Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Service equipment in workshop Operator, Interaction with people Fatality, Permanent 3 4 12 ADM 1. Speed limit 1 4 4 ADM Traffic management plan
Mechanic disability, Long term
absence due to treatment
ADM 2. Completed checklist ADM Road / speed signs
EL/SUB 3. Wear safety belt ADM SIMPER
Spotting equipment into workshop Spotter, Blind spot and than Fatality, Permanent 3 4 12 ADM 1. Spotter be visible for operation 1 4 4
Operator, Collision / interaction with disability, Long term
Mechanic people absence due to treatment
ENG/SEG 2. Clear bay of tools
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified 12 4
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Service equipment Mechanic, Hot parts and liquids Permanent disability, Long 2 2 4 ADM 1. Only are OEM parts / oil / coolent 2 2 4
Supervisor term absence due to
treatment
EL/SUB 2. Use drip trap to drain liquid
(Exct / coolant)
EL/SUB 3. Allow components to cool off
before working
EL/SUB 4. Release pleasure in cooling
system before working
EL/SUB 5. Release hyd presure before
removing any components
PPE 6. Use PPE
EL/SUB 7. Use ladder if required to work an
efficient level
ADM 8. Inspect all tools / hand tools or
equipment before use
BHV 9. Good communication and
planning between works to ensure
all task are done safety
ADM 10. Good house keeping
BHV 11. Keep walk areas around
equipment clear of clean up oil / any
tripping hazard
EL/SUB 12. Use three contact point when
embark / disembark
ADM 13. Ensure all gourds / covers in
place
EL/SUB 14. All levels are toped up as
required
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
plan
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference