Item No. Identification P&ID No.

Description of Work

PG 1076 Pressure Gauge ( after 1000-PID-06 PG to be installed


HBG-001 discharge P1011)

TG 1101 Temperature Gauge


HBG-002a 1000-PID-01 TG to be installed
(from N5 of T-1001)
HBG-002b Ball Valve (from N4 of T-1001) 1000-PID-01 Valve to be installed
HBG-002c Ball Valve (from N1 of T-1001) 1000-PID-01 Valve to be installed
HBG-002d Leveling Gauge of T-1001 1000-PID-01 LG to be installed
HBG-002e Nozzle 6 of T-1001 1000-PID-01 Install N6
HBG-002f Ball Valve (from N2 of T-1001) 1000-PID-01 Valve to be installed
Piping connecting from T-1001
HBG-002g 1000-PID-01 Install the pipe
to P-1003
1000-PID-01 Install P-1003
1000-PID-01 Install PG-1009
1000-PID-01 Install ball valves
P-1003, Piping and its
HBG-003 1000-PID-01 Install PSV 1010
Equipments

1000-PID-01 Install piping connecting P-


1003 to T-1003 and T-1001

HBG-004a Leveling Gauge of T-1003 1000-PID-01 LG to be installed


Design a catch basin that
tG 1101 Temperature Gauge
HBG-004b 1000-PID-01 will capture the overflow
(from N5 of T-1001) catalyst from T-1003
HBG-005 Leveling Gauge of T-1002 1000-PID-01 LG to be installed
Upate PID and GA sheet
1000-PID-01 methanol input diameter
HBG-006 Methanol Input R1001A/B should be 40mm
(equipment from vendor)
HBG-007a
Pressure auge 1006 (from N5 of 1000-PID-01 Install PG
HBG-007b E-1002)
HBG-007c Ball Valve (from N5 of E-1002) 1000-PID-01 Install Ball valve
Temperature Transmitter 1005 1000-PID-01 install Temperature
HBG-007d (from N4 of E1002) transmitter

Update PID and GA


HBG-008a Nozzle3 of E-1001 1000-PID-01 drawing (equipment from
vendor) nozzle size 110mm

Update PID and GA


HBG-008b Nozzle4 of E-1001 1000-PID-01 drawing (equipment from
vendor) nozzle size 110mm

Temperature Gauge 1079 (from 1000-PID-01 Insatall Temp. Gauge


HBG-008c N2 of E-1001)
Temperature Gauge 1078 (from 1000-PID-01 Insatall Temp. Gauge
HBG-008d N1 of E-1001)
Update PID and GA
HBG-008e Nozzle2 of E-1001 1000-PID-01 drawing (equipment from
vendor) nozzle size 80mm
1000-PID-01
1000-PID-01
1000-PID-01
1000-PID-01
1000-PID-01
1000-PID-01
1000-PID-01
1000-PID-01
1000-PID-01
Work By Completion Status Remarks
Date

PTI Cons Before startup

PTI Cons Before startup


PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup
PTI Cons Before startup

PTI Cons Before startup

PTI Cons Before startup

PTI Design Dec. 22 2107

PTI Cons Before startup

PTI Design Dec. 22 2107

PTI Cons Before startup


PTI Cons Before startup
PTI Cons Before startup

PTI Design Dec. 22 2107

PTI Design Dec. 22 2107

PTI Cons Before startup

PTI Cons Before startup

PTI Design Dec. 22 2107