The document contains a list of items requiring work on equipment and piping identified on P&ID drawings for a process. It includes the installation of temperature gauges, pressure gauges, ball valves, piping, and updates to drawings. All work is to be completed by PTI Construction or Design and verified before startup of the process.
The document contains a list of items requiring work on equipment and piping identified on P&ID drawings for a process. It includes the installation of temperature gauges, pressure gauges, ball valves, piping, and updates to drawings. All work is to be completed by PTI Construction or Design and verified before startup of the process.
The document contains a list of items requiring work on equipment and piping identified on P&ID drawings for a process. It includes the installation of temperature gauges, pressure gauges, ball valves, piping, and updates to drawings. All work is to be completed by PTI Construction or Design and verified before startup of the process.
PG 1076 Pressure Gauge ( after 1000-PID-06 PG to be installed
HBG-001 discharge P1011)
TG 1101 Temperature Gauge
HBG-002a 1000-PID-01 TG to be installed (from N5 of T-1001) HBG-002b Ball Valve (from N4 of T-1001) 1000-PID-01 Valve to be installed HBG-002c Ball Valve (from N1 of T-1001) 1000-PID-01 Valve to be installed HBG-002d Leveling Gauge of T-1001 1000-PID-01 LG to be installed HBG-002e Nozzle 6 of T-1001 1000-PID-01 Install N6 HBG-002f Ball Valve (from N2 of T-1001) 1000-PID-01 Valve to be installed Piping connecting from T-1001 HBG-002g 1000-PID-01 Install the pipe to P-1003 1000-PID-01 Install P-1003 1000-PID-01 Install PG-1009 1000-PID-01 Install ball valves P-1003, Piping and its HBG-003 1000-PID-01 Install PSV 1010 Equipments
1000-PID-01 Install piping connecting P-
1003 to T-1003 and T-1001
HBG-004a Leveling Gauge of T-1003 1000-PID-01 LG to be installed
Design a catch basin that tG 1101 Temperature Gauge HBG-004b 1000-PID-01 will capture the overflow (from N5 of T-1001) catalyst from T-1003 HBG-005 Leveling Gauge of T-1002 1000-PID-01 LG to be installed Upate PID and GA sheet 1000-PID-01 methanol input diameter HBG-006 Methanol Input R1001A/B should be 40mm (equipment from vendor) HBG-007a Pressure auge 1006 (from N5 of 1000-PID-01 Install PG HBG-007b E-1002) HBG-007c Ball Valve (from N5 of E-1002) 1000-PID-01 Install Ball valve Temperature Transmitter 1005 1000-PID-01 install Temperature HBG-007d (from N4 of E1002) transmitter
Update PID and GA
HBG-008a Nozzle3 of E-1001 1000-PID-01 drawing (equipment from vendor) nozzle size 110mm
Update PID and GA
HBG-008b Nozzle4 of E-1001 1000-PID-01 drawing (equipment from vendor) nozzle size 110mm
Temperature Gauge 1079 (from 1000-PID-01 Insatall Temp. Gauge
HBG-008c N2 of E-1001) Temperature Gauge 1078 (from 1000-PID-01 Insatall Temp. Gauge HBG-008d N1 of E-1001) Update PID and GA HBG-008e Nozzle2 of E-1001 1000-PID-01 drawing (equipment from vendor) nozzle size 80mm 1000-PID-01 1000-PID-01 1000-PID-01 1000-PID-01 1000-PID-01 1000-PID-01 1000-PID-01 1000-PID-01 1000-PID-01 Work By Completion Status Remarks Date
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup PTI Cons Before startup