1.1 Introduction to ERP/SAP, Plant Maintenance & Scope 1.2 Overview of Organization Structure 1.3 Organizational Levels in Plant Maintenance 2 Technical Objects (6 Days) 2.1 Functional Locations 2.2 Equipment 2.3 Bills of Material 2.4 Management of Task Lists 2.5 Measuring Points and Counters 2.6 Permits 2.7 Warranties 3 Overview Business Processes (1 day) 3.1 Breakdown Maintenance process 3.2 General Maintenance Process 3.3 Preventive Maintenance process 3.4 Project Oriented Process 3.5 Calibration Process 3.6 Refurbishment Processing 4 Maintenance Process Organization (5 Days) 4.1 Notification of Maintenance Requirements 4.2 Order Planning 4.3 Scheduling of Maintenance Tasks 4.4 Execution of Maintenance Tasks 4.5 Completion of Notifications and Orders 4.6 Processing of External Services 5 Breakdown Maintenance Process (1 day) 6 Refurbishment of Spare Parts (1 day) 7 Preventive Maintenance ( 9 Days) 7.1 Overview of Preventive Maintenance 7.2 Single Cycle Maintenance Planning (Time Based & Performance based) 7.3 Maintenance Planning with Strategy: Time-Based & Performance Based 7.4 Maintenance Planning with Multiple Counter Plans Cycles of Different Dimensions 7.5 Condition-Based Maintenance 7.6 Maintenance Plan Scheduling 7.7 Dead line Monitoring 8 Calibration of Test Equipment Management (2 Day) 9 Project-Oriented Maintenance (1 day) 10 Reporting and Analysis ( 2 days) 10.1 Tables and fields 10.2 Maintenance History 10.3 Evaluations in the Logistics Information System (LIS)
Mobile Numbers: 0091 7799882172; 0091 9176162193
shivabodicherla@yahoo.com; shivabodicherla@gmail.com SAP Plant Maintenance Module Content
11 ASAP Methodology with Real time Scenarios (4 Days)
11.1 System Landscape 11.2 PM Module ASAP Methodology Phase wise Documents discussions 11.3 Project Preparation 11.4 Business Blue print (BPP) 11.5 Realization (GAP Analysis & Config Doc) 11.6 Pre Go Live (Master Data templates, User Manuals etc...) 11.7 Go Live 11.8 Transport Requests 11.9 Tcodes & Tables