B124 A B C D Remarks

31.10.17
150MM Sand Bending on 1 st layer DC MGS Leveling in
1 st layer, Cable,Cable Dressing progress Excavaction

2nd layer DC cable laying. approval Drum shifting 50 mm Bedding

Leveling. sand filling Drum shiftng.


50 MM
150MM Bedding,
01.11.17 250 MM Bedding, leveling , approval & 2 Excavation, 50 MM Bedding,leveling,
leveling, Bedding. approval, 1st layer DC
nd Layer DC Cable cable

approval & HDPE


Laying.RS485 Drum
shifting

02.11.17 1st layer DC Cable, 150MM Sand Bedding,


100MM Sand bedding, 250MM bedding & dressing,150mm leveling,2nd layer DC
RS485 cable laying. HDPE Pipe Laying Bedding Cable, cable dressing.

03.11.17 2nd layer DC 250MM sand bedding,


100MM Sand Bedding, Cable,dressing ,250 HDPE PIPE Laying,
Waring Tape RS 485 Laying, MM sand bedding, 100MM Sand Bedding.

04.11.17
Crowning Waring tape HDPE Pipe RS 485

05.11.17
Crowning Crowning Crowning
.
Block 152
A B C D 300 Tr.

Survey & marking, Survey & marking, Survey & marking, Survey & marking,
Day1 Excavation. Excavation. Excavation. Excavation.

Dressing & sand bedding, Dressing & sand bedding, Dressing & sand bedding, Dressing & sand bedding,
1st Layer DC cable Laying, 1st Layer DC cable Laying, 1st Layer DC cable Laying, 1st Layer DC cable Laying,
Day2 Cable dressing. Cable dressing. Cable dressing. Cable dressing.

Sand bedding & 2nd layer Sand bedding & 2nd layer Sand bedding & 2nd layer Sand bedding & 2nd layer
DC cable laying, Cable DC cable laying, Cable DC cable laying, Cable DC cable laying, Cable
Day3 dressing dressing dressing dressing

Sand bedding , HDPE & Sand bedding , HDPE & Sand bedding , HDPE & Sand bedding , HDPE &
Day4 bedding, RS 485. bedding, RS 485. bedding, RS 485. bedding, RS 485.

Excavation,Dres
sing & sand
bedding,1st dc
Sand bedding, Warning Sand bedding, Warning Sand bedding, Warning cable, Sand
Day5 Sand bedding, Warning tape tape tape tape Bedding.

Day6 Crown, Finishing works Crown, Finishing works Crown, Finishing works Crown, Finishing works
Block 152
A B C D 300 Tr.

Survey & marking, Survey & marking,


Day1 Excavation. Survey & marking, Excavation. Survey & marking, Excavation. Excavation.

Dressing & sand bedding, Dressing & sand bedding, 1st Dressing & sand bedding, 1st Dressing & sand bedding,
1st Layer DC cable Laying, Layer DC cable Laying, Cable Layer DC cable Laying, Cable 1st Layer DC cable Laying,
Day2 Cable dressing. dressing. dressing. Cable dressing.

Sand bedding & 2nd layer Sand bedding & 2nd layer
DC cable laying, Cable Sand bedding & 2nd layer DC Sand bedding & 2nd layer DC DC cable laying, Cable
Day3 dressing cable laying, Cable dressing cable laying, Cable dressing dressing

Sand bedding , HDPE & Sand bedding , HDPE & Sand bedding , HDPE & bedding, Sand bedding , HDPE &
Day4 bedding, RS 485. bedding, RS 485. RS 485. bedding, RS 485. 1600

Excavation,Dressin
g & sand
bedding,1st dc
Sand bedding, Warning Sand bedding, Warning cable, Sand
Day5 tape Sand bedding, Warning tape Sand bedding, Warning tape tape 900 Bedding.

Day6 Crown, Finishing works Crown, Finishing works Crown, Finishing works Crown, Finishing works
Block X
A B C
Survey & marking,
Day1 Excavation. Survey & marking Survey & marking

Dressing & sand


bedding, 1st Layer
DC cable Laying, Excavation,Dressing
Day2 Cable dressing. 1800 & sand bedding
Sand bedding &
2nd layer DC cable
laying, Cable 1st dc cable, Sand Excavation,Dressing
Day3 dressing 1200 Bedding. 1600 & sand bedding

2nd Layer DC Cable


Sand bedding , Laying, Cable
HDPE & bedding, RS dressing, sand 1st dc cable, Sand
Day4 485. bedding. 900 Bedding.

2nd Layer DC Cable


Laying, Cable
Sand bedding, HDPE & Bedding, RS dressing, sand
Day5 Warning tape 485,Sand bedding. bedding.

Warning tape, HDPE & Bedding,


Crown, Finishing Crowning, Finishing RS 485,Sand
Day6 works works bedding.

Warning tape,
Crowning, Finishing
Day7 works

Crown, Finishing
Day8 works

Day9
Block Y
D 300 Tr. A
Survey &
marking

Excavation,Dres
sing & sand Survey & marking,
bedding Day1 Excavation.

Dressing & sand


bedding, 1st Layer
1st dc cable, DC cable Laying,
1400 Sand Bedding. 1600 Day2 Cable dressing.

Excavation,Dres
2nd Layer DC sing & sand Sand bedding & 2nd
Cable Laying, bedding,1st dc layer DC cable
Cable dressing, cable, Sand laying, Cable
700 sand bedding. 900 Bedding. Day3 dressing

HDPE &
Bedding, RS Sand bedding ,
485,Sand HDPE & bedding, RS
bedding. Day4 485.

Warning tape,
Crowning, Sand bedding,
Finishing works Day5 Warning tape

Crown, Crown, Finishing


Finishing works Day6 works

Day7
Day8
Day9
B C D

Survey & Survey & Survey &


marking marking marking

Excavation,Dr
essing &
1800 sand bedding

Excavation,D Excavation,
1st dc cable, ressing & Dressing &
Sand sand sand
1200 Bedding. 1600 bedding bedding
2nd Layer DC
Cable Laying,
Cable
dressing, 1st dc cable, 1st dc cable,
sand Sand Sand
bedding. 900 Bedding. Bedding.

2nd Layer 2nd Layer


DC Cable DC Cable
Laying, Laying,
HDPE & Cable Cable
Bedding, RS dressing, dressing,
485,Sand sand sand
bedding. bedding. bedding.
Warning
tape, HDPE & HDPE &
Crowning, Bedding, RS Bedding, RS
Finishing 485,Sand 485,Sand
works bedding. bedding.

Warning Warning
tape, tape,
Crowning, Crowning,
Finishing Finishing
works works
Crown, Crown,
Finishing Finishing
works works