Sie sind auf Seite 1von 54

UNIVERSIDAD CENTRAL

DEL ECUADOR
FACULTAD DE INGENIERÍA, CIENCIAS FÍSICAS Y MATEMÁTICA
CARRERA DE INGENIERÍA CIVIL

GRUPO 4

TRABAJO No 2

TEMA:
CÁLCULO DE UN MURO EN
CANTILEVER

INTEGRANTES

Barragán Astudillo Christian David


Gavilánez Revelo Myriam Jeanneth

FECHA DE ENTREGA: 09/01/2018


GRUPO 4
MURO EN CANTILIVER

DIMENSIONAMIENTO
B= (0.70-0.80)H 0.9 3.40
Ld= (0.18-0.25) H 0.3 1.70
Bm= (0.10-0.15)H 0.15 1.00
hz= (0.10-0.12) H 0.12 0.90

CARGAS

0.3

h1 h2
1 6.85 5.55 h1
5.95

3
0.90

1.70 1.00 3.40

MURO Ycg zapata 3.05


OPERACIONES
FIGURA a b c nº p.especifico
1 0.30 5.30 8.45 1.00 2.40
2 0.70 5.30 8.45 0.50 2.40
3 6.10 0.90 8.45 1.00 2.40

PDC = 181.2018 t
ydc = 2.6669091587 m
edc = 0.38 m
Mdco = 483.24874 tm
Mdc = 69.41675 tm

inclinacion de la pared ɞ 82.4761795614

0.3
6

5 5

0.680
o
1.70 1.00 3.40

C.vertical relleno Ycg zapata 3.05


OPERACIONES
FIGURA
a b c nº p.especifico
4 3.40 5.15 8.45 1 1.75
5 0.68 5.15 8.45 0.5 1.75
6 4.08 0.46 8.45 0.5 1.75
7 1.70 0.85 8.45 1 1.7

PDC = 319.61 t
ydc = 4.03 m
edc = -0.98 m
Mevo = 1287.46 tm
Mev = -312.65 tm
PRESION DE TIERRAS

longitud = 8.45 m
Hpromedio = 6.515 m
ɞ= 82.4761795614 1.4394808878
ɣr = 1.75 t/m3
Φr = 31 0.5410520681
ʠ= 20.67 0.3607013787
ῐ= 6.5 0.1134464014
ka = 0.376
po = 4.28 T/m2
Eh = 117.9347753642 T
Zeh = 2.1716262597 m
MEH = 256.1102551148 Tm
SOBRECARGA VIVA
heq(m)
altura del muro distancia al borde d
m ˃ 30m
1.524 1.524 0.61
3.048 1.067 0.61
6.096 0.61 0.61
CARGA VERTICAL pv
L = 8.45
d = 0.00
heq = 0.61
pv = 1.07
ls = 4.08
PLS = 36.80
yLs = 3.560
els = -0.510
Mlsv = -18.7669921444
Mlsvo = 131.0217296149
PRESION LATERAL
heq = 0.61
ka = 0.38
L = 8.45
p1 = 0.40
Els = 22.08
zls = 3.26
Mlsh = 71.94
Mls = 53.17
SISMO
DATOS DEL SITIO DE UBICACION DEL MURO
ᵑ = 1 As = Fpga * PGA
Pga = 0.4 Fpga = 1
MURO
Kh = 0.5Kho Kho = 0.4
fig PESO Z M= Pz
1 32.25 3.55 114.47
2 37.62 2.67 100.32
3 111.34 0.45 50.10
181.202 264.89
1
Eqmuro = 36.240 T
Zi= 1.462 m
Meqmuro= 52.978 Tm

RELLENO EN EL TALON

figura T z M
4 258.93 3.48 899.78
5 25.90 4.33 112.23
6 14.02 6.20 87.02
298.85 1099.03 5

kh= 0.2
Eqearth= 59.7707 T
Zearth= 3.6775 m
Meearth= 219.807 Tm
PIR= 96.0111 T
0.68

PRESION DEL SUELO EN CONDICION


D
CONSIDERACIONES
1.Material de relleno homogeneo no cohesivo, cuña de suelo 3H:1V, desde el talon
2. Relleno no Saturado
Tipo de suelo B
Kho= 0.48 𝐾ℎ/(1−𝐾�) ῐ 0.1134464
0.24
0.24
Kh= 0.24 ῐ+ѲMO 0.006091
Kv= 0 ѲMO 0.235545 Φr 0.5410521

FUERZA ACTIVA SISMIA DE LA MASA DEL SUEL

Kae= 0.64834 PAE= 203.460685

ΔPAE= 85.5259 z= 3.90892727

TOTAL (efectos sismicos)


