Lantai Satu
M1 M1 M1
Vertikal B-B 3.75
C-C 5.65
D-D 7.50
F-F 4.00
G-G 4.00
H-H 7.00
I-I 3.00
L-L 2.25
M-M 1.75
O-O 12.00
Horizontal 4.00
10 4.00
Pekerjaan dinding
Lantai dua Vertikal
B-B 9.50
C-C 11.00
D-D 6.00
F-F 4.00
G-G 4.00
H-H 4.00
I-I 4.00
K-K 4.00
O-O 12.00
Pekerjaan dinding 1 BT
Lantai dua
Vertikal 2.00
Horizontal 2.00
4 4.00
Pekerjaan dinding 1/2 Bt
Lantai tiga Vertikal
A-A
B-B
C-C
D-D 2.50
E-E 4.50
G-G 0.00
H-H 4.00
I-I 4.00
J-J 3.50
M-M 0.00
N-N 4.50
O-O 11.20
Q-Q 0.00
Horizontal 1\1
2\2 7.50
3\3 3.00
4\4 1.50
6\6 0.00
7\7 0.00
8\8 4.00
9\9 3.50
10 \ 10 0.00
12 \ 12 6.00
14 \ 14 11.00
18 \ 18 12.50
83.2 3.45
Pekerjaan dinding 1 BT
Lantai tiga
Vertikal 9.50
Horizontal 2.00
12 3.45
Pekerjaan dinding
Lantai atap Vertikal
B-B 0.00
C-C 0.00
D-D 12.00
E-E 4.00
G-G 0.00
H-H 4.00
J-J 4.00
K-K 0.00
M-M 0.00
N-N 4.00
O-O 7.00
Q-Q 0.00
TYPE P1 UNT 1 M3
1.2 M3 BETON Ready mix 400000.00
137 KG BESI Dia 12 mm 7500.00
1.73 M2 TRIPLEK t = 9 mm 57500.00
0.75 KG PAKU campur 7500.00
alat bantu 2500.00
Luas Ddng L. Ventsi Vol Ddng Ddng Trsm Ddng Nett Ples Ddng Ples Ddng Ples Luar
1pc : 3 ps 1pc : 5 ps 1pc : 3 ps 1pc : 5 ps 1pc : 3 ps
M2 M2 M2 M2 M2 M2 M2 M2
15% 24
48
32
52
430.6 64.59 366.01 43.06 322.95 86.12 645.9 156
40 6 34 4 30 8 60 0
30.875
39
26
29.25
45.5
401.375 60.20625 341.1688 49.4 291.7688 98.8 583.5375 170.625
8.625
38.64
25.875
10.35
5.175
32.775
43.125
287.04 43.056 243.984 33.28 210.704 66.56 421.408 164.565
39.675 5.95125 33.72375 4.6 29.12375 9.2 58.2475
5%
5%
1 (satu) Sat.
No. Uraian Pekerjaan Satuan Bahan
Pekerjaan
II BETON SITE MIX
1 Beton 1:1,5:2,5/M3, dgn Batu Pecah (Split)
a Semen Uk.50kg/Zak zak 7.200
b Pasir Beton m3 0.500
c Split 2x3 m3 0.700
2 Beton 1:2:3/M3, dgn Batu Pecah (Split)
a Semen Uk.50kg/Zak zak 6.400
b Pasir Beton m3 0.550
c Split 2x3 m3 0.800
3 Beton 1:3:5/M3, dgn Batu Pecah (Split)
a Semen Uk.50kg/Zak zak 4.800
b Pasir Beton m3 0.650
c Split 2x3 m3 0.900
4 Beton 1:1,5:2,5/M3, dgn Batu Koral
a Semen Uk.50kg/Zak zak 7.500
b Pasir Beton m3 0.500
c Koral Beton Ø 1-3cm m3 0.700
5 Beton 1:2:3/M3, dgn Batu Koral
a Semen Uk.50kg/Zak zak 6.500
b Pasir Beton m3 0.550
c Koral Beton Ø 1-3cm m3 0.800
6 Beton 1:3:5/M3, dgn Batu Koral
a Semen Uk.50kg/Zak zak 4.800
b Pasir Beton m3 0.650
c Koral Beton Ø 1-3cm m3 0.900
IV PEMBESIAN
1 Pembesian Polos Ø 6mm s/d 10mm/Kg
a Besi Polos kg 1.150
b Kawat Beton kg 0.015
V PEK.BEKESTING
Dengan Papan & Kayu 1(satu) kali Pakai
1 Bekesting Pondasi Plat Setempat dgn Papan 2x20/m2
a Papan Tepi 2x20cm m3 0.025
b Kaso Stut 4x6 m3 0.040
c Kaso Skur 4x6 m3 0.020
d Benang Rami glg 0.050
e Paku 5cm kg 0.147
f Paku 7cm kg 0.440
VI PEK.PONDASI
A PASANGAN BOUWPLANK
1 Pasangan Bouwplank dgn Tiang Kaso/m'
(Tinggi 50cm dari Muka Tanah)
a Kaso 5/7 Borneo m3 0.004
b Papan 3/20 Borneo m3 0.007
c Benang Rami glg 0.050
d Paku 7cm kg 0.012
VI PEK.PONDASI
B BATU KALI
1 Pondasi Batu Kali 1:4/m3
a Batu Kali m3 1.250
b Semen Uk.50kg/zak zak 2.700
c Pasir Pasang m3 0.585
d Bambu Profil btg 0.250
e Kawat Beton kg 0.010
f Benang Rami glg 0.150
Ukuran
Tabel Standar Koefisien
Nama Bahan Sat Bnyk Sat
Tebal Panjang
Lebar (cm)
(cm) (cm)
KAYU-KAYUAN & TRIPLEX Perkiraan keperluan kayu untuk ce
Balok Kayu, Balok 15.00 15.00 400.00 m3 11.00 btg
Balok Kayu, Balok 12.00 12.00 400.00 m3 17.00 btg
No
Balok Kayu, Balok 10.00 10.00 400.00 m3 25.00 btg
Balok Kayu, Galam 6.00 12.00 400.00 m3 35.00 btg 1
Balok Kayu, Galam 5.00 10.00 400.00 m3 50.00 btg 2
Kaso 5.00 7.00 400.00 m3 72.00 btg 3
Kaso 4.00 6.00 400.00 m3 104.00 btg 4
Reng 3.00 4.00 400.00 m3 208.00 btg 5
Reng 2.00 3.00 400.00 m3 417.00 btg 6
List 1.00 5.00 400.00 m3 500.00 btg 7
Papan 3.00 30.00 400.00 m3 28.00 lbr 8
Papan 3.00 20.00 400.00 m3 42.00 lbr 9
Papan 2.00 20.00 400.00 m3 63.00 lbr 10
Papan 1.00 20.00 400.00 m3 125.00 lbr
Formica Variant 121.00 242.00 m3 1.00 lbr
Melaminto Variant 121.00 242.00 m3 1.00 lbr Kayu-kayu cetak ini dapat dipakai
Triplex/Multiplex Variant 121.00 242.00 m3 1.00 lbr Bila permukaan cetakan harus dila
Gypsum Variant 121.00 242.00 m3 1.00 lbr
BATU-BATUAN
Bataco Semen 10.00 19.00 39.00 bh 1.00 bh Rumus Balok dan atau Kolom
Bataco Tras 7.50 14.00 28.00 bh 1.00 bh
Celcon Blok 7.50 19.00 59.00 plt 224.00 bh
Celcon Blok 10.00 19.00 59.00 plt 168.00 bh
Bata Hebel 7.50 19.00 59.00 bh 1.00 bh
Bata Hebel 10.00 19.00 59.00 bh 1.00 bh
Batu Bata Merah 4.00 10.00 20.00 bh 1.00 bh
Batu Bata Merah 5.00 11.00 22.00 bh 1.00 bh
Keramik, Marmer Variant 10.00 20.00 m2 50.00 bh
Keramik, Marmer Variant 20.00 20.00 m2 25.00 bh
Keramik, Marmer Variant 20.00 25.00 m2 25.00 bh
Keramik, Marmer Variant 30.00 30.00 m2 11.00 bh
Keramik, Marmer Variant 33.00 33.00 m2 9.00 bh
Keramik, Marmer Variant 40.00 40.00 m2 6.00 bh Rumus Plat
Keramik, Marmer Variant 60.00 60.00 m2 3.00 bh
KAWAT & PAKU-PAKUAN
Kawat Beton kg 160.00 m'
Paku Triplex kg 700.00 bh
Paku 5cm kg 200.00 bh
Paku 7cm kg 100.00 bh
Paku 10cm kg 80.00 bh
Paku 12cm kg 65.00 bh
0.814 9.768
0.925 11.100
Untuk membuat tulangan beton tiap 100kg besi diperlukan besi 110kg (terhitung 10% besi terbuang).
Upah pekerjaan memotong, membengkokkan dan memasangnya :
Tukang Besi
Kepala Tukang Besi
Pekerja
1m3 Beton bertulang diperlukan besi 125 kg. (terhitung 10% besi terbuang).
kg Kawat Beton
Upah kerja pembesian 1m3 beton = 1,25 X B
Pemakaian besi untuk tulangan beton bertulang per m3 tidak harus 125 kg.
Namun ada kalanya lebih atau kurang, tergantung dari konstruksi beton strukturnya.
Tabel Standar Koefisien
Perkiraan keperluan kayu untuk cetakan beton dengan luas cetakan 10m²
Kayu-kayu cetak ini dapat dipakai sebanyak 50 - 80%. Kayu tambahan untuk reparasi cetakan antara 0.10 - 0.5m3 tiap 10m2 luas cetakan.
