Beruflich Dokumente
Kultur Dokumente
Specifications
Revision History :
Version No Date Prepared / Modified by List of Changes
Approvers:
Name Version Approved Position Reviewed Date
Karthikeyan Chandar CTO
1.0
Antonio Zumbuca Francisco Director – O&M
Arlindo Alves Director -Implementation
Ramaswamy Pillai Director -Engineering
Mohamed Nazar Director - IT
Pedro Ginga Quality
Distribution List:
Name/Position / Available at Published Date
NOC, Operation Team , Integration and DT Team , Quality Team , vendor ,Engineering and
IT Team
Pankaj@movicel.co.ao
Manuel.merindo@movicel.ao
Antonio.Francisco@movicel.co.ao
Arlindo.Alves@movicel.co.ao
Ramaswamy.Pillai@movicel.co.ao
Mohamed.Nazar@movicel.co.ao
Pedro.Ginga@movicel.co.ao
Directorate of Operations and Maintenance (DOM)
Index
1. INTRODUCTION
2. SCOPE of WORK
3. ORGANIZATION OF THE DOCUMENTATION
3. DOCUMENTS TO DELIVER WITH THE PROPOSAL
4. GENERAL CHARACTERIZATION of the solution to PROVIDE
4.1. TECHNOLOGY
4.2. SPECIFICATION OF THE APPLICATION TO INTEGRATE
5. DESCRIPTION OF THE UMBRELLA SOLUTION FAULT MANAGEMENT
5.1. GENERAL REQUIREMENTS
5.2. HARDWARE
5.2.1. Hardware Requirements Specification
5.3. SOFTWARE REQUIREMENTS
5.3.1. Software licenses
5.4. Installation and configuration
5.5. UPDATES TO FUTURE VERSIONS
6. FUNCTIONAL SPECIFICATION
6.1. GENERAL REQUIREMENTS
6.2. SYSTEM REQUIREMENTS
6.2.1. Architecture
6.2.2. User Interface
6.2.3. Scalability
6.2.4. System Administration
6.2.5. system performance
6.2.6. availability and reliability
6.2.7. Security
7. TECHNICAL DESCRIPTION of the SOLUTION
7.1. FAULT MANAGEMENT
Directorate of Operations and Maintenance (DOM)
1. INTRODUCTION
Objective of this document is the specification of the functional and technical requirements
concerning the supply and installation of Fault and Performance management solution. This
solution should facilitate the provision of services, troubleshooting and service quality
assurance.
2. SCOPE OF WORK
It is intended to acquire a solution that aims at the simplification of procedures for operation,
high robustness and scalability, open architecture that allows for easy integration with other
management systems, in-built graphical interface (user-friendly), Web browser-based, and
enabling access via the Internet/Intranet.
Commercial paper, with details, by project phase (timeline), and per item, the price and
quantity for the component or service equipment (HW and SW), mentioning explicitly
optional items, if any.
Must contain the following breakdown of costs:
1. HW
Directorate of Operations and Maintenance (DOM)
Proposed schedule of activities (in the Gantt diagram) with indication of time associated with
the supply of equipment to the various phases of the project, as well as each of the various
activities and interdependencies, identifying critical paths.
Must contain the following project phase’s discrimination:
1. The design phase
2. Implementation phase
3. Rollout phase
4. Maintenance Phase
As regards risk management, the supplier shall provide the resumes of project management
and implementation, as well as an array of Movicel responsibilities/Vendor during the
various phases of the project.
subsystem, intelligent network and IT system platforms providing services and additional
features, etc.) and their premises;
The supplier can deliver the proposal, description of the system or components, installation
and operation, etc., if it considers that the provision of such elements help the understanding
of the proposal.
All documentation should be delivered in electronic form (DOCX, XLSX file format, PDF,
JPG and MPP, CSV), accompanied by 3 copies in paper. The business proposal containing
quotations should be delivered, separated from the remaining documentation, in sealed
envelope identified as "business proposal".
4.1. TECHNOLOGY
It should support the provision of mobile services of voice and data using the
technology GPRS/GSM//UMTS/HSDPA/LTE and LTE advance
Directorate of Operations and Maintenance (DOM)
The chronological order of applications to integrate should respect the applications most
relevant from the point of view of its impact on businesses, suggests the following priority:
#
Owner of the
Name Details Connector/Protocol events/day
platform
(1)
OSS (Ericsson) Management GSM, UMTS and LTE for Luanda Ericsson -
Net Numen Unified Man.
