Sie sind auf Seite 1von 61

Associated Constructors Limited

TRI PPACK FILMS PROJECT


Estimated Quantity Summery of Different Components R

1200 1800 2400 600 Internal


900 Infill 1200 Infill Drop Fork 600 Tie 900 Tie 1200 Tie 1800 Tie
Slab Description Deck Deck Deck Infill Beam
Beam Beam Head Head Bracing Bracing Bracing Bracing
Beam Beam Beam Beam Bracket

PTB Main Plant , Slab From


Grid 8 ~ 10/A ~ C at EL-5.454 30 16 324 100 720 250 70 160 100
M

PTB Main Plant , Slab From


4 10 342 114 640 240 150 120 60
Grid 1 ~ 8/D ~ E at EL-5.35 M

Total 34 26 666 214 1360 490 220 280 160

Printed By:Muhammad Ali

1 of 61 376793817.xlsx / RMd Slab PTB 01/17/2018


onents Requirement

1470 1790 2350 2660 2730


2400 Tie Base Joint Pins 1500 2000
Coupler Coupler Coupler Coupler Coupler Remarks
Bracing Jacks (Spigots) Standard Standard
Bracing Bracing Bracing Bracing Bracing

Ref Dwg #
1300 250 500 500 100 100 100
490-A-S-19

Ref Dwg #
1200 240 480 480 100 100 100
490-A-S-17

2500 490 980 980 200 200 200

2 of 61 376793817.xlsx / RMd Slab PTB 01/17/2018


Associated Constructors Limited
TRI PPACK FILMS PROJECT
Estimated Quantity Summery of Different Components Requ

1200 1800 2400 Internal


Floor 600 Infill 900 Infill 1200 Infill Drop 600 Tie 900 Tie 1200 Tie 1800 Tie 2400 Tie
T.O.C Deck Deck Deck Fork Head Beam
Nos. Beam Beam Beam Head Bracing Bracing Bracing Bracing Bracing
Beam Beam Beam Bracket

9.000 60 100 130 220 120 20 200 450


2
9.000 100 100 300 60

5.000 42 20 60 30 75 225
M-2
5.000 100 45 200 60

5.500 18 5 75 16 16 160 70 150 20 20 70 25 290


M-1
5.500 150 150 200 150

4.000 70 20 120 39 30 230


1
4.000 0 50 50 200

18 65 287 16 186 560 259 400 95 50 990 225 1465

3 of 61 376793817.xlsx / RMd Slab Req 01/17/2018


Printed By:Muhammad Ali

4 of 61 376793817.xlsx / RMd Slab Req 01/17/2018


s Requirement

1470 1790 2350 2660 2730


Joint Pins 1500 2000
Base Jacks Coupler Coupler Coupler Coupler Coupler Remarks
(Spigots) Standard Standard
Bracing Bracing Bracing Bracing Bracing

120 480 480 Slab

100 265 350 Beam

30 60 60 0 150 40 5 Slab

100 70 Beam

70 140 140 150 70 Slab

70 70 0 140 70 70 40 5 Beam

42 85 90 70 100 50 Slab

40 40 90 40 15 Beam

532 1170 140 1120 70 290 330 130

5 of 61 376793817.xlsx / RMd Slab Req 01/17/2018


6 of 61 376793817.xlsx / RMd Slab Req 01/17/2018
Associated Constructors Limited
TRACKER TOWER PROJECT
Propping Height Schedule Under Beam Segment
Floor Heights Beam Thickness Corresponding Prop,s Height Required Appropriate Standards
Floor
Drophead
Nos. Height in Height in
Beam 1 Beam 2 Beam3 Beam 4 Prop 1 Prop 2 Prop 3 Prop 4 Standard -1 Standard -2
fts meter

Roof 35.00 10.667 - - - - - - - - - - -

29 17.67 5.386 0.610 - - - 0.667 4.109 - - - 1.982+1.982 -

28 17.67 5.386 0.610 0.457 - 0.914 0.667 4.109 4.261 - 3.804 1.982+1.982 1.982+1.982

27 17.67 5.386 0.610 0.457 - - 0.667 4.109 4.261 - - 1.982+1.982 1.982+1.982

26 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

25 17.67 5.386 0.610 0.457 - - 0.667 4.109 4.261 - - 1.982+1.982 1.982+1.982

24 8.83 2.691 0.610 0.457 - - 0.667 1.415 1.567 - - 0.990 1.486

23 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

22 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

21 13.25 4.038 0.610 0.457 - 0.914 0.667 2.762 2.914 - 2.457 1.486+0.990 1.486+0.990

20 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

19 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

18 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

17 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

16 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

15 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

14 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

13 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

12 13.25 4.038 0.610 0.457 - - 0.667 2.762 2.914 - - 1.486+0.990 1.486+0.990

11 15.92 4.852 0.610 0.457 - 1.524 0.667 3.576 3.728 - 2.661 1.486+1.982 1.486+1.982

7 of 61 376793817.xlsx / RMD Beams by Drop Head 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
Propping Height Schedule Under Beam Segment
Floor Heights Beam Thickness Corresponding Prop,s Height Required Appropriate Standards
Floor
Drophead
Nos. Height in Height in
Beam 1 Beam 2 Beam3 Beam 4 Prop 1 Prop 2 Prop 3 Prop 4 Standard -1 Standard -2
fts meter

10 15.00 4.572 0.610 0.457 - - 0.667 3.295 3.448 - - 1.486+1.486 1.486+1.486

9 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

8 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

7 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

6 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

5 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

4 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

3 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

2 10.34 3.151 0.610 0.457 - 0.762 0.667 1.875 2.027 - 1.723 1.486 1.486

1 10.34 3.151 0.610 0.457 0.914 0.762 0.667 1.875 2.027 1.570 1.723 1.486 1.486

Printed By:Muhammad Ali

8 of 61 376793817.xlsx / RMD Beams by Drop Head 01/17/2018


R TOWER PROJECT
hedule Under Beam Segment
Required Appropriate Standards Length (Combinations) Base Jack Adjustment
Remarks
Standard -3 Standard -4 Base 1 Base 2 Base 3 Base 4