Bila permukaan cetakan harus dilapisi oli maka banyaknya sekitar 2 sampai 3,75 liter untuk bidang seluas 10m2.
b
Rumus Plat Menghitung kg tulangan plat /m2
<=> (2a(1+b/c) + 2b(1+a/c)) x Ø tulangan plat
c
b
a
Pasangan Batu kali : Bahan dan Upah Kerja per 1m3
m2 luas cetakan.
pah Kerja
Mandor
0.135
0.135 format costum cell :
0.135 _( #.##0_);_( (#.##0);_( "-"_);_(@_)
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
0.135
NAMA MATERIAL SAT Jml H-SAT HARGA TOTAL
Sok drat luar PPR VESBO 1 1/4" #N/A 6.0 300,000 Rp 1,800,000
Sok drat luar PPR VESBO 1/2" #N/A 10.0 50,000 Rp 500,000
PEKERJAAN PERSIAPAN
1 Upah Pembersihan Lokasi m2
a Kenek ht 0.0750 90,000
b Mandor ht 0.0038 140,000
PEKERJAAN BETON
1 Upah pembuatan Lantai kerja m3
a Kenek ht 4.5000 90,000
b Tukang Batu ht 1.0000 110,000
c Kepala Tukang ht 0.1000 135,000
d Mandor ht 0.3000 140,000
PEKERJAAN PEMBESIAN
1 Upah Pembesian (Terpasang) kg
a Kenek ht 0.020625 90,000
b Tukang Besi ht 0.01035 110,000
c Kepala Tukang ht 0.0021 135,000
d Mandor ht 0.000675 140,000
3 Tkg baja
Tukang las 0.0035 120,000
Tukang Besi 0.0035 110,000
Mandor 0.0015 140,000
Tkg ctat besi
Tukang Cat 0.0050 110,000
Kenek 0.0050 90,000
Mandor 0.0020 140,000
PEKERJAAN BEKESTING
1 Upah Begesting dinding m2
a Kenek ht 0.1815 90,000
b Tukang Kayu Kasar ht 0.0908 110,000
c Kepala Tukang ht 0.0182 135,000
d Mandor ht 0.0061 140,000
9 Upah Acian m2
a Kenek ht 0.1540 80,000
b Tukang Batu ht 0.0513 100,000
c Kepala Tukang ht 0.0103 120,000
d Mandor ht 0.0034 140,000
PEKERJAAN ATAP
1 Upah Buat & Pasang Kuda-kuda m3
2 Upah Buat & Pasang Gording m3
3 Upah Buat & Pasang Kuda-kuda Exposed m3
4 Upah Buat & Pasang Gording Exposed m3
5a Upah Buat Kuda-kuda Baja WF kg
5b Upah Pasang Kuda-kuda Baja WF kg
6a Upah Buat Kuda-kuda Baja Siku kg
6b Upah Pasang Kuda-kuda Baja Siku kg
7a Upah Buat Kuda-kuda Baja Kanal C kg
7b Upah Pasang Kuda-kuda Baja Kanal C kg
8 Upah Pasang Kaso m2
9 Upah Pasang Reng m2
10 Upah Pasang Papan Nok m2
11 Upah Pasang Papan Talang Datar m'
12 Upah Pasang Lisplank Papan m'
13 Upah Pasang Genteng Plentong Badan m2
14 Upah Pasang Genteng Beton Badan uk. Besar m2
15 Upah Pasang Genteng Beton Badan uk. Sedang m2
16 Upah Pasang Genteng Keramik m2
17 Upah Pasang Genteng Nok Beton m'
18 Upah Pasang Genteng Nok Keramik m'
a Kenek ht 0.1925 90,000
b Tukang Kayu Kasar ht 0.0963 110,000
c Kepala Tukang ht 0.0193 135,000
d Mandor ht 0.0064 140,000
PEKERJAN SANITARY
1 Closet bh
2 Wastafel bh
3 Shower bh
4 Kran Bath tube bh
5 Jet Washer bh
6 Kran sink bh
7 Faucet / kran taman bh
8 Roll holder bh
9 Towel holder bh
10 Wall Hang Urine bh
11 Material bantu Ls
12 Transportasi dan akomodasi Ls
PEKERJAAN LISTRIK
1 Upah Pemasangan Titik Lampu Dalam bawah plafond titik
a Kenek ht 0.3465 90,000
b Tukang Listrik ht 0.1733 110,000
c Mandor ht 0.0866 140,000
PEKERJAAN PENGECATAN
1 Upah Pekerjaan Cat Meni/Dasar m2
a Tukang Cat ht 0.0550 110,000
b Kepala Tukang ht 0.0183 135,000
c Mandor ht 0.0061 140,000
d. PEKERJAAN GRANIT
1 Upah Pasang Lantai Granit m2
a Kenek ht 0.4140 90,000
b Tukang Batu ht 0.1898 110,000
c Kepala Tukang ht 0.0380 135,000
d Mandor ht 0.0127 140,000
1 Upah Pasang dinding Granit m2
a Kenek ht 0.6210 90,000
b Tukang Batu ht 0.2846 110,000
c Kepala Tukang ht 0.0569 135,000
d Mandor ht 0.0190 140,000
2 Upah Pasang Lantai Granit Black Galaxy m2
3 Upah Pasang Lantai Granit Nero Impala m2
4 Upah Pasang Lantai / Dinding Granit Nero Absolute (GNAB) m2
e. PEKERJAAN MARMER
1 Upah Pasang Lantai Marmer m2
2 Upah Pasang Lantai Marmer Sevegiante M2
3 Upah Pasang Dinding Marmer Travertine M2
4 Upah Pasang Dinding Marmer Mocca Light M2
5 Upah Pasang Dinding Marmer / MTIV M2
6 Upah Pasang Dinding Marmer / MMLI M2
PEKERJAAN PARQUET
1 Upah pekerjaan pasang parquet M2
2 Upah pekerjaan pasang parquet M2
PEKERJAAN PLAFOND
1 Upah Pasang Rangka Plafond Kaso 5x7 m2
2 Upah Pasang Rangka Plafond Kaso 4x6 m2
3 Upah Pasang Rangka Plafond Besi Hollow m2
4 Upah Pasang Plafond Triplex 4mm m2
5 Upah Pasang Plafond Triplex 6mm m2
6 Upah Pasang Plafond Triplex 9mm m2
7 Upah Pasang Plafond Gypsum m2
a Kenek ht 0.1100 85,000
b Tukang Plafond ht 0.1100 120,000
c Kepala Tukang ht 0.0220 120,000
d Mandor ht 0.0073 150,000
PEKERJAAN KUSEN
1 Upah Buat Kusen kayu sudah diserut (Kamper) m3
2 Upah Buat Kusen kayu belum diserut (Kamper) m3
3 Upah Buat Kusen kayu sudah diserut (Jati) m3
4 Upah Buat Kusen kayu belum diserut (Jati) m3
5 Upah pasang Kusen kayu m1
6 Upah pasang daun pintu kayu/ kaca m2
Keterangan
BUKU RAB
50,000
40,000
45,000
40,000
40,000
45,000
40,000
40,000
30,000
30,000
0
0
Rp 67,080 Rp 67,100 analisa (pembulatan) 0
50,413 0.75 0.4583 82,500
12,380 - 0.0917
4,284 - 0.0306
0
Rp 57,910 Rp 30,000 tasikin 0
41,247 0.35 0.4583
12,380 0.0917
4,284 0.0306
0
Rp 34,740 Rp 30,000 tasikin 0
24,750 0.35 0.275 0.275
7,425 0.055 0.055
2,562 0.0183 0.0183
0
Rp 106,050 Rp 30,000 tasikin 0
74,700 0.35 0.4125 0.8300
22,950 0.0825 0.1700
8,400 0.0275 0.0600
0
Rp 27,800 Rp 28,000 analisa (pembulatan) 0
19,800 0.35 0.22 0.22
5,940 0.044 0.044
2,058 0.0147 0.0147
0 0
Rp 20,850 Rp 6,000 tasikin 0 0
14,850 0.165 0.165
4,455 0.033 0.033
1,540 0.011 0.011
Rp 2,300
420 0.007
385 0.007
210 0.003
Rp 1,280
550
450
280
0
0
Rp 29,630 Rp 29,700 analisa (pembulatan) 0
16,335 0.1815
9,988 0.0908
2,457 0.0182
854 0.0061
Rp 65,190 Rp 65,190
35,937 Rp 36,000 0.1815
21,974 0.0908
5,405 0.0182
1,879 0.0061
Rp 26,720 0
17,325 0.1925
7,062 0.0642
1,728 0.0128
602 0.0043
0
Rp 26,710 Rp 26,710 TEJO 0
17,325 0.275
7,061 0.0917
1,729 0.0183
598 0.0061
0
Rp 19,080 Rp 19,080 TEJO 0
12,375 0.275
5,044 0.0917
1,235 0.0183
427 0.0061
0
Rp 46,170 Rp 15,000 TEJO 0
30,319 0.48125
12,357 0.160475
2,594 0.02745
897 0.00915
0
Rp 26,720 0
Rp 61,060 0
39,600 0.44
16,137 0.1467
3,956 0.0293
1,372 0.0098
0
Rp 21,540 Rp 15,000 TEJO 0
11,880 0.2200 0.22 Kenek
7,260 0.1100 0.11 Tukang Batu
1,782 0.0220 0.022 Kepala Tukang
613 0.0073 0.0073 Mandor
0
Rp 53,850 0
29,700 0.33
18,150 0.165
4,455 0.033
1,540 0.011
0
Rp 44,880 0
24,750 0.4 0.275
15,125 0.15 0.1375
3,713 0.0275
1,288 0.0092
0
Rp 60,490 Rp 60,490 0
33,000 0.4 0.4125
20,630 0.15 0.2063
4,944 0.0412
1,918 0.0137
0
Rp 19,170 Rp 19,170 0
12,320 0.22
5,131 0.0733
1,235 0.0147
480 0.0049
0
Rp 22,900 Rp 79,660 0
14,850 0.165
6,050 0.055
1,485 0.011
518 0.0037
0
0
Rp 1,559,800 0
Rp 1,039,860 0
Rp 2,339,700 0
Rp 1,819,760 0
Rp 7,900 0
Rp 2,900 0
Rp 8,600 0
Rp 2,900 0
Rp 5,720 0
Rp 3,860 0
Rp 23,890 0
Rp 13,480 0
Rp 17,950 0
Rp 22,900 0
Rp 25,990 Rp 30,000 TEJO MALANG 0
Rp 17,950 0
Rp 22,450 0
Rp 22,450 0
Rp 31,420 Rp 17,500 TEJO 0
Rp 26,920 0
Rp 31,420 0
17,325 0.1925
10,593 0.0963
2,606 0.0193
896 0.0064
Rp 17,500 TEJO
Rp 30,000 TEJO
Rp 45,000 TEJO
Rp 21,900
12,600 Pekerja Oh 0.1400
Tukang
7,370 kayu Oh 0.0670
Kepala
945 tukang Oh 0.0070
980 Mandor Oh 0.0070
0.0000
Rp 21,900
12,600 Pekerja Oh 0.1400
Tukang
7,370 kayu Oh 0.0670
Kepala
945 tukang Oh 0.0070
980 Mandor Oh 0.0070
0.0000
Rp 24,100 Rp 8,000 Parman / GPI 0
Rp 28,930 Rp 8,000 Parman / GPI 0
Rp 33,750 Rp 8,000 Parman / GPI 0
Rp 38,560 Rp 9,000 Parman / GPI 0