Manage GSM and UMTS, energy and temperature alarms ZTE Java 521
System
CAS Registration and management of incidents, NDRs Movicel http 90
Backbone monitoring (Luanda-Angola; Lda-Cabinda; Bgla-
U2000 Huawei Java 3408
Huila)
PTN Client MetroLAN Movicel's network monitoring ZTE Java 20
Solar Winds Enterprise network monitoring (retail chain), intranet Movicel (Solaris) http 793
Monitoring the output of internet (Telephonic and Cable &
Cacti Movicel http 28
wireless
Citrix Monitoring of the components of the CORE (Ericsson) Ericsson http 3711
Monitoring and management of services GSM, UMST and
Net Numen M32 ZTE Java 398
LTE
E-Guard Temperature alarms, monitoring sites and Central energy ZTE http -
Nagios IVR monitoring IT System http 978
Rabbitmq SMS monitoring of loading plans IT System http -
Graylog2 Application log monitoring IT System Java 100
PNMS Backbone monitoring of Malange NEC Java -
Unitrans ZXONM E300
Fiber-optic and microwave transmission (SDH) ZTE Java -
(SDH)
1. The Umbrella system fault and Performance management must present a flexible
application architecture, allowing also to your future expansion and integration
architecture TMN (Telecommunications Management Network), ensuring the
standardization of communications and of the interfaces.
2. This must generate TT for each alarms and Change request for all Changes. There
must be WO (work order) for TT and CR where third party or team is involved.
5. System should be able to check the amount and efficiency of fuel. System should
give warning and alarms for the action like Fuel is going to finish. This
information need to come one day before.
6. CR (Change Request), WO (Work Order and TT (Trouble Tickets) must have gone
to different phases as per ITIL. Like Analysing and Scheduling, Approval,
Execution, testing and close phase.
3. Must be detail information about the items below and considering the conditions indicated
at each point:
Directorate of Operations and Maintenance (DOM)
5. The platform should be a scalable and flexible solution with open architecture, which
allows for easy integration with other management systems.
6. The platform must be in compliance with the latest relevant recommendations ITU-T and
TMF Forum (eTOM, SIM/SID, NGOSS) ensuring the standardization of communications
and of the interfaces.
5.2. HARDWARE
1. The sizing of Hardware must be proposed to support the volumes and response times
indicated for centralized and decentralized operations.
3. The architecture of the platform should be modular and flexible allowing for future
expansion.
5. The Operating System and hardware version of the equipment to be supplied is the last and
must be indicated.
2. The Software should be easy integration, based on the industry standard, open transport
technologies and middleware products.
3. The Software should offer the ability to import and export information from/to external
files or systems.
4. The Software will support the CORBA, XML and HTML standards for Internet data
exchange.
Directorate of Operations and Maintenance (DOM)
7. Parameterization of software required to meet the business needs of Companies, for the
system supplied, must be done by the supplier during the implementation phase of the
project.
8. The software version of the equipment to be supplied is the last and must be indicated.
9. All modules and sub-modules of the software must be described in summary form.
2. The Competitor has to calculate the total licensing requirement of different software,
including the RDBMS, etc., as the gift given in volumetric notice with invitation to bid and
the same must be specified, along with the basis for licensing.
4. The copies certified and licensed in the name of the application software Companies, the
RDBMS databases and any other required software for each application according to the
case, with backup will be provided.
2. The system should also provide a system configuration application. This should be a user
application that allows Companies to set up and define the various parameters associated with
the installation.
3. The supplier shall develop and maintain a good cooperation with the hardware vendor and
suppliers of network elements (NE) existing Companies.
1. The supplier shall provide a roadmap for future versions of the proposed system.
2. The supplier must also provide an update script to migrate the schema and data from the
previous version to the new version. Upgrade scripts can be used in sequence, if necessary.
3. All APIs should be compatible with previous versions.
6. FUNCTIONAL SPECIFICATION
2. Fault management must receive every alarm event sources, to unify them in a common
format of alarm, correlate and provide a common graphical interface for alarm analysis and
acknowledgement of receipt.
The requirements specified in this section are common to all systems of service execution and
service area. The bidder is obliged to prepare a separate declaration of conformity to the
requirements of the system, individually for each of the functional modules. The failure to
follow this schema will result in disqualification of the bid.