- - - - - -

- - 0.145 - - -

- 1.486+1.982 0.145 0.297 - 0.336

- - 0.145 0.297 - -

- - 0.286 0.438 - -

- - 0.145 0.297 - -

- - 0.425 0.081 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- 1.982 0.286 0.438 - 0.475

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- - 0.286 0.438 - -

- 1.486+0.990 0.108 0.260 - 0.185

9 of 61 376793817.xlsx / RMD Beams by Drop Head 01/17/2018


R TOWER PROJECT
hedule Under Beam Segment
Required Appropriate Standards Length (Combinations) Base Jack Adjustment
Remarks
Standard -3 Standard -4 Base 1 Base 2 Base 3 Base 4

- - 0.323 0.476 - -

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

- 1.486 0.389 0.541 - 0.237

1.486 1.486 0.389 0.541 0.084 0.237

10 of 61 376793817.xlsx / RMD Beams by Drop Head 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJEC
Propping Height Schedule Under Bea
Floor Heights Beam Thickness Beam Thickness Fork Corresponding Prop,s
Slab
Floor Head+Timber
Levels in Height in Height in
Nos. Beam 1 Beam 2 Beam 3 Beam 1 Beam 2 Beam 3 Beam 4 Beam+Runner Prop 1 Prop 2
fts fts meter 340+25+100

Roof 35.00 10.667 - - - - - - -

29 378.99 17.67 5.386 2 - - 0.610 - - - 0.465 4.311 -

28 361.32 17.67 5.386 2 1.5 3 0.610 0.457 - 0.914 0.465 4.311 4.463

27 343.65 17.67 5.386 2 1.5 - 0.610 0.457 - - 0.465 4.311 4.463

26 325.98 13.25 4.038 2 1.5 - 0.610 0.457 - - 0.465 2.964 3.116

25 312.73 17.67 5.386 2 1.5 - 0.610 0.457 - - 0.465 4.311 4.463

24 295.06 8.83 2.691 2 1.5 - 0.610 0.457 - - 0.465 1.617 1.769

23 286.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

22 273.23 13.00 3.962 2.5 0 - 0.762 0.000 - - 0.465 2.735 0.000

21 260.23 13.00 3.962 2 1.5 3 0.610 0.457 - 0.914 0.465 2.888 3.040

20 247.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

19 234.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

18 221.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

17 208.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

16 195.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

15 182.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

14 169.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

13 156.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

12 143.23 13.00 3.962 2 1.5 - 0.610 0.457 - - 0.465 2.888 3.040

11 of 61 376793817.xlsx / RMD Timber Beams by Fork Head 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJEC
Propping Height Schedule Under Bea
Floor Heights Beam Thickness Beam Thickness Fork Corresponding Prop,s
Slab
Floor Head+Timber
Levels in Height in Height in
Nos. Beam 1 Beam 2 Beam 3 Beam 1 Beam 2 Beam 3 Beam 4 Beam+Runner Prop 1 Prop 2
fts fts meter 340+25+100

11 130.23 17.92 5.462 2 2.083 2.33 5 0.610 0.635 0.710 1.524 0.465 4.387 4.362

10 112.31 16.00 4.877 2 1.5 - 0.610 0.457 - - 0.465 3.802 3.954

9 96.31 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

8 85.97 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

7 75.63 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

6 65.29 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

5 54.95 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

4 44.61 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

3 34.27 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

2 23.93 10.34 3.151 2 1.5 2.5 0.610 0.457 - 0.762 0.465 2.077 2.229

1 13.59 10.34 3.151 2 1.500 3.000 2.5 0.610 0.457 0.914 0.762 0.465 2.077 2.229

0 3.25 10.34 3.151


410.74 125.19

Printed By:Muhammad Ali

12 of 61 376793817.xlsx / RMD Timber Beams by Fork Head 01/17/2018


R TOWER PROJECT
chedule Under Beam Segment
Corresponding Prop,s Height Required Appropriate Standards Length (Combinations) Base Jack Adjustment
Remarks
Prop 3 Prop 4 Standard -1 Standard -2 Standard -3 Standard -4 Base 1 Base 2 Base 3 Base 4

- - - - - - - - - -

- - 1.982+1.982 - - - 0.347 - - -

- 4.006 1.982+1.982 1.982+1.982 - 1.982+1.486 0.347 0.499 - 0.538

- - 1.982+1.982 1.982+1.982 - - 0.347 0.499 - -

- - 1.486+0.990 1.486+1.486 - - 0.488 0.144 - -

- - 1.982+1.982 1.982+1.982 - - 0.347 0.499 - -

- - 1.486 1.486 - - 0.131 0.283 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.259 0.000 - -

- 2.583 1.486+0.990 1.486+1.486 - 1.486+0.990 0.412 0.068 - 0.107

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

- - 1.486+0.990 1.486+1.486 - - 0.412 0.068 - -

13 of 61 376793817.xlsx / RMD Timber Beams by Fork Head 01/17/2018


R TOWER PROJECT
chedule Under Beam Segment
Corresponding Prop,s Height Required Appropriate Standards Length (Combinations) Base Jack Adjustment
Remarks
Prop 3 Prop 4 Standard -1 Standard -2 Standard -3 Standard -4 Base 1 Base 2 Base 3 Base 4

- 3.473 1.982+1.982 1.982+1.486 - 1.486+1.486 0.423 0.398 - 0.501

- - 1.486+1.486 1.486+1.982 - - 0.830 0.486 - -

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

- 1.925 1.982 1.982 - 1.486 0.095 0.247 - 0.439

1.772 1.723 1.982 1.982 1.486 1.486 0.095 0.247 0.286 0.237

14 of 61 376793817.xlsx / RMD Timber Beams by Fork Head 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
Propping Height Schedule Under Beam Segment By Fork Head
Floor Heights Beam Thickness Fork Corresponding Prop,s Height Required Appropriate Standa
Floor Head+Steel
Nos. Height in Height in Beam+Runner
Beam 1 Beam 2 Beam 4 Beam 3 490+58+100 Prop 1 Prop 2 Prop 4 Prop 3 Standard -1
fts meter

