• Capacity
- Ability to do work
- The upper limit or ceiling on the load that an operating unit can
handle
- Capacity = f(equipment, space & employee)
• Demand
- The requirement of a given product or service
• In production term, capacity is the maximum production rate of
an organization.
Capacity Supply and Demand 2/3
• Matching organizational capacity and market demand
pD i i
Number of required machines (N) for k products i 1
T
where,
pi standard processing time for product i,
Di demand for product i during the planning horizon,
T processing time available during the planning horizon
Long Range Capacity Planning 1/8
• It is the planning of organizational resources to be
used for a period of 1 year or above.
• Involves planning for:-
Facilities
Workers (permanent)
Operating hours in a year).
• Aim: To ensure that sufficient capacity to execute the
sale and operations plan
• It is the planning at organizational level
Long Range Capacity Planning 2/8
Economies of Scale
• Best operating level - least average unit cost
• Economies of scale - average cost per unit
decreases as the volume increases toward the
best operating level
• Diseconomies of scale - average cost per unit
increases as the volume increases beyond the
best operating level
Long Range Capacity Planning 6/8
Average Unit
Cost of Output ($)
Economies Diseconomies
of Scale of Scale
Economies of Scale
Declining costs result from:
– Fixed costs being spread over more and more
units
– Longer production
– Proportionally less material scrap
Long Range Capacity Planning 8/8
Diseconomies of Scale
Increasing costs is a result of increasing
production due to:
– Increasing inefficiency
– Difficulty in scheduling
– Damaged goods
– Increased use of overtime
Medium Range Capacity Planning 1/2
• It covers week-to-week operation. Mainly for
duration of between 6 months up to one
year.
• The planning is focused on:-
workforce size (temporary)
overtime budgets (shifts)
inventories (material and finished goods), etc
• It is a plan at individual work center or
machine
Medium Range Capacity Planning 2/2
actual output
• Efficiency Efficiency
effective capacity
actual output
• Utilization Utilization
design capacity
Basic Calculations 2/7
Capacity Cushion
– Extra capacity used to offset demand
uncertainty
– Capacity cushion = 100% - Utilization
Basic Calculations 4/7
Productivity
• The ratio of actual output divided by one or more
inputs used
• Single-Factor Productivity (ρ)
ρ = Output
one factor
- Multi-Factor (Total Factor) Productivity (ρ)
ρ = Output
Labour+ Material+Energy+Capital
• The productivity measure helps managers to know
how well the system is doing
Basic Calculations 5/7
Cost-Volume Analysis – used to decide which facility to be
acquired
– Focuses on the relationship between cost, revenue, and
volume of output
• Fixed Costs (FC)
– tend to remain constant regardless of output volume
• Variable Costs (VC)
– vary directly with volume of output
– VC = Quantity (Q) x variable cost per unit (v)
• Total Cost
– TC = FC +VC
• Total Revenue (TR)
– TR = revenue per unit (R) x Q
Basic Calculations 6/7
FC
QBEP
Rv
Basic Calculations 7/7
Cost-Volume Analysis Assumptions
• Cost-volume analysis is a viable tool for comparing capacity
alternatives if certain assumptions are satisfied
– One product is involved
– Everything produced are sold
– The variable cost per unit doesn’t change with volume
– Fixed costs do not change with volume changes
– The revenue per unit is the same regardless of volume
– Revenue per unit exceeds variable cost per unit
Demand Management Strategies