0 OPERATION PLAN
Finish
Process chart for dryer:
Finish
4.2 OPERATIONS LAYOUT
Office
Table
Door Storage room
Dryer Sink
Smart-card
topup machine
Massage chair
Table Washer
Vending machine
Good operation planning is important to make sure that the business is able to produce output
that fulfill sales forecast. In operation planning, the business will determine how much output to
produce for a certain period of time such as in a day, a week or a month.
= 15000 units
Material planning is done to determine the type and amount of raw materials need for the
business operation. The first step in material planning is to identify and list down the raw
materials. For our laundry business, the materials that we need are detergent and softener. Since
there will also a vending machine in our laundry, we also need to estimate the amount of drinks
that need to be purchased.
Next, we need to prepare the bills of materials that will contains a complete list of materials,
parts or components and the amount needed for our business operation. The bills of materials will
be as follows:
Safety Price /
Total Material Total price
Material Quantity unit
Stock Requirement (RM)
(RM)
Total 1520.00
4.5 MACHINE & EQUIPMENT PLANNING
The business’ machine and equipment requisition planning schedule will be as follows:
Once the business's operations have been planned, the expenses associated with the
operation of the business can be developed. These are usually referred to as overhead
expenses. Overhead requirement or expenses refer to all non-labor expenses required to
operate the business. Expenses can be divided into fixed which is those that must be paid,
usually at the same rate, regardless of the volume of business and variable, those which change
according to the amount of business.
Overhead requirement for Hippo laundry include the following:
MONTHLY
ITEM FIXED ASSET OTHER EXPENSES
EXPENSES
Machine and equipment RM 239330.00
Furniture and Fittings RM 1470.00
Shop renovation RM 3000.00
Piping and plumbing RM 1500.00
Electric wiring RM 2500.00 RM 1520.00
Raw materials RM 1529.50
Wages + EPF + SOCSO RM 5000.00
Utilities RM 2800.00
Maintenance RM 300
Shop rent RM 4500.00
Deposit for rent RM 1000.00
Deposit for utilities
Incorporation of Business