Roof 35.00 10.667 - - - - - - - - - -

29 17.67 5.386 0.610 - - - 0.648 4.128 - - - 1.982+1.982

28 17.67 5.386 0.610 0.457 - 0.914 0.648 4.128 4.280 - 3.823 1.982+1.982

27 17.67 5.386 0.610 0.457 - - 0.648 4.128 4.280 - - 1.982+1.982

26 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

25 17.67 5.386 0.610 0.457 - - 0.648 4.128 4.280 - - 1.982+1.982

24 8.83 2.691 0.610 0.457 - - 0.648 1.434 1.586 - - 0.990

23 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

22 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

21 13.25 4.038 0.610 0.457 - 0.914 0.648 2.781 2.933 - 2.476 1.486+0.990

20 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

19 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

18 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

17 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

16 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

15 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

14 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

13 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

12 13.25 4.038 0.610 0.457 - - 0.648 2.781 2.933 - - 1.486+0.990

15 of 61 376793817.xlsx / RMD Steel Beams by Fork Head 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
Propping Height Schedule Under Beam Segment By Fork Head
Floor Heights Beam Thickness Fork Corresponding Prop,s Height Required Appropriate Standa
Floor Head+Steel
Nos. Height in Height in Beam+Runner
Beam 1 Beam 2 Beam 4 Beam 3 490+58+100 Prop 1 Prop 2 Prop 4 Prop 3 Standard -1
fts meter

11 15.92 4.852 0.610 0.457 - 1.524 0.648 3.595 3.747 - 2.680 1.486+1.982

10 15.00 4.572 0.610 0.457 - - 0.648 3.314 3.467 - - 1.486+1.982

9 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

8 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

7 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

6 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

5 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

4 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

3 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

2 10.34 3.151 0.610 0.457 - 0.762 0.648 1.894 2.046 - 1.742 1.486

1 10.34 3.151 0.610 0.457 0.914 0.762 0.648 1.894 2.046 1.589 1.723 1.486

Printed By:Muhammad Ali

16 of 61 376793817.xlsx / RMD Steel Beams by Fork Head 01/17/2018


ent By Fork Head
ired Appropriate Standards Length (Combinations) Base Jack Adjustment
Remarks
Standard -2 Standard -4 Standard -3 Base 1 Base 2 Base 4 Base 3

- - - - - - -

- - - 0.164 - - -

1.982+1.982 - 1.982+1.486 0.164 0.316 - 0.355

1.982+1.982 - - 0.164 0.316 - -

1.486+0.990 - - 0.305 0.457 - -

1.982+1.982 - - 0.164 0.316 - -

0.990 - - 0.444 0.100 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - 1.982 0.305 0.457 - 0.494

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

1.486+0.990 - - 0.305 0.457 - -

17 of 61 376793817.xlsx / RMD Steel Beams by Fork Head 01/17/2018


ent By Fork Head
ired Appropriate Standards Length (Combinations) Base Jack Adjustment
Remarks
Standard -2 Standard -4 Standard -3 Base 1 Base 2 Base 4 Base 3

1.982+1.486 - 1.486+0.990 0.127 0.279 - 0.204

1.486+1.486 - - 0.342 0.495 - -

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 - 1.486 0.408 0.064 - 0.256

1.982 1.486 1.486 0.408 0.064 0.103 0.237

18 of 61 376793817.xlsx / RMD Steel Beams by Fork Head 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
M-K 100 Bracket Height Schedule
Floor Heights Wall W-1 Wall W-2 Wall W-3 Wall W-4 External Part Are
Floor
Nos. Height in Height in MK-100 MK-100 Jump form MK-100 Jump form MK-100 Bracket MK-100
Qty Qty Qty Qty
fts meter Bracket Type Bracket Type Bracket Bracket Type Bracket Type Bracket Type

28 ~ 29 17.67 5.386 - - Large-3 14 - 8 - - Large-3

27 ~ 28 17.67 5.386 - - Large-3 14 - 8 - - Large-3

26 ~ 27 17.67 5.386 Large-3 26 Large-3 14 - 8 - - Large-3

25 ~ 26 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

24 ~ 25 17.67 5.386 Large-3 26 Large-3 14 - 8 - - Large-3

23 ~ 24 8.83 2.691 Tiny-2 26 Tiny-2 14 - 8 - - Tiny-2

22 ~ 23 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

21 ~ 22 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

20 ~ 21 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

19 ~ 20 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

18 ~ 19 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

17 ~ 18 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

16 ~ 17 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

15 ~ 16 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

14 ~ 15 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

13 ~ 14 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

12 ~ 13 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

11 ~ 12 13.25 4.038 Large-1 26 Large-1 14 - 8 - - Large-1

10 ~ 11 15.92 4.852 Large-2 26 Large-2 11 - 8 - - Large-2

19 of 61 376793817.xlsx/ Mix Bracket 01/17/2018


9 ~ 10 15.00 4.572 Large-2 26 Large-2 9 - 8 - - Large-2

8~9 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

7~8 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

6~7 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

5~6 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

4~5 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

3~4 10.34 3.151 Standard 16 Tiny-1 6 10 Standard 4 2 Standard 4 Standard

2~3 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

1~2 10.34 3.151 Standard 16 Standard 6 10 Standard 4 2 Standard 4 Standard

0~1

20 of 61 376793817.xlsx/ Mix Bracket 01/17/2018


Anchor Screw SUMMERY
Max Length
Type MK-100 Type Qty Req Floors Used Note
Use mm

140 mm Tiny-1 3132 6 1


These additional Brackets are
140 mm Tiny-2 3000 82 1 required at Column Corners for
Slab Formwork Quantity of Bracket
140 mm Standard 3650 83 9 May be Reduce due to Reeducation