EQ = 181.537
MEQ = 607.099
FACTORES DE CARGA

COMBINACIONES DE CARGAS Y DIS


qa 22 T/m2 esfuerzo admisible del suelo
Fs 2.5 factor de seguridad tomado en el estudio de suelos
qn 55 T/m2 resistencia portante nominal del suelo
VERIFICACION DE LA CAPACIDAD POR
ϕ 1
qR 55
qn 55

SERVICIO 1
Pumax Humax
TIPO P H M
t m
DC 181.202 0 69.41675 181.2018 0
DW 0.00 0.00 0.00 0.00 0.00
LL 0.00 0.00 0.00 0.00 0.00
BR 0.00 0.00 0.00 0.00 0.00
EH 0.00 117.93 256.11 0.00 117.93
EV 319.61 0.00 -312.65 319.61 0.00
LS 36.80 22.08 53.17 36.80 22.08
TU 0.00 0.00 0.00 0.00 0.00
SH 0.00 0.00 0.00 0.00 0.00
EQ 0.00 181.54 607.10 0.00 0.00
∑ 537.62 140.02

excentricidad (e)= 0.12286 B= 6.10 L=


ancho zapata largo zapata

fundacion en suelo fundacion en roca

� v= 10.8678 �v max = 11.690447859


�v min = 9.1696818598

DESPLAZAMIENTO

rad
ɞ = 90 1.5707963268
ɣ2 = 1.7
Φ2 = 25 0.436332313
ʠ2 = 12.5 0.2181661565
ῐ = 0 0
kp = 3.5524049668
hp1 = 1.5
hp2 = 0.6
he = 0.9 0.6
L = 8.45 qp1
qP1 = 3.6234530662
qP2 = 9.0586326654 qp2
tgʠ1 = 0.5773502692
C = 77.32
Humax = 140.02
Pu min = 537.62

Rt = 387.7112198726 T condicion
Rep = 48.2236309943 T
servicio 1
= 1
= 1 CONTINUAR CALC
= 435.9348508669 T
VOLCAMIENTO

Mu estb = 1901.7352165176 Mvolcam =

CONDICION Muest> Mvolc Ok


EVENTO EXTREMO 1
CAPACIDAD PORTANTE
ϕ 1
qR 55
qn 55

Pumax Humax Mumax


TIPO ɣmax ɣmin
t m tm
DC 1.25 0.9 226.50225 0 86.7709375
DW 1.5 0.65 0 0 0
LL 0.5 0 0 0 0
BR 0.5 0 0 0 0
EH 1.5 0.9 0 176.902163 384.16538267
EV 1.35 1 431.474932636 0 -422.0788638
LS 0.5 0 18.4024159788 11.0424484 26.586610414
TU 0 0 0 0 0
SH 0.5 0.5 0 0 0
EQ 1 1 0.000 181.537 607.099
∑ 676.38 369.48 682.54

excentricidad (e)= 1.00911 B= 6.10 L=


ancho zapata largo zapata

fundacion en suelo fundacion en roca

� v= 19.6103 �v max 26.14674145


�v min 0.0974955711
DESPLAZAMIENTO
rad
ɞ = 90 1.5707963268
ɣ2 = 1.7
Φ2 = 25 0.436332313
ʠ2 = 12.5 0.2181661565
ῐ = 0 0
kp = 3.5524049668
hp1 = 1.75
hp2 = 0.85
he = 0.9 0.85
L = 8.45
qP2 = 10.5684047763 Rep
tgʠ1 = 0.5773502692
C = 77.32
Humax = 369.48
Pu min = 287.68

Rt = 356.0002494337 T
Rep = 78.1401428149 T condicion
extremo 1
= 1
= 1
= 434.1403922486 T CONTINUAR CALC

VOLCAMIENTO

Mu estb = 1722.3886129027 Mvolcam =

Muest> Mvolc Ok
SOLICITACIONES Y DISENO DE LA CIMENTACION EN EVENTO EXTREMO I
DEDO

FLEXION

Pevt2

Pevt1 5.95

Pevd 0.6
a b

Pdcd Pdct 0.9

1.70 1.00 3.40

26.147
ARMADURA

fc = 280 kg/cm2 w=
fy = 4200 kgcm2 As cal p=
bv = 100 cm As=
hz = 90 cm Igg=
de = 80 cm fr=
Asmin
r = 10 cm Mcr=
Mu = 30.0023415859 Tm As=