6.2.1. Architecture
2. The system should be flexible and modular in design, with the ability to add, remove and
adjust modules for a specific configuration, without disrupting existing services, network
communications and data/communication and the functionality of the company.
3. The system should be customizable to allow new features to be added to the existing
network technologies.
5. The components of the solution should be under warranty and service execution which will
interface with the network elements managers (EMS), element and network layer Manager
(NMS), in some cases, you may need a direct interface with the network elements.
6. The system should provide a unique and common mediation platform for alarms.
Directorate of Operations and Maintenance (DOM)
7. The system should provide APIs based on interfaces with open standards to allow for
integration with the components of the solution or other third party applications.
8. The system must provide open interfaces based on standard languages and protocols but
not limited to, CORBA, SOAP, and XML.
9. The system shall provide a customizable activation framework that supports standard
protocols, including, but not limited to CORBA, TL1, Telnet, FTP, HTTP and SNMP.
10. The system should support integration with EAI (Enterprise application integration)
products commercially available.
11. The system must support the existing technologies of Movicel network and
products/services with the flexibility to expand to support future technologies and products
12. The solution must provide testing environment and Toolkit for testing of additional
functionality, software patches, etc., before joining with the online system.
13. The system will have the ability to employ relational database.
15. The hardware platform on the server side must be based on UNIX and/or LINUX
operating systems.
16. All the configuration details of the necessary hardware and specifications for each
supported technology should be provided.
17. The hardware platform of client-side applications should run on Linux operating systems,
Windows 2000/XP/Vista/Windows 7
Directorate of Operations and Maintenance (DOM)
19. The bidder must provide the ability to draft detailed in terms of maximum number of
elements that can be managed, including any conditions or limitations because of the size of
the network, the alarm event rates. This project should include requirements DCN (Digital
Communications Network).
20. The following table for statement of compliance must be met, without discarding the list
of requirement shared earlier.
2. The solution should provide drop-down lists and similar characteristics, as applicable to
allow quick and accurate data input by the user
3. The solution should provide clear feedback messages to the user (such as the confirmation
of the execution of a user command), error messages and context sensitive help.
6.2.3. Scalability
1. The solution must allow for easy expansion of the network, in addition to new services,
new network elements, and new protocols and distribute the network through a wide
geographical area, without updated code for the system.
2. CPU usage on full charge for any one of the systems may not exceed 60%
2. The system should provide a graphical interface that allows administrators to manage users
and monitored devices.
3. The system shall provide the administrator with tools to monitor system performance.
4. The system should support system administration functions. The system shall provide
utilities, procedures and documentation to perform regular administrative functions required
to maintain the system.
6. The system shall retain the history of all changes to the operations of the system and the
user.
1. Response time for login procedures must be less than 5 seconds after the user issuing the
command login.
2. The response time does not include the time that the user provides to the system with
necessary information, such as passwords.
3. During periods of normal load on the system, the system should pass transactions for
multiple systems in less than 2 seconds.
4. During the period of normal load, system operation with database management system
should be completed in less than 10 seconds.
5. During periods of peak load on the system, the system should pass transactions for
multiple systems in less than 10 seconds.
Directorate of Operations and Maintenance (DOM)
6. During the period of maximum load on the system, operation with database management
system should be completed in less than 20 seconds.
7. Provide details about the amount of time required to upgrade a graphics screen and display
a new alarm.
8. Provide details about the time required to perform the backup of the data.
9. Provide details about the time required to generate reports of daily, weekly and monthly
performance preset.
2. The system should incorporate high availability system project using a cluster
configuration.
4. A component of application Failures may not cause any interruption in other application
components running on the system.
5. The operational failures and software application should never cause a complete automatic
system restart.
6. Provide a description on the options and recommendations to provide high availability and
disaster recovery for the proposed solution.
6.2.7. Security
1. The platform should have a coherent security system to protect yourself from malicious
attacks and accidental damage, both internal as external sources.
2. The system should allow the creation of user profiles/Admin/customer management with
authentication based on login identifier and password.
3. The system must support a custom role based on the user profile as Movicel requirement.
4. Access control system with possibility of use in setting SSO (Single Signed On) IE, the
user only needs to login once to be able to access all the necessary applications relevant to
your/your work function and in line with the user profile. In other words, there should be no
login separately required to access the various free software applications (fault management,
resource management, management of tickets, and others).
5. All actions performed by authorized users shall be recorded with the date and time in the
database and must be easily retrievable.
