilled md 5.4 & angle stiffners kg 530 60 times usage
MS pipes dia. 40mm m 160 90 times usage
Clamps no. 91 60 times usage
Nuts & bolts 6mmno.dia. 178 40 times usage
iv) Height more than 9m 10m2
Increase the rate by 10% for every additional meter height to the rate for the previous height
18.02.03 walls with batter. 2
10m Multiply the rates determined for vertical walls by 1.1
18.02.04 For Class F1 Finish Multiply the rates determined for Class F2 finish by 0.75
18.02.05 For Class F3 Finish Multiply the rates determined for Class F2 finish by 1.25
18.03 1804 Providing , Preparing and
1805 Installing form work including
necessary supports and removing
after completion for columns

(class F3 Finish )
18.03.01 Square/Rectangular
a) Using timber (soft wood)
i)Height upto 3m 10m2 skilled md m2
2.75 Ply wood 9mm. thick 11.0 6 times usage
3
unskilled md 2.4 timber m 0.50 12 times usage
Nails kg 3.00

113
ii)Height more than 3m upto 6m 10m2 skilled md m2
3.2 Ply wood 9mm. thick 11.0 6 times usage
3
unskilled md 3.2 timber m 0.60 12 times usage
Nails kg 4.00
iii)Height more than 6m upto 9m 10m2 skilled md m2
4.0 Ply wood 9mm. thick 11.0 6 times usage
3
unskilled md 4.4 timber m 0.75 12 times usage
Nails kg 5.00
iv) Height more than 9m 10m Increase the rate by 10% for every additional meter height to the rate for the previous height
2

b) Using Steel

i)Height upto 3m 10m2 skilled md 2.0 MS sheet 14 gauge


unskilled md 2.4 & angle stiffners kg 530 50 times usage
MS pipes dia. 40mm m 90 90 times usage
Clamps no. 51 50 times usage
Nuts & Bolts 6mm no.dia. 178 35 times usage
ii)Height more than 3m upto 6m 10m2 skilled md 2.3 MS sheet 14 gauge
unskilled md 3.1 & angle stiffners kg 530 50 times usage
MS pipes dia. 40mm m 108 90 times usage
Clamps no. 62 50 times usage
Nuts & bolts 6mmno.dia. 178 35 times usage
iii)Height more than 6m upto 9m 10m2 skilled md 2.9 MS sheet 14 gauge
unskilled md 4.4 & angle stiffners kg 530 50 times usage
MS pipes dia. 40mm m 137 90 times usage
Clamps no. 78 50 times usage
Nuts & bolts 6mmno.dia. 178 35 times usage
iv) Height more than 9m 10m Increase the rate by 10% for every additional meter height to the rate for the previous height
2

18.03.02 Circular surface


a) Using timber
I)Height upto 3m 10m2 skilled md m2
3.6 Ply wood 9mm. thick 11.0 6 times usage

114
unskilled md 3.3 timber m3 0.75 12 times usage
Nails kg 5.00
ii)Height more than 3m upto 6m 10m2 skilled md m2
4.2 Ply wood 9mm. thick 11.0 6 times usage
3
unskilled md 4.2 timber m 1.00 12 times usage
Nails kg 6.50
2 2
iii)Height more than 6m upto 9m 10m skilled md 5.2 Ply wood 9mm. thick
m 11.0 6 times usage
3
unskilled md 5.9 timber m 1.2 12 times usage
Nails kg 8.00
iv) Height more than 9m 10m2 Increase the rate by 10% for every additional meter height to the rate for the previous height
b) Using steel

i)Height upto 3m 10m2 skilled md 2.4 MS sheet 14 gauge


unskilled md 3.3 & angle stiffners kg 530 50 times usage
MS pipes dia. 40mm m 135 90 times usage
Clamps no. 77 50 times usage
Nuts & bolts 6mmno.dia. 178 35 times usage

ii)Height more than 3m upto 6m 10m2 skilled md 2.9 MS sheet 14 gauge


unskilled md 4.2 & angle stiffners kg 530 50 times usage
MS pipes dia. 40mm m 162 90 times usage
Clamps no. 93 50 times usage
Nuts & bolts 6mmno.dia. 178 35 times usage

iii)Height more than 6m upto 9m 10m2 skilled md 3.6 MS sheet 14 gauge


unskilled md 2.9 & angle stiffners kg 530 50 times usage
MS pipes dia. 40mm m 206 90 times usage
Clamps no. 118 50 times usage
Nuts & bolts 6mmno.dia. 178 35 times usage

115
iv) Height more than 9m 10m2 Increase the rate by 10% for every additional meter height to the rate for the previous height

18.03.03 Inclined columns Multiply the rates for vertical columns as determined above by 1.1
18.04 1804 Providing , Preparing and
1805 Installing form work & removing
after completion for Slab
structure.

(Class F2 Finish)
(False work not included )
a)Using timber planks 10m2 skilled md 1.8 Planks 38mm thick. &
unskilled md m3 etc.
2.5 rafters,beam,battens 0.54 6 times usage
Nails, etc. kg 2.5
b) Using steel 10m2 skilled md 1.25 MS sheet 14 gauge
unskilled md 2.50 & angle stiffners kg 530 40 times usage
Nuts & bolts 6mmno.dia. 178 40 times usage
c) Using shuttering ply 10m2 skilled md 1.5 Ply wood 12mm. thick m2 11 6 times usage
unskilled md 2.5 rafters,beam,battens m3 etc. 0.1 8 times usage
Nails, etc. kg 2.0

18.05 1804 Providing , Preparing and


1805 Installing form work & removing
after completion for Slab & beam
structure.

(Class F2 Finish)
(False work not included )
a)Using timber 10m2 skilled md 3.00 Planks 38mm thk.&

116
unskilled md 3.00 rafters m3 0.60 6 times usage
m3
struts, battens, etc. 0.22 8 times usage
Nails,spikes,etc. kg 4.0
b) Using steel 2
10m skilled md 2 MS sheet 14 gauge
unskilled md 3 & angle stiffners kg 530 40 times usage
MS pipes dia. 40mm m 32.0 60 times usage
Clamps no. 18 40 times usage
Nuts & bolts 6mmno.dia. 178 30 times usage
C) Using Shuttering ply 10m2 skilled md 2.5 Ply wood 12mm. thick m2 11 6 times usage
unskilled md 3 rafters m3 0.1 6 times usage
3
struts, battens, etc.
m 0.22 8 times usage
Nails kg 3
18.06 1804 Providing , Preparing and
1805 Installing form work & removing
after completion for arch structure.

(Class F2 Finish)
(False work not included )
a) Using timber 10m2 skilled md 3.5 Ply wood 12mm. thick m2 11 6 times usage
unskilled md 3.0 rafters,beam,battens m3 etc. 0.30 6 times usage
Nails kg 4
b) Using steel 10m2 skilled md 2.5 MS sheet 14 gauge
unskilled md 3.0 & angle stiffners kg 530 40 times usage
Nuts & bolts 6mmno.dia. 178 30 times usage

117
18.07 1804 Providing , Preparing and
1805 Installing form work & removing
after completion for Precast
elements.

(class F3 Finish)
i)Square/Rectangular Section
a) Using Timber 10m2 skilled md m2
2.5 Ply wood 9mm. thick 11 12 times usage
3
unskilled md 2.0 timber m 0.2 18 times usage
Nails kg 2
b)Using steel 10m2 skilled md 2 MS sheet 14 gauge
unskilled md 2 & angle stiffners kg 530 100 times usage
1804 MS pipes dia. 40mm m 32 100 times usage
1805 Clamps no. 18 60 times usage
Nuts & bolts 6mmno.dia. 178 60 times usage
ii)Circular Section
a) Using timber 10m2 skilled md m2
3.0 Ply wood 9mm. thick 11 12 times usage
3
unskilled md 2.5 timber m 0 18 times usage
Nails kg 3
2
b) Using steel 10m skilled md 2.5 MS sheet 14 gauge
unskilled md 2.5 & angle stiffners kg 530 100 times usage
MS pipes dia. 40mm m 42 100 times usage
Clamps no. 24 60 times usage
Nuts & bolts 6mmno.dia. 178 60 times usage

iii) Curved Pre-cast elements Multiply the rates for straight elements as determined above by 1.25
18.08 1803 Providing and assembling in
position falsework for the
construction of RCC superstrcture
and removing after completion
including design & drawings as
per specification.

118
Providing and assembling in
position falsework for the
construction of RCC superstrcture
and removing after completion
including design & drawings as
per specification.

18.08.01 For Slab and Box culverts 10m2


a) Using timber of
formwo
i) Height upto 2m skilled md 8.00 Timber m3 0.80 8 times usage
rk
unskilled md 8.00 Nails, spikes,etc. kg 2.50
ii)Height more than 2m and upto 4m skilled md 16.00 Timber m3 1.40 8 times usage
unskilled md 18.00 Nails, spikes,etc. kg 4.00
iii) Height more than 4m and upto 6m skilled md 24.00 Timber m3 1.90 8 times usage
unskilled md 28.00 Nails, spikes,etc. kg 5.50
iv) Height more than 6m Increase the rate by 10% for every additional meter height to the rate for the previous height
or, Design as a special case and derive Norms
b) Using Steel
i) Height upto 2m skilled md 4.00 MSpipes40-50mm dia m 240.00 60 times usage
unskilled md 6.00 Clamps no 137.00 40 times usage
ii)Height more than 2m and upto 4m skilled md 8.00 MSpipes40-50mm dia m 420.00 60 times usage
unskilled md 14.00 Clamps no 240.00 40 times usage
iii) Height more than 4m and upto 6m skilled md 12.00 MSpipes40-50mm dia m 570.00 60 times usage
unskilled md 20.00 Clamps no 325.00 40 times usage
iv) Height more than 6m Increase the rate by 10% for every additional meter height to the rate for the previous height
or, Design as a special case and derive Norms
Note:- 1) Add 3% of total unit rate of false work for the design and drawings
2) The Unit 10 sq.m refers to the unit of formwork
18.08.0.2 For RCC Beam Bridges 10m2
a) Using timber of
formwo
I) Height upto 3m skilled md 14.00 Timber m3 2.00 8 times usage
rk
unskilled md 14.00 Nails, spikes,etc. kg 6.00

119
ii) Height more than 3m and upto 6m skilled md 28.00 Timber m3 4.00 8 times usage
unskilled md 32.00 Nails, spikes,etc. kg 12.00
iii) Height more than 6m and upto 9m skilled md 40.00 Timber m3 7.00 8 times usage
unskilled md 50.00 Nails, spikes,etc. kg 21.00
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height
or, Design as a special case and derive Norms
b) Using Steel
I) Height upto 3m skilled md 7.0 MSpipes40-50mm m dia. 300 60 times usage
unskilled md 11.0 Clamps no 171 40 times usage
ii) Height more than 3m and upto 6m skilled md 14.0 MSpipes40-50mm m dia. 600 60 times usage
unskilled md 25.0 Clamps no 342 40 times usage
iii) Height more than 6m and upto 9m skilled md 20.0 MSpipes40-50mm m dia. 980 60 times usage
unskilled md 40.0 Clamps no 560 40 times usage
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height
or, Design as a special case and derive Norms
Note:- 1) Add 3% of total unit rate of false work for the design and drawings
2) The Unit 10 sq.m refers to the unit of formwork
18.08.03 For RCC arch Bridges 10m2
a) Using timber of
formwo
I) Height upto 3m skilled md 18 Timber m3 1.20 8 times usage
rk
unskilled md 16 Nails, spikes,etc. kg 3.50
ii) Height more than 3m and upto 6m skilled md 36 Timber m3 2.40 8 times usage
unskilled md 36 Nails, spikes,etc. kg 7.00
3
iii) Height more than 6m and upto 9m skilled md 50 Timber m 4.20 8 times usage
unskilled md 57 Nails, spikes,etc. kg 12.00
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height
or, Design as a special case and derive Norms
b) Using Steel
I) Height upto 3m skilled md 8.0 MSpipes40-50mm
m dia. 360 60 times usage

120
unskilled md 12.0 Clamps no 205 40 times usage
ii) Height more than 3m and upto 6m skilled md 16.0 MSpipes40-50mm m dia. 720 60 times usage
unskilled md 25.0 Clamps no 410 40 times usage
iii) Height more than 6m and upto 9m skilled md 25.0 MSpipes40-50mm m dia. 1180 60 times usage
unskilled md 46.0 Clamps no 674 40 times usage
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height
or, Design as a special case and derive Norms
Note:- 1) Add 3% of total unit rate of false work for the design and drawings
2) The Unit 10 sq.m refers to the unit of formwork
Notes:
1) Norms for falseworks have been prepared for general topography where average height can be practically assessed. For typical topographycal sites, like
gorge, these norms may not be applicable.Separate norms specific to the site should be developed.

2) Generally, materials for form/false work shall not be mentioned in the contract documents/bill of quantities. The materials may be timber, steel or their
combinations as per contractors option, subject to the approval of the Engineer.
3) For the purpose of this rate analysis, the unit rate of form/false work materials shall be derived by dividing the prevailing rate of materials by number of
times of usage mentioned in the remarks column (neglecting scrap value).

121
Norms for Rate Analysis
Activity Group:- 19 : Bearings and expansion joints (Bridges, slab etc.)
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
19.01 1902 Providing and installing different no Bearing no 1.0000
type of Bearings including all
necessaary axilliary and incidental Add 10% of the cost of Bearing for necessary labour, materials, equipment and other consumables.
works etc. complete as per
drawing and specification.

19.02 1901 Providing and installing Expansion m Expansion Joint m 1.1000


Joints including all necessaary
axilliary and incidental works etc. Add 10% of the cost of expansion joint for necessary labour, materials, equipment and other consumables.
complete as per drawing and
specification.

122
Norms for Rate Analysis
Activity Group:- 20: Concrete for structures
Activity Spec. Resources
No. Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
20.01 2000 a) Providing and placing machine
mixed cement concrete for the
foundation and footing etc.
including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
i)M 10/40 m3 skilled md 0.50 cement t 0.220 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
cost of concrete
unskilled md 3.50 aggregate 20-40mm m3 0.650 vibrator hr 0.25
for mix design
aggregate 10 -20mm m3 0.250 and quality
coarse sand m 3
0.480 control as per
specification.
petrol lit 0.100
diesel lit 3.000
water lit 132.000
ii)M 15/40 m3 skilled md 0.50 cement t 0.260 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 20-40mm m3 0.530 vibrator hr 0.25 cost of
3
concrete for
aggregate 10-20mm m 0.240 mix design and
3
aggregate 10mm & down m 0.110 quality control
3
coarse sand m 0.460
petrol lit 0.100
diesel lit 3.000
water lit 156.000
iii)M 20/40 m3 skilled md 0.50 cement t 0.320 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 20-40mm m3 0.520 vibrator hr 0.25 cost of
concrete for
mix design and
quality control

123
Add 2.5% of
cost of
concrete for
aggregate 10-20mm m3 0.220 mix design and
3
aggregate 10mm & down m 0.120 quality control
3
coarse sand m 0.450
petrol lit 0.100
diesel lit 3.000
water lit 192.000
2000 iv)M 20/20 m3 skilled md 0.50 cement t 0.330 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 20-40mm m3 0.580 vibrator hr 0.25 cost of
3
concrete for
aggregate 10 -20mm m 0.300 mix design and
3
coarse sand m 0.440 quality control
petrol lit 0.100
diesel lit 3.000
water lit 198.000
v)M 25/20 m3 skilled md 0.50 cement t 0.375 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 20-40mm m 3
0.580 vibrator hr 0.25 cost of
3
concrete for
aggregate 10 -20mm m 0.300 mix design and
3
coarse sand m 0.450 quality control
petrol lit 0.100
diesel lit 3.000
water lit 225.000
20.01 2000 b) Providing and placing manually
mixed cement concrete for the
foundation and footing etc.
including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
drawing.

i)M 10/40 m3 skilled md 1.00 cement t 0.245 Add 2.5% of cost


unskilled md 4.00 aggregate 20-40mm m3 0.650 of concrete for

124
aggregate 10 -20mm m3 0.250 mix design and
coarse sand m3 0.480 quality control as

water lit 147.000 per specification.