Mumaterial= 60.0889231057
USAR AS MIN
Mu= 30.0023415859

Resumen de As As adoptado
Asmin Ascal 1.33As cal Asdefinitivo 1
20.2104200421 10.0328 13.3435711493 20.2104200421 #

Asmdx
ξmin > 0.005
c = 3.9460143019 CALCULO ESTA BIEN
ξt = 0.0578208642
ARMADURA POR CONTRACCION Y TEMP
2.33 <= Asmin y max<=
Ascal 4.26316 cm2/m

As adoptado
1 16 @
# diam

CORTE
0.9de 0.72
dv dv adoptado 0.72
072h 0.648

Pevt2
�𝑑�

Pevt1 5.95 �𝑚𝑎�

Pevd 0.85 0.88


a b
Pdcd Pdct 0.9

1.70 1.00 3.40

comprobacion en la seccion a-a


𝝈𝒎𝒂� = 26.147
�𝑎𝑎 = 18.89
Vr>Vuaa
Vuaa= 33.4133784
Vr= 57.2516416

TALON

Pevt2

Pevt1 5.95

Pevd 0.85
a b

Pdcd Pdct 0.9

1.70 1.00 3.40

Pdct
0.9
3
C= 10.6508249107
y= 2.8979942709
Rt= 15.4330147857 T

FLEXION

y = 2.8979942709
Rt= = 15.4330147857
bv = 1.00
Lt = 3.40
hr = 5.8
dt = 1.7
Pdct = 7.34
Pevt1 = 34.51
Pevt2 = 1.613570058
Mubb = -68.7444871896 Tm
ARMADURA

fc = 280 kg/cm2 w
fy = 4200 kgcm2 As cal p
bv = 100 cm As
hr = 90 cm Igg
de = 80 cm fr
Asmin
r = 10 cm Mcr
Mu = 68.7444871896 Tm As

Mumaterial= 60.0889231057
USAR Ascal
Mu= 68.7444871896

Resumen de As As adoptado
Asmin Ascal 1.33As cal Asdefinitivo 1
20.2104200421 23.3354 31.0360310976 23.3353617275 #

As de varilla requerido =

Asmdx
ξmin > 0.005
c = 6.5223376891 CALCULO ESTA BIEN
ξt = 0.0337966228
ARMADURA POR CONTRACCION Y TEM
2.33 <= Asmin y max<=
Ascal 4.26316 cm2/m

As adoptado
1 16 @
# diam

CORTE
0.9de 0.72
dv dv adoptado 0.72
072h 0.648

Pevt2 0.46

Pevt1 5.95

2.68

a b
Pdcd Pdct 0.9

1.70 1.00 3.40

0.46 comprobacion en la seccion a-a


0.31174 Vuaa 46.0503346
Vr>Vuaa
2.28 Vr 57.2516416

CONTROL DE FISURAMIENTO
DEDO

Pevt2 0.46

0.85 Pevt1 Pevd 5.95


a b

Pdcd Pdct 0.9


1.70 1.00 3.40
9.1696818598
11.69045 10.99 10.57

ɞs = 1.2
Eacero = 2030
n = 10
ɣc = 0.75 M 11.959222201
Ehormigon = 200.7984063682 As 19.006635554
fs = 1680 de 0.8
fc = 112 y 15.641248849
k = 0.4 Itranf 914.81781796
j = 0.8666666667 fs 841.34850729
recubrimiento (dc) = 10 Smax 72.45574138
h = 0.9 Svarilla 20
b = 100 cm

TALON

ɞs = 1.2
Eacero = 2030
n = 10
ɣc = 0.75
Ehormigon = 200.7984063682 M 15.444039211
fs = 1680 As 31.415926536
fc = 112 de 0.8
k = 0.4 y 19.50
j = 0.8666666667 Itranf 1397.06
recubrimiento (dc) = 10 fs 668.834
h = 0.9 Smax 96.30
b = 100 cm Svarilla 0.1

ESTADO LIMITE RESISTENCIA I


Verificacion de la capacidad portante

= 0.45
qn= 55
= 24.75 t/m2

Pumax Humax Mumax


TIPO ɣmax ɣmin
t m tm
DC 1.25 0.9 226.50225 0 86.7709375
DW 1.5 0.65 0 0 0
LL 1.75 1.75 0 0 0
BR 1.75 1.75 0 0 0
EH 1.5 0.9 0 176.902163 384.16538267
EV 1.35 1 431.474932636 0 -422.0788638
LS 1.75 1.75 64.4084559257 38.6485695 93.053136449
TU 0.5 0.5 0 0 0
SH 0.5 0.5 0 0 0
EQ 0 0 0 0 0
722.385638562 215.550733 141.91059284

