AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 1 Of 28
Site: Panel/Designation/Location
S/S 9015
ELECTRICAL TEST:
Function Test:
3. RELAY BURDEN:
1
(healthy case)
50W TYPICALLY
2
(faulty case )
4. SUPPLY OFF
TERMINALS (CLOSED) - (X11:2, X11:3) :
TERMINALS (OPEN) -:(X11:1,X11:2) :
SUPPLY ON
TERMINALS (CLOSED) -:(X11:1,X11:2) :
TERMINALS (OPEN) - (X11:2, X11:3) :
5. TIME AND DATE CHECK:-
To check time &date go to main menu on the display for RED670 &go to setting& time &system time
&adjust time &date.
To test this, remove the auxiliary supply from to the relay for approximately 30 seconds, on restoring the auxiliary
supply the time and date should be correct.
Result: ____________
3. U2 76.15KV 66.4V
4. U3 76.15KV 66.4V
5. I1 1200A 1A
6. I2 1200A 1A
7. I3 1200A 1A
8. UL1-2 132KV
9. UL2-3 132KV
11. F 60HZ
13. P 274.14 MW
14. Q 0 MVAR
15. PF 1
7. IMPEDANCE MEASUREMENTS:
IMPEDANCE Φ = 60 Φ = 240
CALCULATED MEASURED CALCULATED MEASURED
57.50 -57.50
XL1
33.2 -33.2
RL1
57.50 -57.50
XL2
33.2 -33.2
RL2
57.5 -57.5
XL3
33.2 -33.2
RL3
8. DIRECTIONAL TEST:
115O 90O
UND FW
165O
45O
180O 0O
RV
RV 345O
295O
270
ANGLE
FROM TO
DIRECTION
EXP. MEAS. EXP. MEAS.
165 115
UNDEFINED
295 165
REVERSE
345 295
UNDEFINED
DATE: CARRIED OUT BY WITNESSED BY
AT&C ENGINEER SEC
115 345
FORWARD
Setting Adopted:
Refer enclosed setting printout
3 phase 40 35
MEASURED VALUE
SETTING VALUE sec
2.00 S 2.004 S
-2ND STAGE: 3PHASE V&I (I=Ir, V/I <inner zone setting impedance).
-3RD STAGE TAKE du/dt = 0.2 v/sec.
-PSD start contact to dual timer.
Z1
Z2
Z3
Z4 N/A N/A
A 59.67 0.902
3U0= Ua + Ub + Uc
3I0= Ia + Ib + Ic
Limit: ± 1 % of Ur for 3U0> and ± 1 % of Ir (see the tech. ref. manual page 468 table 256).
GENERAL MODE
-1ST STAGE: 3PHASE V&I HEALTHY CASE.
- DECREASE ONE PHASE VOLTAGE TILL THE INDICAION LED FUSE FAIL APPERAS.
- DECREASE THE SAME PHASE CURRENT TILL THE INDICTION LED FUSE FAIL RESET.
--- Check the relay operation if a fault occurred during the fuse fail [ ].
* General mode:
- 1ST STAGE: FUSE FAIL CONDITION (TAKE TIME 1 SEC)
-2ND STAGE: FAULT CONDITION
U (MEAS.) =
VT MCB TRIP:
Check the blocking of the relay when the general block functions (VT MCB TRIP) is activated
ZONE 1: WITH OUT VT MCB TRIP : TRIP WITH TIME = 19.2 msec
WITH VT MCB TRIP: BLOCK
ZONE 2: WITH OUT VT MCB TRIP : TRIP WITH TIME = 426.5 msec
WITH VT MCB TRIP: BLOCK
ZONE 3: WITH OUT VT MCB TRIP : TRIP WITH TIME = 822.3 msec
WITH VT MCB TRIP: BLOCK
Measured Values
Setting
Phase
U<(V) I<(A) U<(V) I<(A)
B 5%(0.05)
60%( 39.84)
C 5%(0.05)
60%( 39.84)
Limit: ± 1 % of Ur for U< and ± 1 % of Ir (see the tech. ref. manual page 242 table 125 ).
Testing guidelines: refer to the function logic and the commissioning manual page 95 .
TEST PROCEDURE:
- APPLY 3 PHASE V & I AT HEALTHY CASE ON GENERAL MODE.
- DECREASE ONE PHASE VOLTAGE UNTILL THE DLDUL INDICATION APPEARS.
- DECREASE ONE PHASE CURRENT UNTILL THE DLDIL INDICATION APPEARS.