2000 ii)M 15/40 m3
skilled md 1.00 cement t 0.285 Add 2.5% of cost
unskilled md 4.00 aggregate 20-40mm m 3
0.530 of concrete for
aggregate 10-20mm m 3
.0.24 mix design and
3 quality control as
aggregate10mm & down m 0.110
3
coarse sand m 0.460 per specification.
water lit 171.000
iii)M 20/40 m3 skilled md 1.00 cement t 0.355 Add 2.5% of
cost of
unskilled md 4.00 aggregate 20-40mm m3 0.520
3
concrete for
aggregate 10-20mm m 0.220 mix design and
3
aggregate10mm & down m 0.120 quality control
3
sand m 0.450
water lit 213.000
iv)M 20/20 m3 skilled md 1.00 cement t 0.365 Add 2.5% of
unskilled md 4.00 aggregate 10-20mm 3
0.580 cost of
m
3
concrete for
aggregate 10mm & down m 0.300 mix design and
3
coarse sand m 0.440 quality control
water lit 219.000
v)M 25/20 m3
skilled md 1.00 cement t 0.415 Add 2.5% of
cost of
unskilled md 4.00 aggregate 10-20mm m3 0.580
3
concrete for
aggregate 10mm & down m 0.300 mix design and
3
sand m 0.440 quality control
water lit 249.000
20.02 2000 a) Providing and placing machine
mixed cement concrete for the
abutement, pier, wall etc.
including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
drawing.

125
a) Providing and placing machine
mixed cement concrete for the
abutement, pier, wall etc.
including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
drawing.

i)M 15/40 m3 skilled md 0.90 cement t 0.260 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 9.00 aggregate 20-40mm m 3
0.530 vibrator hr 0.25 cost of
3
concrete for
aggregate 10-20mm m 0.240 mix design and
3
aggregate 10mm & down m 0.110 quality control
3
sand m 0.460
Petrol lit 0.100
Diesel lit 3.000
water lit 156.000
ii)M 20/40 m3 skilled md 0.90 cement t 0.320 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 9.00 aggregate 20-40mm m 3
0.520 vibrator hr 0.25 cost of
3
concrete for
aggregate 10-20mm m 0.220 mix design and
3
aggregate 10mm & down m 0.120 quality control
sand m 3
0.450 as per
Petrol lit 0.100 specification.
Diesel lit 3.000
water lit 192.000
iii)M 20/20 m3 skilled md 0.90 cement t 0.330 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 9.00 aggregate 10-20mm m3 0.580 vibrator hr 0.25 cost of
3
concrete for
aggregate 10mm & down m 0.300 mix design and
3
sand m 0.440 quality control
Petrol lit 0.100 as per
Diesel lit 3.000 specification.
water lit 198.000
iv)M 25/20 m3 skilled md 0.90 cement t 0.375 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
cost of
concrete for
mix design and
quality control
as per
specification.
126
Add 2.5% of
unskilled md 9.00 aggregate 10-20mm m3 0.580 vibrator hr 0.25 cost of
3
concrete for
aggregate 10mm & down m 0.300 mix design and
3
sand m 0.450 quality control
Petrol lit 0.100 as per
Diesel lit 3.200 specification.
water lit 225.000
20.02 2000 b) Providing and placing manually
mixed cement concrete for the
abutement, pier, wall etc,
including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
drawing.
i)M 15/40 m3 skilled md 0.90 cement t 0.285 Add 2.5% of
unskilled md 10.00 aggregate 20-40mm 3
0.530 cost of
m
3
concrete for
aggregate 10-20mm m 0.240 mix design and
3
aggregate 10mm & down m 0.110 quality control
3
sand m 0.460
water lit 171.000
ii)M 20/40 m3 skilled md 0.90 cement t 0.355 Add 2.5% of
unskilled md 10.00 aggregate 20-40mm 3
0.520 cost of
m
3
concrete for
aggregate 10-20mm m 0.220 mix design and
3
aggregate 10mm & down m 0.120 quality control
3
sand m 0.450
water lit 213.000
iii)M 20/20 m3 skilled md 0.90 cement t 0.365 Add 2.5% of
unskilled md 10.00 aggregate 10-20mm 3
0.580 cost of
m
3
concrete for
aggregate 10mm & down m 0.300 mix design and
3
sand m 0.440 quality control

127
water lit 219.000
iv)M 25/20 m 3
skilled md 0.90 cement t 0.415 Add 2.5% of cost
unskilled md 9.00 aggregate 10-20mm m3 0.580 of concrete for
aggregate 10mm & down m3 0.300 mix design and
sand m 3
0.450 quality control as
water lit 249.000 per specification.
20.03 2000 a) Providing and placing machine
mixed cement concrete for the
super structure, deckslab, girder
etc. including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
drawing.

i)M 20/20 m3 skilled md 0.80 cement t 0.330 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 6.00 aggregate 10-20mm m 3
0.580 vibrator hr 0.25 cost of
3
concrete for
aggregate10mm & down m 0.300 mix design and
3
sand m 0.440 quality control
petrol 0.100
diesel lit 3.000
water lit 198.000
ii)M 25/20 m3 skilled md 0.80 cement t 0.375 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 6.00 aggregate 10-20mm m 3
0.580 vibrator hr 0.25 cost of
3
concrete for
operator md 0.20 aggregate10mm & down m 0.300 mix design and
3
sand m 0.450 quality control
petrol lit 0.100
diesel lit 3.000
water lit 225.000
iii)M 30/20 m3 skilled md 0.80 cement m3 0.410 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 6.00 aggregate 10-20mm m 3
0.570 vibrator hr 0.25 cost of
concrete for
mix design and
quality control

128
Add 2.5% of
cost of
concrete for
aggregate10mm & down m3 0.330 mix design and
3
sand m 0.440 quality control
petrol lit 0.100
diesel lit 3.000
water lit 246.000
iv)M 35/20 m3 skilled md 0.80 cement m3 0.450 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 6.00 aggregate 10-20mm m3 0.570 vibrator hr 0.25 cost of
3
concrete for
aggregate10mm & down m 0.330 mix design and
3
sand m 0.440 quality control
petrol lit 0.100
diesel lit 3.000
water lit 270.000
20.03 2000 b) Providing and placing manually
mixed cement concrete for the
super structure, deckslab, girder
etc. including compaction, curing,
testing and lead 30m. etc. all
complete as per specification and
drawing.

i)M 20/20 m3 skilled md 0.80 cement t 0.365 Add 2.5% of


cost of
unskilled md 7.00 aggregate 10-20mm m3 0.580
3
concrete for
aggregate10mm & down m 0.300 mix design and
3
sand m 0.440 quality control
water lit 219.000 as per
ii)M 25/20 m3 skilled md 0.80 cement t 0.415 specification.
Add 2.5% of
unskilled md 7.00 aggregate 10-20mm 3
0.580 cost of
m
3
concrete for
aggregate10mm & down m 0.300 mix design and
3
sand m 0.450 quality control
water lit 249.000 as per
specification.

129
iii)M 30/20 m3 skilled md 0.80 cement t 0.450 Add 2.5% of
cost of
unskilled md 7.00 aggregate 10-20mm m3 0.570
3
concrete for
aggregate10mm & down m 0.330 quality control
3
sand m 0.440 as per
water lit 270.000 specification.
iv)M 35/20 m3 skilled md 0.80 cement t 0.495 Add 2.5% of
unskilled md 7.00 aggregate 10-20mm m 3
0.570 cost of
3
concrete for
aggregate10mm & down m 0.330 mix design and
3
sand m 0.440 quality control
water lit 297.000 as per
20.04 2000 Providing and placing machine specification.
per specification
mixed cement concrete
(prestressed) for prestressed
structures including compaction,
curing, testing and lead 30m. etc.
all complete as per specification
and drawing.

i)M 40/20 m3 skilled md 0.50 cement t 0.480 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 10-20mm m3 0.570 vibrator hr 0.25 cost of
concrete for
aggregate10mm & down m3 0.330 mix design and
coarse sand m3 0.440 quality control
petrol lit 0.100 as per
diesel lit 3.000 specification.
water lit 288.000
ii)M 45/20 m3 skilled md 0.50 cement t 0.550 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 10-20mm m3 0.570 vibrator hr 0.25 cost of
concrete for
aggregate10mm & down m3 0.330 mix design and
quality control
as per
specification.

130
Add 2.5% of
cost of
concrete for
mix design and
coarse sand m3 0.440 quality control
petrol lit 0.100 as per
diesel lit 3.000 specification.
water lit 330.000
iii)M 50/20 m3 skilled md 0.50 cement t 0.550 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 2.5% of
unskilled md 3.50 aggregate 10-20mm m3 0.570 vibrator hr 0.25 cost of
concrete for
aggregate10mm & down m3 0.330 mix design and
sand m3 0.440 quality control
petrol lit 0.100 as per
diesel lit 3.000 specification.
water lit 330.000
20.05 2000 a) Providing and placing No Fines m3 skilled md 0.50 cement t 0.200 mixer (0.28/ 0.20 m3 ) hr 0.60
machine mixed cement concrete unskilled md 3.50 aggregate-40-10mm m3 0.900 vibrator hr 0.25
including compaction, curing,
petrol lit 0.100
testing and lead 30m. etc .all
complete as per specification and diesel lit 3.000
drawing.
water lit 120.000

b) Providing and placing No Fines m3 skilled md 1.00 cement t 0.200


manually mixed cement concrete unskilled md 4.00 aggregate(40-10mm) m3 0.900
including compaction, curing,
water lit 120.000
testing and lead 30m. etc. all
complete as per specification and
drawing.

20.06 2000 a) Providing and placing machine


mixed non structural cement
concrete including compaction,
curing, testing and lead 30m. etc.
all complete as per specification
and drawing.

131
a) Providing and placing machine
mixed non structural cement
concrete including compaction,
curing, testing and lead 30m. etc.
all complete as per specification
and drawing.

i)1:4:8 (cement : sand : aggregate) m3 skilled md 0.50 cement t 0.170 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 0.5% of
unskilled md 3.50 aggregate 20-40mm m3 0.650 vibrator hr 0.25 cost of
3 concrete for
aggregate 10 -20mm m 0.240
3
quality control
sand m 0.470 as per
petrol lit 0.100 specification.
diesel lit 3.000
water lit 102.000
ii)1:3:6 (cement : sand : aggregate) m3 skilled md 0.50 cement t 0.220 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 0.5% of
unskilled md 3.50 aggregate 20-40mm m3 0.650 vibrator hr 0.25 cost of
concrete for
aggregate 10 -20mm m3 0.240 quality control
sand m3 0.470 as per
petrol lit 0.100 specification.
diesel lit 3.000
water lit 132.000
iii)1:2:4 (cement : sand : aggregate) m3 skilled md 0.50 cement t 0.320 mixer (0.28/ 0.20 m3 ) hr 0.60 Add 0.5% of
unskilled md 3.50 aggregate 20-40mm m3 0.520 vibrator hr 0.25 cost of
3 concrete for
aggregate 10 -20mm m 0.330
3
quality control
sand m 0.450 as per
petrol lit 0.100 specification.
diesel lit 3.000
water lit 192.000
20.06 2000 b) Providing and placing manually Add 0.5% of
mixed non structural cement cost of
concrete including compaction, concrete for
curing, testing and lead 30m. etc. quality control
all complete as per specification as per
and drawing. specification.
i)1:4:8 (cement : sand : aggregate) m3 skilled md 1.00 cement t 0.190

132
unskilled md 4.00 aggregate 20-40mm m3 0.650
3
aggregate 10 -20mm m 0.240
sand m3 0.470
water lit 114.000

ii)1:3:6 (cement : sand : aggregate) m3 skilled md 1.00 cement t 0.240


unskilled md 4.00 aggregate 20-40mm m3 0.650
3
aggregate 20mm & down m 0.240
3
sand m 0.470
water lit 144.000
Note: Add 10
of cost for thin
iii)1:2:4 (cement : sand : aggregate) m3 skilled md 1.00 cement t 0.350 concrete ( <
unskilled md 4.00 aggregate 20-40mm m3 0.520 100mm thick)
m 3 for
aggregate 10 -20mm 0.330
3 construction
sand m 0.450 of drain with
water lit 210.000 out form work.
20.07 2000 Providing and laying
Reinforcement including cutting,
bending, binding, fixing in position
and lead 30m. etc. all complete as
per specification and drawing.

i) Diameter upto 8mm. t skilled md 15.00 Reinforcement t 1.150


unskilled md 15.00 Binding wire kg 12.000

ii) Diameter above 8mm and t skilled md 12.00 Reinforcement t 1.150


upto 16mm. unskilled md 12.00 Binding wire kg 10.000

iii) Diameter above 16mm. t skilled md 9.00 Reinforcement t 1.150


unskilled md 9.00 Binding wire kg 9.000

133
Note:i) On contracts with the provision of lab. Setup and operation as a separate BOQ item, the addition of certain percentage in the cost of concrete for mix design
and quality control is not applicated.
ii) For item "machine mixed concrete", if rate analysis is to be done with the use of bigger capacity concrete mixer i.e. 0.4/0.28 m3, the mixer hour 0.47 is to be adopted.
adopted

134
Norms for Rate Analysis
Activity Group:- 21: Presstressed Concrete
Resources
Activity Spec.
Description of works Labour materials Equipment Remarks
Nos Clause no Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
21.01 2106 Providing and installing Engineer md 1.4 Tendon/ wire t 1.1 Pre-stressing Jack hr 8
2107 prestressing tendons including Technician md 2.8
2108 prestressing, anchoring etc. t Skilled md 10
complete as per specification and
2109 Unskilled md 10
drawing.

21.02 2106 Providing and installing Engineer md 0.03 Tendon sheath m 11.0 Grouting Pump hr 0.2
2110 prestressing tendons sheaths with 10m Skilled md 0.2 Cement kg 33
necessary supports including Unskilled md 0.2
removal of extractable ones and
grouting of ducts etc. complete as
per specification and drawing.

21.03 2105 Providing and installing Anchorage no 1 Add 10% of the


anchorage assembly in position material cost
assembly
etc. complete as per specification no for
and drawing. necessary
labour,
equipment
and
other
consumables.