249
in Floor Area at upper Floor Levels
140 mm Large-1 4440 82 13 it subjected to Drawings variation in
future
140 mm Large-2 5328 79 2

140 mm Large-3 5836 82 4

Jump form

36
200 mm Standard 12
Bracket

21 of 61 376793817.xlsx/ Mix Bracket 01/17/2018


REV-3

Part Area At Grid H/9~8 MK-100 at Jump form


Corner of MK-100 Total Bracket
MK-100 Column for Slab Floor Wise
Remarks
Qty Qty Total Floor
Bracket Type Form work Wise

26 Large-3 10 16 66 8 Roof

26 Large-3 10 16 66 8

26 Large-3 10 16 92 8 Wall-1 End

26 Large-1 10 16 92 8

26 Large-3 10 16 92 8

26 Tiny-2 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-1 10 16 92 8

26 Large-2 10 16 89 8

22 of 61 376793817.xlsx/ Mix Bracket 01/17/2018


26 Large-2 10 16 87 8

37 Standard 7 16 90 12 Wall-4 End

37 Standard 10 16 93 12

37 Standard 7 16 90 12

37 Standard 10 16 93 12

37 Standard 7 16 90 12
Wall-2 Thickness
37 Standard 10 16 93 12 change

37 Standard 7 16 90 12

37 Standard 10 16 93 12

Ground Floor

23 of 61 376793817.xlsx/ Mix Bracket 01/17/2018


Angel Lenth

(518)

(650)

790

1,678

2,186

24 of 61 376793817.xlsx/ Mix Bracket 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
M-K 100 Bracket Height Schedule
Floor Heights Wall W-1 Wall W-2 Wall W-3 Wall W-4
Floor
Nos. Height in Height in MK-100 MK-100 Jump form MK-100 MK-100 Bracket
Qty Qty Qty Qty Qty
fts meter Bracket Type Bracket Type Bracket Bracket Type Type

28 ~ 29 17.67 5.386 - - Large-3 14 Large-3 6 - -

27 ~ 28 17.67 5.386 - - Large-3 14 Large-3 6 - -

26 ~ 27 17.67 5.386 Large-3 26 Large-3 14 Large-3 6 - -

25 ~ 26 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

24 ~ 25 17.67 5.386 Large-3 26 Large-3 14 Large-3 6 - -

23 ~ 24 8.83 2.691 Tiny-2 26 Tiny-2 14 Tiny-2 6 - -

22 ~ 23 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

21 ~ 22 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

20 ~ 21 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

19 ~ 20 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

18 ~ 19 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

17 ~ 18 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

16 ~ 17 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

15 ~ 16 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

14 ~ 15 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

13 ~ 14 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

12 ~ 13 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

11 ~ 12 13.25 4.038 Large-1 26 Large-1 14 Large-1 6 - -

10 ~ 11 15.92 4.852 Large-2 26 Large-2 8 Large-2 6 - -

25 of 61 376793817.xlsx/ MK100 01/17/2018


9 ~ 10 15.00 4.572 Large-2 26 Large-2 6 Large-2 6 - -

8~9 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4

7~8 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4

6~7 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4

5~6 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4

4~5 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4


3~4 10.34 3.151 Standard 16 Tiny-1 18 Standard 6 Standard 4
2~3 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4

1~2 10.34 3.151 Standard 16 Standard 18 Standard 6 Standard 4

0~1 10.34 3.151 Standards 16 Standard 18 Standard 6 Standard 4

26 of 61 376793817.xlsx/ MK100 01/17/2018


SUMMERY Remarks

Length
MK-100 Type Length Fts Qty Req Floors Used
mm
Length
Tiny-1 3132 10'-4" 18 1
Change
Length
Tiny-2 3000 9'-10" 62 1
Change
Standard 3650 11'-11.97" 97 9

Large-1 4440 14'-6.81" 78 13

Large-2 5328 17'-5.75" 72 2

Large-3 5836 19'-1.75" 62 4

27 of 61 376793817.xlsx/ MK100 01/17/2018


REV-2

External Part Area MK-100 at


Corner of Total Floor
MK-100 Column for Slab
Remarks
Qty Wise
Bracket Type Form work

Large-3 26 16 62 Roof

Large-3 26 16 62

Large-3 26 16 88

Large-1 26 16 88

Large-3 26 16 88

Tiny-2 26 16 88

Large-1 26 16 88 Wall-1 End

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-1 26 16 88

Large-2 26 16 82

28 of 61 376793817.xlsx/ MK100 01/17/2018


Large-2 26 16 80

Standard 37 16 97 Wall-4 End

Standard 37 16 97

Standard 37 16 97

Standard 37 16 97

Standard 37 16 97
Wall-2 Thickness
Standard 37 16 79
change
Standard 37 16 97

Standard 37 16 97

Standard 37 16 97 Ground Floor

29 of 61 376793817.xlsx/ MK100 01/17/2018


Note

These additional Brackets are required


at Column Corners for Slab Formwork
Quantity of Bracket May be Reduce
due to Reeducation in Floor Area at
upper Floor Levels it subjected to
Drawings variation in future

30 of 61 376793817.xlsx/ MK100 01/17/2018


Associated Constructors Limited
Indus Hospital PROJECT
Summery of Different Components Required in Form-work For Retaining Wall ( assume poure length is 7.8X3 + 2.6

Plastic Sleeve
Net Wall Water Weller Re-usable PVC Pipe Push Anchor
Description Soildure GTX Clamp Wing Nut for water
Height Stoper Plates Cones Slave Pull Prop Screw Bolt
Stoper

For wall (Grid N192.9/ E 71.8, ~


3.600 48 1248 120 240 240 240 240 120 24 24
E103.0 incl L/3

For Striping Corenr 3.600 48

Total 48 1248 120 240 288 240 240 120 24 24

31 of 61 376793817.xlsx / Retaining Wall (2) 01/17/2018


Associated Constructors Limited
Indus Hospital PROJECT
Summery of Different Components Required in Form-work For Retaining Wall ( assume poure length is 7.8X3 + 2.6

