0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
29 Ansichten1 Seite
The document is an undertaking by a student to complete their industrial/summer/vocational training according to Panjab University rules. The student agrees to: 1) undergo training as required, 2) finish training before the start of the next semester classes according to the academic calendar, and 3) submit required documents within the stipulated timeframe as per notice number 1696/PUSSGRC dated 04-05-2017. The student signs with their information to confirm the undertaking.
The document is an undertaking by a student to complete their industrial/summer/vocational training according to Panjab University rules. The student agrees to: 1) undergo training as required, 2) finish training before the start of the next semester classes according to the academic calendar, and 3) submit required documents within the stipulated timeframe as per notice number 1696/PUSSGRC dated 04-05-2017. The student signs with their information to confirm the undertaking.
The document is an undertaking by a student to complete their industrial/summer/vocational training according to Panjab University rules. The student agrees to: 1) undergo training as required, 2) finish training before the start of the next semester classes according to the academic calendar, and 3) submit required documents within the stipulated timeframe as per notice number 1696/PUSSGRC dated 04-05-2017. The student signs with their information to confirm the undertaking.
(Before leaving for 4 to 6 Week Industrial Training (CSE & IT)/ Summer Training (ECE)/Vocational Training (ME) after 4th / 6th semester)
I______________________________Roll. No._______________student of ________________
(branch/Semester) undertake that:
i. I will undergo training as per Panjab University rules.
ii. I will complete my training before commencement of classes of next semester as per PU academic calendar 2017-18 (i.e. before 10-07-2017). iii. I will submit required documents as per notice no. 1696/PUSSGRC dated 04-05-2017 within the stipulated time.