Sie sind auf Seite 1von 1

L&T CONSTRUCTION Public Health and Municipal

Water and Effluent Treatment IC – Wastewater BU Engineering Department

Construction of Decentralized Sewage Treatment REV


Plants with any proven Technology including
receiving sumps cum pumping stations, Providing
DOCUMENT NO
Sewer Network System in entire city including
PROJECT: .
construction of Conventional Manholes & Precast A
LE160315-C-WW-SW-DC-3205
Manholes, House Sewer Connections and Allied
Works, O&M for a period of 5 years complete, in
Nellore Municipal Corporation.
Design Calculation for Security Guard Building for DESIGNED CHECKED APPROVED SHEET
TITLE:
55 MLD STP at Allipuram MGK/RVS
VJ VJ/SURE

TABLE OF CONTENTS PAGE NO.

I. Design Basis 1

II. Primary Load Calculations 3

III. Staad Details 7

IV. Design of Structural Elements 12

Das könnte Ihnen auch gefallen