Rp 10,000 Asumsi 0
Rp 12,500 Parman / GPI
Rp 15,000 Asumsi
Rp 9,000 IMAM/malang
Rp 10,000 IMAM/malang
Rp 10,000 IMAM/malang
Rp 14,000 IMAM/malang
Rp 9,000 IMAM/malang
Rp 300,000 IMAM/VMI
Rp 300,000 IMAM/malang
Rp 10,000 IMAM/VMI
Rp 250,000 IMAM/malang
Rp 100,000 IMAM/malang
Rp 400,000 IMAM/malang
Rp1,400,000 IMAM/malang
Rp 250,000 IMAM/malang
Rp1,000,000 IMAM/malang
Rp 200,000 IMAM/malang
Rp 600,000 IMAM/malang
Rp 300,000 IMAM/malang
Rp 200,000 IMAM/malang
Rp 200,000 IMAM/malang
0
0
Rp 62,370 0
31,185 0.3465
19,063 0.1733
12,124 0.0866
0
Rp 83,160 0
Rp 118,250 0
Rp 74,510 0
Rp 99,330 0
Rp 74,510 0
Rp 135,000 0
Rp 124,180 0
Rp 186,270 0
Rp 248,330 0
Rp 310,420 0
Rp 496,650 0
Rp 931,250 0
Rp 1,489,950 0
Rp 15,250 0
0
Rp 400,000 Misrun
Rp 45,000 Misrun
Rp 45,000 Misrun
Rp 45,000 Misrun
Rp 45,000 Misrun
Rp 45,000 Misrun
Rp 13,000 Misrun
Rp 3,000 Misrun
Rp 10,000 Misrun
Rp 5,000 Misrun
Rp 5,000 Misrun
Rp 5,000 Misrun
0
Rp 9,370 0
6,050 0.055
2,471 0.0183
854 0.0061
0
Rp 18,760 0
12,100 0.11
4,955 0.0367
1,708 0.0122
0
Rp 46,861 0
12,100 0.11
4,955 0.0367
1,708 0.0122
28,098 0.0122
Rp 145,616 0
50,160 0.11
6,156 0.0367
11,900 0.0122
77,400 0.0122
0
Rp 9,375 Rp 9,375 TEJO 0
6,050 0.055
2,471 0.0183
854 0.0061
0
0
Rp 80,780 0
44,550 0.275
27,225 0.1375
6,683 0.0275
2,318 0.0092
Rp 31,410 0
17,325 0.275
10,588 0.1375
2,599 0.0275
902 0.0092
Rp 120,000 Agus/Df-harga
Rp 53,850 Rp 53,850 TEJO 0
29,700 0.275
18,150 0.1375
4,455 0.0275
1,546 0.0092
Rp 55,000 AGUS
Rp 55,000 AGUS
Rp 55,000 AGUS
Rp 134,610 0
74,250 0.825
45,375 0.4125
11,138 0.0825
3,850 0.0275
Rp 117,500 AGUS / GPI
Rp 117,500 Tasikin
Rp 65,000 AGUS / GPI
Rp 55,000 AGUS
Rp 65,000 Tasikin
Rp 55,000 AGUS / MK
Rp 55,000 AGUS / MK
Rp 55,000 AGUS / GPI
Rp 55,000 AGUS
Rp 65,030 0
37,260 0.275 0.4968
20,873 0.1375 0.2277
5,123 0.0275 0.04554
1,777 0.0092 0.0152352
Rp 97,550 0
55,890 0.275 0.9315
31,309 0.1375 0.4269375
7,685 0.0275 0.0853875
2,666 0.0092 0.028566
Rp 70,000 AGUS / GPI
Rp 75,000 AGUS / MK
Rp 70,000 AGUS / GPI
Rp 35,890 0
Rp 60,000 AGUS / VMI
Rp 125,000 AGUS / VMI
Rp 110,000 AGUS / VMI
Rp 115,000 AGUS / GPI
Rp 115,000 AGUS / GPI
Rp 71,800 0
39,600 0.44
24,200 0.22
5,940 0.044
2,058 0.0147
0
Rp 80,770 0
44,550 0.495
27,225 0.2475
6,683 0.0495
2,310 0.0165
0
Rp 98,720 0
54,450 0.605
33,275 0.3025
8,168 0.0605
2,828 0.0202
0
Rp 98,720 0
54,450 0.605
33,275 0.3025
8,168 0.0605
2,828 0.0202
0
0
Rp 26,920 0
Rp 24,220 0
Rp 24,220 0
Rp 13,000 0
Rp 16,270 0
Rp 21,120 0
Rp 26,290 Rp 15,000 Parno 0
9,350 0.11
13,200 0.11
2,640 0.022
1,095 0.0073
0
Rp 32,500 0
Rp 25,990 Rp -
Rp 17,080 Rp -
5,850 0.065
7,150 0.065
3,375 0.025
700 0.005
Rp 50,000 tasikin
Rp 98,720 0
54,450 0.605
33,275 0.3025
8,168 0.0605
2,828 0.0202
0
0
0
Rp 996,600 0
Rp 1,494,900 0
Rp 1,993,200 0
Rp 2,989,800 0
Rp 40,208 0
Rp 64,375 0
0.8300
0.1700
0.0600
Rp189,600
Tukang Batu
Kepala Tukang
MATERIAL & SUBKON
II. SUBKON
Scaffolding
1 set untuk 2 M2 plat
Main Frame
Cross Brace
U Head
Join Pin
Jack Base
Ongkos angkut (PP) Scaffolding
IV. MATERIAL
MATERIAL BESI
Besi Beton 6 mm Polos 0.2219
Besi Beton 8 mm Polos 0.3946
Besi Beton 10 mm Polos 0.6165
Besi Beton 12 mm Polos 0.8878
Besi Beton 13 mm Ulir 1.0419
Besi Beton 16 mm Ulir 1.5782
BESI BETON rata-rata
Besi Wiremesh M6 2,1 x 5,4
Besi Wiremesh M8 2,1 x 5,4
Kawat beton 11.5
Kawat ayakan
Paku
Paku Beton
Paku Seng
Seng Gelombang 0,2 X 80 X 180
Paku Visher drat kasar 4" S8
Paku Visher drat kasar 3" s6
Dina bolt Dia 12 mm x 20 cm
Baja Profil
Kawat las
Lpg
Angin
erecsen
Water stoper ex sika
MATERIAL KAYU
KAYU MERBAU SERUT /m3
KAYU NYATOH SERUT /m3
KAYU KAMPER SERUT /m3
Daun kayu merbau solid di garuk
Daun pintu kaca polos
Daun jendela kaca polos
List kaca
Daun pintu RED oax 374,488.64
Daun pintu Taekwood 650000
PEKERJAAN KACA
Kaca polos 6mm
Kaca polos 8mm
Kaca polos 10mm
Kaca polos LAMINATE ( 3+3) 6mm
Kaca polos Tempered 8mm
Kaca polos Tempered 10mm
Stiker kaca / sanblast
Gosok kaca halus
Fame Aluminium U 20x 20 mm
Fame Aluminium U 1,2x 1,2 mm
Siku Aluminium L 5x5 cm
Hollow Aluminium 4x6 cm
Besi Hollow 4x6 cm t = 1,2 mm
Besi Hollow 2x3 cm t = 1,2 mm
Besi Hollow 3x3 cm t = 1,2 mm
Grinda
Sealent
MATERIAL SEMEN
Semen gresik 50 kg
Semen putih
Beton READYMIX K-225
Beton READYMIX K-300
Beton READYMIX K-350
Drymix acian 20
Semen MU-400
MATERIAL WATERPROOFING
SIKA TOP 107 A 25 kg/sak
SIKA TOP 107 B 1 (A) : 1(B)
Aquaproof 25
MATERIAL CAT
DULUX PENTALITE
DULUX WEATHERSIELD
Cat Plafond DULUX PENTALITE
Cat Precoat ex mowilex
Cat Coating ex mowilex
Plamir tembok Matex
Ultran lazur P.03
Gasiller A+B
Thinner Impala
Lakban
Kain Bal
Amplas Kayu
Wood filler impra
Sending sealer
Top coat/wood staind
Polyuretan
Kompresor
Upah pengecatan melamix daun pintu
MATERIAL BANTU
Coldbond
Lem Fox
Lem PVC Isarplas
Lem Epoxy
Isolatip
Amplas
Benang
Sekop
Cangkul
Sepatu boot
Plastic Cor
Ember
Roll cat
Kwas 5 "
Kwas 4 "
Kwas 3 "
Sikat kawat / ijuk
Gembok pintu besi
Resin
silent
Atap zingkalum 0,35 lebar 90 cm
Nok zingkalume 0,35
MATERIAL GENTENG
Genteng Kanmuri-Melenia
Nok segitiga - kanmuri
Nok Ujung - kanmuri
Nok Atas - kanmuri
Cat Genteng
MATERIAL GENTENG
ESPANICA NATURAL
Genteng Kanmuri type STANDAR KE 1
Genteng Kanmuri type HIASAN AKIR KE 1 HA
Genteng Kanmuri type PEMANAS AIR KE 1 PA
Genteng Kanmuri type NOK KE 2
Genteng Kanmuri type PENANGKAL PETIR KE 2 PP
Genteng Kanmuri type LISPLANK KIRI KE 3
Genteng Kanmuri type ESPANICA MEDI KE 3 HA
Genteng Kanmuri type LISPLANK KANAN KE 4
Genteng Kanmuri type LISPLANK KN. HISAN AKIR KE 4 HA
Genteng Kanmuri type SETENGAH KE 5
Genteng Kanmuri type UJUNG JURAI KE 6
Genteng Kanmuri type UJ. NOK KANAN KE 7A
Genteng Kanmuri type UJ. NOK KIRI KE 7B
Genteng Kanmuri type NOK 3 ARAH KN KE 8A
Genteng Kanmuri type NOK 3 ARAH KR KE 8B
Genteng Kanmuri type HISAN SDT JURAI KE 9 +9A
Genteng Kanmuri type NOK 2 ARAH KE 10 A
Genteng Kanmuri type NOK 2 ARAH KN KE 10 B
Genteng Kanmuri type NOK 2 ARAH KR KE 10 C
Genteng Kanmuri type NOK JURAI 4 ARAH KE 11
Genteng Kanmuri type GENTENG TALANG KE 12
Genteng Kanmuri type GNTNG DOUBLE KE 13
Genteng Kanmuri type GEN. VENTILASI KE 14
Genteng Kanmuri type CEROBONG. UDR KE 15
Genteng Kanmuri type ASSECCORIES SPCIAL KE 16
ESPANICA MEDI
Genteng Kanmuri type STANDAR KE 1
Genteng Kanmuri type HIASAN AKIR KE 1 HA
Genteng Kanmuri type PEMANAS AIR KE 1 PA
Genteng Kanmuri type NOK KE 2
Genteng Kanmuri type PENANGKAL PETIR KE 2 PP
Genteng Kanmuri type LISPLANK KIRI KE 3
Genteng Kanmuri type ESPANICA MEDI KE 3 HA
Genteng Kanmuri type LISPLANK KANAN KE 4
Genteng Kanmuri type LISPLANK KN. HISAN AKIR KE 4 HA
Genteng Kanmuri type SETENGAH KE 5
Genteng Kanmuri type UJUNG JURAI KE 6
Genteng Kanmuri type UJ. NOK KANAN KE 7A
Genteng Kanmuri type UJ. NOK KIRI KE 7B
Genteng Kanmuri type NOK 3 ARAH KN KE 8A
Genteng Kanmuri type NOK 3 ARAH KR KE 8B
Genteng Kanmuri type HISAN SDT JURAI KE 9 +9A
Genteng Kanmuri type NOK 2 ARAH KE 10 A
Genteng Kanmuri type NOK 2 ARAH KN KE 10 B
Genteng Kanmuri type NOK 2 ARAH KR KE 10 C
Genteng Kanmuri type NOK JURAI 4 ARAH KE 11
Genteng Kanmuri type GENTENG TALANG KE 12
Genteng Kanmuri type GNTNG DOUBLE KE 13