Plastic Sleeve
Net Wall Water Weller Re-usable PVC Pipe Push Anchor
Description Soildure GTX Clamp Wing Nut for water
Height Stoper Plates Cones Slave Pull Prop Screw Bolt
Stoper

Printed By:Muhammad Ali

32 of 61 376793817.xlsx / Retaining Wall (2) 01/17/2018


X3 + 2.6 = 26 m )

Lifting Walk Way


Remarks
Plates Bracket

18 18

18 18

33 of 61 376793817.xlsx / Retaining Wall (2) 01/17/2018


Associated Constructors Limited
TRACKER TOWER PRO
Soldiur Height Schedu
Floor Heights Soldiur Height Wall W-1 Wall W-2 Wall W-3 Wall W-4
Floor Slab
Height in Height in Diff
Nos. Thickness Standered Segment-1 Segment-2 Steel Steel Super Slim Steel Super Slim Steel
fts meter 3600mm Soldiur Soldiur Soldier Soldiur Soldier Soldiur

28 ~ 29 17.67 5.386 0.229 3.600 0.900 0.900 0.243 - 23 10 7 8 -

27 ~ 28 17.67 5.386 0.229 3.600 0.900 0.900 0.243 - 23 10 7 8 -

26 ~ 27 17.67 5.386 0.229 3.600 0.900 0.900 0.243 45 23 10 7 8 -

25 ~ 26 13.25 4.038 0.229 3.600 0.900 - 0.691 45 23 10 7 8 -

24 ~ 25 17.67 5.386 0.229 3.600 0.900 0.900 0.243 45 23 10 7 8 -

23 ~ 24 8.83 2.691 0.229 3.600 - - 1.138 45 23 10 7 8 -

22 ~ 23 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

21 ~ 22 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

20 ~ 21 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

19 ~ 20 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

18 ~ 19 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

17 ~ 18 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

16 ~ 17 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

15 ~ 16 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

14 ~ 15 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

13 ~ 14 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

12 ~ 13 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

11 ~ 12 13.25 4.038 0.229 3.600 - 0.600 0.391 45 23 10 7 8 -

10 ~ 11 15.92 4.852 0.229 3.600 0.900 0.600 0.477 45 30 10 7 8 -

9 ~ 10 15.00 4.572 0.229 3.600 0.900 - 0.157 45 30 10 7 8 -


34 of 61 376793817.xlsx/ Mix Soldiur 01/17/2018
8~9 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

7~8 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

6~7 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

5~6 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

4~5 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

3~4 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

2~3 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

1~2 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

0~1 10.34 3.151 0.229 3.600 - - 0.678 45 30 10 14 7 8

Steel Soldier Req Plates Super Slim Soldier Req Plates


No of Peace/ Total no of Required Attached Balance No of Peace/ Total no of Required Attached
Type Type
Soldiur Soldiur Peace Plates Plates Plates Soldiur Soldiur Peace Plates Plates
900 38 4 152 304 76 228 900 9 4 36 72 18

600 14 6 84 168 28 140 600 3 6 18 36 6

368

35 of 61 376793817.xlsx/ Mix Soldiur 01/17/2018


REV-2
WER PROJECT
ht Schedule
Steel Net total Required inside out side Net total Required
Super Slim
Soldier
Soldier Total Remarks
Total Floor 3600mm 900mm 600mm Set Pins Bolts Bolts 3600mm 900mm 600mm
Floor Wise
Wise

30 30 60 - 240 18 18 36 - 144 Roof

30 30 60 - 240 18 18 36 - 144

75 75 150 - 600 18 18 36 - 144 Wall-1 End


Due to
75 75 150 - 600 18 18 36 - 144 speed of
Work
75 75 150 - 600 18 18 36 - 144

75 75 - - - 18 18 - - -

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

75 75 - 75 300 18 18 - 18 72

82 82 82 82 656 18 18 18 18 144

82 82 82 - 328 18 18 18 - 72
36 of 61 376793817.xlsx/ Mix Soldiur 01/17/2018
97 97 - - - 17 17 - - - Wall-4 End

97 97 - - - 17 17 - - -

97 97 - - - 17 17 - - -

97 97 - - - 17 17 - - -

97 97 - - - 17 17 - - -

97 97 - - - 17 17 - - -

97 97 - - - 17 17 - - -

97 97 - - - 17 17 - - -
Ground
97 97 - - - 98 42 17 17 - - -
Floor

SUMMERY Max Nos. Required SUMMERY Max Nos. Required


Length 3600 900 600 Length 3600 900 600

Nos. 97 150 82 Nos. 18 36 18

Balance
Plates
54

30

84

37 of 61 376793817.xlsx/ Mix Soldiur 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
Soldiur Height Schedule
Floor Heights Soldiur Height Wall W-1 Wall W-2 Wall W-3 Wall W-4 Net total Re
Floor Slab Total Floor
Height in Height in Diff
Nos. Thickness Standered Segment-1 Segment-2 Qty Qty Qty Qty Wise by 3600mm
fts meter 3600mm

