Sie sind auf Seite 1von 3

1 SUMMARY INFORMATION CONTRAM 5.09 (11.12.

89) RUN ON 15/ 7/12

PEMBEBANAN PERJALANAN KOTA IMAJINER


PEMBEBANAN PERJALANAN KOTA IMAJINER
PEMBEBANAN PERJALANAN KOTA IMAJINER
ITERATION NUMBER 3
TIME SLICES :
1
700 800
TOTALS
0 JOURNEY-TIME (VEH-H)
0FREEMOVING 223.4 223.4
FLOW DELAY .0 .0
QUEUEING 22.2 22.2
TOTAL 245.6 245.6
0WARNING: 16 PACKETS WERE DELAYED BEYOND THE END OF THE FINAL TIME SLICE ( SEE EXCESS TRAVEL TIME TABLE ) - CHECK DATA
WARNING+ TOTAL EXCESS TIME OF 12.82 (VEH-H) IS INCLUDED IN JOURNEY TIME FIGURES

0 DISTANCE TRAVELLED (VEH-KM)


0 12673.6 12673.6

0 OVERALL NETWORK SPEED (KM/H)


0 51.6 51.6

0 TOTAL FINAL QUEUES (VEH)


0 22.5 22.5
0

0 FUEL CONSUMPTION (LITRES)


0TRAVELLING 1345.1 1345.1
QUEUEING 53.1 53.1
TOTAL 1398.2 1398.2

0 TOTAL LINK COUNTS (VEH)


0ARRIVALS 7788 7788
PCU FACTOR 1.05 1.05
STOPS 1772 1773
% STOPPED 22.8 22.8
0PACKET SIZE WITHIN EACH O-D MOVEMENT IS VARIABLE ROUTES AND ROUTE MEMORY:
TOTAL NUMBER OF PACKETS ENTERING THE NETWORK 198 MEAN LINKS PER ROUTE 3.09
TOTAL NUMBER OF VEHICLES 2520 WORDS AVAILABLE 102711 ( OUT OF 102711 )
TOTAL NUMBER OF PCUS 2642 USED PER ITERATION 99
MEAN PCU FACTOR 1.05 CODONS PER WORD 10
1 CONVERGENCE MONITOR - SUMMARIES OF JOURNEY-TIMES, DISTANCES AND CHANGES - FOR ALL ITERATIONS RUN ON 15/ 7/12

PEMBEBANAN PERJALANAN KOTA IMAJINER


PEMBEBANAN PERJALANAN KOTA IMAJINER
PEMBEBANAN PERJALANAN KOTA IMAJINER
ITERATION NUMBER 3
TIME SLICES :
1
700 800
ITN.
TOTAL JOURNEY-TIME (VEH-H) NO.

243 0 0 0 0 0 0 0 0 0 0 0 0 243 1
246 0 0 0 0 0 0 0 0 0 0 0 0 246 2
246 0 0 0 0 0 0 0 0 0 0 0 0 246 3

TOTAL DISTANCE TRAVELLED (VEH-KM)

12674 0 0 0 0 0 0 0 0 0 0 0 0 12674 1
12674 0 0 0 0 0 0 0 0 0 0 0 0 12674 2
12674 0 0 0 0 0 0 0 0 0 0 0 0 12674 3

ITN.NO. RMS LINK DEMAND CHANGES ( ARRIVALS PLUS INITIAL QUEUES (VEH) ) TOTAL ITN.