excentricidad= 0.19645 B= 6.10 L=


ancho zapata largo zapata

fundacion en suelo fundacion en roca

�v 14.9795 oK �v max 16.72266618


�v min 11.306653388

DESPLAZAMIENTO
rad
ɞ = 90 1.5707963268
ɣ2 = 1.7
Φ2 = 25 0.436332313
ʠ2 = 12.5 0.2181661565
ῐ = 0 0
kp = 3.5524049668
hp1 = 1.5
hp2 = 0.6
he = 0.9 0.6
L = 8.45 qp1
qP1 = 0
qP2 = 0 qp2
tgʠ1 = 0.5773502692
C = 77.3175
Humax = 215.550732565
Pu min = 547.1011371378

Rt = 393.1864888005 T condicion
Rep = 48.2236309943 T
servicio 1
= 0.8
= 0.5 CONTINUAR CALC
= 338.6610065376 T
VOLCAMIENTO
Mu estb = 2032.4941203814 Mvolcam =

Muest> Mvolc Ok
SOLICITACIONES Y DISENO DE LA CIMENTAC
DEDO
FLEXION
Pevt2

Pevt1 5.95

Pevd 0.6
a b

Pdcd Pdct 0.9

1.70 1.00 3.40

ARMADURA

fc = 280 kg/cm2 w
fy = 4200 kgcm2 As cal p
bv = 100 cm As
hz = 90 cm Igg
de = 80 cm fr
Asmin
r = 10 cm Mcr
Mu = 19.1542543008 Tm As

Mumaterial= 60.0889231057
USAR AS MIN
Mu= 19.1542543008

Resumen de As As adoptado
Asmin Ascal 1.33As cal Asdefinitivo 1
20.2104200421 6.3791 8.4841967167 20.2104200421 #
Asmdx
ξmin > 0.005
c = 3.9460143019 CALCULO ESTA BIEN
ξt = 0.0578208642

ARMADURA POR CONTRACCION Y TE


2.33 <= Asmin y max<=
Ascal 4.26316 cm2/m

As adoptado
1 16 @
# diam
CORTE
0.9de 0.72
dv dv adoptado 0.72
072h 0.648

Pevt2
�𝑑�

�𝑚𝑎�
Pevt1 5.95

Pevd 0.6 0.88

a b
Pdcd Pdct 0.9

1.70 1.00 3.40

�𝑑�

�𝑚𝑖�
�𝑎𝑎
�𝑚𝑎�

comprob
𝝈𝒎𝒂�
𝝈𝒂𝒂
Vuaa
Vr

TALON
Pevt2

Pevt1 5.95

Pevd 0.6
a b

Pdcd Pdct 0.9

1.70 1.00 3.40

10.4441877717

�𝑎𝑎 �𝑚𝑖�
�𝑚𝑎� �𝑏𝑏10.7747278393 Pdct

C 2.61821003
y 0.75235576
Rt 0.9849127 T

FLEXION

y = 0.7523557576
Rt = 0.9849126972
bv = 1.00
Lt = 3.40
hr = 5.8
dt = 1.7
Pdct = 7.34
Pevt1 = 34.51
Pevt2 = 1.613570058
Mubb = -39.8491256811 Tm

ARMADURA
fc = 280 kg/cm2 w
fy = 4200 kgcm2 As cal p
bv = 100 cm As
hr = 90 cm Igg
de = 80 cm fr
Asmin
r = 10 cm Mcr
Mu = 39.8491256811 Tm As

Mumaterial 60.0889231057
Mu 39.8491256811
USAR AS MIN

Resumen de As As adoptado
Asmin Ascal 1.33As cal Asdefinitivo 1
20.2104200421 13.3755 17.7894608816 20.2104200421 #

As de varilla requerido

Asmdx
ξmin > 0.005
c = 6.5223376891 CALCULO ESTA BIEN
ξt = 0.0337966228

ARMADURA POR CONTRACCION Y TEMPERATURA


2.33 <= Asmin y max<=
Ascal 4.26316 cm2/m

As adoptado
1 16 @
# diam
CORTE
0.9de 0.72
dv dv adoptado 0.72
072h 0.648

0.46
Pevt2

Pevt1 5.95

2.68
a b

Pdcd Pdct 0.9

1.70 1.00 3.40


0.46 comprobacion en la seccion a-a
0.31174 Vubb -26.023843
Vr>Vuaa
2.28 Vr 57.2516416