28 ~ 29 17.67 5.386 0.229 3.600 0.900 0.900 0.243 - 37 14 - 51 51

27 ~ 28 17.67 5.386 0.229 3.600 0.900 0.900 0.243 - 37 14 - 51 51

26 ~ 27 17.67 5.386 0.229 3.600 0.900 0.900 0.243 45 37 14 - 96 96

25 ~ 26 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

24 ~ 25 17.67 5.386 0.229 3.600 0.900 0.900 0.243 45 37 14 - 96 96

23 ~ 24 8.83 2.691 0.229 3.600 - - 1.138 45 37 14 - 96 96

22 ~ 23 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

21 ~ 22 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

20 ~ 21 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

19 ~ 20 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

18 ~ 19 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

17 ~ 18 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

16 ~ 17 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

15 ~ 16 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

14 ~ 15 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

13 ~ 14 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

12 ~ 13 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

11 ~ 12 13.25 4.038 0.229 3.600 - 0.600 0.391 45 37 14 - 96 96

10 ~ 11 15.92 4.852 0.229 3.600 0.900 0.600 0.477 45 37 14 - 96 96

9 ~ 10 15.00 4.572 0.229 3.600 0.900 - 0.157 45 37 14 - 96 96

38 of 61 376793817.xlsx/ Soldiur 01/17/2018


8~9 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

7~8 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

6~7 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

5~6 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

4~5 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

3~4 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

2~3 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

1~2 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

0~1 10.34 3.151 0.229 3.600 - - 0.678 45 37 20 8 110 110

SUMMERY Max Nos. Required


ignored in calculatation
Length 3600 900 600

Nos. 110 192 92

Peace/ Total no of Required Attached Ball


Type No of Soldiur
Soldiur Peace Plates Plates Plates
900 48 4 192 384 96 288

600 16 6 96 192 32 160

448

39 of 61 376793817.xlsx/ Soldiur 01/17/2018


Net total Required
Remarks
900mm 600mm

102 - Roof

102 -

192 - Wall-1 End

- 96

192 -

- -

- 96

- 96

- 96

- 96

- 96

- 96

- 96

- 96

- 96

- 96

- 96

- 96

96 96

96 -

40 of 61 376793817.xlsx/ Soldiur 01/17/2018


- - Wall-4 End

- -

- -

- -

- -

- -

- -

- -

- - Ground Floor

d in calculatation only Click Clack Area.

41 of 61 376793817.xlsx/ Soldiur 01/17/2018


Associated Constructors Limited
Indus Hospital TIH PH1-STR (C&S)
Summery of Different Components Required in Form-work For Slab for ECOL Block
Standards to be used
Slab Slab Slab H-20+100mm Corresponding Required
Base Jack
Floor Nos. Levels Height Thickness Lumber+ 18mm Prop's Height Appropriate Jack
Adjustment
in M in M in mm Ply Wood in M (mm) 1982 1486 990 Adjustment

OHWT 95700 2750 300.000 0.318 2132.00 1 - - (150) 50.000

Mech Room 92950 2550 300.000 0.318 1932.00 - 1 - (446) 246.000

F-26/Roof 90400 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-25 87200 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-24 84000 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-23 80800 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-22 77600 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-21 74400 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-20 71200 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-19 68000 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-18 64800 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-17 61600 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-16 58400 3200 300.000 0.318 2582.00 1 - - (600) 400.000

42 of 61 376793817.xlsx/ RMD SLAB 01/17/2018


Associated Constructors Limited
Indus Hospital TIH PH1-STR (C&S)
Summery of Different Components Required in Form-work For Slab for ECOL Block
Standards to be used
Slab Slab Slab H-20+100mm Corresponding Required
Base Jack
Floor Nos. Levels Height Thickness Lumber+ 18mm Prop's Height Appropriate Jack
F-15 55200 3200 300.000 0.318 in M 2582.00 1 - - (600) Adjustment
400.000
in M in M in mm Ply Wood (mm) Adjustment
F-14 52000 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-13 48800 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-12 45600 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-11 42400 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-10 39200 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-9 36000 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-8 32800 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-7 29600 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-6 26400 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-5 23200 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-4 20000 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-3 16800 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-2 13600 3200 300.000 0.318 2582.00 1 - - (600) 400.000

F-1 10400 3200 300.000 0.318 2582.00 1 - - (600) 400.000

P-2 7200 3200 300.000 0.318 2582.00 1 - - (600) 400.000

P-1 4000 4000 300.000 0.318 3382.00 1 - - (1400) 1200.000

43 of 61 376793817.xlsx/ RMD SLAB 01/17/2018


Associated Constructors Limited
Indus Hospital TIH PH1-STR (C&S)
Summery of Different Components Required in Form-work For Slab for ECOL Block
Standards to be used
Slab Slab Slab H-20+100mm Corresponding Required
Base Jack
Floor Nos. Levels Height Thickness Lumber+ 18mm Prop's Height Appropriate Jack
GF Adjustment
in0M in M in mm Ply Wood in M (mm) Adjustment

Screw Jack Adjustment


30 ~ 280 mm 40 ~ 650mm 140 ~ 750mm
Solid Hollow Solid

Printed By:Muhammad Ali

44 of 61 376793817.xlsx/ RMD SLAB 01/17/2018


Hospital TIH PH1-STR (C&S)
onents Required in Form-work For Slab for ECOL Block

Top/Fork
Jack Remarks
Adjustment

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

45 of 61 376793817.xlsx/ RMD SLAB 01/17/2018


Hospital TIH PH1-STR (C&S)
onents Required in Form-work For Slab for ECOL Block

Top/Fork
Jack Remarks
200.000
Adjustment
200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000

200.000 Locul

46 of 61 376793817.xlsx/ RMD SLAB 01/17/2018


Hospital TIH PH1-STR (C&S)
onents Required in Form-work For Slab for ECOL Block

Top/Fork
Jack Remarks
Adjustment

47 of 61 376793817.xlsx/ RMD SLAB 01/17/2018


Associated Constructors Limited
Indus Hospital PROJECT
Summery of Different Components Required in Form-work For Retaining Wall ( assume poure length is 7.8X3 + 2.6

Plastic Sleeve
Net Wall Water Weller Re-usable PVC Pipe Push Anchor
Description Soildure GTX Clamp Wing Nut for water
Height Stoper Plates Cones Slave Pull Prop Screw Bolt
Stoper

For wall (Grid N192.9/ E 71.8, ~


3.600 48 1248 120 240 240 240 240 120 24 24
E103.0 incl L/3

For Striping Corenr 3.600 48

Total 48 1248 120 240 288 240 240 120 24 24

48 of 61 376793817.xlsx / Retaining Wall 01/17/2018


Associated Constructors Limited
Indus Hospital PROJECT
Summery of Different Components Required in Form-work For Retaining Wall ( assume poure length is 7.8X3 + 2.6

