SITE INSPECTION AND TEST RECORD

AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 1 Of 28
Site: Panel/Designation/Location
S/S 9015

PANEL REF : SERIAL NO :

PH -PH VOLTAGE : 115V PH CURRENT APPLIED: 1A

FREQUENCY : 60Hz ORDER NUMBER :

CT RATIO : 1200/1A PT RATIO : 132/0.115KV

MECHANICAL CHECK AND VISUAL INSPECTION:

Item Description Checked


1 Inspection for physical damage / defects.
2 Check tightness of all connections
3 Check ferrules
4 Check apparatus list

ELECTRICAL TEST:

Function Test:

Item Description Checked


1 Human Machine Interface (HMI) checked.
2 Test switch checked for correct function.
3 Case earthing checked.
4 Indications checked.
5 Alarm contacts checked.
6 Trip contacts checked.
7 Reset of indications checked.

3. RELAY BURDEN:

ITEM DC Voltage (V) Current (mA) Watts Limits W

1
(healthy case)
50W TYPICALLY
2
(faulty case )

Limits: according to the Catalogue for Technical Data – 50W Typically


DATE: CARRIED OUT BY WITNESSED BY
AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 2 Of 28
Site: Panel/Designation/Location
S/S 9015

4. SUPPLY OFF
TERMINALS (CLOSED) - (X11:2, X11:3) :
TERMINALS (OPEN) -:(X11:1,X11:2) :
SUPPLY ON
TERMINALS (CLOSED) -:(X11:1,X11:2) :
TERMINALS (OPEN) - (X11:2, X11:3) :
5. TIME AND DATE CHECK:-
To check time &date go to main menu on the display for RED670 &go to setting& time &system time
&adjust time &date.
To test this, remove the auxiliary supply from to the relay for approximately 30 seconds, on restoring the auxiliary
supply the time and date should be correct.
Result: ____________

6.1 - OPERATIONAL MEASUREMENTS:


APPLIED: VPH - N = …66.4 V I PH = …1 AMP Φ V-I = …0°.

MEASURED VALUES IN THE RELAY


PARAMETER
S.N0 PRIMARY SECONDARY
MEASUREMENT MEASUREMENT
CALC(PRI) MEAS. CALC(SEC) MEAS.
2. U1 76.15KV 66.4V

3. U2 76.15KV 66.4V

4. U3 76.15KV 66.4V

5. I1 1200A 1A

6. I2 1200A 1A

7. I3 1200A 1A

8. UL1-2 132KV

9. UL2-3 132KV

10. U1-3 132KV

11. F 60HZ

12. S 274.14 MVA

13. P 274.14 MW
14. Q 0 MVAR

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 3 Of 28
Site: Panel/Designation/Location
S/S 9015

15. PF 1

THEESE VALUES CAN NOT BE


READ IN SECONDARY

7. IMPEDANCE MEASUREMENTS:

Injected Impedance Z = 66.4 OHMS


R = Z * COS Φ , X = Z * SIN Φ
ALL READING OF R & X IN FREJA ARE MULTIPLIED BY VTR/CTR = 1148/1200
Read these values from following path:
Red670 – test – fun. Status – directional impedance – ZD01
Note : single phase fault or 3 phase fault from RX page and two phase fault from general page

IMPEDANCE Φ = 60 Φ = 240
CALCULATED MEASURED CALCULATED MEASURED

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 4 Of 28
Site: Panel/Designation/Location
S/S 9015

57.50 -57.50
XL1
33.2 -33.2
RL1
57.50 -57.50
XL2
33.2 -33.2
RL2
57.5 -57.5
XL3
33.2 -33.2
RL3

8. DIRECTIONAL TEST:
115O 90O

UND FW
165O
45O
180O 0O
RV
RV 345O

295O
270

* Test procedure: -APPLY SINGLE PHASE V & I UNDER PHS SETTING.


- CHANGE THE VOLTAGE ANGLE FROM 0 DEGREE UP TO
360 DEGREE UNTIL THE INDICATION OF FW, REVESE
AND NON DIRECTIONAL APPEARS AS PER SETTING APPLIED.

