SITE TEST REPORT Date :

Customer:
Contractor’s name: AL-OSAIS Co.
SEC-EOA
Name of substation: Construction of New 115/13.8kV Khudariyah SS Contract No. : 4400003554/00

GIS BUSBAR CONTACT RESISTANCE TEST Page 1 of 2


Panel No: E11 Equip. No.: Dwg. Ref.: Record No.:

Overall Contact Resistance for the Main Circuit

1. GENERAL DATA AND INFORMATION:

Bay No. E11


Make: ABB
Mechanism: EARTH SWITCH
Instrument MICRO OHM METER
Make / Model MOM 600A
Equipment Calibration due to 26-12-2017

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : Amr Antar Name : ________________
ID : OSA-001 ID :
SITE TEST REPORT Date :
Customer:
Contractor’s name: AL-OSAIS Co.
SEC-EOA
Name of substation: Construction of New 115/13.8kV Khudariyah SS Contract No. : 4400003554/00

GIS BUSBAR CONTACT RESISTANCE TEST Page 2 of 2


Panel No: E11 Equip. No.: Dwg. Ref.: Record No.:

2. Contact Resistance measurement of GIS:


Measuring Value is 1.2 of the Factory Value Test Current: 100A DC
Site Measured Value
(µ Ω)
BAY NO. Measuring Parts Remarks
R-PH Y-PH B-PH

K641 – A611 – K639


K641 – A611 – K639
K643 – D631 – A611 – K639
E11/ SPARE
K643 – D631 – A611 – K639
K641 – A611 – D629 – D623 – A609 – K633
K641 – A611 – D627 – D621 – A609 – K633

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer


Signature: ________________ Signature: ________________
Name : Amr Antar Name : ________________
ID : OSA-001 ID :