Beruflich Dokumente
Kultur Dokumente
BO1001
BO1000
BO1002
Proyecto / Project:
000570-00-TUB-ET-0020 1/8 A4
Título del documento / Document Title: Unid
Cambios / Changes:
© This document must not be copied or disclosed to third parties without TSK consent.
Projectcode Document Title:
BO1001
BO1000
Color Concept Plan
BO1002
Logo Originator Document Number Prep. By Checked by
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 2/8
TABLE OF CONTENTS:
1 INTRODUCTION ..................................................................................................3
1.2 PURPOSE................................................................................................................................ 3
2 COLORS IDENTIFICATION.................................................................................4
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 3/8
1 INTRODUCTION
- Termoeléctrica de Warnes, that will be located near Warnes (Santa Cruz), and will consist on Two (2)
blocks of Combined Cycle Power Plants on 2x1 configuration + Two (2) blocks of Steam Tailing
Power Plants on 2x1 configuration, all of them based on a Wet Cooling Technology and providing a
Total Gross Power Production of 377MW.
- Termoeléctrica del Sur, that will be located near Yaguacua (Yacuiba), and will consist on Two (2) blocks
of Combined Cycle Power Plants on 2x1 configuration + Two (2) blocks of Steam Tailing Power
Plants on 2x1 configuration, all of them based on a Dry Cooling Technology and providing a Total
Gross Power Production of 373MW.
- Termoeléctrica de Entre Ríos, that will be located near Entre Ríos (Cochabamba), and will consist on
Three (3) blocks of Combined Cycle Power Plants on 2x1 configuration, all of them based on a Wet
Cooling Technology and providing a Total Gross Power Production of 442.5MW.
1.2 PURPOSE
The purpose of this document is to specify The Color Concept Plan of external paint of piping, pipe supports,
steel structures, machinery and equipment for shop and field painting of the three (3) Thermoelectric Power
Plants (Warnes, Sur and Entre Rios).
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 4/8
2 COLORS IDENTIFICATION
Pipes with the same base colors will be differentiated with plates, bands (of size, disposition and characteristics
according to DIN 4203) in the important points with views to maintenance or security of the facilities, which
will be as minimum the beginning and end of the pipes, branching, passes through enclosures or roofs and
connections with equipment and accessories.
Steel carbon pipes will be completely painted with the base colors indicated in tables of paragraph 2.2
except when the pipe is insulated, in which case a label or band will be installed indicating color.
All pipes, included the isolated, galvanized or stainless pipes, shall be clearly identified by labels or bands
specifying the nature of the fluid conveyed, with the colors indicated in tables below. This labels should be
according with DIN 2403.
In case the pipes carry dangerous fluids, orange bands will be provided with a maximum separation of 2 m on
both side of an obstacles.
All pipes will be identified throughout the facility with directional arrows and bands unless they are hidden or in
inaccessible places.
The bands and arrows will be painted or adhesive plastic bands must be used. Adhesive bands will be used
when the pipes are covered with aluminum or other covers.
The direction of the flow identification will be done with the same color as the bands. The arrows will be installed
each 1.5m or 2m and will be readable form the floor.The arrow will have the following dimensions:
Pipes with an outer diameter up to 5” (including insulation if used), 25 mm wide and 300 mm long.
Pipes 6” and bigger (including insulation if used), 50 mm wide and 300 mm long.
Fluids are classified into large groups for the purposes of identification, and each has been assigned a distinctive
basic color, as DIN 2304.
In accordance with this identification system of bands and labels, the piping for the various systems will be as
follows:
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 5/8
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 6/8
COMPONENT COLOR
Mechanical
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 7/8
Equipment Finish Colors (cont.)
COMPONENT COLOR
Condenser:
GasTurbine:
Electrical (1)
Main control room panels and cabinets Grey RAL 7035 or manufacturer standard
Electronics, energy and communications room panels and Grey RAL 7035 or manufacturer standard
cabinets
Auxiliary transformer earthing resistance cabinet Grey RAL 7035
Cabinets (switchgear, power centers, MCC, lighting and direct Grey RAL 7035 or manufacturer standard
service centers, emergency centre, dc, UPS)
Local panels and cabinets Grey RAL 7035 or manufacturer standard
MNR RMG
BO1001-20610-BEC102- 448222996
Revision Page Number
02 8/8
COMPONENT COLOR
Civil
Instrumentation
(1) Electrical conductor pipe will be galvanized steel and not be painted
General Note: stainless steel, PV, PVC, PP, HDPE, GRP, aluminum, galvanized parts whitout painting.
Note: Foundations where the oil or chemicals pollution can occur will be coated accordingly.