SETTING ARG DIR=15 ARG NEG RES=115

ANGLE
FROM TO
DIRECTION
EXP. MEAS. EXP. MEAS.

165 115
UNDEFINED
295 165
REVERSE
345 295
UNDEFINED
DATE: CARRIED OUT BY WITNESSED BY
AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 5 Of 28
Site: Panel/Designation/Location
S/S 9015

115 345
FORWARD

9 -TIME CHECK & ZONE CHECK:

Setting Adopted:
Refer enclosed setting printout

SECONDARY INJECTION TESTS:


9.1 DISTANCE PROTECTION:

ZONE REACH MEASUREMENTS:


Item Description Checked
1 Print out from Freja attached.

PH-E (PE): -Resistive reach: RFn (Ω/loop) = RFn (Ω/loop)*Mf


-Reactive reach: Xn (Ω/loop) = Xn (Ω/phase) + XNn (Ω/phase), XNn = KNx* Xn (Ω/phase),
KNx= 1/ 3 ((X0 – X1)/ X1)
S0: Xn (Ω/loop) = 1/ 3 {(2 * Xn (Ω/phase) + X0n (Ω/phase)}*Mf.

PH-PH (PP&3PH): -Resistive reach: RFn (Ω/phase) = 1/ 2 RFn (Ω/loop)*Mf.


- Reactive reach: Xn (Ω/phase) = Xn (Ω/phase)*Mf.
RFn: Zone n resistive reach resistance.
Xn: zone n positive sequence reactance.
XNn: zone n earth returns reactance.
KNx: reactive compensation factor.
X0n: zone n zero sequence reactance.
X0: line zero sequence reactance.
X1: line positive sequence reactance.
Mf:CTR/VTR.

ZONE TIMING TEST:


Item Description Checked
1 Print out from Freja attached.
Limit: 24 ms typically ± 10ms ± 0.5 %.

9.2 PHASE SELECTION FUNCTION (PHS):

9.2.1. PHS REACH MEASUREMENTS:


Item Description Checked
1 Print out from Freja attached.

PH-E (PE): -Resistive reach: RLdfwphs (Ω/loop) = RLdfwphs (Ω/loop)*Mf.&RFrvphs(Ω/loop)= RFrvphs(Ω/loop)*Mf


-Reactive reach: X1phs (Ω/loop) = 1/ 3 {(2 * X1phs (Ω/phase) + X0phs (Ω/phase)}*Mf.
PH-PH (PP): -Resistive reach: RFphs (Ω/phase) = 1/ 2 RFphs (Ω/loop)*Mf.

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 6 Of 28
Site: Panel/Designation/Location
S/S 9015

- Reactive reach: X1phs (Ω/phase) = X1phs (Ω/phase)*Mf.


3PH: -Resistive reach: RFphs (Ω/phase) = 0.666 RFphs (Ω/phase)*Mf
- Reactive reach: X1phs (Ω/phase) = 1.333 * X1phs (Ω/phase)*Mf.

9.2.2. PHS TIMING TEST:


Item Description Checked
1 Print out from Freja attached.
Limit: 24 ms typically ± 10ms ± 0.5 %.

9.3POWER SWING DETECTION (PSD):


3.4.3.1 PSD Reach test Measurement:

Item Description Checked


1 Print out from Freja attached.

CHECK THE OPERATING TIME (TP1):

Type of fault Tp1 setting Tp1 actual


msec msec

3 phase 40 35

-Freja general mode, sequence, 3 stages.


-1ST STAGE: 3phase V&I to get the impedance outside the outer zone area (I=Ir & V/I>Zouter and T =1 SEC).
-2ND STAGE: 3phase V&I to get the impedance between the outer and the inner zone area (I=Ir, V/I<Zouter,
V/I >Zinner and adjust the time; start with 30 msec; till you get PSD start).
-3RD STAGE: 3phase V&I to get the impedance inside zone1 (I=Ir & V/I<Zzone1 and T =0.1 SEC).