Genteng Kanmuri type GEN. VENTILASI KE 14
Genteng Kanmuri type CEROBONG. UDR KE 15
Genteng Kanmuri type ASSECCORIES SPCIAL KE 16
ESPANICA STANDARD
Genteng Kanmuri type STANDAR KE 1
Genteng Kanmuri type HIASAN AKIR KE 1 HA
Genteng Kanmuri type PEMANAS AIR KE 1 PA
Genteng Kanmuri type NOK KE 2
Genteng Kanmuri type PENANGKAL PETIR KE 2 PP
Genteng Kanmuri type LISPLANK KIRI KE 3
Genteng Kanmuri type ESPANICA MEDI KE 3 HA
Genteng Kanmuri type LISPLANK KANAN KE 4
Genteng Kanmuri type LISPLANK KN. HISAN AKIR KE 4 HA
Genteng Kanmuri type SETENGAH KE 5
Genteng Kanmuri type UJUNG JURAI KE 6
Genteng Kanmuri type UJ. NOK KANAN KE 7A
Genteng Kanmuri type UJ. NOK KIRI KE 7B
Genteng Kanmuri type NOK 3 ARAH KN KE 8A
Genteng Kanmuri type NOK 3 ARAH KR KE 8B
Genteng Kanmuri type HISAN SDT JURAI KE 9 +9A
Genteng Kanmuri type NOK 2 ARAH KE 10 A
Genteng Kanmuri type NOK 2 ARAH KN KE 10 B
Genteng Kanmuri type NOK 2 ARAH KR KE 10 C
Genteng Kanmuri type NOK JURAI 4 ARAH KE 11
Genteng Kanmuri type GENTENG TALANG KE 12
Genteng Kanmuri type GNTNG DOUBLE KE 13
Genteng Kanmuri type GEN. VENTILASI KE 14
Genteng Kanmuri type CEROBONG. UDR KE 15
Genteng Kanmuri type ASSECCORIES SPCIAL KE 16
HARDWARE PINTU & JENDELA
Lockase WILKA 1492 SS Pintu Utama PK1
Lockase WILKA 1490.55/ SS Pintu Utama PK1
Cylinder WILKA 1405 SS Pintu Utama PK1
Cylinder WILKA 1405 / 30T30SS Pintu Utama PK1
Engsel PIVOT 110 kg/ NEW STAR TO 120 Pintu Utama PK1
Pull handle SS BIM type 216 Pintu Utama PK1
Lockase WILKA 1490 SS
Engsel Deckson 4"
Espagnolet 64 cm
Espagnolet 100 cm
Espagnolet 160 cm
Espagnolet 200 cm
Handle ARROW 8 - 9
Handle STERLING 2803/8820/8822 satin
Handle DENVER
Grendel Tanam BEST 415/ 15 s/d 30 Atas & Bawah
Hak Angin FERCO
Rambuncis TRUTH 25 - 31
Spring Knip RYOBI RF 001
Handle Pintu Shower SS
Casement Bahan baja
Casement 20 cm BERG kap. 8 kg Tinggi jendela
Casement 30 cm ANDERBERG kap. 12 kg Tinggi jendela
Casement 40 cm ANDERBERG kap. 18 kg Tinggi jendela
Casement 50 cm ANDERBERG kap. kg Tinggi jendela
Casement 60 cm ANDERBERG kap. 58 kg Tinggi jendela
Casement 60 cm ANDERBERG kap. 70 kg Tinggi jendela
Casemen Bahan SS
Casement 20 cm ANDERBERG kap. 8 kg Tinggi jendela
Casement 30 cm ANDERBERG kap. 12 kg Tinggi jendela
Casement 40 cm ANDERBERG kap. 18 kg Tinggi jendela
Casement 50 cm ANDERBERG kap. kg Tinggi jendela
Casement 60 cm ANDERBERG kap. 58 kg Tinggi jendela
Casement 60 cm ANDERBERG kap. 70 kg Tinggi jendela
Double Doralux Door(BD-DNB) W/ LOUVER 2300 X 1800
Lockase GRIFF 2201.00
Cylinder GRIFF 3301.60
Handle/ Backplate 1205/ 2013
Doorstoper standar
Accessories / Perlengkapan
Kunci ex WILKa / Bh x @ Rp.
Handle / Bh x @ Rp.
Grendel / Bh x @ Rp.
Ongkos pasang / Bh x @ Rp.
Ongkos kirim / Bh x @ Rp.
MATERIAL PLUMBING
Pipa D WAVIN ½"
Pipa D WAVIN ¾"
PipaD AW WAVIN 1"
Pipa D WAVIN 11/4"
Pipa D WAVIN 1½"
Pipa D WAVIN 2"
Pipa D WAVIN 2½"
Pipa D WAVIN 3"
Pipa D WAVIN 4"
Pipa D WAVIN 5"
Pipa D WAVIN 6"
Pipa D WAVIN 8"
Pipa D WAVIN 10"
Pipa D WAVIN 12"
PERALATAN LISTRIK
ARISTON Water Heater TI 15 R/ 15 liter
Hallogen 50 W/ 120 Volt/ Mata Kucing/ Oval
KDK Exhaust Fan 30 X 30/ Plafon
Lampu Down Light Saten 18 W
Lampu Gantung Artolite HLG CD 5 ACR GRILL 32 CDMT
Lampu gantung Artolite HLG CEDE GRILL 42 E 27
Lampu Gantung Artolite HLG CF D 32
Lampu Hallogen Kotak u/. Lampu Box
Lampu Kapal/ Baret + Lampu Essential 8 W
LEGRAND Cover Plate 1 modul - 75576
LEGRAND Cover Plate 2 modul - 75577
LEGRAND Cover Plate 2 x 2 modul - 75578
LEGRAND Cover Plate 3 modul - 75579
LEGRAND Mekanism/ Cable Outlet - 74398
LEGRAND Mekanism/ Outlet Telepon - 74341
LEGRAND Mekanism/ Outlet TV Male Connector - 74382
LEGRAND Mekanism/ Saklar Hotel 1 modul - 74001
LEGRAND Mekanism/ Stop Kontak - 74130
LEGRAND Stop Kontak Lantai - 650340
LEGRAND Support Frame 2 modul - 74826
LEGRAND Support Frame 2 X 2 modul - 74828
LEGRAND Support Frame 3 modul - 74827
NASIONAL Saklar Hotel Tunggal
NASIONAL/ White Series/ Outlet Telepon
NASIONAL/ White Series/ Outlet TV
NASIONAL/ White Series/ Saklar Ganda
NASIONAL/ White Series/ Saklar Tunggal
NASIONAL/ White Series/ Stop Kontak Ganda
NASIONAL/ White Series/ Stop Kontak Tunggal
Spot Light 12 V 50 W - IP 68
Stop Kontak AC/ LEGRAND/ MILAC
ZETALUX Hallogen Kotak/ Box
XING FENG XF 001 CT
XING FENG XF300 1F
XING FENG XF 3080
XING FENG XF 70 C/ XF 150 C
Lampu Hallogen Spot ZETALUX/ Lampu OSRAM
SIEMENS/ Socket Telepon/ Silver
SIEMENS / Saklar Seri/ Silver
SIEMENS/ Stop Kontak/ Silver
Hallogen 1 X 20 W/ Downlight/ LC.1303/20-38 OS, ELEC
Hallospot 2 X 50 W/ LC.8202/2 X 50, ELEC
Hallospot 2 X 50 W + 1 X 70 W CDM-R/ LC.8403/2X50,ELEC,CDMR 70-/94 PHL CAM
PLC 18 W/ LC,2300/E.18/P. PHL
Metahilide 70 W/ DL>MH 70 KT, Control CAM PHL
MATERIAL ELECTRIKAL
Exhaust KDK plafond
Exhaust KDK dinding
Plc twrst philips 8 w (k)
Plc osram 20w 182 k
Lampu sorot JFYE + par osram 20w
Lampu kolam stainls + trafo+ Lampu 50w
Lampu spots par osram 80w
Down Light Panasonic nlp
Down Light Hinode FP5"
PLC eclot 15W coolwhite
Lampu TL 36 W Komplit
Lampu TL 18 W Komplit
Lampu Down Light Panasonic Komplit
Lampu Hallogen Pinthol Komplit
Stop Kontak Single Panasonic
Stop Kontak Double Panasonic
Stop Kontak outbow waterproof
Stop Kontak AC clipsal komplit
Stop Kontak TV
Outlet TV Panasonic
Stop Kontak TELP
Outlet Telepon Panasonic
Saklar Seri Panasonic
Saklar Engkel Panasonic
Saklar Hotel Seri Panasonic
Saklar Hotel engkel Panasonic
Kop TS 28 W
Dimmer Panasonic 500 W
Timer Legrand
Kabel NYY Supreme 3 x 2,5 / 100
Kabel NYY Eterna 2 x 2,5
Kabel NYY Eterna 4 x 4
Kabel NYM Eterna 3 x 2,5 / 100
Kabel NYM Eterna 2 x 2,5 / 100
Kabel Telpon Supreme isi 4
Kabel TV
Kabel toufor 4x16
Klem no.10
Selotip
Fitting Heleza
Inbow dus Panasonic
Pipa clipsal 20ǿ
T.dus c3
T.dus c4
Box MCB HAGGER 8 Group
Box MCB HAGGER 24 Group
Box MCB HAGGER 36 Group
Box MCB HAGGER 36 Group- info misrun
MCB HAGGER 1 Phase -info misrun
MCB HAGGER 1 Phase 10.A
MCB HAGGER 1 Phase 16.A
MCB 3 Phase 32. A
PERALATAN LISTRIK
ARISTON Water Heater TI 15 R/ 15 liter
Hallogen 50 W/ 120 Volt/ Mata Kucing/ Oval
KDK Exhaust Fan 30 X 30/ Plafon
Lampu Down Light Saten 18 W
Lampu Gantung Artolite HLG CD 5 ACR GRILL 32 CDMT
Lampu gantung Artolite HLG CEDE GRILL 42 E 27
Lampu Gantung Artolite HLG CF D 32
Lampu Hallogen Kotak u/. Lampu Box
Lampu Kapal/ Baret + Lampu Essential 8 W
LEGRAND Cover Plate 1 modul - 75576
LEGRAND Cover Plate 2 modul - 75577
LEGRAND Cover Plate 2 x 2 modul - 75578
LEGRAND Cover Plate 3 modul - 75579
LEGRAND Mekanism/ Cable Outlet - 74398
LEGRAND Mekanism/ Outlet Telepon - 74341
LEGRAND Mekanism/ Outlet TV Male Connector - 74382
LEGRAND Mekanism/ Saklar Hotel 1 modul - 74001
LEGRAND Mekanism/ Stop Kontak - 74130
LEGRAND Stop Kontak Lantai - 650340
LEGRAND Support Frame 2 modul - 74826
LEGRAND Support Frame 2 X 2 modul - 74828
LEGRAND Support Frame 3 modul - 74827
NASIONAL Saklar Hotel Tunggal
NASIONAL/ White Series/ Outlet Telepon
NASIONAL/ White Series/ Outlet TV
NASIONAL/ White Series/ Saklar Ganda
NASIONAL/ White Series/ Saklar Tunggal
NASIONAL/ White Series/ Stop Kontak Ganda