1 591 0 0 0 0 0 0 0 0 0 0 0 0 591 1
2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
1 LINK-BY-LINK VALUES IN TIME SLICE 1 - FOR TRAFFIC AND ECONOMIC ASSESSMENTS RUN ON 15/ 7/12

PEMBEBANAN PERJALANAN KOTA IMAJINER


PEMBEBANAN PERJALANAN KOTA IMAJINER
PEMBEBANAN PERJALANAN KOTA IMAJINER
0TIME SLICE 1 START 700 FINISH 800 DURATION 60 MINUTES *EXCESS* ITERATION NUMBER 3

LINK LINK MEAN ARRIVALS DEPART MEAN THRU- MEAN ARR/ MEAN-TIME TOTAL-TIME-&-DELAY OCCUP- AV. JUNC.---SIGNAL----
NO. ENTRY INIT. BY CLASS FROM FINAL PUT PCU CAP PER VEHICLE FREE- FLOW- QUEUE ANCY// SPEED NO. GREEN: O LINK
AND FLOW QUEUE C B L QUEUE QUEUE CAP/Y FACTOR (RHO) TOTAL QUEUE MOV/G DELAY -ING STOPS CYCLE P -ING
TYPE (VEH) (VEH) (VEH) (VEH) (VEH) (VEH) (SEC) (SEC) (VEH-H) (%//%) (KM/H) (SEC) T (%)

211S 135 107 6 22 134 1.2 879 1.05 .15 157 30 4.76 1.13 0 67 50.0 21 60:155
212S 577 459 25 93 571 6.3 880 1.05 .66 166 39 20.33 6.25 1 87 47.3 21 60:155
213S 392 312 17 63 388 3.9 800 1.05 .49 290 35 27.73 3.81 1 80 50.0 21 60:155
214S 248 197 11 40 246 2.3 799 1.05 .31 276 33 16.75 2.27 0 73 52.5 21 60:155
215S 594 472 27 95 587 7.3 672 1.05 .88 87 44 7.14 7.27 6 95 30.9 21 60:155
216S 167 133 7 27 166 1.5 671 1.05 .25 79 32 2.20 1.48 1 71 34.0 21 60:155
511U 1171 931 52 188 1171 2273 1.05 .52 268 87.33 54.0 51
512U 235 187 10 38 235 2272 1.05 .10 6 .41 58.0 51
513U 640 509 28 103 640 2272 1.05 .28 6 1.13 56.6 51
521U 433 343 20 70 433 2272 1.05 .19 98 11.83 51.2 52
522U 743 591 33 119 743 2273 1.05 .33 6 1.31 56.6 52
523U 663 527 29 107 663 2272 1.05 .29 6 1.17 56.5 52
531U 915 727 41 147 915 2273 1.05 .40 156 39.76 58.9 53
532U 261 207 12 42 261 2272 1.05 .11 6 .46 56.5 53
533U 614 489 26 99 614 2272 1.05 .27 6 1.09 56.6 53
0TOTAL TIMES BY VEHICLE CLASS C B L TOTAL FLAGS: R = REDUCED CAPACITY
* = RHO EXCEEDING 90%
(VEH-H) FREEMOVING 168.00 11.24 44.16 223.40 ** = RHO 100% OR GREATER
FLOW DELAY 0.00 0.00 0.00 0.00 F = FULL LINK
QUEUEING 17.67 0.98 3.57 22.22 S = OPTIMISED SPLITS
TOTAL 185.66 12.22 47.73 245.61 C = OPTIMISED CYCLE & SPLITS
TOTAL DISTANCES
NOTE: FOR FULL DEFINITIONS OF THE
(VEH-KM) TRAVELLING 10073.8 561.7 2038.2 12673.6 COLUMN HEADINGS SEE USER GUIDE

TOTAL FUEL CONSUMPTION TOTAL LINK COUNTS (VEH)

(LITRES) TRAVELLING 722.64 138.90 483.57 1345.11 ARRIVALS 7788.0


QUEUEING 20.26 7.09 25.75 53.10 STOPS 1771.8
TOTAL 742.90 145.99 509.31 1398.21 % STOPPED 22.75
1 LINK-BY-LINK ALL-TIME-SLICES - ARRIVALS (VEH/H) RUN ON 15/ 7/12

Das könnte Ihnen auch gefallen