CHECK THE BLOCKING TIME (TR2):

MEASURED VALUE
SETTING VALUE sec

2.00 S 2.004 S

Limit: ± 10 ms (see the tech. ref. manual page 90).


- FREJA GENERAL MODE
-1ST STAGE: 3PHASE V&I (I=Ir, V/I >outer zone setting impedance).
DATE: CARRIED OUT BY WITNESSED BY
AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 7 Of 28
Site: Panel/Designation/Location
S/S 9015

-2ND STAGE: 3PHASE V&I (I=Ir, V/I <inner zone setting impedance).
-3RD STAGE TAKE du/dt = 0.2 v/sec.
-PSD start contact to dual timer.

CHECK THE HOLDING TIME (TH):


TH setting
Type of fault TH actual
Sec
Sec
phase 0.5 0.497
-Test procedure: SAME AS BEFOR BUT
-use timer by start contact (general trip) and stop contact (PSD).

CHECK THE PSD BLOCKING TIME:

ZONE RELAY OPERATION WITHOUT PS ( mSec) RELAY OPERATION WITH PS ( Sec)

Z1

Z2

Z3

Z4 N/A N/A

10 - FUSE FAIL SUPERVISION (FSD1):


OpMod UZsIZs

Setting Measured values

3U0>V 3I0<A Phase 3U0>(V) 3I0<(A)

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 8 Of 28
Site: Panel/Designation/Location
S/S 9015

A 59.67 0.902

10% 6.64V 10% 0.1A B

3U0= Ua + Ub + Uc
3I0= Ia + Ib + Ic
Limit: ± 1 % of Ur for 3U0> and ± 1 % of Ir (see the tech. ref. manual page 468 table 256).

GENERAL MODE
-1ST STAGE: 3PHASE V&I HEALTHY CASE.
- DECREASE ONE PHASE VOLTAGE TILL THE INDICAION LED FUSE FAIL APPERAS.
- DECREASE THE SAME PHASE CURRENT TILL THE INDICTION LED FUSE FAIL RESET.

Fuse Fail Operating Time: 26.0 msec

-1ST STAGE: 3PHASE V&I HEALTHY CASE.


-2ND STAGE: PUT FUSE FAIL CONDITION (TAKE CONTACT FUSE FAIL FUSE BLK Z)
--- V.T supervision latching time = 5.01 sec.
* General mode:
- 1ST STAGE: 3PHASES V&I HEALTHY CASE. (TAKE TIME 1 SEC)
-2ND STAGE: PUT 3 PHASE (V) TO ACHIVE THE DLD AND FUSE FAIL FOR MORE THAN 5 SEC.

--- Check the relay operation if a fault occurred during the fuse fail [ ].
* General mode:
- 1ST STAGE: FUSE FAIL CONDITION (TAKE TIME 1 SEC)
-2ND STAGE: FAULT CONDITION

--- Check seal IN FUNCTION: --------------

U SEALIN (SETTING) = 46.48 V

U (MEAS.) =

VT MCB TRIP:

Check the blocking of the relay when the general block functions (VT MCB TRIP) is activated

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 9 Of 28
Site: Panel/Designation/Location
S/S 9015

ZONE 1: WITH OUT VT MCB TRIP : TRIP WITH TIME = 19.2 msec
WITH VT MCB TRIP: BLOCK

ZONE 2: WITH OUT VT MCB TRIP : TRIP WITH TIME = 426.5 msec
WITH VT MCB TRIP: BLOCK

ZONE 3: WITH OUT VT MCB TRIP : TRIP WITH TIME = 822.3 msec
WITH VT MCB TRIP: BLOCK

CHECKING THE OPERATION OF THE DV/DT AND DI/DT:

Setting Measured Values


EXP. VALUE
IND
DU> DI<
DU> DI< DU> DI<
Phase Exp. Exp.
Setting Setting (V) (A)

60% Ubase 25%Ibase B


26.56 V 0.75 A OK
(39.84) (0.25)

- Active OPDUDI = ON.