21.04 2103 Prestressed Concrete cu.m Refer concerete

21.05 Formwork / Falsework sq.m Refer Formwork / Falsework

135
Norms for Rate Analysis
Activity Group:- 22: Structural Steel Work
Resources
Activity Spec.
Description of works Labour Materials Equipment Remarks
Nos Clause no Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
22.01 2203 Fabricating and Providing N - number of
structural steel components / bolts / rivets
elements including nut, bolt, per metric
gusset plate, shop drawings, tonne (t) of
facilities for inspection & testing steel work.
and trial assembling.
t

22.01.01 RS Joists Engineer md 0.25 Steel t 1.1 Cutting,drilling ,grinding,


l.s. 5% of the N-number / t as per
Technicianmd 0.50 Nuts & bolts/ welding machine etc. cost of design/drgs.
skilled md 2.00 Rivetts no 1.1xN steel
Semi-skilledmd 2.00 Consumables l.s. 5% of
Unskilled md 2.00 (gas,electrodes cost of
drill bits etc.) steel
22.01.02 Built-up-Beams, Plate Girders, etc. Engineer md 0.5 Steel t 1.1 Cutting,drilling ,grinding, 5% of the N-number / t as per
a) Bolted/ Rivetted Technicianmd 1.0 Nuts & bolts/ welding machine etc. l.s. cost of design/drgs.
skilled md 3.0 Rivetts no 1.1xN steel
Semi-skilledmd 4.5 Consumables l.s. 5% of
Unskilled md 4.5 (gas,electrodes cost of
drill bits etc.) steel
b) Welded Engineer md 0.5 Steel t 1.1 Cutting,drilling ,grinding, 5% of the N-number / t as per
Technicianmd 1.0 Nuts & bolts/ welding machine etc. l.s. cost of design/drgs.
skilled md 3.0 Rivetts no 1.1xN steel
Semi-skilledmd 4.5 Consumables l.s. 5% of
Unskilled md 4.5 (gas,electrodes cost of

136
drill bits etc.) steel
22.01.03 Truss Engineer md 0.75 Steel t 1.1 Cutting,drilling ,grinding, 5% of the N-number / t as per
Technicianmd 1.50 Nuts & bolts/ welding machine etc. cost of design/drgs.
skilled md 4.0 Rivetts no 1.1xN l.s. steel
Semi-skilledmd 6.0 Consumables l.s. 5% of
Unskilled md 6.0 (gas,electrodes cost of
drill bits etc.) steel
22.02 2208 Assembling and erecting
fabricated structural steel
components / elements in place
including tying down bolts, nuts,
t
rivets etc. complete as per
drawing. (False work not
22.02.01 RS Joists Engineer md 0.25 Diesel lit 10 20t - Cap. Crane hr 1.00
Technicianmd 0.50
skilled md 2.0
Semi-skilledmd 4.0
Unskilled md 4.0

22.02.02 Built-up Beams, Plate Girders Engineer md 0.50 Diesel lit 15 20t - Cap. Crane hr 1.5
Technicianmd 1.00
skilled md 3.0
Semi-skilledmd 6.0
Unskilled md 6.0

22.02.03 Truss Engineer md 0.75 Fuel lit 20 20t - Cap. Crane hr 2.0
Technicianmd 1.50
skilled md 4.0
Semi-skilledmd 8.0
Unskilled md 8.0
22.03 2207 Providing and installing falsework
for assembling /erecting of steel
super structure and removing
after completion including
design/drawings of falsework etc
complete.
137
Providing and installing falsework
for assembling /erecting of steel
super structure and removing
after completion including
design/drawings of falsework etc
complete. t (unit of steel superstructure)

22.03.01 RS Joists
a)Using timber
i) Height upto 3m Skilled md 3.4 Timber cu.m 0.5 12 times usage
Unskilled md 3.4 Nails,Spikes, etc.kg 1.5
ii) Height more than 3m upto 6m Skilled md 6 Timber cu.m 0.9 12 times usage
Unskilled md 6.4 Nails,Spikes,etc.kg 2.6
iii) Height more than 6m upto 9m Skilled md 9.8 Timber cu.m 1.6 12 times usage
Unskilled md 12 Nails,Spikes,etc.kg 4.8
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height.
b) Using Steel
i) Height upto 3m Skilled md 1.7 M/s pipes m 72 100 times usage
40/50mm dia.
Unskilled md 2.6 Clamps no 42 75 times usage
ii) Height more than 3m upto 6m Skilled md 3 M/s pipes m 132 100 times usage
40/50mm dia.
Unskilled md 5 Clamps no 75 75 times usage
iii) Height more than 6m upto 9m Skilled md 5 M/s pipes m 218 100 times usage
40/50mm dia.
Unskilled md 9.6 Clamps no 125 75 times usage
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height.
22.03.02 Built-up-Beams
a)Using timber
i) Height upto 3m Skilled md 4.2 Timber cu.m 0.6 12 times usage
Unskilled md 4.2 Nails,Spikes, etc.kg 2
ii) Height more than 3m upto 6m Skilled md 7.5 Timber cu.m 1.1 12 times usage

138
Unskilled md 8.0 Nails,Spikes, etc.kg 3.3
iii) Height more than 6m upto 9m Skilled md 12.3 Timber cu.m 2 12 times usage
Unskilled md 15 Nails,Spikes, etc.kg 6
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height.
b)Using Steel
i) Height upto 3m Skilled md 2.1 M/s pipes m 90 100 times usage
40/50mm dia
Unskilled md 3.3 Clamps no 52 75 times usage
ii) Height more than 3m upto 6m Skilled md 3.8 M/s pipes m 165 100 times usage
40/50mm dia
Unskilled md 6.4 Clamps no 94 75 times usage
iii) Height more than 6m upto 9m Skilled md 6.3 M/s pipes m 273 100 times usage
40/50mm dia
Unskilled md 12 Clamps no 156 75 times usage
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height.
22.03.03 Truss
a)Using timber
i) Height upto 3m Skilled md 5.5 Timber cu.m 0.8 12 times usage
Unskilled md 5.5 Nails,Spikes, etc.kg 2.4
ii) Height more than 3m upto 6m Skilled md 9.8 Timber cu.m 1.4 12 times usage
Unskilled md 10.4 Nails,Spikes, etc.kg 4.2
iii) Height more than 6m upto 9m Skilled md 16.0 Timber cu.m 2.6 12 times usage
Unskilled md 20 Nails,Spikes, etc.kg 7.8
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height.
b)Using Steel
i) Height upto 3m Skilled md 2.7 M/s pipes m 117 100 times usage
40/50mm dia
Unskilled md 4.2 Clamps no 67 75 times usage
ii) Height more than 3m upto 6m Skilled md 4.9 M/s pipes m 214 100 times usage
40/50mm dia

139
Unskilled md 8.3 Clamps no 122 75 times usage
iii) Height more than 6m upto 9m Skilled md 8.2 M/s pipes m 355 100 times usage
40/50mm dia
Unskilled md 15 Clamps no 203 75 times usage
iv) Height more than 9m Increase the rate by 10% for every additional meter height to the rate for the previous height.
Remarks:-
1) The Unit t refers to the unit weight of structural steel in Metric tonnes.
2) For the preparation of design and drawings of false work add the following percentage of the total unit rate of falsework determined as above.
a) For RS Joists : 2%
b) For Built up Beams 3%
c) For Truss : 5%
Notes: 1) Norms for falseworks have been prepared for general topography where average height may be practically assessed. For typical
topographycal sites, e. g. gorge these norms may not be applicable.Separate norms specific to the site may have to be developed
2) Generally, materials for formwork/falsework shall not be mentioned in the contract documents/bill of quantities. The materials
may be timber, steel,etc. or their combinations as per contractors option, subject to the approval of the Engineer.
3) For the purpose of this analysis the unit rate of materials shall be determined by dividing the prevailing rate of materials by number of times
of usage mentioned in the remarks (neglecting scrap value).

140
Norms for Rate Analysis
Activity Group:- 23: Timber Construction
Resources
Activity Spec.
Description of works Labour Materials Equipment Remarks
nos Clause no Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
23.01 2300 Fabricating, Providing,
assembling and erecting Timber
superstructure inlcuding m3
necessary hardware (Falsework
not included).

23.01.01 Beam structure Skilled md 15 Salwood m3 1.1 T &P L.s 3% of labour

(seasoned & sawn) cost


Unskilled md 15 Hardware L.s 10% of timber

cost

23.01.02 Truss structure Skilled md 20 Salwood m3 1.1 T &P L.s 3% of labour

(seasoned & sawn) cost


Unskilled md 20 Hardware L.s 10% of timber

cost
23.02 2300 Providing and installing falsework
for assembling/erection of Timber
Superstructure and removing after
completion including 3
m (unit of superstructure work)
design/drawings of falsework etc.
all complete.

23.02.01 Beam structure


a) Using timber
I) Height upto 2m Skilled md 2.0 Timber m3 0.16 12 times usage
Unskilled md 2.0 Nails,spikes ,etc. kg 1.00

141
23.02.01 ii) Height more than 2m upto 4m Skilled md 3.5 Timber m3 0.28 12 times usage
Unskilled md 3.8 Nails,spikes ,etc. kg 1.70

iii) Height more than 4m upto 6m Skilled md 6.0 Timber m3 0.48 12 times usage
Unskilled md 7.2 Nails,spikes ,etc. kg 3.00

iv) Height more than 6m. Increase the rate by 10% for every additional meter height to the rate for the previous height.

b) Using steel
I) Height upto 2m Skilled md 1 MS pipes 40mm m
dia 48.0000 100 times usage
Unskilled md 1.6 Clamps no 27 75 times usage
ii) Height more than 2m upto 4m Skilled md 1.7 MS pipes 40mm dia m 84 100 times usage
Unskilled md 2.9 Clamps no 48 75 times usage

iii) Height more than 4m upto 6m Skilled md 3.0 MS pipes 40mm dia m 145 100 times usage
Unskilled md 5.3 Clamps no 83 75 times usage

iv) Height more than 6m. Increase the rate by 10% for every additional meter height to the rate for the previous height.

23.02.02 Truss
a) Using timber
I) Height upto 3m Skilled md 7.0 Timber m3 1.00 12 times usage
Unskilled md 7.0 Nails,spikes ,etc. kg 3.00

23.02.02 ii) Height more than 3m upto 6m Skilled md 12 Timber m3 1.8 12 times usage
Unskilled md 13 Nails,spikes ,etc. kg 5.3

iii) Height more than 6m upto 9m Skilled md 20 Timber m3 3.1 12 times usage
Unskilled md 24 Nails,spikes ,etc. kg 9.0

142
iv) Height more than 9m. Increase the rate by 10% for every additional meter height to the rate for the previous height.

b) Using steel
I) Height upto 3m Skilled md 3.5 MS pipes 40mm dia m 150 100 times usage
Unskilled md 5.5 Clamps no 86 75 times usage
ii) Height more than 3m upto 6m Skilled md 6.0 MS pipes 40mm dia m 264 100 times usage
Unskilled md 10.0 Clamps no 150 75 times usage

iii) Height more than 6m upto 9m Skilled md 10.0 MS pipes 40mm dia m 436 100 times usage
Unskilled md 19.0 Clamps no 250 75 times usage
iv) Height more than 9m. Increase the rate by 10% for every additional meter height to the rate for the previous height.
Remarks:-
1) The Unit m3 refers to the unit of structural timber superstructure.
2) For the preparation of design and drawings of false work add the following percentage of the total unit rate of falsework determined as above.

a) For Beam structure : 2%


b) For Truss structure : 5%
notes: 1) Norms for falseworks have been prepared for general topography where average height may be practically assessed. For typical
topographycal sites, e. g. gorge these norms may not be applicable.Separate norms specific to the site may have to be developed
2) Generally, materials for formwork/falsework shall not be mentioned in the contract documents/bill of quantities. The materials
may be timber, steel,etc. or their combinations as per contractors option, subject to the approval of the Engineer.
3) For the purpose of this analysis the unit rate of materials shall be determined by dividing the prevailing rate by number of times of usage.
usage mentioned in the remarks..

143
Norms for Rate Analysis
Activity Group:- 24: River training and Protection works
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
24.01 2401 Manually Fabrication of Gabion Add 1% of material
boxes / mattresses with cost for necessary
diapharagms including rolling, testing
cutting and weaving as per

24.01.02 2401 A.Hexagonal mesh type 100mmx120mm


ii) Mesh wire -10swg (0.0615 kg/m)
selvedge wire -8swg( 0.1057kg/m)
Box size (mx m x m)
a) 3x1x1(16sq.m) Box skilled md 0.50 Mesh wire Kg 35.10
unskilled md 0.22 selvedge wire Kg 3.91 3.390361
b) 2x1x1(11 sq.m) Box skilled md 0.34 Mesh wire Kg 24.15
unskilled md 0.15 selvedge wire Kg 2.96 2.566616
c) 1.5x1x1(9sq.m) Box skilled md 0.28 Mesh wire Kg 19.75
unskilled md 0.12 selvedge wire Kg 2.70
d) 1x1x1(6sq.m) Box skilled md 0.19 Mesh wire Kg 13.16
unskilled md 0.08 selvedge wire Kg 2.01
e) 3x1x0.75 (13.5 sq.m) Box skilled md 0.42 Mesh wire Kg 29.62
unskilled md 0.19 selvedge wire Kg 3.59
f) 2x1x0.75(9.25sq.m) Box skilled md 0.29 Mesh wire Kg 20.29
unskilled md 0.13 selvedge wire Kg 2.70
g) 1x1x0.75 (5sq.m) Box skilled md 0.16 Mesh wire Kg 10.97
unskilled md 0.07 selvedge wire Kg 1.80
h) 3x1x0.5(11sq.m) Box skilled md 0.34 Mesh wire Kg 24.15
unskilled md 0.15 selvedge wire Kg 3.28
I) 2x1x0.5(7.5 sq.m) Box skilled md 0.23 Mesh wire Kg 16.45

144
unskilled md 0.10 selvedge wire Kg 2.43
j) 1x1x0.5(4 sq.m) Box skilled md 0.12 Mesh wire Kg 8.78
unskilled md 0.06 selvedge wire Kg 1.59
k)3x1x0.3( 9sq.m) Box skilled md 0.28 Mesh wire Kg 19.75
unskilled md 0.12 selvedge wire Kg 3.03
l) 2x1x0.3(6.1sq.m) Box skilled md 0.19 Mesh wire Kg 13.40
unskilled md 0.08 selvedge wire Kg 2.22
m) 1x1x0.3(2.2sq.m) Box skilled md 0.07 Mesh wire Kg 4.83
unskilled md 0.03 selvedge wire Kg 1.41
24.01.02 2401 B.Hexagonal mesh type 80mmx100mm
ii) Mesh wire -10swg (0.0615 kg/m)
selvedge wire -8swg (0.1057 kg/m)
Box size (mxmxm)
a) 3x1x1(16sq.m) Box skilled md 0.550 Mesh wire Kg 41.30
unskilled md 0.220 selvedge wire Kg 3.91
b) 2x1x1(11 sq.m) Box skilled md 0.380 Mesh wire Kg 28.40
unskilled md 0.150 selvedge wire Kg 2.96
c) 1.5x1x1(9sq.m) Box skilled md 0.310 Mesh wire Kg 23.25
unskilled md 0.120 selvedge wire Kg 2.70
d) 1x1x1(6sq.m) Box skilled md 0.210 Mesh wire Kg 15.49
unskilled md 0.08 selvedge wire Kg 2.01
e) 3x1x0.75 (13.5 sq.m) Box skilled md 0.46 Mesh wire Kg 34.85
unskilled md 0.19 selvedge wire Kg 3.59
f) 2x1x0.75(9.25sq.m) Box skilled md 0.32 Mesh wire Kg 23.88
unskilled md 0.13 selvedge wire Kg 2.70
g) 1x1x0.75 (5sq.m) Box skilled md 0.17 Mesh wire Kg 12.91
unskilled md 0.07 selvedge wire Kg 1.79
h) 3x1x0.5(11sq.m) Box skilled md 0.38 Mesh wire Kg 28.40
unskilled md 0.15 selvedge wire Kg 3.28
I) 2x1x0.5(7.5 sq.m) Box skilled md 0.26 Mesh wire Kg 19.40

