Beruflich Dokumente
Kultur Dokumente
General Proposal
CRCC, one of the world's most powerful and largest integrated construction group,
ranking the 79th among the Fortune Global 500, and 6th among China’s Top 500
Enterprises,as well as 1st among ENR’s Top 250 Global Contractors in 2013, is the
largest engineering contractor in China.
1
Total 316 Total 74
To date CRCC has participated in a total length of 390 Km in LRT over the world.
CRCC leads the future of urban rail transportation construction in China and has
participated in the construction of all urban rail transportation projects from the first
subway in China, the No. 1 Subway in Beijing, to the first straddling single rail urban
light rail transport system in Chongqing, especially the first commercially operated
model line in the world, the Shanghai Maglev Train.
Shanghai Maglev Demonstration Line
In 2001, we participated in the construction of this maglev track, which is the first and
only maglev track currently in commercial operation in China. The track recorded
maximum train speeds of up to 432 km/h during trial operations. The project was
completed in 2002 with a total contract value of RMB540 million. We are currently the
only company in China possessing proprietary knowledge of high-precision maglev
track beam manufacturing technology and have obtained two intellectual property
rights for technologies developed for this project
2
Beijing Metropolitan Railway Lines: We have constructed subway routes No. 1, No.
2,No.5,No. 13 and the Bawangfen-Tongzhou Line of the Beijing Metropolitan Railway
Lines System, the combined subway and light rail connecting Beijing International
Airport with the city center of Beijing. The construction of routes No.1 and No.2 was
completed in 1989 with a total contract value of RMB1.7 billion. As part of the subway
line crosses the city center, we employed underground excavation technology to
minimize interference with city center traffic
3
methods, and successfully overcame difficulties such as steep slopes, multiple curves
and the manufacture and erection of an S-shape reverse curve PC beam. The project
was completed in 2004 with a total contract value of RMB110 million. In 2005, this
project received Top Ten Construction Technology Achievement in China
The project is an extension of the west-end of the No. 2 Subway in Shanghai with a
total length of approximately 6.1 km. We were engaged as the general contractor and
completed the groundworks as well as the construction of the electrical engineering
system and railways of all sections between stations. The project was completed in
2006with a total contract value of RMB3.6 billion.
Apart from the LRT achievement, CRCC has also made huge success in railway, toll
road, airport, wharf, water transportation, etc.
Bandung, is the capital of West Java province in Indonesia and the country's third
largest city by population. Bandung city LRT was built to address the congestion
growing. LRT also serves to provide the best services to the users of public
transportation the city of Bandung.
The project officially named Bandung Monorail Corridors 1 and 2. see map below.
4
Several considerations to be taken for the project including:
Bandung Transportation Network Systems
Monorail Role Function
Land usage along the track
Technical characteristics of the track
Topography condition
Geological and Geotechnical Conditions
Availability of Space
Environmental Impact
Technical Profile
1.Monorail
5
Currently Monorail technical includes three types: H-BAHN, Straddle-Beam Monorail
and AEROMOVEL. Straddle-Beam Monorail and AEROMOVEL are belong to the
same structure type, but different mode of traction. Straddle-Beam Monorail Transit is
electric traction and AEROMOVEL uses air propulsion for the movement of
lightweight.
Bandung is located in plateau basin surround volcanic peaks in west Java, urban area
is gently topography, Monorail can well adapt to the terrain by smaller slope.
Straddle-Beam Monorail is recommended in Bandung.
Transportation system type comparison
Straddle-Beam
Item H-BAHN AEROMOVEL
Monorail
Volume 15000 users/h 30000 users/h 10000 users/h
Design highest speed 50km/h 80km/h 80km/h
Operation speed 25km/h 35km/h 35km/h
Minimum Radium of
curve 50m 50m 25m
Ruling Gradient 6% 6% 12%
Locos. Type Electricity Electricity Air propulsion
At present, Bombardier and Hitachi are product monorail vehicles basically. There is
only one of Bombardier monorail vehicle. Hitachi monorail vehicles have three kinds
of models: minimum, medium and maximum. Bombardier INNOVIA300 is
recommended for the urban monorail vehicles.
6
Figure 2 Hitachi urban monorail vehicles
7
Comparison of Main technical parameters for INNOVIA300 and HITACHI
INNOVIA300 HITACHI HITACHI HITACHI
minimum Medium maximum
maximum speed (km/h) 80 80 80 80
Standard span of rail beam make use of precast prestressed concrete (PC).The
section size is set to 1.5 m (high) by 0.85 m (width). Dedicated Cast steel bearing of
PC track beam is adopted as Standard prefabricated beam of Straddle-Beam
Monorail.
Pier foundation of bridge is according to geology to adopt the formation of digging pile,
8
drilled pile or open-cut foundation. Reinforcement ratio of pile will control of 0.4% ~
2%, the depth of rock-socketed pile should meet the requirements of the stress.
Pier of urban light rail is located in the middle of the road space, the overall landscape
requirements for pier is higher. Generally ordinary pier should adopt reinforced
concrete T-shaped single-column pier priority, The Inverted L-shaped pier or portal
pier column is adopted in special the terrain restriction.
9
Figure 5 Inverted L-shaped prestress concrete pier
10
Figure 7 Portal pier column
11
Financial Profile
Corridor 1 is 10.147 km on the main line, with the total investment of USD
314,252,600 and technical economic indicator of USD 30,970,000 / main line km;
Corridor 2 is 20.046 km on the main line, with the total investment of USD
590,356,000 and technical economic indicator of USD 29,450,000 /main line km.
The project shall be Chinese bank funded, like The Import Export Bank of China,
China Development Bank. If Bandung government could provide Indonesia sovereign
guarantee, the Chinese bank will avail the preferential loan interests and longer
repayment period to support Indonesia infrastructure development.
It is very important for the Bandung government to avail the support to this project,
including land
acquisition, providing capital to the project company, etc.
The Indonesia sovereign guarantee shall be the best option, with which the loan
interests will be
lower, repayment period longer, and the procedures for the loan shorter, therefore the
sovereign
guarantee will meet the requirement of project commencement at its earliest
opportunity.
Other options are also negotiable.
Organizational profile
CRCC desires to cooperate with local companies to create jobs including construction
company, rolling stock supplier, and operational service company by forming the
consortium.
CRCC shall complete the feasibility study and cover its expense provided that
Bandung government appoints CRCC officially and wishes to have cooperation with
us in this Monorail project.
12