- Then inject 2 stages :
- First stage / healthy
- Second stage / keep your voltage at single phase more than UDLD and other two phases are healthy
and 3 ph current healthy then decrease voltages up to fuse fail detected and repeat this test for current.
- The fuse fail will operate. the contact of BLKZ will be operate latched up to voltage return back
to more than setting of Uph

DEAD LINE DETECTION FUNCTION (DLD) USED FOR FUSE FAIL


DATE: CARRIED OUT BY WITNESSED BY
AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 10 Of 28
Site: Panel/Designation/Location
S/S 9015

Measured Values
Setting
Phase
U<(V) I<(A) U<(V) I<(A)

A 60%( 39.84) 5%(0.05)

B 5%(0.05)
60%( 39.84)
C 5%(0.05)
60%( 39.84)

ABC 60%( 39.84) 5%(0.05)

Limit: ± 1 % of Ur for U< and ± 1 % of Ir (see the tech. ref. manual page 242 table 125 ).
Testing guidelines: refer to the function logic and the commissioning manual page 95 .
TEST PROCEDURE:
- APPLY 3 PHASE V & I AT HEALTHY CASE ON GENERAL MODE.
- DECREASE ONE PHASE VOLTAGE UNTILL THE DLDUL INDICATION APPEARS.
- DECREASE ONE PHASE CURRENT UNTILL THE DLDIL INDICATION APPEARS.

11 . AUTOMATIC SWICHT ON TO FAULT (SFV1):

DISTANCE PROTECTION

SOTF – ON Trip Time (msec) REMARKS


All zones trip inst.
Internal SOTF with Select
* Make at setting auto init (ON).
impedance mode.

External SOTF with manual Z1 & Z4 ONLY TRIP INST. WITH SOTF
Close pulse. FUNCTION

SOTF WITH DISTANCE PROTECTION:


Mode Impedance Auto Init off
2 Bi/p CB open + CB Manual Close

SOTF WITH Z1 Time W/O SOTF = mSec


Time WITH SOTF = mSec

SOTF WITH Z2 Time W/O SOTF = mSec


Time WITH SOTF = mSec

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 11 Of 28
Site: Panel/Designation/Location
S/S 9015

SOTF WITH Z3 Time W/O SOTF = mSec


Time WITH SOTF = mSec

SOTF WITH Z4 Time W/O SOTF = mSec


Time WITH SOTF = mSec

Test of dead line detection time ( TDLD ):


Put tdld = 0.2 sec , mode = impedance , autoinit = on .
- inject three stages like that :
- first stage : healthy with time 4sec
- second stage : ( V&I) zero with time 0.15 sec
- third stage : zone fault with time 1 sec
- so it will trip by zone fault time because tdld is 0.2sec the increase the time of second stage up to mor than 0.2 sec
then it will be trip by sotf .
- TDLD ( MEAS.) =

test of drop off time for sotf ( TSOTF) :


put tsotf = 1 sec , mode = impedance , autoinit = on .
- inject 2 stage from RX pge :
- first stage : healthy with time 58 ccs
- second stage : fault with time 300 ccs
- then it will be trip by sotf then increase time of first stage up to 60 ccs then itzone fau will trip by zone time .
- TSOTF (MEAS.) =

SOTF with UI Level:


Mode = UILevel , AutoInit = off , tDuration = 1sec

Setting Measured Values


Phase
U<(V) I<(A) U<(V) I<(A)

A 70%( 46.48) 20%(0.2A)


B 70%( 46.48) 20%(0.2A)
C 70%( 46.48) 20%(0.2A)
ABC 70%( 46.48) 20%(0.2A)

Tduration (set) = 0.2sec Tduration (Meas) = sec

TEST PROCEDURE:

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 12 Of 28
Site: Panel/Designation/Location
S/S 9015

- APPLY 3 PHASE V & I all 3-phase 50V& I=0.0.27A AT GENERAL MODE.


- DECREASE ONE PHASE VOLTAGE UNTILL THE SOTF TRIP APPEARS
-
- APPLY 3 PHASE V & I all 3-phase 39.7V& I=0.190A AT GENERAL MODE.
- INCREASE ONE PHASE CURRENT UNTILL THE SOTF TRIP APPEARS
-

12 .SCHEME COM.TEST (ZCOM):

Tcoord = 0.07 s , Tsend min = 0.02 s

Tsend min ( meas) =

A) Scheme selected: Permissive under reach.