145
unskilled md 0.10 selvedge wire Kg 2.43
j) 1x1x0.5(4 sq.m) Box skilled md 0.14 Mesh wire Kg 10.33
unskilled md 0.06 selvedge wire Kg 1.59
k)3x1x0.3( 9sq.m) Box skilled md 0.31 Mesh wire Kg 23.25
unskilled md 0.12 selvedge wire Kg 3.03
l) 2x1x0.3(6.1sq.m) Box skilled md 0.21 Mesh wire Kg 15.75
unskilled md 0.08 selvedge wire Kg 2.22
m) 1x1x0.3(2.2sq.m) Box skilled md 0.08 Mesh wire Kg 5.68
unskilled md 0.03 selvedge wire Kg 1.41
24.01.03 2401 C.Hexagonal mesh type 60mmx80mm
ii) Mesh wire -12swg (0.0409 kg/m)
selvedge wire -10swg( 0.0615kg/m)
Box size (mx m x m)
a) 3x1x1(16sq.m) Box skilled md 0.44 Mesh wire Kg 32.25
unskilled md 0.18 selvedge wire Kg 2.28
b) 2x1x1(11 sq.m) Box skilled md 0.30 Mesh wire Kg 22.17
unskilled md 0.12 selvedge wire Kg 1.72
c) 1.5x1x1(9sq.m) Box skilled md 0.25 Mesh wire Kg 18.14
unskilled md 0.10 selvedge wire Kg 1.57
d) 1x1x1(6sq.m) Box skilled md 0.16 Mesh wire Kg 12.09
unskilled md 0.07 selvedge wire Kg 1.17
e) 3x1x0.75 (13.5 sq.m) Box skilled md 0.37 Mesh wire Kg 27.21
unskilled md 0.15 selvedge wire Kg 2.09
f) 2x1x0.75(9.25sq.m) Box skilled md 0.25 Mesh wire Kg 18.64
unskilled md 0.10 selvedge wire Kg 1.57
g) 1x1x0.75 (5sq.m) Box skilled md 0.14 Mesh wire Kg 10.08
unskilled md 0.06 selvedge wire Kg 1.04
h) 3x1x0.5(11sq.m) Box skilled md 0.30 Mesh wire Kg 22.17
unskilled md 0.12 selvedge wire Kg 1.90
I) 2x1x0.5(7.5 sq.m) Box skilled md 0.21 Mesh wire Kg 15.12

146
unskilled md 0.08 selvedge wire Kg 1.41
j) 1x1x0.5(4 sq.m) Box skilled md 0.11 Mesh wire Kg 8.06
unskilled md 0.04 selvedge wire Kg 0.92
k)3x1x0.3( 9sq.m) Box skilled md 0.25 Mesh wire Kg 18.14
unskilled md 0.10 selvedge wire Kg 1.76
l) 2x1x0.3(6.1sq.m) Box skilled md 0.17 Mesh wire Kg 12.29
unskilled md 0.07 selvedge wire Kg 1.28
m) 1x1x0.3(2.2sq.m) Box skilled md 0.06 Mesh wire Kg 4.43
unskilled md 0.02 selvedge wire Kg 0.82

24.02 2402 Mechanically woven crates (Gabion boxes and mattresses) with diapharagms including rolling, cutting and weaving as per specification.
Heavy zinc coated Hexagonal
mesh type 100mmx120mm, mesh
24.02.01 wire 3 mm, selvage wire 3.9 mm, crates sqm 1.00
lacing wire 2.4 mm

sqm
Heavy zinc coated Hexagonal
mesh type 80mmx100mm, mesh
24.02.02 wire 3 mm, selvage wire 3.9 mm, crates sqm 1.00
lacing wire 2.4 mm

sqm
Heavy zinc coated Hexagonal
mesh type 100mmx120mm, mesh
24.02.03 wire 2.7 mm, selvage wire 3.4 crates sqm 1.00
mm, lacing wire 2.2 mm

sqm

147
Heavy zinc coated Hexagonal
mesh type 80mmx100mm, mesh
24.02.04 wire 2.7 mm, selvage wire 3.4 crates sqm 1.00
mm, lacing wire 2.2 mm

sqm

Heavy zinc coated Hexagonal


mesh type 60mmx80mm, mesh
24.02.05 wire 2.2 mm, selvage wire 2.7 crates sqm 1.00
mm, lacing wire 2.2 mm

sqm

Zinc + PVC coated Hexagonal


mesh type 100mmx120mm, mesh
wire 2.7 mm/3.7mm, selvage wire
3.4 mm/4.4mm, lacing wire 2.2
24.02.06 mm/3.2mm with Pvc coating crates sqm 1.00
thickness nominal 0.5 mm (
minimum 0.38 mm)

sqm
Zinc + PVC coated Hexagonal
mesh type 80mmx100mm, mesh
wire 2.2 mm/3.2mm, selvage wire
2.7 mm/3.7mm, lacing wire 2.2
24.02.07 mm/3.2mm with Pvc coating crates sqm 1.00
thickness nominal 0.5 mm (
minimum 0.38 mm)

sqm

148
Zinc + PVC coated Hexagonal
mesh type 60mmx80mm, mesh
wire 2.7 mm/3.7mm, selvage wire
3.4 mm/4.4mm, lacing wire 2.2
24.02.07 mm/3.2mm with Pvc coating crates sqm 1.00
thickness nominal 0.5 mm (
minimum 0.38 mm)

sqm
24.03 Assembling Gabion boxes Box unit should
mattressess, placing in position be converted to
including stretching; forming m3 unit
compartments; tying the sides and according to
diaphragms with binding wire in size of box to
each mesh; tying with bracing arrive at norms
wires and tie wires; and tying per m3.
down the lid complete as per
specification (stone filling not
included)

Binding wire -
Binding wire -11swg
24.03.01 2401 A.Hexagonal mesh type 100mmx120mm 12swg
Box size (mxmxm)
a) 3x1x1(16sq.m) Box unskilled md 1.04 G I wire Kg 2.23 1.81
b) 2x1x1(11 sq.m) Box unskilled md 0.75 G I wire Kg 1.60 1.30
c) 1.5x1x1(9sq.m) Box unskilled md 0.68 G I wire Kg 1.54 1.25
d) 1x1x1(6sq.m) Box unskilled md 0.45 G I wire Kg 0.94 0.76
e) 3x1x0.75 (13.5 sq.m) Box unskilled md 0.90 G I wire Kg 2.06 1.67
f) 2x1x0.75(9.25sq.m) Box unskilled md 0.64 G I wire Kg 1.46 1.18
g) 1x1x0.75 (5sq.m) Box unskilled md 0.39 G I wire Kg 0.91 0.74
h) 3x1x0.5(11sq.m) Box unskilled md 0.76 G I wire Kg 1.46 1.19
I) 2x1x0.5(7.5 sq.m) Box unskilled md 0.54 G I wire Kg 1.05 0.85

149
j) 1x1x0.5(4 sq.m) Box unskilled md 0.32 G I wire Kg 0.64 0.52
k)3x1x0.3( 9sq.m) Box unskilled md 0.67 G I wire Kg 0.97 0.79
l) 2x1x0.3(6.1sq.m) Box unskilled md 0.47 G I wire Kg 0.72 0.58
m) 1x1x0.3(2.2sq.m) Box unskilled md 0.26 G I wire Kg 0.44 0.36

24.03.02 2401 B. Hexagonal mesh type 80mmx100mm I)Binding wire ii)Binding wire iii)Binding wire
Box size (mxmxm) -
-11swg -12swg 13sw
g
a) 3x1x1(16sq.m) Box unskilled md 1.18 G I wire Kg 2.54 2.06 1.61
b) 2x1x1(11 sq.m) Box unskilled md 0.85 G I wire Kg 1.80 1.46 1.15
c) 1.5x1x1(9sq.m) Box unskilled md 0.77 G I wire Kg 1.75 1.42 1.11
d) 1x1x1(6sq.m) Box unskilled md 0.51 G I wire Kg 1.07 0.87 0.68
e) 3x1x0.75 (13.5 sq.m) Box unskilled md 1.04 G I wire Kg 2.34 1.9 1.49
f) 2x1x0.75(9.25sq.m) Box unskilled md 0.74 G I wire Kg 1.66 1.35 1.06
g) 1x1x0.75 (5sq.m) Box unskilled md 0.45 G I wire Kg 0.99 0.8 0.63
h) 3x1x0.5(11sq.m) Box unskilled md 0.85 G I wire Kg 1.67 1.36 1.06
I) 2x1x0.5(7.5 sq.m) Box unskilled md 0.64 G I wire Kg 1.27 1.03 0.80
j) 1x1x0.5(4 sq.m) Box unskilled md 0.38 G I wire Kg 0.77 0.63 0.49
k)3x1x0.3( 9sq.m) Box unskilled md 0.77 G I wire Kg 1.22 0.99 0.77
l) 2x1x0.3(6.1sq.m) Box unskilled md 0.54 G I wire Kg 0.89 0.72 0.56
m) 1x1x0.3(2.2sq.m) Box unskilled md 0.30 G I wire Kg 0.55 0.45 0.35

24.03.03 2401 c.Hexagonal mesh type 60mmx80mm (II) Binding wire-


(I)Binding wire-13swg
Box size (mxmxm) 14swg
a) 3x1x1(16sq.m) Box unskilled md 1.45 G I wire kg 1.97 1.70
b) 2x1x1(11 sq.m) Box unskilled md 1.04 G I wire kg 1.42 1.23
c) 1.5x1x1(9sq.m) Box unskilled md 0.95 G I wire kg 1.35 1.06
d) 1x1x1(6sq.m) Box unskilled md 0.63 G I wire kg 0.85 0.67
e) 3x1x0.75 (13.5 sq.m) Box unskilled md 1.26 G I wire kg 1.8 1.41

150
f) 2x1x0.75(9.25sq.m) Box unskilled md 0.90 G I wire kg 1.28 1.00
g) 1x1x0.75 (5sq.m) Box unskilled md 0.55 G I wire kg 0.76 0.60
h) 3x1x0.5(11sq.m) Box unskilled md 1.08 G I wire Kg 1.37 1.18
I) 2x1x0.5(7.5 sq.m) Box unskilled md 0.77 G I wire Kg 0.99 0.86
j) 1x1x0.5(4 sq.m) Box unskilled md 0.42 G I wire Kg 0.6 0.51
k)3x1x0.3( 9sq.m) Box unskilled md 0.95 G I wire Kg 1.02 0.88
l) 2x1x0.3(6.1sq.m) Box unskilled md 0.67 G I wire Kg 0.74 0.64
m) 1x1x0.3(2.2sq.m) Box unskilled md 0.38 G I wire Kg 0.46 0.39

Norms for Rate Analysis


Activity Group:- 24: River Training and Protection works
Spec. Resources
Activity
Clause Description of works Unit Labour Materials Equipment Remarks
Nos
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
24.04 2401, Providing and filling stone m 3 skilled md Stone 3
m 1.100 This activity is to
2402 /boulder in gabion boxes becombined
1.25 with activity no
/mattress etc. including dressing,
beding, bonding and all 24.02.01,
transportation as per specification. unskilled md 24.02.02 or
24.02.03 as
2.0
applicable

Add 2% of material cost excluding transportation cost for necessary testing


24.05 Providing & laying Dry-stone
pitching in protection work, lead
30m, lift 1.5m

151
2411 Soil nailing system for slope protection
1.0 Taking panels from the 5%
Krismer 3D Wire cutter, Labour
palette, cutting them if
10 m2 unskilled nos 0.25 Profile Kg 34.5 safety cables L.S. costs
necessary, joining the panels
to longer rows by overlapping 12 mm bars Kg 12.46
and binding and putting on Clamps Nos 4
Binding wire
the slope, insertion of
loops Nos 50
distribution bars, fixing with
2.0

Driving the nails by using


handhold or pneumatic
hammer (nail length between
1-1.25 m), (first drilling with a
diameter of 28 mm hole and
filling with cement mortar and
then driving the nails (T-
25x35mm with curved head),
max distance 1.5 m-2.0 m
Handhold or
T-Profile 5%
a In soft soil
2
10 m Skilled nos 0.156 25x35mm
Kg 19.35 Pneumatic L.S.
hammer, safety Labour
2
b In rocky soil (holes may need to 10
be m
bored, cement may
Skilled nos be required)
0.208 Cement Kg 6 cables L.S. costs
3.1
Filling the installed Krismer
Profile with gravel size 30-60
mm using equipment
Dredger crane,
Shallow slope (< 45 Degree) loader or bucket
a with use of machine 10 m2 skilled nos 0.043 m3 0.5 conveyer belt hr 0.4
Steep Slope (>45 degrees) Gravel 30-
b with use of machine 10 m2 skilled nos 0.060 60mm m3 0.5 hr 0.5

152
3.2
Filling the installed Krismer
Profile with gravel size 30-60
mm using labours
Doko, Thunche 5%
2 3 Labour
a Shallow slope (< 45 Degree) 10 m unskilled nos 0.430 Gravel 30- m 0.5
costs
b Steep Slope (>45 degrees) 10 m2 unskilled nos 0.600 60mm m 3
0.5
4.0 Filling with humus using
labours
Doko, Thunche 5%
2 3 Labour
a Shallow slope (< 45 Degree) 10 m unskilled nos 0.350 Humus m 0.4
costs
b Steep Slope (>45 degrees) 10 m2 unskilled nos 0.500 material m 3
0.4

24.04.01 2413 With stone size not less than m3 skilled md 0.60 stone m3 1.100 Pitching should be
(4) 0.01m3 including levelling etc. unskilled md 2.00 measured in
complete. sq.m. converting
m3 into sq.m.
Considering the
design thickness
24.04.02 2406 with stone weight not less than 40 m3 skilled md 0.60 stone m3 1.100
(2,5) kg including levelling etc. unskilled md 3.00
complete.
24.05 2413 Providing and laying grouted m3 skilled md 0.8 stone m3 1.100 Pitching should be
(5); stone pitching in protection work unskilled md 2.5 cement t 0.194 measured in sq.m.
2416 with stone size not less than 0.01 sand 3 0.420 considering the
m
m3 and cement : sand motar (1:3)
(5)(b)
lead 30m, lift 1.5m thickeness

24.06 2413 Providing and Installation of Rock


Dowel including grouting

153
a) without using mechanical aid no unskilled md 1.00 Dowel bar 20mm dia.
Or as specified m 1.000
Grouting materials

as specifed
b) using mechanical aid
i)Pneumatic rock driller no unskilled Diesel lit 2.000
(for grouting ) md 0.02 Dowel bar 20mm dia Air-compressor hr 0.17 holes : 48 nos/day
or as specifed m 1.000 (40-60 HP)
Grouting materials Jack hammer hr 0.17
as specifed
ii) Portable rock driller no unskilled Petrol lit 1.000
(for grouting )md 0.02 Dowel bar 20mm dia
or as specifed m 1.000
Grouting materials portable rock drill hr 0.5 holes : 16 nos/day
as specifed
24.07 2413, Drilling works (except for vertical m unskilled md 1.40 Diesel lit 6.000 Air compressor
2415 drilling rig, including fixing of (40-60 HP) hr 0.60
machine, drill in a hole Drilling plateformLs see note Pneunatic driller incl. hr 0.60
dia<120mm, drill hole length Drilling bits no 0.4 Casing pipe
upto 25m & accessories
Note: (I) LS for drilling plateform to be determined considering the type of drilling and site conditions.
24.08 2413 Installation of Rock anchor( Air compressor
(10) 25mm)dia grouted dowel bar 40-60Hp hr 0.50
or as specified), in fractured Rm unskilled md 2.40 Diesel lit 6.000
rock, driill dia <120 mm
including drilling work Drilling plateformLs see note Jack hammer incl. 0.40
Drill bits no 0.400 Casing pipe
Rock dowel rod m 1.000 & accessaries (coupling in
Hexagonal anchor 3m piece)
coupling no 0.330

154
Anchor plate
with hexagonal no 0.070
nut
cement kg to be determined as per design
grout Injection
Admixture 0.005% Equipment hr 0.10
of cement
Note: (i) LS for drilling plateform to be determined considering the type of drilling and site condition
24.09 2413 Installation of Rock bolts Air compressor
(ii) Including drilling Rm unskilled md 2.40 Diesel lit 6.000 (40-60Hp) hr 0.50
Drilling plateform Ls see note
Jack hammer hr 0.40
drill bits no 0.400 Casing pipe
Rock dowel rod m 1.000 accessories
Hexagonal materials Ls
anchor coupling no 0.330 spare parts Ls
(coupling in 3m
piece)
Anchor plate with grout Injection
hexagonal nut no 0.070 equipment hr 0.1

Cement kg to be determined as per design


Admixture 0.005%
of cement
Note: LS for drilling plateform to be determined considering the type of drilling and site conditions.