6. Passwords should have a limited duration, and the duration can be provisioned.
The solution will make it possible to implement processes of supervision of networks and
services. Shall carry out the monitoring in real time of infrastructure (networks, equipment,
and platforms) and services. Will be able to:
Main features
11. Allow the enrichment of the alarm with the SP information, contact, contract, SLA.
12. Signaling the alarm severity (Critical, Major, Minor Alarm alarm and warning) on
affected entities, using standard colours mechanism.
13. The Dashboard must present all relevant statistics for the user on the home page for
graphic and tabular methods, including the view bar. Each user can set your own Panel
and can select a Panel to be displayed on the home page. The performance statistics can
be viewed with alarm by the statistics Panel.
14. Automatic creation of a "work order" associated with the trouble ticket, sent by the NOC
for the resolution.
15. Manual and Automatic Generation of trouble tickets.
16. Association of multiple events at the same alarm log.
17. Shares of alarms with Manual closing comments and registration to the event log.
18. Registration and storage of the alarms and events Log of the network.
19. Available workflow configuration rules alarm (End time, Time, Time of Urgency for
action, and Required Recognition threshold).
20. Summary of module alarms by severity in tabular and graphic format.
21. Preview mode for videowall.
22. Allow extraction of reports intuitively and in a short space of time in Excel, pdf and word
format.
23. Allow extraction of reports of number of breakdowns and average time of interruption in
service because of the malfunction.
23.1 By dimension analysis period.
23.2 By dimension type of intervention (energy-infrastructure, energy-Hvac, energy-
Diesel, transmission, Core, Access, etc.).
23.3 By dimension type of malfunction.
23.4 By dimension company providing services.
23.5 By OSS dimension.
23.6 For technology dimension.
23.7 By dimension Movicel feature that accompanies the event.
23.8 By Geographical Area dimension (Province/County).
23.9 By dimension types of equipment.
Directorate of Operations and Maintenance (DOM)
8.1. METHODOLOGY
Should be described in detail the methodology and acceptance testing of all components
supplied (HW and SW), as well as your integration in the proposed solution. Also should be
described in the scope and content of the documentation to produce and deliver to the same
purpose. Should be clearly specified and accepted the conditions of test and their results
(acceptance/rejection) before performing any test phase.
The tests for the purposes of receipt will have as purpose to establish the full compliance of
facilities, features and quality of service with their respective technical and functional
Specifications, as well as with the requirements arising out of applicable Standards. The
Directorate of Operations and Maintenance (DOM)
acceptance procedures shall be drawn up by the supplier and approved before the gross and
sale of your respective tests.
The tests for the purposes of receipt shall be obligatorily accompanied by representatives of
the Companies, and the respective program and achievement dates be previously agreed for
this purpose.
The supplier shall draw up where documentation showing the various items or parameters
checked in tests and values or conditions to obtain, with express indication of the reference
test conditions and completion of "valid" or "invalid" and, in this case, accompanied by a
description of possible corrective actions which it intends to perform, to resolve the non-
validating.
For any parameters or conditions which do not pass the test suite and are provisional
acceptance system conditions, the supplier shall have a reasonable amount of time (which
may not exceed 15 days) to make the corrections and perform new tests validation sets
associated with the item or parameter in question, with a view to concluding a provisional
system acceptance.
As mentioned in the previous points, the set of tests to be carried out include integration
testing of equipment that constitute the complete system, therefore, required to complete the
statement of proper interworking and interoperability with equipment to install, possibly by
other suppliers.
8.3. WARRANTY
The warranty will cover the versions "releases" of SW necessary for the correction of
systemic problems or other errors and shortcomings of the system.
The supplier shall submit quote for warranty extension for a further period of one year.
After the warranty period on the date of Provisional Reception, and since the system does not
present anomalies or deficiencies of operation or integration, will be made Final reception.
This Receipt can be carried out without testing. If the Companies want the tests to be carried
out prior to such acceptance, will give knowledge of such claim to the supplier with an
advance of up to 30 days of the end of this period, indicating the tests that you want to be
performed, so that the agreed timetable.
At the end of the warranty period, either choose the Companies not testing or after the
completion and acceptance of these, will be drawn up a Definitive Reception self.
8.5. SUPERVISION
Without prejudice to the full responsibility of the Supplier by final results obtained, the
Companies will monitor and supervise all installation works on it's own or outside entity
designated and accredited for this purpose.