Send Logic : CS @ ZM1 ( ) ONLY Z1


Trip Logic : Trip = ZM2+CR ( ) TRIP AFTER Tcoord TIME
Trip Logic : Trip = ZM2+NOCR ( ) TRIP AFTER ZONE2 TIME
Trip Logic : Trip = ZM3, 4+ CR ( ) TRIP AFTER EVERYZONE TIME

B) Permissive Over Reach Scheme

Send Logic : CS @ ZM2 ( ) ONLY Z2


Trip Logic : Trip = ZM2+CR ( ) TRIP AFTER Tcoord TIME
Trip Logic : Trip = ZM2+NOCR ( ) TRIP AFTER ZONE2 TIME
Trip Logic : Trip = ZM3 + CR ( ) TRIP AFTER EVRYZONE TIME

C) Direct Intertrip Scheme:

Send Logic: CS = ZM1 ( ) ONLY Z1


Trip Logic : Trip = CR ( ) TRIP AFTER Tcoord TIME

D) Blocking Scheme: (Final setting)

Send Logic : CS @ REVERSE ZONES ( ) ONLY Z3


Trip Logic : Trip = ZM2+NOCR ( ) TRIP AFTER Tcoord TIME
Trip Logic : Trip = ZM2+CR ( ) TRIP AFTER ZONE2 TIME

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 13 Of 28
Site: Panel/Designation/Location
S/S 9015

13 - WEAK END INFEED ECHO(ZCAL):

WEI ECHO= ON

A. Apply momentary pulse to Channel Receive Input With out any fault injection and check
Channel send is given CB should be in open position

Send Logic: CS = CR + CB open ( ) AFTER Tpickup WEI TIME

13.1- WEAK END INFEED TRIP:

WEI TRIP = ON

a. Check trip signal after Tpickup WEI ( OK )


Tpickup WEI(set) = 0.01 sec Tpickup WEI(meas) = m sec
b. Apply momentary pulse to Channel Receive Input and keep binary input for CB close
and inject only one stage with undervoltage setting then we have echo signal with trip.
* Thecondition is 3V0 > setting of Vpp<

14. CURRENT REVERSAL LOGIC CHECK (ZCAL):

CurrRev = ON & ZCOM Scheme type Permissive OR


Apply a reverse fault to check: t pick up (zone 3)
Freja general mode, 2 stages
1ST STAGE: 3phase V&I to get the reverse Z3 fault 0.
With time>PickUpRev
Bi/p DISTANCE CR

2ND STAGE: 3phase V&I to get the get forward Z2 fault


With time > tDelayRev
Bi/p DISTANCE CR

Increase the 1st stage time until the trip in the 2nd stage change from tCoord trip to Z2 trip
(if Z2 trip < Tdelay rev) or Tdelay rev (Tdelay rev <Z2 trip)
The time of 1st stage = PickUpRev and the trip time in the 2nd stage = tDelayRe

T pick up setting = 0.02 sec T pick up Meas = msec

Tdelay rev setting = 0.05 sec Tdelay rev Meas = msec

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 14 Of 28
Site: Panel/Designation/Location
S/S 9015

ALL BI/P CHECKED OK


ALL BO/P CHECKED OK

(LINE DIFF TEST)


1. 1- MEASUREMENTS:-
Ι - For Angle Measurement; Set Measurement Ref is VRN.