Plastic Sleeve
Net Wall Water Weller Re-usable PVC Pipe Push Anchor
Description Soildure GTX Clamp Wing Nut for water
Height Stoper Plates Cones Slave Pull Prop Screw Bolt
Stoper

Printed By:Muhammad Ali

49 of 61 376793817.xlsx / Retaining Wall 01/17/2018


X3 + 2.6 = 26 m )

Lifting Walk Way


Remarks
Plates Bracket

18 18

18 18

50 of 61 376793817.xlsx / Retaining Wall 01/17/2018


Associated Constructors Limited

EMAAR PLOT 8 PROJECT (TOWER-4)


Tower Area-1436 Sq-m INVENTORY

ITEM QTY for Balance after Pro-Rata


S No. DESCRIPTION QTY OF BOX for Zone-1 Qty Per Box ARL Landhi UAE ACL Stock Remarks
Zone-1 for 56,941 Sq-ft

1 K/Stage Drophead 4 - - 317 1,800 2,117 2,117

2 4 200 800 - 500 1,209 1,709


K/Stage Adj U-Head 186mm 909 show only critically
3 K/S Spigot Jack - Hollow 75 200 15,000 - - 1,309 1,309 (13,691)
4 K/Stage Standard OE 1000mm - - - - 1,320 1,320 1,320
5 K/Stage Standard OE 1500mm 20 - 650 681 1,331 1,331
6 K/Stage Standard OE 2000mm 75 - - 1,284 1,570 500 3,354 3,354
7 K/Stage Spigot Adaptor 75 10 750 450 1,500 690 2,640 1,890
8 K/Stage Base Jack 75 10 750 320 1,500 1,820 1,070
9 K/Stage Propping Tie 600mm 75 - - 270 300 570 570
10 K/Stage Propping Tie 900mm 75 - - 1,403 1,403 1,403
11 K/Stage Propping Tie 1200mm 75 - 900 1,603 2,503 2,503
12 K/Stage Propping Tie 1800mm 75 48 3,600 2,435 1,848 4,283 683
13 K/Stage Propping Tie 2400mm 75 48 3,600 2,012 2,471 4,483 883
K/Stage Brace - Coupler 1470mm 75 - - - 1,570 1,570 1,570
14 K/Stage Brace - Coupler 1790mm 75 - - - 491 491 491
15 K/StageBrace - Coupler 2170mm 75 - - - - - 0
16 K/Stage Brace - Coupler 2560mm 75 - - - - - 0
17 K/Stage Brace - Coupler 2730mm 75 - - - 1,486 1,486 1,486
18 K/Stage Int. Bm Brkt 1500mm 75 14 1,050 - 500 1,595 2,095 1,045
19 K/Stage Cant. B'm Frame 1.5m 75 - 69 264 333 333
20 Scaffold Tube 1.0m 75 - - - - 0
21 Scaffold Tube 2.0m 75 - - - - 0
22 Coupler - 90 Deg 2" x 2" 75 - - - - 0
23 Coupler - Swivel 2"x2" 75 - - - - 0
24 K/Stage Decking Beam 900mm 75 - - - 12 12 12
25 K/Stage Decking Beam 1200mm 75 - - 15 15 15
26 K/Stage Decking Beam 1800mm 75 16 1,200 250 956 1,206 6
27 K/Stage Decking Beam 2400mm 75 16 1,200 154 998 867 2,019 819
28 K/Stage Cant. Decking Beam 75 - - - 1,351 1,351 1,351
29 K/Stage Infill Beam 600mm 75 - 347 310 657 657
30 K/Stage Infill Beam 900mm 75 48 3,600 248 902 1,150 (2,450)
31 K/Stage Infill Beam 1200m 75 48 3,600 440 1,008 547 1,995 (1,605)
32 K/Stage Decking Beam Brkt - - - 106 106 106
33 K/Stage Drophead Extension - - - - 0
Associated Constructors Limited

INDUS HOSPITAL PROJECT PH-1


Zone-1 Area-22,918 Sq-ft INVENTORY
Zone-2 Area-26,910 Sq-ft

QTY OF BOX QTY OF BOX ITEM QTY for ITEM QTY for Total ITEM QTY Balance after Pro-Rata Shifting from Balance to be
S No. DESCRIPTION Qty Per Box ARL Landhi UAE ACL Stock Shifting from Soorty Remarks
for Zone-1 for Zone-2 Zone-1 Zone-2 for Zone-1 & 2 for 49,828 Sq-ft Landhi2 Required