CUERPO O PANTALLA

0.680
6 0.08 0.46

5
4
5.8
1 4.5

CARGA

fig
0
5
6
0.3 0.70 ∑
1 3

Presion en tierras
longitud = 8.45 m
Hpromedio = 5.615 m
ɞ = 0 0
ɣr = 1.75 t/m3
Φr = 31 0.5410520681
ka = 0.376
po = 3.69 T/m2
Eh = 87.6011837465 T
Zeh = 1.8716262597 m
MEH = 163.9566758825 Tm

SOBRECARGA VIVA
heq(m)
altura del muro distancia al borde d
m ˃ 30m
1.524 1.524 0.61
3.048 1.067 0.61
6.096 0.61 0.61
CARGA VERTICAL
L = 8.45
d = 0.00
heq = 0.61
pv = 1.07
ls = 0.67
PLS = 6.04
yLs = 0.665
els = -0.165
Mlsv = -0.9972024563
Mlsvo = 4.0190280813
PRESION LATERAL
heq = 0.61
ka = 0.38
L = 0.67
p1 = 0.40
Els = 19.03
zls = 2.81
Mlsh = 53.4367220854
Mls = 52.44
SISMO
DATOS DEL SITIO DE UBICACION DEL MURO

ᵑ = 1 As = Fpga * PGA
Pga = 0.4 Fpga = 1
MURO
Kh = 0.5Kho Kho = 0.4
fig PESO Z M= Pz
1 32.25 2.65 85.45
2 37.62 1.77 66.46
69.86 151.91

1
Eqmuro 13.973 T
Zi 2.174 m
Meqmuro 30.382 Tm
3

RELLENO SOBRE EL MURO


figura e dc z M
4 258.93 2.58 666.74
5 25.90 3.43 88.92
6 14.02 5.30 74.40
298.85 830.07

kh 0.2
Eqearth 59.7707 T
Zearth 2.7775 m
Meearth 166.013 Tm
PIR 73.7436 T
PRESION DEL SUELO EN CONDICION SISMICA
CONSIDERACIONES
1.Material de relleno homogeneo no cohesivo, cuña de suelo 3H:1V, desde el talon
2. Relleno no Saturado
Tipo de suelo B
Kho 0.48𝐾ℎ/(1−𝐾�) 0.24 po 0.0644496027
Kh 0.24 ῐ+ѲMO 0.0052358932
Kv 0 ѲMO 0.2355449807 Φr 0.5410520681

FUERZA ACTIVA SISMIA DE LA MASA DEL SUELO SOBRE EL MURO

Kae 0.64834 PAE 151.129273

ΔPAE 63.5281 z 3.36892727

TOTAL (efectos sismicos)


EQ = 137.272
MEQ = 410.417

SOLICITACIONES ULTIMAS

EXTREMO I
TIPO P H M
ɣmax ɣmin
DC 69.8646 0 10.03184 1.25 0.9
DW 0.00 0.00 0.00 1.5 0.65
LL 0.00 0.00 0.00 0.5 0
BR 0.00 0.00 0.00 0.5 0
EH 0.00 87.60 163.96 1.5 0.9
EV 26.29 0.00 -7.10 1.35 1
LS 6.04 19.03 53.44 0.5 0
TU 0.00 0.00 0.00 0 0
SH 0.00 0.00 0.00 0.5 0.5
EQ 0.00 137.27 410.42 1 1

EXTREMO 1
Pumax Humax Mumax Pumin Humin Mumin
t m tm t t tm
87.33075 0 12.5398 62.87814 0 9.028656
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 131.402 245.9350138237 0 78.8410654 147.56100829
35.4912896997 0 -9.5794246175 26.289844222 0 -7.095870087
3.021825625 9.51699 26.7183610427 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 137.272 410.4166796099 0 137.271737 410.41667961
125.84 278.19 686.03 89.17 216.11 559.91

RESISTENCIA I
Pumax Humax Mumax Pumin Humin Mumin
t m tm t t tm
87.33075 0 12.5398 62.87814 0 9.028656
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 131.402 245.9350138237 0 78.8410654 147.56100829
35.4912896997 0 -9.5794246175 26.289844222 0 -7.095870087
10.5763896875 33.3095 93.5142636494 10.5763896875 33.3094506 93.514263649
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
133.40 164.71 342.41 99.74 112.15 243.01

DISENO
B 845 cm
H 100 cm

ARMADURA

fc = 280 kg/cm2 w
fy = 4200 kgcm2 As cal p
bv = 845 cm As
hr = 100 cm Igg
de = 92 cm fr
Asmin
r = 8 cm Mcr
Mu = 686.03 tm As

Mumaterial 626.853580547
Mu 686.030429859
USAR Ascal

Resumen de As As adoptado
Asmin Ascal 1.33As cal Asdefinitivo 1
183.1250541413 201.912 268.5434510463 201.912369208 #