APPLIED
DISPLAY SECONDARY DISPLAY PRIMARY
CURRENT
PHASE VALUE VALUE

Magnitude Angle Magnitude Angle Magnitude Angle

R 0.5 0.0 º º

Y 1.0 240.0 º º
B 1.50 120.0 º º
N 0.866 150.0 º º
APPLIED
DISPLAY SECONDARY DISPLAY PRIMARY
VOLTAGE
PHASE VALUE VALUE

Magnitude Angle Magnitude Angle Magnitude Angle

RN 66.4 0.0 º º

YN 66.4 240.0 º º
BN 66.4 120.0 º º
RY 115 30 ---- º º
YB 115 270 ---- º º
BR 115 150 ---- º º

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 15 Of 28
Site: Panel/Designation/Location
S/S 9015

2. PICK UP & DROP OFF TEST FOR DIFFERENTIAL CURRENT (IdMin):


A-Also charge current should not active in the setting. Pick Up Value = IdMin A

Measured Measured Drop


SETTING Calculate Pick Up Off Value (A) Limits :
PHASE
IdMin (A) Pick UP (A) Value (A) . Pick up &
Drop Out ±2% of Ir
0.2 0.2 According to the
Catalogue for
R-N 0.6 0.6 Technical Data Page:
132
1.0 1

0.2 0.2

Y-N 0.6 0.6

1.0 1

0.2 0.2

B-N 0.6 0.6

1.0 1

R-Y 0.4 0.4

Y-B 0.4 0.4

B-R 0.4 0.4

R-Y-B 0.4 0.4


Note : 1) Before Testing Put Charging Current off Will Decrease Pick Up Value To 50%
2) Before Testing Put tId MinHigH =0.0 sec

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 16 Of 28
Site: Panel/Designation/Location
S/S 9015

3- DEFINITEOPERATING TIME TEST FOR DIFFERENTIAL CURRENT (IdMin):


Set: DEFINITE Mode & IdMin = 0.2Ibase
NOTE: before test put (Id Min High & I diff Alarm > 2 * Idmin)

** set t Id ** set t Id
Inject current (A) Operating Operating
.PHASE MinHigH at MinHigH at
2*IdMin Time (ms) Time (ms)
switching cond. normal cond.

0.40 0.0 0.0


R
0.40 100 100
0.40 500 500
0.40 0.0 0.0
Y 0.40 100 100
0.40 500 500
0.40 0.0 0.0
B 0.40 100 100
0.40 500 500
** This time effective during switching for inruch current and this time is en effective during normal
Condition
For check at normal condition put 1 st healthy condition more than t Idminhigh time and 2 nd st. at fault
condition.
Accuracy: Instantaneous Operation: 25 ms.typically at 0 to 10*Id
According to the Catalogue for Technical Data –Page: 133

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 17 Of 28
Site: Panel/Designation/Location
S/S 9015

4 -PICK UP & DROP OFF TEST& OPERATING TIME FOR DIFFERENTIAL CURRENT
ALARM (Idiff Alarm):

Calculate Measured Measured Delay Time Operating


SETTING Pick UP Pick Up Drop Off Tdiff Time(sec) 2*Ip.U
PHASE
Idiff Alarm (A) (A) Value (A) Value (A) Alarm (sec)

3.0
0.2 0.2
R
0.5 0.5 5.0
0.2 0.2 3.0
Y
0.5 0.5 5.0
0.2 0.2 3.0
B
0.5 0.5 5.0
Limits:
Pick up & Drop Out ±2% of Ir According to the Catalogue for Technical Data Page: 132&133
Accuracy: Instantaneous Operation: 25 ms .typically at 0 to 10*Id
NOTE: Before Test for Pick Up Put t Alarm delay =0.0 sec& take output contact I d Alarm for time

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 18 Of 28
Site: Panel/Designation/Location
S/S 9015

5. BIAS CHARACTERISTIC TESTING


Use fiber optic communication between ch1&ch2 then test differential protection element;
as shown figure.(Keep charge current off)

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 19 Of 28
Site: Panel/Designation/Location
S/S 9015

*A current is injected into the R phase which is used as the bias current and another current is
injected into the Y phase which is used as differential current.
Inject a bias current of 1A in the R phase. The relay will trip and any contacts associated with the R
phase will operate.
Slowly increase the current in the Y phase until phase Y trips . Record the phase Y current magnitude
and check that it corresponds to the following equation;
Connect the test circuit as shown figure.

