Beruflich Dokumente
Kultur Dokumente
Volume: 5 Issue: 8 16 – 20
_______________________________________________________________________________________________
Abstract—Knowing the involvement of capital in property market, there is a requirement of accurate valuation of a property which can be
achieved by using artificial intelligence technique. From this project we can study about valuation of commercial properties in Pune, India. The
main goal of this study is to develop a model using neural networks for rate prediction of commercial properties. The final results show 99%
correlation coefficient for selected combination of cases with a high percentage rate of prediction. This study would help the property investors
to buy or sell their properties at exact rate.
__________________________________________________*****_________________________________________________
18
IJRITCC | August 2017, Available @ http://www.ijritcc.org
_______________________________________________________________________________________
International Journal on Recent and Innovation Trends in Computing and Communication ISSN: 2321-8169
Volume: 5 Issue: 8 16 – 20
_______________________________________________________________________________________________
text edit has been completed, the paper is ready for the Graph plotted for desired and actual network outputs
template. Duplicate the template file by using the Save As generated by testing of the cases shown by figure number 3. It
command, and use the naming convention prescribed by your shows the relation between actual value which we provide and
conference for the name of your paper. In this newly created predicted output generated by the network combination. It is
file, highlight all of the contents and import your prepared text observed that all the six cases have nearly same values of actual
file. You are now ready to style your paper. and desired outputs. These combinations are 1f, 2f, 3f, 4f, 5f.
But Mean Square Error value for combination 5f is coming
TABLE 1 CASES COMBINATIONS
smallest rather than for any other combinations.
Sr.
Combination Training CV Testing r Value
No TABLE 2 PERFORMANCE PARAMETRS OF SELECTED
1 1a 60 10 30 0.4930 COMBINATION
2 1b 65 10 25 0.4475 Performance RATE
3 1c 70 10 20 0.5972
RMSE 1136.25117
4 1d 75 10 15 0.6887
5 1e 80 10 10 0.8721
6 1f 86 10 4 0.9817 NRMSE 0.039181075
7 2a 57 13 30 0.5113 MAE 1083.135933
8 2b 62 13 25 0.5517 NMAE 0.037349515
9 2c 67 13 20 0.5769 Min Abs Error 500.0049664
10 2d 72 13 15 0.6471 Max Abs Error 1500.011893
11 2e 77 13 10 0.8673 R 0.990895588
12 2f 83 13 4 0.9908 Score 96.66483336
13 3a 55 15 30 0.5319
14 3b 60 15 25 0.5635 TABLE 2 TRAINING AND CV MSEVALUES
15 3c 65 15 20 0.5793 Minimum Minimum Cross
16 3d 70 15 15 0.5999 Training MSE Validation MSE
17 3e 75 15 10 0.8673
0.00114324 0.00619393
18 3f 81 15 4 0.9908
19 4a 53 17 30 0.5225
Table 2 and table 3 gives the performances statistics for the
20 4b 58 17 25 0.5761
30th case i.e. 5f with 0.990895588 R value as seen in table 1.
21 4c 63 17 81 0.5823
22 4d 68 17 53 0.6131
23 4e 73 17 10 0.8113 VI. OBSERVATIONS
24 4f 79 17 4 0.9908 Following are the observations obtained from Neuro-
25 5a 50 20 30 0.4342 solutions software, it is observed that:
26 5b 55 20 25 0.5836 Total 30 combinations were tried to obtained perfect
27 5c 60 20 20 0.5925 prediction model.5f is the most satisfactory combination
28 5d 65 20 15 0.6166 observed. For this combination out of the hundred and fifty
29 5e 70 20 10 0.8111 cases, 76 cases are given for training, 20 for cross validation
30 5f 76 20 4 0.9908 and 4 for testing. This combination is closer to the optimum
results in terms of rate of production and correlation
coefficient. Compared with other combinations, Table 2 gives
Desired Output and Actual Network
idea about correlation coefficient for combination 5f is
Output 0.990895588. Most accurate result we get it for 5f
20000 combination. Table 2 also gives values of Root Mean Square
Output
15000
10000 Error (RMSE) which is acceptable. Table 3 shows values of
5000 RATE training Mean Square Error (MSE) and CV MSE which is well
0
RATE Output
below zero which is expected.
1 2 3 4 5 6