24.10 2414 Providing, laying and fixing of Geo- m2 unskilled md 0.0170 Geotextile m2 1.200
textile (filter fabrics), lead 30m
3110
24.11 2414 Providing and laying HDP pipes
with perforations including
jointings (no. and dia of holes to
be specified)

155
Providing and laying HDP pipes
with perforations including
jointings (no. and dia of holes to
be specified)
a) series II, HDP pipe 250 mm dia m unskilled md 0.10 HDP pipe m 1.000 Generator<2kva hr 0.44
skilled md 0.05 screw jack hr 0.32
semiskilled md 0.05 Petrol lit. 0.200 electric heaing plate
hr 0.32
electric handdrillerhr 0.13

b) series II HDP pipe 160mm dia m unskilled md 0.09 Generator <2kva hr 0.40
skilled md 0.04 HDP pipe m 1.000 screw jack hr 0.26
semiskilled md 0.04 Petrol lit. 0.180 electric heating plate
hr 0.28
electric handdrillerhr 0.12
24.12 2414 Back fill with graded filter materials in m3 unskilled md 0.8 graded filter
layer with necessary watering and
3110 materials m3 1.100
compaction, lead 30m, lift 1.5m.

24.13 2416 Laying of Rip-rap protection work m3 skilled md 0.70 boulders/stones m3 1.100 crane 15 t - capacity
hr 0.15 Rip-rap should be
(2,3) with boulders weighing 2000 kg unskilled md 2.10 Diesel lit. 2.500 measured in sq.m
minimum and packed with stones considering the
20-40 kg, lead 30m, using crane.
design thickness

24.14.01 2416 Providing and placing concrete


(2),(4) with 60% M 15/40 concrete and
40% boulders/stones as per
specification Lead 30m, lift 1.5m
a) using concrete mixer machine m3 skilled md 0.30 cement t 0.169 concrete mixer hr 0.50
&vibrator unskilled md 3.00 aggregates: 3
0.28/0.20m capacity
20-40(mm) m 3 0.345 concrete vibrator hr 0.10
10-20 (mm) m 3 0.156
5-10(mm) m 3 0.072
24.15 2416 Laying of dry stone rip rap for scour
protection and river training works
with stone weighing not less than 75
kg and packed with stones 20-40kg,
lead 30m.

156
Laying of dry stone rip rap for scour
(2,3) protection and river training works
with stone weighing not less than 75
kg and packed with stones 20-40kg,
lead 30m.
a) using mechanical means m3 skilled md 0.70 boulders/stones m3 1.100 1) Hydraulic jack hr 0.45 Rip-rap should be
unskilled md 2.10 2) power winch hr 0.45 measured in sq.m
Petrol lit. 0.010 considering the
design thickness
b) without using mechanical m3 skilled md 0.70 boulders/stones m3 1.100
means unskilled md 5.00
24.16.01 2416 Providing and placing concrete
(2),(4) with 60% M 15/40 concrete and skilled md 0.30 cement t 0.169 concrete mixer hr 0.50
40% boulders/stones as per unskilled md 3.00 aggregates: 3
0.28/0.20m capacity
specification Lead 30m, lift 1.5m
20-40(mm) m 3 0.345 concrete vibrator hr 0.10
a) using concrete mixer machine m3 10-20 (mm) m 3 0.156
&vibrator 5-10(mm) 3 0.072
m
sand m 3 0.299
petrol lit 0.100
diesel lit 3.000
Boulder/Stone m3 0.440
b) without using concrete mixer m3 skilled md 0.30 cement t
machine & vibrator unskilled md 4.00 aggregates: 0.185
20-40(mm) m 3 0.156
10-20 (mm) m3 0.072
5-10(mm) m3 0.299
sand m3 0.299
Boulder/Stone m3 0.440

24.16.02 2416 Providing and placing plum-


(2),(4) concrete with 70% M 15/40
concrete and 30%
boulders/stones as per
specification. Lead 30m, lift 1.5m.

157
Providing and placing plum-
concrete with 70% M 15/40
concrete and 30%
boulders/stones as per
specification. Lead 30m, lift 1.5m.

158
Providing and placing plum-
concrete with 70% M 15/40
concrete and 30%
boulders/stones as per
specification. Lead 30m, lift 1.5m.

a) using concrete mixer machine m3 skilled md 0.30 cement t 0.195 concrete mixer hr 0.50
&vibrator unskilled md 3.00 aggregates: 0.28/0.20m3 capacity
20-40(mm) m 3 0.398 concrete vibrator hr 0.10
10-20(mm) m 3 0.180
5-10(mm) m 3 0.082
sand m 3 0.345
petrol lit 0.100
diesel lit 3.000
Boulder/Stone m3 0.330
b) without using concrete mixer m3 skilled md 0.30 cement t 0.214
machine & vibrator unskilled md 4.00 aggregates:
20-40(mm) m3 0.398
10-20 (mm) m 3 0.180
5-10(mm) m 3 0.082
sand m3 0.345
Boulder/Stone m3 0.330

Norms for Rate Analysis


Activity Group:- 25: Bricksworks for Structures
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
Providing and laying brick 1. Add 1.5% of
25.01 2502, masonry in machine mixed
cement mortar including
preparation of mortar as per
specification, lead 30 m.

159
Providing and laying brick
masonry in machine mixed
cement mortar including the total cost
2503, preparation of mortar as per for
specification, lead 30 m. quality
2504,
control
2505, test
2. Add 3%of
2507,
the
total labour
(cement : sand) 1:3 m3 Skilled md 1.50 Bricks no 560.000 Concrete mixer hr 0.150
cost
for small
Unskillled md 2.50 Cement t 0.120 (0.28 / 0.2 m3)
tools
Sand m3 0.220 and plant
Diesel lit 1.000
water lit 72.000
(cement : sand) 1:4 m3 Skilled md 1.50 Bricks no 560.000 Concrete mixer hr 0.150
3
Unskillled md 2.50 Cement t 0.090 (0.28 / 0.2 m )
3
Sand m 0.250
Diesel lit 1.000
water lit 54.000
(cement : sand) 1:6 m3 Skilled md 1.50 Bricks no 560.000 Concrete mixer hr 0.150
3
Unskillled md 2.50 Cement t 0.060 (0.28 / 0.2 m )
3
Sand m 0.300
Diesel lit 1.000
water lit 36.000
Providing and laying brick 1. Add 1.5% of
25.02 2502, masonry in manual mixed cement
mortar including preparation of the total cost
2503, mortar as per specification, lead for
30 m. quality
2504,
control
2505, test

160
2. Add 3%of
2507, (cement : sand) 1:3 m3 Skilled md 1.50 Bricks no 560.000
the
total labour
Unskillled md 3.00 Cement t 0.120
cost
for small
Sand m3 0.220
tools
water lit 72.000 and plant
3
(cement : sand) 1:4 m Skilled md 1.50 Bricks no 560.000
Unskillled md 3.00 Cement t 0.090
Sand m3 0.250
water lit 54.000
(cement : sand) 1: 6 m3 Skilled md 1.50 Bricks no 560.000
Unskillled md 3.00 Cement t 0.060
Sand m3 0.300
water lit 36.000
Providing and applying 12.5mm 1. Add 1.5% of
25.03 2502 thick cement plaster including
mortar mixing, scaffolding, curing the total cost
2510 etc. complete as per specification for
lead 30 m (Using mixer machine)
quality control
(4)

100m2 test
2. Add 3%of
the
total labour
(cement : sand) 1: 2 Skilled md 11.00 Cement t 0.850 Concrete mixer hr 0.75 cost

for small tools


Unskilled md 11.00 Sand m3 1.200 (0.28 / 0.2 m3)

Water lit 300.000 and plant


Diesel lit 5.000

161
(cement : sand) 1: 3 Skilled md 11.00 Cement t 0.650 Concrete mixer hr 0.75
3
Unskilled md 11.00 Sand m 1.300 (0.28 / 0.2 m3)
Water lit 200.000
Diesel lit 5.000
(cement : sand) 1: 4 Skilled md 11.00 Cement t 0.550 Concrete mixer hr 0.75
3 3
Unskilled md 11.00 Sand m 1.450 (0.28 / 0.2 m )
Water lit 170.000
Diesel lit 5.000
(cement : sand) 1: 6 Skilled md 11.00 Cement t 0.380 Concrete mixer hr 0.75
3 3
Unskilled md 11.00 Sand m 1.560 (0.28 / 0.2 m )
Water lit 130.000
Diesel lit 5.000
Providing and applying 12.5mm 1. Add 1.5% of
25.04 2502, thick cement plaster including
mortar mixing, scaffolding, curing the total cost
2510, etc. complete as per specification for
lead 30 m (manual mixing) quality
(4) 100m2 control
test
2. Add 3%of
.
the
(cement : sand) 1: 2 total labour
Skilled md 12.00 Cement t 0.85
cost
for small
Unskilled md 16.00 Sand m3 1.20
tools
Water lit 300.00 and plant

(cement : sand) 1: 3 Skilled md 12.00 Cement t 0.65


3
Unskilled md 16.00 Sand m 1.30
Water lit 200.00

162
(cement : sand) 1: 4 Skilled md 12.00 Cement t 0.55
3
Unskilled md 16.00 Sand m 1.45
Water lit 170.00

(cement : sand) 1: 6 Skilled md 12.00 Cement t 0.38


3
Unskilled md 16.00 Sand m 1.56
Water lit 130.00
Providing and applying 20mm 1. Add 1.5% of
25.05 2502, thick cement plaster including
mortar mixing, scaffolding, curing the total cost
2510 etc. complete as per specification for
lead 30 m (Using mixer machine) quality
(4)
control
100m2 test
2. Add 3%of
the
total labour
cost
(cement : sand) 1: 2 for small
Skilled md 13.00 Cement t 1.300 Concrete mixer hr 1.50
tools
Unskilled md 13.00 Sand m3 1.900 (0.28 / 0.2 m3) and plant
Water lit 450.000
Diesel lit 7.000
(cement : sand) 1: 3 Skilled md 13.00 Cement t 0.950 Concrete mixer hr 1.50
3
Unskilled md 13.00 Sand m3 1.950 (0.28 / 0.2 m )
Water lit 300.000
Diesel lit 7.000
(cement : sand) 1: 4 Skilled md 13.00 Cement t 0.800 Concrete mixer hr 1.50
3
Unskilled md 13.00 Sand m3 2.200 (0.28 / 0.2 m )

163
Diesel lit 7.000
Water lit 270.000
(cement : sand) 1: 6 Skilled md 13.00 Cement t 0.580 Concrete mixer hr 1.50
3
Unskilled md 13.00 Sand m3 2.320 (0.28 / 0.2 m )
Diesel lit 7.000
Water lit 190.000
Providing and applying 20mm 1. Add 1.5% of
25.06 2502, thick cement plaster including
mortar mixing, scaffolding, curing
etc. complete as per specification
lead 30 m (manual mixing)

164
Providing and applying 20mm
thick cement plaster including
mortar mixing, scaffolding, curing the total cost
2510 etc. complete as per specification for
lead 30 m (manual mixing) quality
(4) 100m2 control
test
2. Add 3%of
the
total labour
cost
(cement : sand) 1: 2 for small
Skilled md 14.00 Cement t 1.300
tools
Unskilled md 19.00 Sand m3 1.800 and plant
Water lit 450.000

(cement : sand) 1: 3 Skilled md 14.00 Cement t 0.950


3
Unskilled md 19.00 Sand m 1.950
Water lit 300.000

(cement : sand) 1: 4 Skilled md 14.00 Cement t 0.800


3
Unskilled md 19.00 Sand m 2.200
Water lit 270.000

(cement : sand) 1: 6 Skilled md 14.00 Cement t 0.580


3
Unskilled md 19.00 Sand m 2.320
Water lit 190.000

Norms for Rate Analysis


Activity Group:- 26:Masonry work for Structures
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos
No. Unit

165
Spec.
Activity
Clause Description of works Remarks
Nos
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
26.01 2602 Providing and laying dry stone
2603 masonry (coursed rubble)
2608 including dressing etc. complete
as per specification, lead 30m.
(a) Masoned height 0-5m. m3 Skilled md 1.25 Stone m3 1.150 Add 3%of the
total labour cost
Unskillled md 2.0
for T & P

26.02 Providing and laying random rubble m3 Skilled md 1.00 Stone m3 1.150
stone mansory in mud mortar lead 30m Unskillled md 2.25 Mud (clay) m 3
0.400 Add 3%of the
total labour cost
masoned height 0-5m Water lit 60.000
for T & P

26.03 2602 Providing and laying Random (i) Add 1.5%of


2603 rubble stone masonry in cement the total cost
2607 mortar including scaffolding, for quality
curing, preparation of mortar etc. control test.
complete, masoned height 0-5m,
(ii) For 5-10m
lead 30m (machine mixing) mortar
height, add one
35%
(cement :sand )1:3 unskilled
m3 Skilled md 1.50 Diesel lit 1.000
labour
Unskillled md 3.50 Cement t 0.190 Concrete mixer hr 0.150 (iii) Add 3% of
3
Sand m 0.400 (0.28/0.2 m3) the total labour
Stone m 3
1.150 cost for t & p
water lit 120.000

(cement :sand )1:4 Skilled md 1.50 Cement t 0.155 Concrete mixer hr 0.150
3 3
m Unskillled md 3.50 Sand m 0.450 (0.28/0.2 m3)
3
Stone m 1.150
Diesel lit 1.000
water lit 100.000

166
(cement :sand )1:6 m3 Skilled md 1.50 Cement t 0.105 Concrete mixer hr 0.15
3
Unskillled md 3.50 Sand m 0.500 (0.28/0.2 m3)
3
Stone m 1.150
Diesel lit 1.000
water lit 70.000
26.04 2607 Providing and laying Random (i) Add 1.5%of
rubble masonry in cement mortatr the total cost
including scaffolding, curing, for quality
preparation of mortar etc. control test.
complete, masoned height 0-5m,
(ii) For 5-10 m height,
lead 30m (manual mixing) mortar
35% add one unskilled
(cement sand) 1:3 m3 Skilled md 1.5 Cement t 0.190 labour
3
Unskillled md 4.5 Sand m 0.400 (iii) Add 3% of the
3
Stone m 1.150 total labour cost for
water lit 120.000 T&P

(cement sand) 1:4 m3 Skilled md 1.5 Cement t 0.155


3
Unskillled md 4.5 Sand m 0.450
3
Stone m 1.150
water lit 100.000
(cement sand) 1:6 m3 Skilled md 1.5 Cement t 0.105
3
Unskillled md 4.5 Sand m 0.500
3
Stone m 1.150
water lit 70.000
26.05 2600 Providing and laying coursed (i) Add 1.5%of
rubble masonry in cement mortatr the total cost
including dressing, scaffolding, for quality
curing and preparation of mortar control test.
etc. complete, masoned height 0-
5m, lead 30m (machine mixing)
mortar 30%