Slope Idmin set I bias Inject Id calculated(Trip) Id Measured (A)


section1 A R Y B

0.2 1.0<1.25*IBase 0.20

IdminOp 0.4 1.0<1.25*IBase 0.40

0.6 1.0<1.25*IBase 0.60

I-Section 1
When bias current is between:
0 ≤ Ibias ≤ Endsection1*IBase

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 20 Of 28
Site: Panel/Designation/Location
S/S 9015

Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance – Page132
NOTE: NOT INJECTED VOLTAGE (NOT TAKE VRef OR IRef )

ІI – SLOPE Section 2
When bias current is between:
Endsection1*Ibase ≤ Ibias ≤ Endsection2*IBase
Trip = (IdminOp *Ibase+ slope section2/100 *(Ibias - End section1*Ibase ) A
Where; Idmin ; The Basic Diff Current Setting.
To check more than one point at the same slope, Change the bias current value and the equation above
can be used, and also for other differential settings '' Different slopes, '
Apply the above procedure for each phase.
Set End section1 = 1.25*IBase
End section2 =3.0*IBase
IBase = 1200A

Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance – Page132

Slope Idmin set I bias Id Id Measured (A)


section2 Inject calculated R Y B
(A) (Trip)

0.2 1.5 0.276

30 % 0.4 2.0 0.626

0.6 3.0 1.126

0.2 1.5 0.326

50 % 0.4 2.0 0.776

0.6 3.0 1.476

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 21 Of 28
Site: Panel/Designation/Location
S/S 9015

П I– SLOPE Section3
Repeat the test and check the result with the following equation;
When bias current is more than:
Ibias ≥ End section2*Ibase
Trip = Ibase*(IdminOp + slope section2/100*(End section2 - End section1)) +
(slope section3/100 * ( Ibias- End section2*Ibase ) A
Set End section1 = 1.25*IBase
End section2 =3.0*IBase
IBase = 1200A
Slope section2 = 30%

Id Id Measured
Slope Idmin
I injectedA calculated
section3 set. R Y B
(Trip)
50% 0.2 4.0 1.225

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 22 Of 28
Site: Panel/Designation/Location
S/S 9015

0.4 5.0 1.925

0.6 6.0 2.625

0.2 4.0 1.525

80 % 0.4 5.0 2.525

0.6 6.0 3.525

6. Harmonic current check:


I. Check the 2nd blocking:

2nd Iinjected (A) Iop Measured (A)


Harmonic 2nd Harm. R
Idmin set. Fundamental Y B
current Calculated
A CURRENT
set(I2/I1) (120HZ) % % %
(60HZ)
Ratio Harm Harm Harm
0.2*
14%IBase 1.0 0.14
IBase

I injected = 1.0 (60 HZ)


I injected = 0.14 (120 HZ)
Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance –; Page132

II.Check the 5th blocking:

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 23 Of 28
Site: Panel/Designation/Location
S/S 9015

5th Idmin set. Iinjected (A) Iop Measured (A)


Harmonic A Fundamental 5th Harm. R Y B
current set CURRENT Calculated
(60HZ) (300HZ) % % %
Harm. Harm Harm
0.2*
25%IBase 1.0 0.25
IBase
Limits; ± 6 %Ir According to the Catalogue for Commissioning and Maintenance –; Page132

7. IdMinHigh & TdMinHigh :

OPERTD TIME (Td Min High)


PHASE Id Min High

PICKUP VALUE INJECTET CURRENT


AT 0.5A AT 2.0A SETTING ( S )
SETTING AT 0.5A AT 2.0
P.U D.O P.U D.O

Y 0.5A 2A 2.0 SEC

- inject current inst. From only one stage up to Idiff operate by zero sec

8. Idunres current check:

Ibase = 1200A CTR = 1200:1 A

Idunres set. Idunres Measured (A)


A CAL (A) R Y B

2.0* IBase 2

4.0* IBase 4

6.0* IBase 6

8.0* IBase 8

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 24 Of 28
Site: Panel/Designation/Location
S/S 9015

12.0* IBase
12

Limits; ± 2 %Ir According to the Catalogue for Commissioning and Maintenance –; Page132

9. CROSS BLOCKING FUNCTION

Id ( Minimum ) =
Cross Block Function = ON
Cross Block
Cross Block ON
IR IY IB OFF
Tripping
i>pickup without 2nd
I >pickup with 2nd harmonic. BLOCKED
harmonic.
I >pickup with 2nd i>pickup without 2nd
BLOCKED
harmonic. harmonic.
i>pickup without 2nd I >pickup with 2nd
BLOCKED
harmonic. harmonic.