NASIONAL/ White Series/ Stop Kontak Tunggal
Spot Light 12 V 50 W - IP 68
Stop Kontak AC/ LEGRAND/ MILAC
ZETALUX Hallogen Kotak/ Box
XING FENG XF 001 CT
XING FENG XF300 1F
XING FENG XF 3080
XING FENG XF 70 C/ XF 150 C
Lampu Hallogen Spot ZETALUX/ Lampu OSRAM
SIEMENS/ Socket Telepon/ Silver
SIEMENS / Saklar Seri/ Silver
SIEMENS/ Stop Kontak/ Silver
Hallogen 1 X 20 W/ Downlight/ LC.1303/20-38 OS, ELEC
Hallospot 2 X 50 W/ LC.8202/2 X 50, ELEC
Hallospot 2 X 50 W + 1 X 70 W CDM-R/ LC.8403/2X50,ELEC,CDMR 70-/94 PHL CAM
PLC 18 W/ LC,2300/E.18/P. PHL
Metahilide 70 W/ DL>MH 70 KT, Control CAM PHL
TOTO
1 CW825J Discound 30%
CW825IJ "Vision" One Piece Toilet Bowl Only ( S-Trap)
CW825CRJ "Vision" Tank Cover for CW825J
Tank Trim W/O
TX825C1WS Stop Valve for
CW825J (6
Liters)
TX250CV1 Stop Valve (Body
Only) for
CW436NJ(N),
TC283 Duroplast Seat &
CW820J,
Cover W/Metal
CW820PJ,
T53P100 Hinges
Floor Flange W/Seal Gasket
CW825J
TX276C (Elongated)
Fixing Bracket
(Col:#W, #PIV)
T53DV5 Supporting Fitting for CW436NJ(N), CW825J
2 CW820J Discound 30%
CW820IJ "Avante" One Piece Toilet Bowl Only ( S-Trap)
CW820CRJ "Avante" Tank Cover for CW820J, CW820PJ
Tank Trim W/O
TX820C1WS Stop Valve for
TX250CV1 CW820PJ,
Stop Valve (Body
CW820J
Only) for (6
Liters)
CW436NJ(N),
TC282 Duroplast Seat &
CW820J,
Cover W/Metal
CW820PJ,
TX215C Hinges
Slip-in Conector
CW825J
TX276C (European
Fixing Bracket
Standard)
3 CW820PJ Discound 30%
(Col:#W, #PIV)
CW820IPJ "Avante" One Piece Toilet Bowl Only ( S-Trap)
CW820CRJ "Avante" Tank Cover for CW820J, CW820PJ
Tank Trim W/O
TX820C1WS Stop Valve for
TX250CV1 CW820PJ,
Stop Valve (Body
CW820J
Only) for (6
Liters)
CW436NJ(N),
TC282 Duroplast Seat &
CW820J,
Cover W/Metal
CW820PJ,
TX215C Hinges
Slip-in Conector
CW825J
TX276C (European
Fixing Bracket
Standard)
4 CW436NJ(N) Discound 30%
(Col:#W, #PIV)
CW436INJ(N) "Superior" One Piece Toilet Bowl Only ( S-Trap)
CW436CRNJ "Superior" Tank Cover for CW436NJ(N)
Tank Trim W/O
TX436C1WS Stop Valve for
TX250CV1 CW436NJ,(N) (6
Stop Valve (Body
Liters)
Only) for
CW436NJ(N),
TC281 Duroplast Seat &
CW820J,
Cover W/Metal
CW820PJ,
T53P100V3 Hinges
Floor Flange W/Seal Gasket for CW436NJ(N)
CW825J
TX276C (European
Fixing Bracket
Standard)
T53DV5 Supporting Fitting for CW436NJ(N), CW825J
(Col:#W, #PIV)
5 C436 Discound 30%
C436I "Superior" One Piece Toilet Bowl Only
C436CR "Superior" Tank Cover for C436
Tank Trim W/O
TS436SRXNWS Stop Valve for
TS251FT2N C436 (16 Liters)
Stop Valve
W/Flexible Hose
TC365 Plastic Seat &
Cover W/Plastic
T53P100 Hinges
Floor Flange W/Seal Gasket
T53DSR (Elongated)
Screws &Caps (plus 2 Big Caps)
6 CW823J Discound 30%
CW823IJ "Avante" One Piece Toilet Bowl Only ( S-Trap)
CW823CRJP "Avante" Tank Cover for CW823J
Tank Trim W/O
TX823C1WS Stop Valve for
CW823J (6
Liters)
TS251FT2N Stop Valve
W/Flexible Hose
TC281 Duroplast Seat &
Cover W/Metal
TX215C Hinges
Slip-in Conector
TX276C (Elongated)
Fixing Bracket
(Col:#W, #PIV)
7 CW914J Discound 30%
CW914IJ One Piece Toilet Bowl Only
CW914CRJ Tank Cover for CW914J
Tank Trim W/O
TX296CWS Stop Valve for
TS251FT2N CW914J (6
Stop Valve
Liters)
W/Flexible Hose
TC281 Duroplast Seat &
Cover W/Metal
T53P100 Hinges
Floor Flange W/Seal Gasket
TSU01W12 (Elongated)
Outlet Conector (Rough-in 12")
(Col:#W, #PIV)
8 CW894J Discound 30%
CW894IJ "Prominence" One Piece Toilet Bowl Only
CW894CRJP "Prominence" Tank Cover for CW894J
Tank Trim W/O
TX295CWS Stop Valve for
TS251FT2N CW894J (8
Stop Valve
Liters)
W/Flexible Hose
TC365 Plastic Seat &
Cover W/Plastic
T53P100 Hinges
Floor Flange W/Seal Gasket
T53R (Elongated)
Caps (Small)
(Col:#W, #PIV)
9 CW868NJ Discound 30%
CW868INJ "Prominence" One Piece Toilet Bowl Only (S-Trap)
CW868CRJP "Prominence" Tank Cover for CW894J
Tank Trim W/O
TX868CWS Stop Valve for
TS251FT2N CW894J (8
Stop Valve
Liters)
W/Flexible Hose
TX284CN Plastic Seat &
Cover W/Plastic
TX215C Hinges
Slip-in Conector
TX276C (Elongated)
Fixing Bracket
(Col:#W, #PIV)
10 CW868NPJ Discound 30%
CW868INPJ "Omni" One Piece Toilet Bowl Only (S-Trap)
CW868CRJP "Omni" Tank Cover for CW868NJ, CW868NPJ
Dual FlushTank
TX868CWS Trim W/O Stop
TS251FT2N Valve for
Stop Valve
CW868NJ,
W/Flexible Hose
CW868NPJ (6/3
TX284CN Duroplast
Liters) Seat &
Cover W/Metal
TX215C Hinges
Slip-in Conector
TX276C (Elongated)
Fixing Bracket
(Col:#W, #PIV)
11 CW867NJ Discound 30%
CW867INJ "Omni" One Piece Toilet Bowl Only
CW867CRJP "Omni" Tank Cover for CW867NJ
Dual FlushTank
TX241CWS Trim W/O Stop
TS251FT2N Valve for
Stop Valve
CW867NJ,
W/Flexible Hose
CW867NJT1 (6/3
Liters)
TC830 Plastic Seat &
Cover W/Plastic
TX215C Hinges
Slip-in Conector
TX276C (European
Fixing Bracket
Standard)
12 CW826J / SW826JP Discound 30%
"Vision" Toilet
CW826JWS Bowl (S-
SW826IJP Trap)w/Fixing
"Vision" Low Tank W/O Cover for SW826JP
Bracket (TX276C)
SW826RJP "Vision" Tank
Cover for
TX826CWS Dual FlushTank
SW826JPT1
Trim W/O Stop
Valve for
TS251FT2N Stop Valve
sW826JP,(6/3
W/Flexible Hose
Liters)
TC283 Duroplast Seat &
Cover W/Metal
T53P100 Hinges
Floor Flange W/Seal Gasket
T53DV5 (Elongated)
Supporting Fitting for CW436NJ(N), CW825J
(Col:#W, #PIV)
13 CW821J / SW821JP Discound 30%
"Avante" Toilet
CW821JWS Bowl (S-
SW821IJP Trap)w/Fixing
"Avante" Low Tank W/O Cover for SW821JP
Bracket (TX276C)
SW821RJP "Avante" Tank
Cover for
TX821CWS Dual FlushTank
SW821JP,
Trim W/O
SW821JPT1 Stop
Valve for
TS251FT2N Stop Valve
sW821JP,(6/3
W/Flexible Hose
Liters)
TC282 Duroplast Seat &
Cover W/Metal
TX215C Hinges
Slip-in Conector
14 CW862NJ / SW862JP (Elongated)
Discound 30%
(Col:#W, #PIV)
"Omni" Toilet
CW862NJWS Bowl (S-
SW862IJP Trap)w/Fixing
"Omni" Low Tank W/O Cover for SW821JP
Bracket (TX276C)
SW862CRJP "Omni" Tank
Cover for
TX862CWS Dual FlushTank
SW821JP,
Trim W/O Stop
SW821JPT1
Valve for
TS251FT2N Stop Valve
sW821JP,(6/3
W/Flexible Hose
Liters)
TX284CN Duroplast Seat &
Cover W/Metal
TX215C Hinges
Slip-in Conector
(Elongated)
(Col:#W, #PIV)
HARGA RAB
- -
M2 17,500 M2 20,000 28-Sep-07
ls 3,000 3,000
hr 350,000 hr 350,000
ls 750 ls 750
ls 1,000 ls 1,000
ls 500 ls 500 Buku RAB
267,600 120,400
bh 5,500 bh 22,000
bh 3,500 bh 14,000
bh 3,750 bh 15,000
bh 1,250 bh 5,000
bh 3,600 bh 14,400
rit/mobi 250,000 rit/m 50,000
350,000 350,000
M2 160,000 M2 160,000
M/Roll roll 325,000 M2 6,500
M2 19,000 M2 20,000
M/Roll roll 200,000 M2 4,000
60,000 65,000
5,210,700
40 % PPn = 10 %
30% disc bt 14,500 bt 10,150 23-Jan-09
30% disc bt 20,000 bt 14,000 23-Jan-09
30% disc bt 32,500 bt 22,750 23-Jan-09
30% disc bt 52,900 bt 37,030 23-Jan-09
30% disc bt 80,000 bt 56,000 23-Jan-09
30% disc bt 125,000 bt 87,500 23-Jan-09
30% disc bt 186,000 bt 130,200 23-Jan-09
30% disc bt 270,000 bt 189,000 23-Jan-09
30% disc bt 416,000 bt 291,200 23-Jan-09
30% bt bt - 23-Jan-09
30% disc bt 20,750 bt 14,525 23-Jan-09
30% disc bt 32,500 bt 22,750 23-Jan-09
30% disc bt 55,000 bt 38,500 23-Jan-09
30% disc bt 82,100 bt 57,470 23-Jan-09
30% disc bt 128,000 bt 89,600 23-Jan-09
30% disc bt 200,000 bt 140,000 23-Jan-09
30% disc bt 310,000 bt 217,000 23-Jan-09
30% disc bt 440,000 bt 308,000 23-Jan-09
30% disc bt 630,000 bt 441,000 23-Jan-09
