Number of
Main Location Room Sub Locations Indications
1. GSS LV
2. GSS MV
Plant GSS 3. GSS/DCP 5
4. GSS DEG LCP
5. GSS S/S
1. E/V MV
2. E/V LV
Plant EDC/VCM 4
3. E/V MV VFD
4. EV LV VFD
1. STG LV
STG 2. STG Field Station 3
3. STG MV
1. PVC II MV
Plant PVC II 2. PVC II LV 3
3. PVC-II DEG LCP
1. PVC MV
2. PVC I MAR (Rack Room)
Plant PVC I 4
3. PVC-I battery room
PVC LV
1. MAR UTY-PP
2. MAR CA
CCR 4
3. MAR EDC-VCM
4. MAR PVC II
GT A GT A Compartment 1
GT B GT B Compartment 1
CA CA LV 1
28
Temperature Indications on DCS
Spares Channel Available in System
IO Panel Location System / Marshalling Location
AI RTD
GSS LV ABB - PP 16 14
E/V LV HW - EDC/VCM 24 3
STG LV ABB - PP 16 14
PVC II MV HW - PVCII 8 21
CA LV HW - CA 15 6
Remarks
ABB - PP 16 11
Honeywell - EDC/VCM 24 4
Yamatake - PVCI 53 4
Honeywell - CA 15 2
Channels Availability after
Modification
5
20
17
49
13
BOM and Cost of Project (Thermocou
Material
Thermocouple + Transmitter
RTD + Transmitters
Single Pair Cable (Meters)
Multicore Cable (Meters)
Cable Laying Scaffolding
OM and Cost of Project (Thermocouple based)
Quantity Unit Cost Total
24 10200 244,800
4 20000 80,000
950 - 80,000
350 - 240,000
150,000
Total 794,800