As de varilla requerido

Asmdx
ξmin > 0.005
c = 6.5223376891 CALCULO ESTA BIEN
ξt = 0.0429957786

ARMADURA POR CONTRACCION Y TEMPERATURA

2.33 <= Asmin y max<=


Ascal 4.5 cm2/m

As adoptado
1 14 @
# diam

CORTE
0.9de 0.828
dv dv adoptado 0.828
072h 0.72
Pevt2

Pevt1

a b

Pdcd Pdct

t m tm
comprobacion en la seccion a-a
Vuaa 287.678295
Vr>Vuaa
Vr 559.634797

CONTROL DEL FISURAMIENTO: ESTADO LIMITE DE SERVICIO

BETA S = 1.0869565217 M
TIPO
rc = 0.5 tm
n= 10 DC 10.03184
bv = 845 DW 0
Cuerpo LL 0
dc = 8 BR 0
h = 100 EH 163.95667588
As = 31.231126968 EV -7.095870087
Asmuro = 265.4645792283 LS 53.436722085
de = 92 TU 0
y = 21.051389762 SH 0
Itranf = 15990416.6191727 EQ 410.41667961
fs = 977.5894411048 Mu
Smax = 87.7578578191
Sreal = 10

c= 70.948610238
ϒe= 0.75

Sreal DEBE SER


10

CORTE

0.9 * (de)= 82.8


0.72 * (h)= 72
SE TOMA EL VALOR MAYOR

Vu=
Ф=
Vc=
Vs=
Vn=
Vr=

Vr
558.45018667
O EN CANTILIVER

DATOS
f`c 280 concreto
h1 6.85 altura muro
h2 5.55 altura muro
L 8.45 largo del muro
ɣr 1.75 suelo de relleno
Φr 31 angulo friccion relleno
ῐ 6.5 inclinacion relleno
zs 3 zona sismica
fy 4200 acero
ɣ1 1.7 suelo naturaL
Φ1 30 suelo natura friccion
c 0.15 constante
ʠ1 20
ɣ2 1.7 relleno delantero
Φ2 25 angulo friccion s. natural
xx 0.15 altura entre relleno y muro
qa 22 esfuerzo admisible suelo
fs 2.5

CARGAS

h2
4.65
PESO Y Mo ∑Mo
T m T-m T-m
32.25 1.85 59.65 59.65
37.62 2.23 84.02 143.67
111.34 3.05 339.58 483.25
181.2018 483.24874

6 0.465

4
5.150

3.40 1.70

1.1
htierra
0.6

PESO Y Mo ∑Mo
T m T-m T-m
258.93 4.40 1139.28815 1139.28815
25.90 2.47 64.05794429 1203.346094
14.02 4.74 66.47484136 1269.820936
20.76 0.85 17.64381125 1287.464747
319.61 1287.464747
SION DE TIERRAS

Ls 4.08

Els

Zls

5.6
N DEL MURO
Clase del sitio B
As = 0.4

Kh = 0.2

h1 h2
6.85 5.55
h1 h2
5.95 4.65
2

3 0.9

LLENO EN EL TALON

6 0.46

4
5.15

3.40
1.70
1.1
htierra
0.6

UELO EN CONDICION SISMICA

𝜃𝑀�=𝑎𝑟𝑐𝑡𝑔(𝑘ℎ/(1−𝑘�))
∅≥�+𝜃𝑀�
V, desde el talon
𝐾ℎ�=1.2𝐹𝑝𝑔𝑎∗𝑃𝐺�

ɞ 1.439
ʠ 0.361

DE LA MASA DEL SUELO SOBRE EL MURO

EH= 117.9347754

MEAE= 334.3145618

CIONES DE CARGAS Y DISENO

studio de suelos

N DE LA CAPACIDAD PORTANTE

Mumax Pumin Humin Mumin


tm t t tm
69.41675 181.2018 0 69.41675
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
256.11 0.00 117.93 256.11
-312.65 319.61 0.00 -312.65
53.17 36.80 22.08 53.17
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
66.05 537.62 140.02 66.05

8.45 A= 51.545
largo zapata area cimentacion

ESPLAZAMIENTO

3
0.9

6.10

> Hu max ok

CONTINUAR CALCULO
328.050468087

Pumin Humin Mumin


t t tm
163.08162 0 62.475075
0 0 0
0 0 0
0 0 0
0 106.1412978 230.4992296
319.6110612121 0 -312.65101
0 0 0
0 0 0
0 0 0
0 181.537 607.099
482.69 287.68 587.42