-
bh 185,000 bh 185,000 28-Mar-08
bh 225,000 bh 225,000 02-May-08
bh 30,000 bh 30,000 11-Mar-08
bh 25,000 bh 25,000 12-Mar-08
set 235,000 set 235,000 12-Mar-08
set 275,000 set 275,000 12-Mar-08
bh 27,500 bh 27,500 12-Mar-08
bh 48,000 bh 48,000 12-Mar-08
bh 60,000 bh 60,000 03-Mar-08
bh 25,000 bh 25,000 03-Mar-08
bh 55,000 bh 55,000 28-Mar-08
bh 50,000 bh 50,000 28-Mar-08
bh 73,000 bh 73,000 28-Mar-08
bh 85,000 bh 85,000 10-Mar-08
bh 9,500 bh 9,500 28-Mar-08
bh 18,050 bh 18,050 28-Mar-08
bh 35,000 bh 35,000 22-Mar-08
bh 55,000 bh 55,000 22-Mar-08
bh 35,000 bh 35,000 23-Oct-07
bh 35,000 bh 35,000 28-Mar-08
bh 32,700 bh 32,700 23-Oct-07
bh 32,700 bh 32,700 28-Mar-08
bh 15,050 bh 15,050 28-Mar-08
bh 9,650 bh 9,650 28-Mar-08
bh 17,100 bh 17,100 23-Oct-07
bh 10,650 bh 10,650 23-Oct-07
bh 55,000 bh 55,000 23-Oct-07
bh 147,850 bh 147,850 28-Mar-08
bh 35,000 bh 35,000 22-Mar-08
rol 1,053,000 rol 1,053,000 22-Mar-08
m1 8,000 m1 8,000 27-Feb-08
m1 17,800 m1 17,800 10-Mar-08
rol 358,800 rol 358,800 22-Mar-08
rol 281,300 rol 281,300 22-Mar-08
m1 2,000 m1 2,000 22-Mar-08
m1 8,000 m1 8,000 01-May-08
m1 98,000 m1 98,000 25-Apr-08
bh 3,500 bh 3,500 22-Mar-08
bh 4,000 bh 4,000 22-Mar-08
bh 20,000 bh 20,000 22-Mar-08
bh 1,250 bh 1,250 22-Mar-08
btg 4,500 btg 4,500 22-Mar-08
bh 1,500 bh 1,500 22-Mar-08
bh 1,750 bh 1,750 22-Mar-08
bh 95,000 bh 95,000 22-Mar-08
bh 195,000 bh 195,000 28-Mar-08
bh 325,000 bh 325,000 28-Mar-08
bh 475,000 bh 475,000 01-May-08
bh 37,000 bh 37,000 01-May-08
bh 35,000 bh 35,000 28-Mar-08
bh 30,000 bh 30,000 28-Mar-08
bh 140,000 bh 140,000 28-Mar-08
-
m1 130,000 m1 130,000 16-Oct-06
bh 135,000 bh 135,000 16-Oct-06
bh 250,000 bh 250,000 16-Oct-06
bh 120,000 bh 120,000 16-Oct-06
20% disc set 1,250,000 set 1,000,000 16-Oct-06
20% disc set 900,000 set 720,000 16-Oct-06
20% disc set 300,000 set 240,000 16-Oct-06
set 90,000 set 90,000 16-Oct-06
bh 1,000,000 bh 1,000,000 16-Oct-06
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
25% disc bh bh - 31-Oct-05
bh 25,000 bh 25,000 16-Oct-06
bh 33,000 bh 33,000 16-Oct-06
bh 35,000 bh 35,000 16-Oct-06
bh 15,250 bh 15,250 16-Oct-06
bh 9,650 bh 9,650 16-Oct-06
bh 22,600 bh 22,600 16-Oct-06
bh 11,500 bh 11,500 16-Oct-06
bh 110,000 bh 110,000 16-Oct-06
bh 23,000 bh 23,000 16-Oct-06
bh 85,000 bh 85,000 16-Oct-06
set 160,000 set 160,000 16-Oct-06
set 160,000 set 160,000 16-Oct-06
set 900,000 set 900,000 16-Oct-06
set 550,000 set 550,000 16-Oct-06
set 75,000 set 75,000 16-Oct-06
bh 47,000 bh 47,000 08-Sep-06
bh 35,000 bh 35,000 08-Sep-06
bh 24,500 bh 24,500 08-Sep-06
set 62,000 set 62,000 08-Sep-06
set 285,000 set 285,000 08-Sep-06
70-/94 PHL CAM set 940,000 set 940,000 08-Sep-06
set 42,000 set 42,000 08-Sep-06
set 300,000 set 300,000 08-Sep-06
#REF!
#REF!
#REF! ### #REF! #REF!
#REF!
#REF!
#REF!
50,890.80 - - Rp -
#REF!
#REF!
#REF! ### #REF! #REF!
#REF! ### #REF! #REF!
#REF! ### #REF! #REF!
#REF! ### #REF! #REF!
PO K-TENGAH
BOJONG/po-KT
PO K-TENGAH
#REF! ### #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
BOJONG/po-KT
PO K-TENGAH
INSTALASI PIPA AIR KOTOR DAN AIR BEKAS
Pipa 2 " EX AW wavin 16 M1
Pipa 3 " EX AW wavin 59 M1
Pipa 4 " EX AW wavin 73 M1
Pipa 6 " EX AW wavin 27 M1
Roof drain 3 bh
Floor drain Toto Tx 1Bn untuk balkon 3 bh
Keni Pipa 6" ABK 4 bh
Keni Pipa 4" ABK 15 bh
Keni Pipa 4" 45 ABK 4 bh
Keni Pipa 3" ABK 17 bh
Keni Pipa 3" 45 ABK 4 bh
Keni Pipa 2" ABK 12 bh
TY Pipa 4 '' ABK 4 bh
Flook sok 4" X 2" 6 bh
Flook sok 4'' X 2" 10 bh
Flook sok 4'' X 3" 10 bh
Instalasi pipa air bersih dan pipa Gas
Pipa Gas 1 1/4" 129 M1
Pipa Gas 2 " 37 M1
Flok sok 1 1/2" X 2" pipa gas 14 Bh
Flok sok 1 1/4" X 2" Pipa gas 14 Bh
Keni pipa Gas pipa Gas 2 " 8 Bh
Keni drat dalam pipa Gas pipa Gas 2 " 6 Bh
Sok drat luar pipa Gas 1 1/4" 6 Bh
Keni pipa Gas 1 1/4" 8 Bh
T pipa Gas pipa Gas 2 " 3 Bh
T pipa Gas 1 1/4" 6 Bh
3 Pembuatan pagar pengaman proyek tinggi 180 CM 1.000 M' 118,550 7,500 126,050
Kaso 5/7 per btg 1.500 btg 40,000 60,000
Seng Gelombang 0,2 X 80 X 180 1.270 lbr 45,000 57,150
Paku 0.100 kg 14,000 1,400
2 Pembuatan direksi keet, gudang material + MCK 1.000 M2 325,233 101,500 426,733
Triplex 6 mm uk .1,2 x 2,4 0.347 lbr 73,333 25,463
Kaso 5/7 per btg 2.000 btg 40,000 80,000
Balok 6/10 per btg 0.638 btg 70,000 44,625
Seng Gelombang 0,2 X 80 X 180 0.758 lbr 45,000 34,091
Paku 0.250 kg 14,000 3,500
MCK dan material 0.018 ls 3,500,000 62,500
II. PENGECORAN -
1 Pembuatan Lantai Kerja 1:4:5 1.000 M3 598,280 250,000 848,280
Semen gresik 50 kg 2.680 zak 65,000 174,200
Pasir hitam - pasang 0.548 m3 285,000 156,180
Batu Split 0.940 m3 285,000 267,900
3 Cor Beton ad.1:2:3 Site Mix & Alat Bantu 1.000 M3 840,850 282,200 1,123,050
Semen gresik 50 kg 6.800 zak 65,000 442,000
Pasir putih 0.550 m3 300,000 165,000
III. PEMBESIAN -
1 Besi Beton 1.000 KG 9,916 3,370 13,286
BESI BETON rata-rata 1.100 kg 8,750 9,625
Kawat beton 0.018 kg 16,000 291
1 Besi Beton 8 mm untuk sambungan weyrmes 1.000 ttk 3,718 2,500 6,218
BESI BETON rata-rata 0.392 kg 8,750 3,427
Kawat beton 0.018 kg 16,000 291
1 Besi Beton 8 mm untuk angkur chemical 1.000 ttk 12,347 7,500 19,847
BESI BETON rata-rata 0.235 kg 8,750 2,056
Chemikal 0.050 Tube 200,000 10,000
Kawat beton 0.018 kg 16,000 291
1 Besi Beton 10 mm untuk angkur chemical 1.000 ttk 13,528 9,000 22,528
BESI BETON rata-rata 0.370 kg 8,750 3,238
Chemikal 0.050 Tube 200,000 10,000
Kawat beton 0.018 kg 16,000 291
IV. BEGESTING -
1 Begesting Pondasi (Batako kapur ) 1.000 M2 x pakai 54,693 29,700 84,393
Bata Kapur 34x17x8 cm 14.286 bh 1,200 17,143
Semen gresik 50 kg 0.310 zak 65,000 20,150
Pasir putih 0.058 m3 300,000 17,400
2 Begesting Pondasi (Papan) & alat bantu 1.500 M2 x pakai 100,762 17,000 117,762
Papan 2/20 per lbr 0.855 lbr 70,000 59,829
Kaso 5/7 per btg 1.0 btg 40,000 40,000
Paku 0.067 kg 14,000 933
3 Begesting Tie Beam & alat bantu 1.500 M2 x pakai 80,196 17,000 97,196
Triplex 9 mm uk .1,2 x 2,4 0.231 lbr 110,000 25,463
Kaso 5/7 per btg 1.3 btg 40,000 53,333
Paku 0.100 kg 14,000 1,400
5 Begesting Kolom & alat bantu 1.500 M2 x pakai 66,863 35,540 102,403
Triplex 9 mm uk .1,2 x 2,4 0.231 lbr 110,000 25,463
Kaso 5/7 per btg 1.0 btg 40,000 40,000
Paku 0.100 kg 14,000 1,400
6 Begesting Plat lantai atas & alat bantu 1.500 M2 x pakai 174,446 35,540 209,986
Triplex 9 mm uk .1,2 x 2,4 0.23 lbr 110,000 25,046
Kaso 5/7 per btg 0.7 btg 40,000 26,667
Paku 0.167 kg 14,000 2,333
Scaffolding 1.000 set 120,400 120,400
9 Begesting Tangga & alat bantu 1.500 M2 x pakai 107,293 92,310 199,603
Triplex 9 mm uk .1,2 x 2,4 0.213 lbr 110,000 23,467
Kaso 5/7 per btg 0.833 btg 40,000 33,333
Paku 0.167 kg 14,000 2,333
Scaffolding 0.400 set 120,400 48,160
10 Begesting Kolom & Balok Praktis 1.500 M2 x pakai 28,867 15,000 43,867
Triplex 9 mm uk .1,2 x 2,4 0.213 lbr 110,000 23,467
Kaso 5/7 per btg 0.100 btg 40,000 4,000
Paku 0.100 kg 14,000 1,400
11 Begesting Listplank & alat bantu 1.500 M2 x pakai 113,960 29,700 143,660
Triplex 9 mm uk .1,2 x 2,4 0.213 lbr 110,000 23,467
Kaso 5/7 per btg 1.000 btg 40,000 40,000
Paku 0.167 kg 14,000 2,333
Scaffolding 0.400 set 120,400 48,160
