Pre-
Engineering Prepare project specific Check List
Activities Understanding of Review Bid Equipment Layouts, Review of FEED Water Demand Collection of As-built
documents (for brown field) & for survey. Eg. availability of space Perform Pre-
Prepare & Issue Pre-
Scope of Work as tender P&IDs for adequacy of Calculation, check for for escape routes, location for engineering site engineering site survey
per Bid documents adequacy/availability of water, details of major new safety equipments like Life raft, report to client for
.information EERA/FERA studies .survey
.equipments & packages .Ring buoys, Fireman's cabinet etc .approval
Reciept of Rev.0 Prepare Nozzle Receipt of Equipment Prepare Escape routes along with
Prepare and Issue Fire Perform Hydraulic Prepare prelim fire Perform Preliminary spray coverage safety signs and safety equipments
Equipment Layout from water demand list from Process with
Water P&ID for IDC calculation in Pipenet .water layout drawings for each dimensions like Fire Water Hosse reel, Portable
. Piping calculation Fire Extinguisgers etc.
.equipment
Receipt of IDC Issue F W P&ID, Receipt of client Re-Issue FW P&ID, IF APPROVED IN CODE-2
Comments from all Hydraulic Calculation Hydraulic
disciplines & resolution for client comments/approval Calculation for
and their resolution. Re-Issue Escape Receipt of client Issue Escape Route
of the same. review/approval. client approval Route layout for comments/approval layout for client
client approval and their resolution. review/approval.
Activities IF COMMENTS RECEIVED
before 30% IF COMMENTS RECEIVED
Model review
IF COMMENTS RECEIVED
IF COMMENTS RECEIVED
3D Modeling:
Ensure completeness of modelias per Code-1 P&IDs Modeling by other departments:
Activities Modeling of all Vendor items & skids as per Code-1 approved vendor Completion of 3D modeling for structure •
before 90% drawings. 3D Modelling of all balance Equipment •
Modeling of Fire Water Network Spray Nozzle arrangement.
Model review