167
Providing and laying coursed
rubble masonry in cement mortatr
including dressing, scaffolding,
curing and preparation of mortar
etc. complete, masoned height 0-
(ii) For 5-10m
5m, lead 30m (machine mixing)
height add one
mortar 30%
(cement : sand) 1:3 unskilled
m3 Skilled md 2.0 Cement t 0.190 Concrete mixer hr 0.15
3 3
labour
Unskillled md 3.5 Sand m 0.40 (0.28/0.20 m ) (iii) Add 3% of
Stone m 3
1.15 total labour
Diesel lit 1.0 cost for T & P
water lit 120.000

(cement : sand) 1:4 m3 Skilled md 2.0 Cement t 0.155 Concrete mixer hr 0.15
3 3
Unskillled md 3.5 Sand m 0.45 (0.28/0.20 m )
3
Stone m 1.15
Diesel lit 1.0
water lit 100.000

(cement : sand) 1:6 m3 Skilled md 2.0 Cement t 0.105 Concrete mixer hr 0.15
3 3
Unskillled md 3.5 Sand m 0.50 (0.28/0.20 m )
3
Stone m 1.15
Diesel lit 1.0
Diesel lit 1.0
26.06 2600 Providing and laying coursed (i) Add 1.5%of
rubble masonry in cement mortatr the total cost
including dressing, scaffolding, for quality
curing and preparation of mortar control test.
etc. complete, masoned height 0-
5m, lead 30m (manual mixing) (ii) For 5-10 m height
(cement : sand) 1:3 m3 Skilled md 2.0 Cement t 0.190 add one unskilled labour
3
Unskillled md 4.5 Sand m 0.400 (iii) Add 3% of
Stone m 3
1.150 total labour
water lit 120.000 cost for T & P

168
(cement : sand) 1:4 m3 Skilled md 2.0 Cement t 0.155
3
Unskillled md 4.5 Sand m 0.450
3
Stone m 1.150
water lit 100.000

(cement : sand) 1:6 m3 Skilled md 2.0 Cement t 0.106


3
Unskillled md 4.5 Sand m 0.500
3
Stone m 1.150
water lit 70.000

26.07 2602 Providing, Mixing and Pointing (i) Add 1.5%of


2603 cement mortar over rubble the total cost
2510 mansory works including for quality
scaffolding etc.complete as per control test.
(3)
specification lead 30m (machine
(cement : sand) 1:1 100 Skilled md 10.00 Cement t 0.612 Concrete mixer hr 0.75 (ii) Add 50%
m 2
Unskilled md 13.00 Sand m 3 3
0.430 (0.28/0.20 m ) labour
coefficient for
water lit 100.000
ruled pointing
Diesel lit 4.000
work.
(cement : sand) 1: 2 100 Skilled md 10.00 Cement t 0.408 Concrete mixer hr 0.75
2 3 3 (iii) Add 3%
m Unskilled md 13.00 Sand m 0.570 (0.28/0.20 m )
total labour
water lit 70.000 cost for T & P
Diesel lit 4.000
(cement : sand) 1: 3 100 Skilled md 10.00 Cement t 0.306 Concrete mixer hr 0.75
2 3 3
m Unskilled md 13.00 Sand m 0.630 (0.28/0.20 m )

169
water lit 50.000
Diesel lit 4.000
26.08 2602 Providing, Mixing and Pointing (i) Add 1.5%of
2603 cement mortar over rubble the total cost
2510 mansory works including for quality
scaffolding etc.complete as per control test.
specification lead 30m (manual
(3) mixing)
(cement : sand) 1:1 100 Skilled md 10.00 Cement t 0.612
2 3
m Unskilled md 14.00 Sand m 0.430
water lit 100.000

100 Skilled md 10.00 Cement t 0.408 (ii) Add 50%


(cement : sand) 1: 2 m 2
Unskilled md 14.00 Sand m 3
0.570 labour
coefficient for
water lit 70.000
ruled pointing
work.
100 Skilled md 10.00 Cement t 0.306
2 3 (iii) Add 3% of
m Unskilled md 14.00 Sand m 0.630
total labour
(cement : sand) 1: 3 water lit 50.000 cost for T & P

Norms for Rate Analysis


Activity Group:- 27 : Repairs of structures
Resources
Activity Spec.
Description of works Labour materials Equipment Remarks
nos Clause no. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
27.01 2706 Proving epoxy adhesive and compressed air Add 5% of total
sealing of cracks by injecting operated epoxy cost for quality
epoxy adhesive as per injection gun (A) hr 0.60 control
specification

170
100kg unskilled md 0.1 epoxy resin kg 100 or
skilled md 0.5 like sikadur injection equipment hr 0.08
Diesel for (A) lit 6.00 having automatic
or pressure control (B)
27.02 2707 Supply and place epoxy mortar, 25mm thick, Diesel for (B) lit 2.00
for replacement of spalled concrete
including prime coat and seal coat as per
specification

m2 skilled md 1.20 Diesel lit 2.00 Add 5% of total cost

unskilled md 2.00 epoxy resin kg 0.40 for quality control


epoxy mortar kg 55 mortar mixer hr. 0.4 as per specification

27.03 2708 Supply and place epoxy resin for skilled md 1.00 epoxy resin like kg 1.00 Air compressor hr 0.01 Add 5% of total cost
bonding of new concrete to m2 unskilled md 0.10 skadur for quality control
old concrete as per specification as per specification

27.04 2709 Providing and performing 100 Diesel lit 8.00 Drilling machine hr 1.0
2403(10) cement Grouting kg of unskilled md 0.13 Cement kg 100 mechanical mixer hr 0.8
2403(11) cement md
skilled(operator) 0.26 Sand (optional) kg as per design Grout injecting pump hr 0.6
Admixture(optional) kg as per design or

high pressure hr 0.1


Diesel lit 1.00 grouting pump
Water lit 80.00
27.05 2709 Providing and installing nipples for
cement grouting no Add 10% of the cost

Nipple no 1 of nipples for labour,

(Material, dia. and equipment etc.


length as per design)

171
Norms for Rate Analysis
Activity Group:- 27 : Repair of structures
Resources
Activity Spec.
Description of works Labour Materials Equipment Remarks
nos Clause no. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
27.06 2710 Providing and application of 10 unskilled md 2.300 cement t 0.17 Air compressor
gunite/shortcrete mixed by sq.m skilled md 0.530 sand m3 0.19 >65HP hr 0.330
machine, lead 30m (including 3
aggregates m 0.37 concrete mixer
30% loss)
i) 1:1.5:3 mix 5-10mm >0.5m3(dry) hr 0.670
Quick setting short creting
compound kg 5.30 machine hr 0.330
diesel lit 5.50
Water lit 70
ii) Mix 1:1:2 10 unskilled md 2.300 cement t 0.260 Air compressor
sq.m skilled md 0.530 sand m3 0.19 >65HP hr 0.330
3
aggregates m 0.37 concrete mixer
5-10mm >0.5m3(dry) hr 0.670
Quick setting short creting
compound kg 5.3 machine hr 0.330
diesel lit 5.5
Water lit 70
iii) Mix 1:3(cement & coarse 10 unskilled md 2.300 cement t 0.221 Air compressor
sand) sq.m skilled md 0.530 sand m3 0.47 >65HP hr 0.330
Quick setting concrete mixer
compound kg 4.43 >0.5m3(dry) hr 0.670
Diesel lit 5.5 short creting
machine hr 0.330
27.07 2713 Removal of old paints by sand blastingm 2
skilled Diesel lit 4.0 Air compressor hr 0.320 Add 10% for total
cleaning and repairing of metal surfaces md 0.120 sand m 3
0.04 Blasting cost scaffolding,

172
for the application of new paints as per (1.7mm to machine hr 0.320 protection etc.
specification. unskilled md 0.080 600 micro-mm)

27.08 2713 Painting of steel bridges with one coatmof2 skilled md 0.014 i) Epoxy Red Paint sprayer 1) Add 10% for
primer, one coat of epoxy and 2 coats unskiled md 0.014 Zinc Oxide machine with total cost
of acrylic polyurethane as per Phosphate Primer lit 0.075 compressor hr 0.019 scaffolding,
specification. Diesel lit 0.3 protection etc.
ii) 2 Pack high Paint sprayer 2) Add 10% of
built epoxy lit 0.192 machine with total cost for
Diesel lit 0.6 compressor hr 0.048 testing and
iii) 2 Pack high Paint sprayer providing
built polyur - machine with inspection
ethane lit 0.194 compressor hr 0.048 facilities
Diesel lit 0.6

27.09 2713 Painting of steel bridges with one coatmof2 skilled md 0.600 I) Epoxy 1) Add 10% of
primer , one coat of epoxy and 2 coats unskilled md 0.600 Red oxide total cost for
of Acrylic polyurethane as per Zinc phosphate scaffolding,
speicfication (without using paint primer lit 0.075 protection etc. if
sprayer) II) 2 pack of high required 2) Add
built epoxy lit 0.192 10% for testing
iii) 2 pack of and providing
high built 0.194 inspection
polyurethane facilities as per
specification

173
27.10 Providing and planning of concrete for
repair of defects in concrete structure
including removal of defective
concrete
2703 a) for minor defects m3 Skilled md 1.050 Acrylic polymer m3 1.000 Add 10% of total
Unskilled md 4.250 modified cementious cost for all types
mortar of test
facilities

2704 b) for major defects m3 Skilled md 0.550 M30/10 m3 1.000


2705 Unskilled md 3.750 concrete
as per design
drawings
27.11

27.12

27.13
27.14

Norms for Rate Analysis


Activity Group:- 28 : Bio- Engineering
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
no Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
28.01 2802 Collection and preparation of seeds
28.01.01 2802 Collection of grass seeds from kg Unskilled md 1.50 Sealed bag no 1.00 Khukuri - 3% of the
sources within 1km of the road,
including separating and
preparing seed for storage, and
drying seed in the sun.

174
Collection of grass seeds from
sources within 1km of the road, labour cost
including separating and
preparing seed for storage, and
drying seed in the sun.

28.01.02 2802 Collection of large shrub seeds kg Unskilled md 0.45 - - - Khukuri - 3% of the
(e.g. bhujetro from sources within labour cost
1km of the road including seed
preparation for storage after
drying.
28.01.03 2802 Collection of medium-sized shrub kg Unskilled md 0.75 Sealed bag no 1.00 Nanglo - 3% of the
seeds (eg Keraukose) from labour cost
sources within 1km of the road,
including seed preparation for
storage after drying.

28.01.04 2802 Collection of medium-sized shrub kg Unskilled md 0.95 Sealed bag no 1.00 Nanglo - 3% of the
and tree seeds (eg arefi, khayer, labour cost
ghobre and rani salla, sisau) from
sources within 1 km of the road,
including seed preparation for
storage after drying.

28.01.05 2802 Collection of small shrub and tree kg Unskilled md 2.50 Sealed bag no 1.00 Nanglo - 3% of the
seeds (eg Dhanyero, dhusun, labour cost
tilka, utis) from the sources within
1km of the of the road, including
seed preparation for storage after
drying.

28.02 2803 Collection of grass and hardwood


cuttings for vegetative propagation

28.02.01 2803 Collection of grass clumps (eg 1000 Unskilled md 1.50 Adequate supply Kodalo - 3% of the
amliso, kans, khar)from sources slips of appropriate labour cost
within 1km of the road to make
slips for multiplication in the
nursery.

175
Collection of grass clumps (eg
amliso, kans, khar)from sources
within 1km of the road to make clumps - -
slips for multiplication in the 2
Hessian jute m 5.00
nursery.

28.02.02 2803 Collection of cuttings of small 1000 Unskilled md 3.00 Adequate Kodalo - 3% of the
bamboos (e.g. padang bans, tite slips supply of Khukuri - labour cost
nigalo bans), suitable for appropriate
traditional planting, from the
clumps - -
sources within 1km of the road. 2
Material minimum 10 cm of the Hessian jute m 10.00
rooted rhizome and 90 cm of

28.02.03 2803 Collection of hardwood cuttings 1000 Unskilled md 0.85 Adequate Khukuri - 3% of the
(e.g. assuro, basin, kanda phul, slips supply of labour cost
namdi phul, saruwa, simali) , from appropriate
the sources within 1km of the road
clumps -
of the road.Material minimum 30
cm in length and 2 cm in dia. Hessian jute m2 5.00

28.03 2804 Nursery operation and


management (bed preparation)

28.03.01 2804 Construction of seed beds for tree 5m2 Skilled md 1.50 Bamboo poles no 9.00 Khanti - 3% of the
seedlings, including materials for Unskilled md 2.00 Polyethene Sheet m 2
9.00 Shovel - labour cost
beds and shades. Bed is 1m wide
Bricks no 96.00 Pick axe -
x 17cm high and made up of 5 cm
of washed gravel, 5cm of Gravel m3 0.25 Screen
3
unsieved forest soil, 5cm of 1:3 Unsieved Soil m 0.10 Mesh -
mix of sieved forest soil, and Line String m 13.00
washed sand, 2 cm of washed, Binding wire kg 3.00
sieved and sterilized sand. [Add
5% to the number of bricks to
allow for normal wastage].

176
28.03.02 2804 Construction of stand out beds for 5m2 Unskilled md 6.00 Bamboo no 15.00 Khanti - 3% of the
tree seedling in polypots, including Bricks no 96.00 Shovel - labour cost
material for beds and shades.Bed
Line String m 13.00 Pick axe -
is 100cm widex15cm high, with a
Binding wire kg 3.00
5cm layer of gravel placed above
the compacted ground. [Add 5% Gravel 0.25
to the number of bricks to allow
for normal wastages.]

28.03.03 2804 Construction of beds for grass 5m2 Skilled md 1.00 Gravel m3 0.38 Shovel - 3% of the
seeds, grass slips (ie vegetative Unskilled md 1.50 Forest soil 3
1.46 Pick axe -
m labour cost
propagation ) and tree cuttings, 3
including materials and hessian Compost m 0.38
3
cover. Bed is 100 cm wide x 25 Washed Sand m 0.46
cm high and made up of 5cm of Hessian jute cover m 2
10.00
washed gravel placed above the
ground, 5cm of 1:1 mix of sieved
soil and compost, and topped
with 15 cm of 3:1 mix of sieved
forest topsoil and washed sand.
28.03.04 2804 Constuction of beds for 5m2 Skilled md 2.00 Gravel m3 0.38 Shovel - 3% of the
propagation of bamboo culm Forest soil 3
1.46 Pick axe -
m labour cost
cuttings, including materials and 3
hessian cover. Bed is 100 cm Compost m 0.38 Khukuri -
3
wide x 30cm high. The ground Washed Sand m 6.00 Log saw -
below the bed is dug to a depth of Hessian jute cover m2 25.00
30 cm. Bed is made with 10cm
unsieved soil and 20cm high is
formed around the edge.

28.04 2805 Nursery operation and


management (seed sowing and
transplanting; planting
hardwood cuttings)
28.04.01 2805 Tree seed sowing @ 10 grammes 5m2 unskilled md 0.04 Seed g 50.00 Bowl - 3% of the
per sq.m. (medium sized seeds )
or 2 grammes per sq.m (very fine
seeds) into seed beds including
pre-sowing treatment.

177
Tree seed sowing @ 10 grammes
per sq.m. (medium sized seeds ) Trowel - labour cost
or 2 grammes per sq.m (very fine
seeds) into seed beds including
pre-sowing treatment.

28.04.02 2805 Preparing potting mix and filling 1000 unskilled md 10.00 Polypot no 1050.00 Sieve - 3% of the
polypots, including all materials for no Sand m 3
0.46 Shovel - labour cost
container seedlings. [Note.1kg of 3
Soil m 0.70
200 guage polypots (4"x7" laid
3
flat)= 464 bags; 200 guage black Compost m 0.23
polythene is preferred]
28.04.03 2805 Direct sowing of tree seeds into 1000 Unskilled md 0.62 Seed no 1500.00 Wooden peg no 1.00
polypots including seed treatment, no 3% of the
by sowing one seed in half the labour cost
pots and two seeds in the other
half.
28.04.04 2805 Pricking out young seedling and 100 Unskilled md 0.18 - - - Wooden peg no 1.00
transplanting into polypots. no Tray - 3% of the
labour cost
28.04.05 2805 Pricking out young seedling and 1000 Unskilled md 0.12 - - - Wooden peg no 1.00
transplanting into beds. no
28.04.06 2805 Transplanting grass slips into m2 Unskilled md 0.12 Hessian jute m2 0.30 Khurkuri - 3% of the
beds, from clumps.Slips are Shovel - labour cost
planted at 10 cm centres in row
25 cm apart.
28.04.07 2805 Planting of hardwood cuttings of 1000 Unskilled md 0.60 Hardwood no 1000.00 Khanti - 3% of the
minimum 30cm length to 20 cm no Cuttings labour cost
depth into prepared beds. Cutting
spaced at 5cm centres within
rows, with 20 cm between rows.

28.05 2805 Preparation of raised materials for


extraction from the nursery

178
28.05.01 2805 Grass culm cutting production 1000 Unskilled md 0.70 Hessian jute m2 2.70 Khukuri - 3% of the
from nursery stock: single or no labour cost
double node (eg napier)

28.05.02 2805 Uprooting and preparing grass 1000 Unskilled md 0.63 Hessian jute m2 1.35 Fork - 3% of the
slips ready for site planting from no Pick axe - labour cost
nursery seedling.
Khukuri -
28.05.03 2805 Uprooting and preparing grass 1000 Unskilled md 0.33 Hessian jute m2 4.20 Shovel - 3% of the
slips ready for site planting from no Khanti - labour cost
nursery grass clumps raised from
slips by vegetative propagation.

28.06 2805 Compost and mulch production


28.06.01 2805 Mulch production by collection m3 Unskilled md 0.12 - - - Hansiya - 3% of the
and cutting of weeds and other Doko - labour cost
vegetation such as tite pati,
banmara etc, within 1 km of the
road, and stacking along
roadside.
28.06.02 2805 Compost production by collection m3 Unskilled md 0.12 - - - Doko - 3% of the
and cutting of weeds and other labour cost
vegetation such as tite pati,
banmara etc, within 1 km of the
road, including fine cutting and
filling compost pit.

28.06.03 2805 Turning compost once per month. m3 Unskilled md 0.10 - - - Shovel - 3% of the
labour cost
28.07 2807 Direct seedling on site

28.07.01 2807 Broadcasting grass seeds on 100 Unskilled md 0.17 Seed kg 2.50 - - -
slopes <40o; seedling rate 25g per m2 Mulch
m2.

179
28.07.02 2807 Broadcasting grass seeds on 100 Unskilled md 5.00 Seed kg 2.50 - - -
slopes <40o;including cover with m2 Mulch m 3
5.00 - - -
long mulch, seedling rate 25g per
m2.

28.07.03 2807 Broadcasting grass seeds on slopes 100 Unskilled md 6.25 Seed kg 2.50 Khukuri - 3% of the
<40-45* including cover with long mulch, m2 Mulch m 3
5.00 Mallet labour cost
and jute netting of mesh size 300mm * Jute net m2 105.00 (Wooden
500mm. Seedling @25g per sq.m. Live pegs no 128.00 hammer) -
Operation includes pegging with suitable
live pegs or hardwood cutting (eg Simali)
1m spacing, jute net of 6.75m*1m size.

28.07.04 2807 Sowing shrub or tree seeds on all slopes at 100 Unskilled md 1.00 Seeds no 3200.00 Ms rod of - 3% of the
25cm intervals, including digging planting m2 50cm length labour cost
holes to 5 cm depth and covering with soil.

Two seeds per planting hole.

2.08 2807 8) Planting grass on site


2.08.01 2807 Planting single node culm cutting of grass 100 Unskilled md 0.20 Grass cuttings no 100.00 Ms rod or hard- - 3% of the
(eg napier) on fill slopes<45 and embankment 2
no Hessian Jute m 0.27 wood peg of labour cost
slopes in plain areas. Approx length 50cm length
15-20cm, including digging planting hole
10-20cm depth using a metal rod or
hardwood peg.

2.08.02 2807 Planting single node culm cutting of grass 100 Unskilled md 0.35 Grass cuttings no 100.00 Ms rod or hard- - 3% of the
2
(eg napier) on hard cut slopes <45 . no o
Hessian Jute m 0.27 wood peg of labour cost
Approx. length 15-20cm, including digging 50cm length
planting hole 10-20cm depth using a metal

180
rod or hardwood peg.
28.08.03 2807 Planting single node culm cutting of grass (eg 100 Unskilled md 0.50 Grass cuttings no 100.00 Ms rod or hard- - 3% of the
2
o
napier) on hard cut slopes >45 . Approx. no Hessian Jute m 0.27 wood peg of labour cost
length 15-20cm, including digging planting 50cm length
hole 10-20cm depth using a metal rod or
hardwood peg.

28.08.04 2807 Planting rooted grass slips on embankment m Unskilled md 0.02 Grass slips no Ms rod or hard-
slopes in plain areas, at 10cm spacing within of wood peg of
the row.The first row is 0.75m from the edge drills 11.00 50cm length - 3% of the
of the pavement and subsequent rows are Hessian Jute m2 0.14 labour cost
spaced at 1m intervals down the Line string m 1.00
embankment.

28.08.05 2807 Planting rooted grass slips on the slopes <45o m2 Unskilled md 0.20 Grass slips no Ms rod or
including preparation of slips on site. of hard- wood
Opearation includes dingging planting hole to drills 100.00 peg of 50cm
a max of 5 cm depth with metal rod or Hessian Jute m2 0.27 length - 3% of the
hard-wood peg, depending on the nature of Khukuri - labour cost
the soil.The planting drills should be space

28.08.06 2807 Planting rooted grass slips on the slopes m2 Unskilled md 0.30 Grass slips no Ms rod or
o o
45 -60 including preparation of slips on site. of hard- wood
Opearation includes dingging planting hole to drills 100.00 peg of 50cm
a max of 5 cm depth with metal rod or Hessian Jute m2 0.27 length - 3% of the
hard-wood peg, depending on the nature of Khukuri - labour cost
the soil.The planting drills should be space

28.08.07 2807 Planting rooted grass slips on the slopes >60o m2 Unskilled md 0.40 Grass slips no Ms rod or
including preparation of slips on site. of hard- wood

181
Opearation includes dingging planting hole to drills 100.00 peg of 50cm
a max of 5 cm depth with metal rod or Hessian Jute m2 0.27 length - 3% of the
hard-wood peg, depending on the nature of Khukuri - labour cost
the soil.The planting drills should be space

10cm apart.

28.09 2807 Planting shrub and tree seedling


and cutting on site

28.09.01 2807 Planting containerised tree and shrub 10 Unskilled md 0.25 Container Khanti - 3% of the
seedlings, including pitting, transplanting, no Seedling no 10.00 Mallet labour cost
composting and placing tree guards, on toe
Compost m3 0.05 (Wooden
of embankment slopes in plain areas, not Tree guard no 10.00 hammer) -
less than 8m from the road centre line.Pit size 3
Green mulch m 0.04 Doko -
30 cm diameter x 30cm depth.Compost
volume 1/4 of the volume of the pit, mixed

with original soil.

28.09.02 2807 Planting containerised tree and shrub 10 Unskilled md 0.33 Seedling no 10.00 Khanti - 3% of the
seedling, including pitting, transplanting, no Compost m 3
0.05 Doko - labour cost
composting and mulching , on slopes <30. Green mulch 3
0.04
m
Pit size 30 cm diameter x 30cm depth. Mix
compost with soil and back fill into pit to 1/4 of

the pit volume.


28.09.03 2807 Planting containerised tree and shrub 10 Unskilled md 0.40 Seedling no 10.00 Khanti - 3% of the
seedling, including pitting, no Compost m 3
0.05 Doko - labour cost
transplanting, composting and Green mulch m3 0.04
mulching , on slopes 30-40. Pit size 30
cm diameter x 30cm depth. Mix

182
compost with soil and back fill into pit ,
to 1/4 of pit volume.
28.09.04 2807 Planting rooted tree stump cutting and 10 Unskilled md 0.17 Seedling no 10.00 Khanti - 3% of the
bare root seedlings, including pitting, no Compost m 3
0.03 labour cost
transplanting, composting and Green mulch m 3
0.04
mulching on slopes <30. Pit size 10 cm
diameter x 20cm depth. Compost
volume 1/4 of volume of the pit mix
with original soil.
28.09.05 2807 Planting rooted tree stump cutting and 10 Unskilled md 0.25 Seedling no 10.00 Khanti - 3% of the
bare root seedlings, including pitting, no Compost m 3
0.03 labour cost
transplanting, composting and Green mulch m 3
0.04
mulching on slopes 30-45. Pit size 10
cm diameter x 20cm depth. Compost
volume 1/4 of volume of the pit mix with
original soil.
28.09.06 2807 Planting rooted tree stump cutting and 10 Unskilled md 0.33 Seedling no 10.00 Khanti - 3% of the
bare root seedlings, including pitting, no Compost m 3
0.03 labour cost
transplanting, composting and Green mulch m 3
0.04
o
mulching on slopes >45 . Pit size 10 cm
diameter x 20cm depth. Compost
volume 1/4 of volume of the pit mix
with original soil.
28.10. 2807 Vegetative paliscade construction,
brush layering and fascines
28.10.01 2807 Collection of hardwood for cuttings for 1000 Unskilled md 0.85 Adequate - - Khukuri - 3% of the
planting material (eg assuro, namdi phul, no Supply of labour cost
simali)from the sources within 1km of the bushes
road. Material to be approx 1 km in length

183
and minimum 5 cm in diameter.
28.10.02 2807 Preparation and planting of live pegs slected m Unskilled md 0.17 Live pegs no 20.00 Crowbar - 3% of the
species(eg assuro, namdi phul, simali)of labour cost
minium 1m length to 0.5 m depth into hard
ground.Pegs spaced at 5cm centres within
rows, and interwoven with vegetation.
28.10.03 2807 Preparation and planting of live cuttings of m Unskilled md 0.12 Live pegs no 20.00 Crowbar - 3% of the
selected species(eg assuro, namdi phul, labour cost
simali)of minium 1m length to 0.5 m depth into

soft debris. Pegs spaced at 5-20cm centres


within rows, and interwoven with vegetation.

28.10.04 2807 Site preparation for fascine laying: earth m Unskilled md 0.06 - - - Pick axe - 3% of the
works in excavation of trench to 20 cm depth Shovel - labour cost
28.10.05 2807 Laying fo live fascines, using live m Unskilled md 0.17 Hardwood Khukuri - 3% of the
hardwood cuttings of selected cutting of at Shovel - labour cost
species(eg assuro, namdi phul, simali) least 1m in
of minium 1m length placed in bundles length m 8.00
to give 4 running meters of cutting per
metre of fascine, including backfilling
of trench and careful compaction.
28.11 2808 Jute netting works
28.11.01 2808 Standard jute netting for bare slopes and m2 Skilled md 0.36 Raw jute kg 1.25 Khukuri - 3% of the
under planting with slips.Spinning raw jute
from 100% jute fibre into yarn and weaving Bamboo labour cost
the yarn into netting.Hand spun yarn 5 to 8 sticks(10 nos)
mm in diameter, width of net 1.20 meters -
warp strands 27 no per 100cm, mesh Weaving
size30-40 mm sq. and 1.25 kg/m weight at frame -
1.20m width.[Note A toro is the weaving Torso -
shuttle, normally made from a split large

184
bamboo culm.]
28.11.02 2808 Wide mesh jute netting for holding mulch on m2 Skilled md 0.15 Raw jute kg 0.26 Khukuri - 3% of the
slopes. Spinning raw jute from 100% jute Bamboo labour cost
fibre into yarn and weaving the yarn into sticks(10 nos)
netting. Hand spun yarn 3 to 5 mm in diameter -
1.20m side and 11.2m long. Mesh size150mm Weaving
x 500mm rectangular mesh and 0.25 kg/m at frame -
1.20m width. [Note A torso is the weaving Torso -
shuttle, normally made from a split large
bamboo culm.]
28.11.03 2808 Placing 30-40 mm square mesh jute netting m2 Unskilled md 0.15 Woven jute net m
2
1.00 MS rod of 3% of the
on bare slopes (for later underplanting with Hardwood 50 cm labour cost
grass slips), including pegging with live Cuttings or length -
hardwood cutting or split bamboo pegs and split bamboo Mallet
loosening tension so that the net hugs the pegs no 5.00 (wooden
slope throuhout. hammer) -
28.11.04 2808 Placing 150x500 mm mesh jute netting to m2 Unskilled md 0.10 Cut mulch m3 0.05 MS rod of 3% of the
hold mulch on slopes, including application 2
Woven jute net m 1.00 50 cm labour cost
of mulch and pegging with live hardwood Hardwood length -
cutting or split bamboo pegs and loosening Cuttings or Mallet
tension so that the net hugs the slope split bamboo (wooden
throughout. pegs no 5.00 hammer) -
28.12 2809 Fabrication of gabion bolster cylinders

28.12.01 2809 Site preparation for 30cm dia. bolster: earth m Unskilled md 0.09 - - - Pick axe - 3% of the
works in excavation of trench Shovel - labour cost
28.12.02 2909 Site preparation for 60cm dia. bolster: earth m Unskilled md 0.36 - - - Pick axe - 3% of the
works in excavation of trench Shovel - labour cost
28.12.03 2809 Manufacture of bolsters panels: 70x100mm m2 Skilled md 0.10 GI wire kg 2.00 Gabion
hexagonal mesh wire construction (10swg frame &

185
frame and 12 swg mesh) tools - 3% of the
28.12.04 2809 Construction of 30 cm bolster cylinder: m Unskilled md 0.375 Boulders m3
0.09 Gabion
placing, stretching wire mesh, filling with tools - 3% of the
boulders, closing and backfilling Doko - labour cost
28.12.05 2809 Construction of 60 cm bolster cylinder: m Unskilled md 0.75 Boulders m3
0.36 Gabion
placing, stretching wire mesh, filling with tools - 3% of the
boulders, closing and backfilling Doko - labour cost
28.12.06 2809 Construction of 30 cm bolster cylinder: m Unskilled md 0.375 Black Gabion
placing, stretching wire mesh over 20 guage polyethane m2 0.40 tools - 3% of the
black polyethane sheeting, filling with Boulders m3
0.09 Doko - labour cost
boulders, closing and backfilling.
28.12.07 2809 Construction of 60 cm bolster cylinder: m Unskilled md 0.75 Black Gabion
placing, stretching wire mesh over 20 guage 2
polyethane m 0.80 tools - 3% of the
black polyethane sheeting, filling with Boulders m3
0.36 Doko - labour cost
boulders, closing and backfilling.

186
28.12.08 2809 Anchoring bolster: 12 mm dia MS re-bar cut m Unskilled md 0.05 MS rod m 2.00 Sledge
into 2m lengths for anchorage and placed at hammer - 3% of the
1m inetervals labour cost
2
28.12.09 2809 Laying of terram paper (geotextile) m Unskilled md 0.05 Terram Paper m 1.15 Khukuri - 3% of the
labour cost
28.13 2810 Bamboo tree guards

28.13.01 2810 Weaving bamboo tree guards using bamboo m Unskilled md 0.25 Bamboo no 2.20 Khukuri - 3% of the
poles as uprights: 1.60 m in height ; and labour cost
weaving split bamboo with the outer wall
intact around the posts. Diamention of the
guard are 0.60 m diameter x 1.30 high.