8.45 A= 51.545
largo zapata area cimentacion

2
3
0.9

6.10

> Hu max ok

CONTINUAR CALCULO

1027.2348482436

N EVENTO EXTREMO I

ɣDcmin 0.90
ɣevmin 1.00
ɣhormigon 2.40 T/m3
Ldiseno 1.00 m
Ld 1.70 m
hz 0.90 m
hr 0.60 m
az 6.10 m
Pdcd 3.67 T
Pevd 1.73 T
�𝑚𝑎� 26.15 T/m2
�𝑚𝑖� 0.10 T/m2
�𝑎𝑎 18.89 T/m2
Mvaa 30.00234159 Tm

1.734

3.672

18.887
0.0188114255
0.001254095
10.0327602627
6075000
33.4664010614
45.1796414328
20.2104200421

SAR AS MIN

As adoptado 19.0066356
22 @ 0.2 5
diam cm total varillas

ULO ESTA BIEN


R CONTRACCION Y TEMPERATURA
12.7

10.0530964915
0.2 5
cm total varillas

CORTE

CALCULO
ɣevmin 1.00
�𝑑� ɣDcmin 0.90
Pdcv 2.1168 T
�𝑎𝑎 Pevv 0.9996 T
�𝑚𝑖� 0.097 T/m2
�𝑚𝑎� 26.147 T/m2
�𝑑� 22.05328853 T/m2
Vud 18.30329319 T
Φ 0.9

beta 2
Vc 63.61293514 T
Vs 0 T
Vn 63.61293514 T
Vr 57.25164162 T

on en la seccion a-a

SI CUMPLE

TALON

ɣhormigon 2.40 T/m3


ɣDcmax 1.25
ɣevmax 1.35
B 6.10 m
excen 1.216970293 m
L 8.45 m
A 51.545 m2
Pu min 482.69 T
Mcmin 587.42 Tm
�𝑚𝑎� 20.57 T/m2
�𝑚𝑖� -1.84 T/m2

0.0775 Pevt2 0.46


3.40

Ycg 0

Pevt1 5.95
3
Ycg 1.5
0.0437538032
0.0029169202
23.3353617275
6075000
33.4664010614
45.1796414328
20.2104200421

USAR Ascal

As adoptado 31.4159265
20 @ 0.1 10
diam cm total varillas

varilla requerido = 4.285341756

ULO ESTA BIEN

CONTRACCION Y TEMPERATURA
12.7
10.0530964915
0.2 5
cm total varillas

CALCULO
ɣevmin 1.35
ɣDcmin 1.25
Pdctv 5.7888 T
Pevt1v 27.202
Pevt2v 1.5494 T
Vudv 46.05033456

Φ 0.9

beta 2
Vc 63.61293514 T
Vs 0T
Vn 63.61293514 T
Vr 57.25164162 T

SI CUMPLE

0.0775 Pevt2 0.46


3.40

Ycg 0
Pcdd 3.67 T
Pevd 1.73 T
Pdct 7.34 T
Pevt1 34.51 T
Pevt2 1.61 T
Maa 11.9592222 Tm
Mbb -15.4440392 Tm

cm
cm
cm4
kg/cm2
ESPACIAMIENTO CORRECTO

cm
cm
cm4
kg/cm2
ESPACIAMIENTO CORRECTO

Pumin Humin Mumin


t t tm
163.08162 0 62.475075
0 0 0
0 0 0
0 0 0
0 106.1412978 230.4992296
319.6110612121 0 -312.65101
64.4084559257 38.64856952 93.05313645
0 0 0
0 0 0
0 0 0
547.1011371378 144.7898673 73.37643085

8.45 A= 51.545
largo zapata area cimentacion

oK

3
0.9

6.10

> Hu max ok
CONTINUAR CALCULO

523.3506915948

O DE LA CIMENTACION : RESISTENCIA I

ɣDcmin 0.90
ɣevmin 1.00 1.734
ɣhormigon 2.40 T/m3
Ancho zapata 1.00 m 3.672
Ld 1.70 m
hz 0.90 m
hr 0.60 m 16.723 15.213
az 6.10 m
Pdcd 3.67 T
Pevd 1.73 T
�𝑚𝑎� 16.72 T/m2
�𝑚𝑖� 11.31 T/m2
�𝑎𝑎 15.21 T/m2
Mvaa 19.1542543 Tm

0.0119608036
0.0007973869
6.3790952757
6075000
33.4664010614
45.1796414328
20.2104200421

