Civil / Structural Works Yes No NA


Masonry
I. General Requirements
1 Materials used are in good quality and in
approved specifications.
2 Materials are stored properly and neatly.
3 There is a stable source of clean water
for construction use.
4 Wall footing was carefully set and
reinforced as per plan.
5 Lintel beams are provided as specified in
the plan/shop drawings.
6 Stiffener columns are provided as
specified in the plan/shop drawings.
7 Shelf angles are provided as specified in
the plan/shop drawings.
8 Steel reinforcements are provided as
specified in the plan/shop drawings.
9 Steel reinforcements are tied properly
with the specified tie wires.
10 Proper control and expansion joints
and/or backer rod are provided.
11 Masonry units are properly placed and
aligned.
12 Spacing between masonry units are
observed and maintained as specified in
the plan.

II.Strength
1 Compressive strength of concrete masonry
units adheres to specifications set in
the plans.
2 Compressive strength of grout adheres to
the specifications set in the plans.
3 Tensile strength of steel reinforcements
adheres to the specifications set in the
plans.
4 Grout does not show excessive scratches
when scraped by a screw driver.
aa Page 1 of 6
5 Masonry wall does not move/vibrate
excessively when pushed or pounded.
6 Lintel beams do not exhibit bending or
sagging.
III. Aesthetics
1 Masonry walls are horizontally and
vertically plumb.
2 Concrete plaster does not exhibit a
"powdery" surface when rub with fingers.
3 Expansion joints are carefully sealed /
grouted.
Tiling Works
I. General Requirements
1 Materials used are in good quality and in
approved specifications.
2 Materials are stored properly and neatly.
3 There is a stable source of clean water
for construction use.
4
Tile grout and adhesive used adhered to
the specifications set in the plan/shop
drawings.
5 Tiles are spaced appropriately as
required in the plan/shop drawings.
6
Tile type, brand, origin, type of joint
and physical sample made available to the
client.
II. Strength
1 Tiles are properly set with the correct
mixture and thickness of topping.
2 Tile quality is the same or higher as
specified in the plan/shop drawings.
3 Tile adhesive additives are applied
appropriately as specified in the shop
drawings.

III. Aesthetics
1 Tiles are set in correct level as
specified in the plan/shop drawings.
2 Tile gradient done properly, water goes
to drain and does not exhibit ponding.
3 Tile trims are properly and neatly placed
as needed.
4 Tile are set neatly, without stains from
grout, adhesives, etc.
Ceiling Works
I. General Requirements
1 Materials used are in good quality and in
approved specifications.
2 Materials are stored properly and neatly.
3
Material specifications adheres to the
specifications set in the plan/shop
drawings.

aa Page 2 of 6
4 Appropriate manholes are provided for
checking and inspections.
II. Strength
1 Ceiling boards are properly anchored as
specified in the plan/shop drawings.
2 Ceiling boards are properly fastened to
its frame as specified in the plan/shop
drawings.
3 Ceiling boards and frame does not move
when touched or pressed.
4
5
III. Aesthetics
1 Ceiling boards are fastened neatly.
2 Edges and corners of the ceiling are completely flushed to the wall and withou
Architecture
I. General Requirements
1 Materials used are in good quality and in approved specifications.
2 Materials are stored properly and neatly.
3 Material specifications adheres to the specifications set in the plan/shop dra
II. General Architecture
1
2
3
Punchlists

aa Page 3 of 6
Format: Example
YYYYMMDD-### 20171227-001

aa Page 4 of 6
aa Page 5 of 6
to the wall and without openings.

t in the plan/shop drawings.

aa Page 6 of 6