28.14 Turfing
28.14.01 Grass sodding works including sod m2 Unskilled md 0.05
cutting , transporting , placing in
position and water sprinkling (Lead
upto 10m).

2
28.14.02 Spreading mannure on the grass turf. 100 m Unskilled md 0.04 Chemical manures kg 7.0

Norms for Rate Analysis


Activity Group:- 29 : Maintainence works
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.

187
29.01.0 Routine ( regular maintenance) of
2901 In case of more
1 black top road in plain area ( Km Supervisor md 0.05 fuel 8 % of labour cot Tools and plants 9 % of labour cost
than two lane
cross slope upto 10 percent) Unskilled md 0.20 Training ARMP 1.7 % of labour cost maintenance of tools 3 % of labour cost road add 20 %
Insurance 1 % of labour cost additional for
each extra lane
First Aid 0.3 % of labour cost
29.01.0 Routine ( regular maintenance) of
2901 black top road in Rolling, Km Supervisor md 0.05 fuel 8 % of labour cot Tools and plants 9 % of labour cost
2
Mountainous, steep area ( cross
In case of more
slope > 10 percent)
than two lane
Unskilled md 0.33 Training ARMP 1.7 % of labour cost maintenance of tools 3 % of labour cost road add 20 %
additional for
each extra lane
Insurance 1 % of labour cost
First Aid 0.3 % of labour cost

29.01.0 Routine ( regular maintenance) of


2901 In case of more
3 Gravelled road in plain area ( Km Supervisor md 0.05 fuel 8 % of labour cot Tools and plants 9 % of labour cost
than two lane
cross slope upto 10 percent) Unskilled md 0.20 Training ARMP 1.7 % of labour cost maintenance of tools 3 % of labour cost road add 20 %
Insurance 1 % of labour cost additional for
each extra lane
First Aid 0.3 % of labour cost
29.01.0 Routine ( regular maintenance) of
2901 In case of more
4 Gravelled road in Rolling, Km Supervisor md 0.05 fuel 8 % of labour cot Tools and plants 9 % of labour cost
than two lane
Mountainous, steep area ( cross Unskilled md 0.50 Training ARMP 1.7 % of labour cost maintenance of tools 3 % of labour cost road add 20 %
slope > 10 percent) additional for
Insurance 1 % of labour cost
each extra lane
First Aid 0.3 % of labour cost

Note: Routine ( Regular maintenance mention in activity 29.01.01 to 04 consist of R1= maintenance of shoulder, Re= Cutting of grass, R3= Clearing of side drains, R4 =
Cleaning of culvert, R5 = Minor Reshaping of drains, R6 = Clearing of bridges, R7 = Sweeping of Road, R8= cleaning of minor slides, R9= Cleaning of road furnitures etc.

188
29.02 2902 Routine ( reactive ) maintnance, Guide lines for working out quantities from year of surfacing

Year from surfacing Percentage of


Percentage of slope surface
Percentage of
shoulder area for area ( in case of
surface area for
making up of earthe
filling potholes
shoulder embankment) for
Restoration of
I 0 7.5 5 Note: multiply the quantities of surface area
II 0.5 9 6 for filling pot holes by 1.25 for AADT of
III 1 10.5 7 commercial vehicle having 150 to 450 and by
IV 1.5 12 8 1.5 for AADT of commercial vehicle more than
V 2 13.5 9 450.
Note: add 20 % of above cost for repair and maintenance of cross drainage structure, road side structures and road furnitures.

29.03 2902
Routine ( regular + reactive Km Supervisor md 0.05 Qty as perr item no 29.02 Patching machine hr 1
maintenance) of Black top / Unskilled md 0.70 ( Gang of 9+ 1 will
gravelled road formed and 4+ 1
will carryout patch
and crack seal
work., this team
will cover 20 km
lengh

3
29.01 2902 Restoration of rain cuts in M3 Skilled md 0.10 Suitable materialm 1.1 Add 3% of
embankment slopes including
watering and compaction etc. all
complete lead 10m.

189
Restoration of rain cuts in
embankment slopes including Unskilled md 0.75 labour cost for
watering and compaction etc. all
T& P.
complete lead 10m.
29.02 2903 Maintenance of earthen shoulders m2 Skilled md 0.02
by making irregularities even to Unskilled md 0.2 Add 3% of
the required level including
labour cost for
watering and compaction etc. all
T& P.
complete lead 10m.

29.03 2904 Maintenance of gravel shoulders m2 Skilled md 0.03 Suitable gravel Add 3% of
and gravel carriageway by Unskilled md 0.3 material m3 0.11 labour cost for
repairing pot holes and making
T& P.
iregularities even to the required
level including watering and
compaction etc. all complete lead
10m.
29.04 2905 Repair of pot holes & damaged
bituminous surface including
cleaning, brooming and rolling
etc. all complete lead 10m.
a) 40mm Shallow patching
i) Using hot premix material 100m2 Skilled md 0.22 MC 30 cutback
Unskilled md 10.25 bitumen lit 110.00
Bitumen lit 515.00 Asphalt mixing
Mineral filler t 0.09 Plant hr 0.18 Add 3% of
Aggregate m3 5.30 Wheel loader hr 0.29 labour cost for
Diesel lit 35.00 Steel wheel roller hr 2.2 T& P.
29.04 2905 ii) Using cold premix material 2
100m Skilled md 0.26 MC 30 cutback Mixing plant hr 1.1
bitumen lit 110.00
Unskilled md 10.56 Emulsion lit 572.00 Wheel loader hr 0.31
aggregate 10mm cu.m 4.00 Steel wheel roller hr 2.2
aggregate 6mm cu.m 1.30

190
Diesel lit 35.00
b) 20mm Shallow patching
i) Using hot premix material 100m2 Skilled md 0.15 MC 30 cutback
Unskilled md 7.00 bitumen lit 110.00
Bitumen lit 250.00 Asphalt mixing
Mineral filler t 0.05 Plant hr 0.10 Add 3% of
Aggregate m3 2.80 Wheel loader hr 0.15 labour cost for
Diesel lit 20.00 Steel wheel roller hr 1.20 T& P.

29.04 2905 ii) Using cold premix material 100m2 Skilled md 0.17 MC 30 cutback Mixing plant hr 0.60
bitumen lit 110.00
Unskilled md 7.50 Emulsion lit 280.00 Wheel loader hr 0.15
aggregate 10mm cu.m 2.00 Steel wheel roller hr 1.20
aggregate 6mm cu.m 0.70
Diesel lit 20.00
c) Deep Patching (More than 100m2 Labour & materials of shallow patching to be increased according to the thickness of base and sub base to be
40mm) excavated and filled using the norms of related items.
d) Carriage way edge repair 100m2 Refer shallow patching or deep patching as applicable
29.05 2906 Maintenance of pavement surface
with slurry seal including cleaning, 100m2 Refer norms of Activity group No. 13 (13.08.01 -- 13.08.03)
brooming and rolling etc. all
complete lead 10m.

29.06 2907 Maintenance with surface Refer norms of surface dressing


Dressing including cleaning,
brooming and rolling etc. all
complete lead 10m.

29.07 2908 Maintenance with Sand Seal Refer norms of Sand Seal.
including cleaning, brooming and
rolling etc. all complete lead 10m.

191
Maintenance with Sand Seal
including cleaning, brooming and
rolling etc. all complete lead 10m.

Maintenance with Fog Seal 2


Slow setting K-
29.08 2909 including cleaning, brooming and 100m Skilled md 0.1 3-60 Air compressor hr 0.30
rolling etc. all complete lead 10m. Bitumen Sprayer with
lit 70.00
Emulsion pressure tank,
flexible hose &
sprayer bar

192
Maintenance with Fog Seal
including cleaning, brooming and
rolling etc. all complete lead 10m. Sprayer with
pressure tank,
Unskilled md 4.1 flexible hose &
Diesel lit 5.00 sprayer bar hr 0.10

29.09 2910 Repair of Brick shoulders / Foot


paths
i)One layer Flat brick soling with
sand filling in Joints & bottom. 10m2 Skilled md 0.50 Brick no 410
3
Unskilled md 0.50 Sand m 0.20
ii)One layer brick soling on edge 10m 2
Skilled md 0.80 Brick no 750
with sand filling in joints and Unskilled md 0.80 Sand 3
0.20
m
bottom.

iii)One layer flat brick soling and 10m2 Skilled md 1.00 Brick no 410
jointing with 1:6 cement sand Unskilled md 2.00 Cement kg 50
mortar.
Sand m3 0.2
Water lit 30
iv)One layer brick soling on edge 10m2 Skilled md 1.5 Brick no 750
and jointing with 1:6 cement sand Unskilled md 3.0 Cement kg 72.5
mortar.
Sand m3 0.3
Water lit 40

Norms for Rate Analysis


Activity Group:- 30 : Sub-Surface Geo-Technical Investiogations
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
30.01 3003 Excavation of Test/Trial pit for sub-
surface Geo-technical cu.m Skilled md 0.2 Add 3% of labour cost for T& P
investigation inlcuding 10m lead.

193
Excavation of Test/Trial pit for sub-
surface Geo-technical
investigation inlcuding 10m lead. Unskilled md 2

30.02 Mobilisation of drilling / Boring To be estimated as follows


equipments, accessories, etc for L.s a) Transportation by 5 t capacity truck upto Road Head including Loading & Unloading
sub-surface Geo-technical (Refer the Norms for transportation.)
investigation.

b) Manual transportation of 5t of equipment & accessories from Road Head upto investigation site.
(Refer the Norms for transportation.)

c) Installation of drilling/Boring equipment/accessories for 1st Borehole


Skilled md 1
Unskilled md 5

30.03 Demobilisation of drilling/ Boring


equipments, accessories, etc.
after completion of sub-surface L.s 75% of the Mobilisation.
Geo-technical investigation.

30.04 Drilling / Boring for sub-soil


investigation Drilling Depth range Engineer md 0.1 Drill bit no. 0.10 Drilling
12-15m m Technician md 0.3 Diesel lit 12 machine & hr 2.56
Driller md 0.3 accessories
i) Soft soil Helper md 0.6 Core-box m 1.00
Labour md 2.0 Water lit 1500
ii) Hard Soil (Gravel, boulder, m Engineer md 0.20 Drill bit no. 0.60 Drilling
cobble etc. mixed soil) Technician md 1.0 Diesel lit 18.0 machine & hr 3.45
Driller md 1.0 accessories

194
ii) Hard Soil (Gravel, boulder,
cobble etc. mixed soil)

Helper md 2.0 Core-box m 1.0


Labour md 4.0 Water lit 4000

iii)Soft Rock m Engineer md 0.14 Drill bit no. 0.4 Drilling


Technician md 0.66 Diesel lit 16 machine & hr 3.20
Driller md 0.66 accessories
Helper md 1.40 Core-box m 1.0
Labour md 3.0 Water lit 2000

iv) Hard Rock m Engineer md 0.20 Drill bit no. 0.6 Drilling
Technician md 1.0 Diesel lit 22 machine & hr 4.48
Driller md 1.0 accessories
Helper md 2.0 Core-box m 1
Labour md 5.0 Water lit 4000
30.05 Drilling / Boring for sub-soil
investigation for other depth range

a)Depth range 0-3m Mulitiply the rate for depth range 12-15m by 0.5
b)Depth range 3-6m Mulitiply the rate for depth range 12-15m by 0.6
c)Depth range 6-9m Mulitiply the rate for depth range 12-15m by 0.72
d)Depth range 9-12m Mulitiply the rate for depth range 12-15m by 0.85
e)Depth range12-15m Mulitiply the rate for depth range 12-15m by 1.0
f)Depth range15-18m Mulitiply the rate for depth range 12-15m by 1.2
g)Depth range18-21m Mulitiply the rate for depth range 12-15m by1.44
h)Depth more than 21m Mulitiply the rate for depth range 12-15m by1.75

30.06 Shifting of equipment from one


Borehole position to another.
To be estimated as follows

195
a) Easy access between Skilled md 2
Boreholes (Access available Unskilled md 20
within 100m)
b) Moderate access between Mulitply the rate for (a) by 2
Boreholes (Access available
within 1km)
c) Difficult access between
Boreholes (access not available Mulitply the rate for (a) by 4
within 1km)fromTrial pit
Sampling
30.07
30.07.01 Disturbed Sampling
a) soil Technician md 0.2 Consumables Ls 10% of T&P Ls 3% of
Unskilled md 0.5 labour cost lab.cost
b)Rock Technician md 0.2 Consumables Ls 10% of T&P Ls 3% of
Unskilled md 0.5 labour cost lab.cost
30.07.02 Undisturbed sampling
a)soil Technician md 0.4 Add 100% of labour cost T&P Ls 3% of
Unskilled md 1 for samplers lab.cost
b)Rock Technician md 0.4 Add 100% of labour cost T&P Ls 3% of
Unskilled md 1.5 for samplers lab.cost
30.1 Sampling from Bore holes
30.08.01 Disturbed sampling
a) Soil Adopt 2% of the rate per m of boring /drilling
b)Rock Adopt 3% of the rate per m of boring /drilling
30.08.02 Undisturbed sampling
a) Soil Adopt 10% of the rate per m of Boring/drilling
b) Rock Adopt 10% of the rate per m of Boring/drilling
30.09 Providing & performing various
kinds of tests no
30.09.01 In-situ Tests Refer Norms & rates of Central Road Laboratary
30.09.02 Laboratory Test Refer Norms & rates of Central Road Laboratary

196
30.10 3006 Preparation of Report including Engineer md 7.0 Paper size A4 Ream 0.1 Computer hr 10
recommendation for foundation. Computer operator md 2.0 (for 1 copy )

Norms for Rate Analysis


Activity Group:- 31 Miscellaneous Works
Spec. Resources
Activity
Clause Description of works Labour Materials Equipment Remarks
Nos Unit
No. Type Unit Qty. Type Unit Qty. Type Unit Qty.
31.01 3105 Providing and installing Railing m To be estimated on the basis of design/ drawings and using the related Norms according to the
including Railing Posts. materials of the Railing and Posts

31.02 3106 Providing and installing R.C.C. Refer the related items of the Norms
approach slab / R.C.C. road
pavement.

31.03 3110 Providing laying and fixing Geo- sq.m Refer Activity No.24.09
textile/Geo-membrane.

31.04 3110 Providing and laying graded filter sq.m Refer Activity No.24.11
material including compaction.

197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
ctivity no.20.02
ctivity no.18.07

ze of concrete
X60cmx5cm.
tivity no.20.02

e of stone slab
X30cmx2.5cm.

277
tivity no.14.03

278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
dd 2.5% of cost
f concrete for

316
mix design and
uality control as

dd 2.5% of cost
f concrete for
mix design and
uality control as

317
318
319
dd 2.5% of cost
f concrete for
mix design and
uality control as
er specification.

320
321
322
323
324
325
326
327
-number / t as per

-number / t as per

-number / t as per

328
-number / t as per

329
2 times usage

2 times usage

2 times usage

00 times usage

2 times usage

2 times usage

330
2 times usage

00 times usage

2 times usage

2 times usage

2 times usage

00 times usage

331
332
333
334
335
336
337
338
339
340
341
342
343
344
tching should be

q.m. converting

esign thickness

tching should be
easured in sq.m.

345
346
347
ip-rap should be
easured in sq.m

esign thickness

348
ip-rap should be
easured in sq.m

esign thickness

349
350
351
352
353
354
355
356
357
358
359
r 5-10 m height
unskilled labour

360
361
362
363
364
365
dd 10% of total

366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
Routine maintenance cost per km 22000 to 8800

Rajasthan rate- year 2014