SAR AS MIN

As adoptado 19.0066356
22 @ 0.2 5
diam cm total varillas
ULO ESTA BIEN

CONTRACCION Y TEMPERATURA
12.7

10.0530964915
0.2 5
cm total varillas

CALCULO
ɣevmin 1.00
�𝑑� ɣDcmin 0.90
Pdcv 2.1168 T
�𝑎𝑎 Pevv 0.9996 T
�𝑚𝑖� 11.307 T/m2
�𝑚𝑎� 16.723 T/m2
�𝑑� 15.87157846 T/m2
Vud 11.43674764 T

Φ 0.9

beta 2
Vc 63.61293514 T
Vs 0T
Vn 63.61293514 T
Vr 57.25164162 T

comprobacion en la seccion a-a


16.723
15.21
22.2801589838
Vr>Vuaa SI CUMPLE
57.2516416237
ɣhormigon 2.40 T/m3
ɣDcmax 1.25
ɣevmax 1.35
B 6.10 m
excen 0.134118586 m
L 8.45 m
A 51.545 m2
Pu min 547.10 T
Mcmin 73.38 Tm
�𝑚𝑎� 12.01 T/m2
�𝑚𝑖� 9.21 T/m2

0.0775 Pevt2 0.46


3.40

Ycg 0
0.9
Pevt1 5.95
3
Ycg 1.5

0.0250791272
0.0016719418
13.3755344975
6075000
33.4664010614
45.1796414328
20.2104200421

AR AS MIN

As adoptado 31.4159265
20 @ 0.1 10
diam cm total varillas

varilla requerido 4.947942685

ULO ESTA BIEN

A
12.7

10.0530964915
0.2 5
cm total varillas

CALCULO
ɣevmin 1.00
ɣDcmin 0.90
Pdctv 5.7888 T
Pevt1v 27.202
Pevt2v 1.7691 T
Vudv -20.7887194

Φ 0.9

beta 2
Vc 63.61293514 T
Vs 0T
Vn 63.61293514 T
Vr 57.25164162 T

on en la seccion a-a
SI CUMPLE

ERPO O PANTALLA

PESO Y M
FIGURA
T m tm
1 32.2452 0.15 4.83678
2 37.6194 0.533333333 20.06368
69.8646 24.90046
Pdc 69.8646 tm
Ydc 0.356410256 m
e dc 0.14 m
Mdco 24.90046 tm
L 8.45 m
Mdc 10.03184

CARGA VERTICAL RELLENO


peso y Mo ∑Mo
t m tm tm
25.9000969929 0.77327044 20.0277794 20.0277794
0.390 0.546540881 0.213012794 20.2407922
26.289844222 20.2407922

Pev 26.28984422 tm
Yev 0.769909172 m
e Ev -0.27 m
Mevo 20.2407922 tm
L 2.5 m
Mev -7.095870087
Ls 0.67

ACION DEL MURO

Clase del sitio B


As = 0.4

Kh = 0.2

h1 h2
6.85 5.55
h1 h2
5.95 4.65
2
3 0.9

ONDICION SISMICA
𝜃𝑀�=𝑎𝑟𝑐𝑡𝑔(𝑘ℎ/(1−𝑘�))
∅≥�+𝜃𝑀�

𝐾ℎ�=1.2𝐹𝑝𝑔𝑎∗𝑃𝐺�

ɞ 0.000
ka 0.007

O SOBRE EL MURO

EH 87.60118375

MEAE 214.0215128

RESISTENCIA I

ɣmax ɣmin
1.25 0.9
1.5 0.65
1.75 1.75
1.75 1.75
1.5 0.9
1.35 1
1.75 1.75
0.5 0.5
0.5 0.5
0 0

0.0389591657
0.0025972777
201.9123692077
70416666.666667
33.4664010614
471.3184816142
183.1250541413

SAR Ascal

As adoptado 265.464579
20 @ 0.1 84.5
diam cm total varillas

4.184983829

# varillas por lado 42


area varillas /m 23.89495494
As colocado 31.23112697

ULO ESTA BIEN

12.7

7.6969020013
0.2 5
cm total varillas

CALCULO
Vudv 287.68

Φ 0.9 T

T
beta 2
Vc 621.816441 T
Vs 0T
Vn 621.816441 T
Vr 559.6347969 T

on en la seccion a-a
SI CUMPLE

Mumax
tm
10.03184
0
0
0
163.9566758825
-7.095870087
53.4367220854
0
0
0
220.3293678808

asumido?

< Smax
< 87.75785782
OK

=dv
=dv
MA EL VALOR MAYOR 82.8 *
bv
278.19
0.9
620.5002074147
0
620.5002074147
558.4501866732

DEBE SER > Vu


> 278.19
OK