Surveillance action does not diminish or affect the liability of the supplier for the proper
execution of work and deadlines, unless it is expressly determined by the Supervision against
the opinion of the supplier, this determination that, to that end, can only be invoked when it
has been made in writing, the supplier may require.
Directorate of Operations and Maintenance (DOM)
9. TRAINING
The supplier shall propose the set of actions Training which it considers appropriate for the
proper understanding of the functioning of the system. The reference framework of training
should include:
(a) A course youstema, with the maximum duration of one week, directed to aspects of
network composition, functional articulation of the components, interconnection with
other systems, HW and SW, supervision and management, etc.;
(b) A course of management and operation, including training "on the job". In addition to
aspects associated with the operation and management of equipment, this course will
also include the creation of configuration parameters and user management;
(c)) A course of maintenance and repair. This course will cover aspects related to the
identification and location of faults ("Faulty location" and "trouble shooting"),
replacement of modules or components, auxiliary equipment testing procedures,
procedures for emergency interventions and analysis of the descriptive list of alarms
system.
With the possible exception of the course system, all training and associated documentation
shall, obligatorily, be in Portuguese language.
Will be the responsibility of the supplier the cost of travel and subsistence of participants, in
case any of these courses take place outside Angola.
Directorate of Operations and Maintenance (DOM)
10. MAINTENANCE
Should be included with an annual value of maintenance services for all components of the
network to provide disaggregated by subsystem basis during the period of warranty including
its extension, in which the supplier requires the following:
The Tenderer shall describe the means and proposed organization for this maintenance
program (size and team composition, level of training and expertise, time, etc.).
Directorate of Operations and Maintenance (DOM)
The competitor should detail that periodic preventive maintenance operations deems
necessary to carry out, and the conditions of the corrective interventions.
The supplier undertakes that all contacts, as well as any supporting documentation, reports,
speeches, etc., are made using the Portuguese language. In the case of "help desk" 2nd line
may be used the English language.
The supplier shall respond to all questions of a technical nature requested by Services
Companies discriminated against in the previous paragraph. In particular all
faults/deficiencies reported should be the subject of a report, identifying the possible causes,
affected services, their spare time, proposed methodology, if possible, avoid future similar
situations.
The supplier shall provide cooperation to the coaching staff of Movicel, or who's designate,
follow the development of the work, whenever needed, or do understand audits to assess the
quality of services provided.
The supplier shall request permission to Companies where, as a result of the contracted
services, there is a need to make amendments to the HW or SW of network components.
The supplier shall guarantee the repair of malfunctioning equipment during and after the
warranty period. Should indicate dipped and main beam repair times ("turn around time") of
modules and components, referring to whether conditions for the realization of this activity in
Angola or if will be held abroad, indicating, in this case the country. In addition, you should
maintain an up-to-date register of all modules or defective components.
Directorate of Operations and Maintenance (DOM)
The supplier shall consider, indicating, in the composition and size of the proposed
replacement, any constraints associated with times of repair of components or modules that,
by your importance, is mandatory to have available to ensure the functionality and
availability of the system.
Should be indicated by the supplier if the methodology of repair support includes, for
modules or important components, the immediate availability of modules or similar
components that ensure operational back-up, and can be used in case of need, during the
repair period. If so, should be given the maximum time of availability, on the premises of the
Companies, as well as being listed these modules or components.
11.1. SPARES
The supplier shall submit unit prices of the components that make up the batch of spare parts.
The supplier should also propose rightly a lot of spares for the extended warranty period.
The supplier shall ensure that ensures the support during this period, both at HW components
repair or the correction of shortcomings of SW to be hired and installed.
If, during the period of 7 years, the lack of vendor support, motivated by their decisions,
associated with simple discontinuance of support components, the supplier assumes
guarantee that will make the replacement of these network elements by others with similar
features, whose support is ensured,
Directorate of Operations and Maintenance (DOM)
For the purposes of the count of years of the system's life cycle, it is considered the date of
provisional reception of the system.
The supplier shall submit annually, the "roadmap" of evolution of both the HW and the SW
("minor" and "major releases") subject to the provision, in particular with regard to:
When available by the supplier a new SW release this consider that adds value to the solution
installed, by adding new features initially planned and contracted, it shall communicate such
fact to the Companies, supporting such understanding. The Companies after review and
possible discussion with the supplier shall decide whether or not, by your opts.
______________________________________
* In this context, by replacement of the HW is also any items re added the SW or licenses
associated with the new hardware.