10 - EFFECT OF CHARGING CURRENT:

ChargcurEnable = ON.

Measured Measured CHAR. CHAR.


SETTING Calculate Pick Up Drop Off CURR. CURR.
PHASE
IdMin (A) Pick UP (A) Value (A) Value (A) EXP. MEAS.

0.2 0.4 0.2

RYB 0.6
1.2 0.6
0.7
1.4 0.7

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 25 Of 28
Site: Panel/Designation/Location
S/S 9015

11: FINAL SETTING:


1-pick up &drop off &time test for diff .current (Id Min): [neg. seq. Diff. En=ON,charg. Curr. En.=on)
Measured Measured Measured
SETTING
SETTING Pick Up Drop Out Time
PHASE Time(sec)
Idmin (A) Value (A) Value (A) AT
tdMin high
2* Is
0.25 1
R-N

Y-N

B-N
R-Y

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 26 Of 28
Site: Panel/Designation/Location
S/S 9015

Y-B

B-R

R-Y-B

2-SLOP TEST FOR SECTION -1


*END SECTION1 = 1.25 IB
*END SECTION2 = 3 IB
Slope Idmin set I bias Id Id Measured
section1 Inject calculated R Y B
A (Trip)

IdminOp 0.25 1.0 0.25

3-SLOP TEST FOR SECTION-2

Slope Idmin set I bias Id Id Measured


section2 Inject calculated R Y B
A (Trip)

40 % 0.25 1.5 0.35

4-SLOP TEST FOR SECTION-3

Id Id Measured
Slope Idmin
I injectedA calculated
section3 set. R Y B
(Trip)

80% 0.25 4.0 1.75

5 - IdMinHigh & TdMinHigh

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 27 Of 28
Site: Panel/Designation/Location
S/S 9015

Td Min High
PHASE Id Min High (A)

OPERATE
PICKUP
SETTING SETTING ( S ) AT 1 A
(A) VALUE

1.0
1.0
Y

6. Idunres current check:

Idunres set. Idunres Measured (A)


(A) R Y B

12 * IBase

7. DIFFERENTIAL CURRENT ALARM

SETTING Measured Pick Measured Drop Measured Time


SETTING Up Value (A) Out Value (A) (Sec) AT
PHASE Id alarm
Time (S) 2*I set
(A)
0.15 10.0
R-N
Y-N

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting


SITE INSPECTION AND TEST RECORD
AT&C
Description: Contract no:
DISTANCE + line diff RELAY RED 670 CNR- 09/0168
Customer: End Client: Sheet:
AL-FANAR CO. SEC-COA 28 Of 28
Site: Panel/Designation/Location
S/S 9015

B-N

8.Harmonic current check:


I. Check the 2nd blocking:

2nd I injected (A) Iop Measured (A)


Harmonic 2nd Harm. R
Idmin set. Fundamental Y B
current Calculated
A CURRENT
set(I2/I1) (120HZ) % % %
(60HZ)
Ratio Harm Harm Harm
0.25*
15%IBase 1.0 0.15
IBase

II.Check the 5th blocking:

5th Idmin set. I injected (A) Iop Measured (A)


Harmonic A Fundamental 5th Harm. R Y B
current set CURRENT Calculated
(60HZ) (300HZ) % % %
Harm. Harm Harm
0.25*
25%IBase 1.0 0.25
IBase

DATE: CARRIED OUT BY WITNESSED BY


AT&C ENGINEER SEC

NAME: ENG.: MOHAMED ABD ELRAZIK ENG: DILEEP NAIR


SIGNATURE:

The relay distance function is tested on final setting