V. PASANGAN BATA -
1 Pasangan dinding bata - T =1/2 batu M2 78,800 26,710 105,510
Batu Bata 75.000 bh 550 41,250
Semen gresik 50 kg 0.310 zak 65,000 20,150
Pasir putih 0.058 m3 300,000 17,400
7 Pek. Plesteran 1:3 dan Acian ( adu manis sudut ) M1 7,550 22,900 30,450
Semen gresik 50 kg 0.100 zak 65,000 6,500
Pasir putih 0.004 m3 300,000 1,050
PEKERJAAN PLAFOND -
1 Pasangan Plafond Lambresering M2 149,504 50,000 199,504
Papan Lambresering 10 x 1 x 400 0.400 lbr 150,000 60,000
Triplex 9 mm uk .1,2 x 2,4 0.365 lbr 110,000 40,104
Kaso 5/7 per btg 1.200 btg 40,000 48,000
Paku 0.100 kg 14,000 1,400
2 Pasangan Plafond plywood veneer M2 159,504 50,000 209,504
Plywood veneer 1,2 x 2,4 x 0.3 0.400 lbr 150,000 60,000
Triplex 9 mm uk .1,2 x 2,4 0.365 lbr 110,000 40,104
Kaso 5/7 per btg 1.200 btg 40,000 48,000
Paku 0.100 kg 14,000 1,400
Lem Epoxy 0.100 kg 100,000 10,000
1 Pasang plafond gypsum 9mm rangka hollow M2 59,477 25,000 84,477
Papan gypsum ex jaya board 9mm 0.365 m2 70,000 25,521
Hollow 20/40 standar Galvanised 0.450 btg 23,000 10,350
Hollow 40/40 standar Galvanised 0.450 btg 27,000 12,150
1 Pekerjaan dinding Keramik granito creame 30x30 1.000 M2 81,475 70,000 151,475
keramik 20x20 standar platinum, KW- A 1.050 m2 55,000 57,750
AM Grout Warna Spesial 0.110 kg 15,000 1,650
Semen gresik 50 kg 0.217 zak 65,000 14,075
Pasir putih 0.027 m3 300,000 8,000
3 Pekerjaan Lantai granito salsa crystal pearl white 60x60 M2 244,330 55,000 299,330
Keramik Granito Salsa, Crystal, Pearl White 60 x 60 1.050 m2 210,100 220,605
AM Grout Warna Spesial 0.110 kg 15,000 1,650
Semen gresik 50 kg 0.217 zak 65,000 14,075
Pasir putih 0.027 m3 300,000 8,000
3 Pekerjaan lantai batu alam Andesit Bakar 30 X 30 1.000 M2 179,575 65,000 244,575
Andesit Bakar 30 X 30 1.050 m2 150,000 157,500
Semen gresik 50 kg 0.217 zak 65,000 14,075
Pasir putih 0.027 m3 300,000 8,000
8 Pekerjaan Lantai Batu alam Palimanan Super 40/40 M2 128,725 65,000 193,725
Palimanan Super 40 X 40 1.050 m2 100,000 105,000
AM Grout Warna Spesial 0.110 kg 15,000 1,650
Semen gresik 50 kg 0.217 zak 65,000 14,075
Pasir putih 0.027 m3 300,000 8,000
1 Instalasi air kotor pipa 2" ex wavin AW M' 21,599 8,000 29,599
Pipa AW WAVIN 2" 0.275 m' 78,540 21,599
2 Instalasi air kotor pipa 2½" ex aw wavin M' 31,521 12,000 43,521
Pipa AW WAVIN 2½" 0.275 m' 114,620 31,521
3 Instalasi air kotor pipa 3" ex aw wavin M' 42,501 12,000 54,501
Pipa AW WAVIN 3" 0.275 m' 154,550 42,501
4 Instalasi air kotor pipa 4" ex wavin D M' 70,400 9,000 79,400
Pipa AW WAVIN 4" 0.275 m' 256,000 70,400
5 Instalasi air kotor pipa 4" ex wavin aw M' 55,000 9,000 64,000
Pipa AW WAVIN 4"aw 0.275 m' 200,000 55,000
5 Instalasi air kotor pipa 5" ex wavin AW M' 116,674 10,000 126,674
Pipa AW WAVIN 5" 0.275 m' 424,270 116,674
6 Instalasi air kotor pipa 6" ex wavin AW M' 163,653 35,000 198,653
Pipa AW WAVIN 6" 0.275 m' 595,100 163,653
7 Instalasi air kotor pipa 8"ex aw wavin M' 274,670 35,000 309,670
2 Instalasi air bersih pipa 3/4" ex Rucika M' 8,250 10,000 18,250
Pipa AW RUCIKA ¾" 0.275 m' 30,000 8,250
3 Instalasi air bersih pipa 1" ex Rucika M' 11,688 10,000 21,688
Pipa AW RUCIKA 1" 0.275 m' 42,500 11,688
4 Instalasi air bersih pipa 1¼" ex Rucika M' 16,500 12,000 28,500
Pipa AW RUCIKA 1¼" 0.275 m' 60,000 16,500
5 Instalasi air bersih pipa 1½" ex Rucika M' 20,625 12,000 32,625
Pipa AW RUCIKA 1½" 0.275 m' 75,000 20,625
6 Instalasi air bersih pipa 2" ex Rucika M' 28,875 12,000 40,875
Pipa AW RUCIKA 2" 0.275 m' 105,000 28,875
10 Roof Tank Stainless Steel EXEL/2.000 liter/ kaki + Instalasi Unit 5,303,000 300,000 5,603,000
Roof tank Stanless Exel 2000 L 1.000 bh 5,300,000 5,300,000
Lem PVC Isarplas 0.100 bh 30,000 3,000
12 Instalasi dan pemasangan pompa suplay sanyo 250 w ph 261 Unit 3,200,000 100,000 3,300,000
Pompa Sanyo 250w 1.000 m' 3,200,000 3,200,000
13 Instalasi dan pemasangan pompa jet pump sanyo 450 w pdh 405 Unit 5,300,000 250,000 5,550,000
Pompa Sanyo 450w-PDH 405 1.000 m' 5,300,000 5,300,000
No
9
10
11
12
Wiremesh
No
Matrial
Triplek begisting
Holow 40x60
Tebal 0.7
Floordeck / Bondek T=0.70 1000 mm * Alfa Prima mm L 1m 98,000
Tebal
0.75mm L
Floordeck / Bondek T=0.75 1000 mm * Bondek 1M 103,000
Tebal
0.85mm L
Floordeck / Bondek 0.85 920 mm Bondek 92 Cm 120,000
Tebal
1.0mm L
Floordeck / Bondek 1mm 880 mm Bondek 88 Cm 156,000
Tebal 1.0
mm L 92
Floordeck / Bondek 1mm 920mm Bondek Cm 149,000
Tebal TCT
0.75mm L
Floordeck / Bondek Sakura DX 75 Sakura 1M 118,000
Tebal
0.65mm
Floordeck / Bondek T=0.65mm L.1000 mm Alfa L1m 94,000
Tebal
0.75mm L
Floordeck / Bondek T=0.75 880 mm Bondek 88 Cm 115,000
Tebal
0.75mm L
Floordeck / Bondek T=0.75 920 mm Bondek 92 Cm 112,000
Tebal
0.85mm
Floordeck / Bondek T=0.85 1000 mm Bondek L1 M 118,000
Tebal
0.85mm L
Floordeck / Bondek T=0.85 880 mm Bondek 88 Cm 129,000
Tebal 1.0
Floordeck / Bondek T=1mm 1000 mm Alfa Prima mm L 1m 148,000
Besi Ulir
Wiremesh M10 SNI wiremesh 2.1 x 5.4 890,000
Besi Ulir
Wiremesh M6 SNI wiremesh 2.1 x 5.4 290,000
Besi Ulir
2.1 x 5.4
(real
Wiremesh M7 SNI wiremesh 7mm) 420,000
Besi Ulir
Wiremesh M8 SNI * wiremesh 2.1 x 5.4 500,000
319.5 1.4791666667
5.075
6
6.525
17.6 8.8
1.481481
2.518519
8.888889
0.592593
16875000
18360000
9720000
8100000
10800000
SUB HARGA
NO. URAIAN PEKERJAAN VOLUME MATERIAL UPAH HARGA MODAL
CONT SATUAN
I. PEKERJAAN PENDAHULUAN
A. Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi 1.00 Ls 2,500,000 2,500,000 2,500,000
2 Pembersihan lokasi lapangan 6x12 1.00 Ls 600,000 600,000 600,000
3 Dereksi kit dan bedeng uk. 3x6 18.00 M2 325,233 101,500 426,733 7,681,186
4 Biaya koordinasi warga setempat dan keamanan 1.00 Ls 9,500,000 9,500,000 9,500,000
5 Biaya tukang untuk turun matrial 1.00 Ls 3,500,000 3,500,000 3,500,000
6 Biaya pembersihan selama kerja 1.00 Ls 1,500,000 1,500,000 1,500,000
7 Pasang terpal di atas bak air 160.00 M2 12,500 7500 20,000 3,200,000
a.Pasang Bambu 140.00 Btg 20,000 3000 23,000 3,220,000
b.Pasang Tali nilon 106.00 M1 3,500 1000 4,500 477,000
sub total Rp 32,178,186
B. PEKERJAAN TANAH
1 Gali tanah untuk wwtp 392.00 M3 3,000 67,080 70,080 27,471,360
2 Gali tanah untuk pile cap 60x60x60 7.68 M3 3,000 67,080 70,080 538,214
3 Gali tanah untuk sloop 25x45 8.91 M3 3,000 67,080 70,080 624,413
4 Pasir urug bawah lantai kerja 7.20 M3 302,400 30,000 332,400 2,393,280
5 Lantai kerja 3.60 M3 598,280 250,000 848,280 3,053,808
6 Pembuangan tanah keluar lokasi 216.00 M3 150,000 - 150,000 32,400,000
7 Urug tanah kembali tepi dinding luar wwtp 176.00 M3 3,000 33,540 36,540 6,431,040
sub total Rp 72,912,115
Total I. Rp 105,090,301
III PEKERJAAN STRUK TUR BETON LANTAI BERTULANG DAN SLOOP BETON
IV PEKERJAAN COR BETON BERTULANG PLAT DAK UNTUK SERVICE/JALAN TEPI WTP
A Cor Balokan 15 x30 cm beton bertulang tepi plat dak service
1 Begisting triplek untukbalokan tepi dak service 12.60 M2 15,000 15,000 189,000
2 Pasang besi 4 D13 123.48 Kg 9,916 3,370 13,286 1,640,521
3 Pasang besi beugel Ø 8-15 /20 65 Kg 9,916 3,370 13,286 865,112
4 Cor Beton K-300 1 M3 1,120,200 189,600 1,309,800 1,673,924
sub total Rp 4,368,558
Total IV #VALUE!