DISTANCE PROTECTION
External SOTF with manual Z1 & Z4 ONLY TRIP INST. WITH SOTF
Close pulse. FUNCTION
TEST PROCEDURE:
WEI ECHO= ON
A. Apply momentary pulse to Channel Receive Input With out any fault injection and check
Channel send is given CB should be in open position
WEI TRIP = ON
Increase the 1st stage time until the trip in the 2nd stage change from tCoord trip to Z2 trip
(if Z2 trip < Tdelay rev) or Tdelay rev (Tdelay rev <Z2 trip)
The time of 1st stage = PickUpRev and the trip time in the 2nd stage = tDelayRe
APPLIED
DISPLAY SECONDARY DISPLAY PRIMARY
CURRENT
PHASE VALUE VALUE
R 0.5 0.0 º º
Y 1.0 240.0 º º
B 1.50 120.0 º º
N 0.866 150.0 º º
APPLIED
DISPLAY SECONDARY DISPLAY PRIMARY
VOLTAGE
PHASE VALUE VALUE
RN 66.4 0.0 º º
YN 66.4 240.0 º º
BN 66.4 120.0 º º
RY 115 30 ---- º º
YB 115 270 ---- º º
BR 115 150 ---- º º
0.2 0.2
1.0 1
0.2 0.2
1.0 1
** set t Id ** set t Id
Inject current (A) Operating Operating
.PHASE MinHigH at MinHigH at
2*IdMin Time (ms) Time (ms)
switching cond. normal cond.
4 -PICK UP & DROP OFF TEST& OPERATING TIME FOR DIFFERENTIAL CURRENT
ALARM (Idiff Alarm):
3.0
0.2 0.2
R
0.5 0.5 5.0
0.2 0.2 3.0
Y
0.5 0.5 5.0
0.2 0.2 3.0
B
0.5 0.5 5.0
Limits:
Pick up & Drop Out ±2% of Ir According to the Catalogue for Technical Data Page: 132&133
Accuracy: Instantaneous Operation: 25 ms .typically at 0 to 10*Id
NOTE: Before Test for Pick Up Put t Alarm delay =0.0 sec& take output contact I d Alarm for time
*A current is injected into the R phase which is used as the bias current and another current is
injected into the Y phase which is used as differential current.
Inject a bias current of 1A in the R phase. The relay will trip and any contacts associated with the R
phase will operate.
Slowly increase the current in the Y phase until phase Y trips . Record the phase Y current magnitude
and check that it corresponds to the following equation;
Connect the test circuit as shown figure.
I-Section 1
When bias current is between:
0 ≤ Ibias ≤ Endsection1*IBase
Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance – Page132
NOTE: NOT INJECTED VOLTAGE (NOT TAKE VRef OR IRef )
ІI – SLOPE Section 2
When bias current is between:
Endsection1*Ibase ≤ Ibias ≤ Endsection2*IBase
Trip = (IdminOp *Ibase+ slope section2/100 *(Ibias - End section1*Ibase ) A
Where; Idmin ; The Basic Diff Current Setting.
To check more than one point at the same slope, Change the bias current value and the equation above
can be used, and also for other differential settings '' Different slopes, '
Apply the above procedure for each phase.
Set End section1 = 1.25*IBase
End section2 =3.0*IBase
IBase = 1200A
Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance – Page132
П I– SLOPE Section3
Repeat the test and check the result with the following equation;
When bias current is more than:
Ibias ≥ End section2*Ibase
Trip = Ibase*(IdminOp + slope section2/100*(End section2 - End section1)) +
(slope section3/100 * ( Ibias- End section2*Ibase ) A
Set End section1 = 1.25*IBase
End section2 =3.0*IBase
IBase = 1200A
Slope section2 = 30%
Id Id Measured
Slope Idmin
I injectedA calculated
section3 set. R Y B
(Trip)
50% 0.2 4.0 1.225
- inject current inst. From only one stage up to Idiff operate by zero sec
2.0* IBase 2
4.0* IBase 4
6.0* IBase 6
8.0* IBase 8
12.0* IBase
12
Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance –; Page132
Id ( Minimum ) =
Cross Block Function = ON
Cross Block
Cross Block ON
IR IY IB OFF
Tripping
i>pickup without 2nd
I >pickup with 2nd harmonic. BLOCKED
harmonic.
I >pickup with 2nd i>pickup without 2nd
BLOCKED
harmonic. harmonic.
i>pickup without 2nd I >pickup with 2nd
BLOCKED
harmonic. harmonic.
ChargcurEnable = ON.
RYB 0.6
1.2 0.6
0.7
1.4 0.7
Y-N
B-N
R-Y
Y-B
B-R
R-Y-B
Id Id Measured
Slope Idmin
I injectedA calculated
section3 set. R Y B
(Trip)
Td Min High
PHASE Id Min High (A)
OPERATE
PICKUP
SETTING SETTING ( S ) AT 1 A
(A) VALUE
1.0
1.0
Y
12 * IBase
B-N