ANNEXURE - I

Sequence of General Civil / Fire Fighting Activities


(For project executed in 3D)

Receipt of laser scan model. Review of


existing facilities in laser scan model
.with respect to Bid Equipment Layouts

Pre-
Engineering Prepare project specific Check List
Activities Understanding of Review Bid Equipment Layouts, Review of FEED Water Demand Collection of As-built
documents (for brown field) & for survey. Eg. availability of space Perform Pre-
Prepare & Issue Pre-
Scope of Work as tender P&IDs for adequacy of Calculation, check for for escape routes, location for engineering site engineering site survey
per Bid documents adequacy/availability of water, details of major new safety equipments like Life raft, report to client for
.information EERA/FERA studies .survey
.equipments & packages .Ring buoys, Fireman's cabinet etc .approval

Review of vendor offers Prepare & Issue


VDR for valves & Prepare & Issue PR for & prepration of TQs / Prepare & Issue MR for Datasheets for Deluge
specialty items valves & specialty items valves & specialty items Skid, FW Hose Reel,
TBAs
Spray Nozzles

Reciept of Rev.0 Prepare Nozzle Receipt of Equipment Prepare Escape routes along with
Prepare and Issue Fire Perform Hydraulic Prepare prelim fire Perform Preliminary spray coverage safety signs and safety equipments
Equipment Layout from water demand list from Process with
Water P&ID for IDC calculation in Pipenet .water layout drawings for each dimensions like Fire Water Hosse reel, Portable
. Piping calculation Fire Extinguisgers etc.
.equipment

Receipt of IDC Issue F W P&ID, Receipt of client Re-Issue FW P&ID, IF APPROVED IN CODE-2
Comments from all Hydraulic Calculation Hydraulic
disciplines & resolution for client comments/approval Calculation for
and their resolution. Re-Issue Escape Receipt of client Issue Escape Route
of the same. review/approval. client approval Route layout for comments/approval layout for client
client approval and their resolution. review/approval.
Activities IF COMMENTS RECEIVED
before 30% IF COMMENTS RECEIVED
Model review

Input for equipment


layout
:Modeling by other Departments 3D Modeling of Escape Routes, Safety Equipments, Drainage System,
3D modelling of Primary Structure• .Deluge Skid
3D Modelling of all Equipments •

Internal Model review


with all disciplines & Model review with 30%
comment resolution client

Receipt of following: IF APPROVED IN CODE-2 Receipt of client Re-Issue FW P&ID,


• Code-2 Equipment Layout comments/approval Resolution of 30% model
• Code-2 approved FW network P&ID Hydraulic Calculation for review comments
• Code-2 approved vendor drawings of skids & other vendor items. and their resolution. client comments/approval

IF COMMENTS RECEIVED

Activities 3D Modeling of:


Changes in Escape Routes, Modeling by other departments:
before 60% Any change in location of Safety Equipments Completion of 3D modeling for Secondary / Tertiary structure•
Model review Any changes regarding Drainage System due to change in location of other
Equipments and accessways, 3D Modelling of all balance Equipment•
Modeling of Fire Water Network

Internal Model review 60% Model review with


with all disciplines &
comment resolution client

Receipt of following: IF APPROVED IN CODE-1 Receipt of client Re-Issue FW P&ID,


• Code-1 Equipment Layout comments/approval Hydraulic Calculation for Resolution of 60% model
• Code-1 approved FW network P&ID and their resolution. client comments/approval review comments
• Code-1 approved vendor drawings of skids & other vendor items.

IF COMMENTS RECEIVED

3D Modeling:
Ensure completeness of modelias per Code-1 P&IDs Modeling by other departments:
Activities Modeling of all Vendor items & skids as per Code-1 approved vendor Completion of 3D modeling for structure •
before 90% drawings. 3D Modelling of all balance Equipment •
Modeling of Fire Water Network Spray Nozzle arrangement.
Model review

Clash check of 3D model


with all disciplines &
resolution of clashes.

Internal Model review 90% Model review with


with all disciplines &
comment resolution client

Receipt of client Re-Issue FW P&ID, Resolution of 90%


approval and their Hydraulic Calculation for model review comments
resolution. client comments/approval

Iss ue FW P&ID, H ydraulic


Calculation for IFD
Activities post
90% Model
review
Receive Site Query / Review of Site
DCR on Fire Water Queries / Issue ECN
Network, if any. DCR. Dispose ECND.

Review of As built I SSUE AS-BUILT


Recieve AS BULT Mark- mark-up for Update 3D Model
Up from site clarifications, if any. if required. DRAWI NGS.