10 Waterprrofing kimia
Page 180 of 203
SUB HARGA
NO. URAIAN PEKERJAAN VOLUME MATERIAL UPAH HARGA MODAL
CONT SATUAN
sub total Rp -
SUB HARGA
NO. URAIAN PEKERJAAN VOLUME MATERIAL UPAH HARGA MODAL
CONT SATUAN
I. PEKERJAAN PENDAHULUAN
A. Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi 1.00 Ls 5,000,000 5,000,000 5,000,000
2 Biaya koordinasi warga setempat dan keamanan 1.00 Ls 2,000,000 2,000,000 2,000,000
3 Biaya tukang untuk turun matrial 1.00 Ls 2,000,000 2,000,000 2,000,000
4 Biaya pembersihan selama pebaikan grond tank 1.00 Ls 1,500,000 1,500,000 1,500,000
sub total Rp 10,500,000
B. PEKERJAAN BONGKARAN
1 Pengukuran 1.00 Ls 1,000,000 10,000 1,010,000 1,010,000
2 Minimal boor pile 200.00 M1 120,000 120,000 24,000,000
3 Pembersihan lumpur 1.00 Ls 2,000,000 2,000,000 2,000,000
Total I. Rp 3,010,000
2,875,000 2,875,000
690,000 690,000
490,700 8,832,600
7,500,000 7,500,000
3,500,000 3,500,000
1,725,000 1,725,000
23,000 3,680,000
26,500 3,710,000
5,200 551,200
Rp 32,178,186 sub total 33,063,800
84,100 32,967,200
84,100 645,888
84,100 749,331
398,900 2,872,080
1,017,900 3,664,440
180,000 38,880,000
43,800 7,708,800
Rp 72,912,115 sub total Rp 87,487,739
Rp 105,090,301 Total I. Rp 120,551,539
3,450,000 3,450,000
154,300 46,290,000
15,300 8,980,435
15,300 3,235,950
1,288,200 8,191,020
Rp 60,979,012 sub total Rp 70,147,404
121,300 4,657,920
15,300 7,483,696
1,506,300 4,880,412
Rp 14,793,878 sub total Rp 17,022,028
Rp 75,772,891 Total II Rp 87,169,432
121,300 2,401,740
15,300 8,780,870
15,300 3,540,973
1,506,300 37,958,760
Rp 45,795,854 sub total Rp 50,280,603
15,300 15,835,500
15,300 9,374,616
1,506,300 37,958,760
Rp 54,898,418 sub total Rp 63,168,876
435,700 19,031,376
15,300 5,587,826
15,300 1,673,915
1,506,300 5,287,113
Rp 27,452,729 sub total Rp 31,580,230
435,700 57,948,100
435,700 47,055,600
15,300 57,183,750
15,300 29,998,771
Page 182 of 203
HARGA SATUAN JUMLAH
(Rp.) HARGA (Rp.)
1,506,300 72,713,102
488,800 52,790,400
Rp 276,143,684 sub total Rp 264,899,323
435,700 14,116,680
15,300 7,241,823
15,300 1,931,440
1,506,300 6,100,515
Rp 25,546,132 sub total Rp 29,390,458
Rp 429,836,818 Total III Rp 439,319,490
17,300 217,980
15,300 1,889,217
15,300 996,260
1,506,300 1,925,051
Rp 4,368,558 sub total Rp 5,028,509
Rp 4,368,558 Total IV Rp 5,028,509
76,700 15,692,820
82,800 16,940,880
Rp 28,377,355 sub total Rp 32,633,700
2,300,000 2,300,000
Rp 2,000,000 sub total Rp 2,300,000
Rp 30,377,355 Total V Rp 34,933,700
5,750,000 5,750,000
2,300,000 2,300,000
2,300,000 2,300,000
1,725,000 1,725,000
Rp 10,500,000 sub total 12,075,000
1,212,000 1,212,000
144,000 28,800,000
2,400,000 2,400,000
Rp 3,010,000 Rp 10,500,000 sub total 32,412,000
JUMLAH TOTAL 44,487,000
I. PEKERJAAN PENDAHULUAN
A. Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi 1.00 Ls
2 Pembersihan lokasi lapangan 6x12 1.00 Ls
3 Dereksi kit dan bedeng uk. 3x6 18.00 M2
4 Biaya koordinasi warga setempat dan keamanan 1.00 Ls
5 Biaya tukang untuk turun matrial 1.00 Ls
6 Biaya pembersihan selama kerja 1.00 Ls
7 Pasang terpal di atas bak air 160.00 M2
a.Pasang Bambu 140.00 Btg
b.Pasang Tali nilon 106.00 M1
A Water profing
1 Water profing ex sika 107 192.00 M2
2 Plester aci lantai dan dinding 192.00 M2
B Pengetesan air
1 Tes air , matrial air dari owner 1.00 Ls
10 Waterprrofing kimia
I. PEKERJAAN PENDAHULUAN
A. Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi 1.00 Ls
2 Biaya koordinasi warga setempat dan keamanan 1.00 Ls
3 Biaya tukang untuk turun matrial 1.00 Ls
4 Biaya pembersihan selama pebaikan grond tank 1.00 Ls
B. PEKERJAAN BONGKARAN
1 Pengukuran 1.00 Ls
2 Minimal boor pile 200.00 M1
3 Pembersihan lumpur 1.00 Ls
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
2,300,000 2,300,000
690,000 690,000
490,700 8,832,600
7,500,000 7,500,000
3,500,000 3,500,000
1,725,000 1,725,000
23,000 3,680,000
26,500 3,710,000
5,200 551,200
sub total 32,488,800 Rp 32,488,800 Rp 32,488,800
84,100 32,967,200
84,100 749,331
398,900 2,872,080
1,017,900 3,664,440
150,000 32,400,000
43,800 7,708,800
sub total Rp 80,361,851 Rp 80,361,851 Rp 80,361,851
Total I. Rp 112,850,651 Rp -
121,300 2,401,740
15,300 8,780,870
15,300 3,540,973
1,506,300 11,184,278
sub total Rp 23,506,121 Rp 23,506,121 23,506,121
15,300 13,491,846
15,300 9,374,616
1,506,300 37,958,760
sub total Rp 60,825,222 Rp 60,825,222 60,825,222
Total II Rp 84,331,343 Rp -
OLOM BETON
435,700 19,031,376
15,300 5,587,826
15,300 1,673,915
1,506,300 5,287,113
sub total Rp 31,580,230 Rp 31,580,230 Rp 31,580,230
435,700 57,948,100
435,700 47,055,600
15,300 20,237,769
15,300 14,061,924
1,506,300 72,713,102
488,800 52,790,400
sub total Rp 264,806,895 Rp 264,806,895 Rp 264,806,895
435,700 14,116,680
15,300 4,789,565
15,300 1,931,440
1,506,300 6,100,515
sub total Rp 26,938,200 Rp 26,938,200 Rp 26,938,200
Total III Rp 323,325,325
76,700 14,726,400
82,800 15,897,600
sub total Rp 30,624,000 Rp 30,624,000 Rp 30,624,000
2,300,000 2,300,000
sub total Rp 2,300,000 Rp 2,300,000 2,300,000
jumlah total Rp 32,924,000 Rp -
5,750,000 5,750,000
2,300,000 2,300,000
2,300,000 2,300,000
1,725,000 1,725,000
sub total 12,075,000 Rp 12,075,000
1,212,000 1,212,000
144,000 28,800,000
2,400,000 2,400,000
sub total 32,412,000 Rp 32,412,000 Rp 12,075,000
JUMLAH TOTAL 44,487,000
3.05882
305.8823529 10
1.0434782609 8.33333
10
1.0434782609
7.14286
8.92857
10.7143
7.142857143
5.35714
PT CITRA HARDA MANDIRI
NAMA PROYEK : PENAMBAHAN LANTAI 2 DAN RUANGAN
NAMA PEMILIK : PT SUNTAK INDONESIA
ALAMAT PROYEK : WANAHERANG
TANGGAL : 22 JANUARI 2016
REKAPITULASI
Err:511
PT CITRA HARDA MANDIRI
NAMA PROYEK : WWTP ( WASTE WATER TREATMENT PLANT )
NAMA PEMILIK : PT SUNTAK INDONESIA
ALAMAT PROYEK : WANAHERANG, CILEUNGSI BOGOR
TANGGAL : 4 FEBRUARI 2016
REKAPITULASI
DIBULATKAN #REF!
TERBILANG :
Err:511