1 K/Stage Drophead 123 144 4 492 576 1,068 317 1,800 2,117 1,049

2 123 144 4 492 576 1,068 - 500 1,209 1,709


K/Stage Adj U-Head 186mm 641 show only critically
3 K/S Spigot Jack - Hollow 123 144 4 492 576 1,068 - - 1,309 1,309 241
4 K/Stage Standard OE 1000mm - - - - - - 1,320 1,320 1,320 655 Err:507
5 K/Stage Standard OE 1500mm - - - - 650 681 1,331 1,331 946 Err:507
6 K/Stage Standard OE 2000mm 123 144 8 984 1,152 2,136 1,284 1,570 500 3,354 1,218 818 Err:507
7 K/Stage Spigot Adaptor 123 144 8 984 1,152 2,136 450 1,500 690 2,640 504
8 K/Stage Base Jack 123 144 4 492 576 1,068 320 1,500 1,820 752
9 K/Stage Propping Tie 600mm 123 144 - - - - 270 300 570 570
10 K/Stage Propping Tie 900mm 123 144 - - - - 1,403 1,403 1,403
11 K/Stage Propping Tie 1200mm 123 144 - - - 900 1,603 2,503 2,503
12 K/Stage Propping Tie 1800mm 123 144 2 246 288 534 2,435 1,848 4,283 3,749 400
13 K/Stage Propping Tie 2400mm 123 144 16 1,968 2,304 4,272 2,012 2,471 4,483 211 1,293 Err:507
K/Stage Brace - Coupler 1470mm 123 144 - - - - - 1,570 1,570 1,570
14 K/Stage Brace - Coupler 1790mm 123 144 - - - - - 491 491 491
15 K/StageBrace - Coupler 2170mm 123 144 - - - - - - - 0
16 K/Stage Brace - Coupler 2560mm 123 144 - - - - - - - 0
17 K/Stage Brace - Coupler 2730mm 123 144 - - - - - 1,486 1,486 1,486
18 K/Stage Int. Bm Brkt 1500mm 123 144 4 492 576 1,068 - 500 1,595 2,095 1,027 450 Err:507
19 K/Stage Cant. B'm Frame 1.5m 123 144 - - - 69 264 333 333
20 Scaffold Tube 1.0m 123 144 - - - - - - 0
21 Scaffold Tube 2.0m 123 144 - - - - - - 0
22 Coupler - 90 Deg 2" x 2" 123 144 - - - - - - 0
23 Coupler - Swivel 2"x2" 123 144 - - - - - - 0
24 K/Stage Decking Beam 900mm 123 144 - - - - - 12 12 12
25 K/Stage Decking Beam 1200mm 123 144 - - - - 15 15 15
26 K/Stage Decking Beam 1800mm 123 144 2 246 288 534 250 956 1,206 672
27 K/Stage Decking Beam 2400mm 123 144 7 861 1,008 1,869 154 998 867 2,019 150
28 K/Stage Cant. Decking Beam 123 144 - - - - - 1,351 1,351 1,351
29 K/Stage Infill Beam 600mm 123 144 - - - 347 310 657 657
30 K/Stage Infill Beam 900mm 123 144 - - - 248 902 1,150 1,150
31 K/Stage Infill Beam 1200m 123 144 14 1,722 2,016 3,738 440 1,008 547 1,995 (1,743)
32 K/Stage Decking Beam Brkt 123 144 - - - - - 106 106 106
33 K/Stage Drophead Extension 123 144 - - - - - - 0
Associated Constructors Limited

TRACKER TOWER PROJECT


Summery of Nos. of Infill & C/C Spacing

Descriptation 1800 Deck Beam 1200 Infill Beam 900 Infill Beam 600 Infill Beam Remarks

Slab Thick & Infill 300 @ 610 Crs 349 @ 610 Crs 636 @ 610 Crs 1016 @ 406 Crs By RMD
Spacing 229 @ 336 Crs 229 @ Crs 229 @ 326 Crs 229 @ 326 Crs By Us
2400 Deck
Beam 4 3 4 5 By RMD
No of In Fill
8 6 6 6 By Us

Slab Thick & Infill 300 @ 610 Crs 620 @ 488 Crs 930 @ 406 Crs 1434 @ 348 Crs By RMD
Spacing 229 @ 420 Crs 229 @ 396 Crs 229 @ 336 Crs 229 @ 336 Crs By Us
1800 Deck
Beam 4 3 4 5 By RMD
No of In Fill
6 4 4 4 By Us

Slab Thick & Infill 900 @ 348 Crs 1226 @ 348 Crs 1798 @ 305 Crs By RMD
Spacing 229 @ Crs 229 @ 330 Crs 229 @ 330 Crs By Us
1200 Deck
Beam 3 3 3 By RMD
No of In Fill
3 3 3 By Us

Ref:-Technical Data Sheet For Propping & Decking System , Shet # RSD-02 & RSD-03, issue Date 29/6/93

53 of 61 376793817.xlsx / infill Statment 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
Summery of Tie Bar Length's Requirement in Different Wall Thickness & Conditions

If One Side Steel Soldier & Other Side Supe


IF Both Side Steel Soldier IF Both Side Super Slim Soldier
Solider
Re
Wall Thick Wall Thick in Tie Bar Wall Thick In Wall Thick Wall Thick Wall Thick in
Tie Bar Inch Remarks Tie Bar mm ma
In Inch mm mm Inch in mm In Inch mm
rks
30 762 1662 65 30 762 1762 30 762
24 610 1510 59 24 610 1610 24 610
18 457 1357 53 4x12=48, 18 457 1457 18 457
15 381 1281 50 15 381 1381 15 381
12 305 1205 47 4x11=44, 12 305 1305 12 305
9 229 1129 44 9 229 1229 9 229
8 203 1103 43 8 203 1203 8 203
6 152 1052 41 6 152 1152 6 152

Calculatation

Notation Description Length mm Notation Description Length mm

(a) Tie bar Stack Out 25 mm (a) Tie bar Stack Out 25 mm

(b) Waller Plate+ Wing Nut 80 mm (b) Waller Plate+ Wing Nut 80 mm

(c) Steel Solder 175 mm (c) Super Slim Solder 225 mm


(d) GTX Beam 150 mm (d) GTX Beam 150 mm
(d) Ply Wood 20 mm (d) Ply Wood 20 mm
For One Side 450 For One Side 500
For Both Side Side 900 For Both Side Side 1000

54 of 61 376793817.xlsx / Tie Bar 01/17/2018


Tie Bar Length = Wall Thickness+900 Tie Bar Length = Wall Thickness+1000 Tie Bar Length = Wall Thickness+450+50

Printed By:Muhammad Ali Req 2900 mm 46 lengths,by producet 500mm 22 nos.

55 of 61 376793817.xlsx / Tie Bar 01/17/2018


ER PROJECT
in Different Wall Thickness & Conditions

If One Side Steel Soldier & Other Side Super Slim


Solider

Tie Bar mm

1712
1560
1407
1331
1255
1179
1153
1102

56 of 61 376793817.xlsx / Tie Bar 01/17/2018


Tie Bar Length = Wall Thickness+450+500

Req 2900 mm 46 lengths,by producet 500mm 22 nos.

57 of 61 376793817.xlsx / Tie Bar 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
Summery of Different Components Requirement
Anchor Screw Screw Screw Strength Total Wt of each
Code # Description Strength in KN In Kg Bracketb in kg
Panel Work Wt Total Weight in Kg Remarks

20X140 For MK-100 Bracket 33 3365 80 1600.00 1680.00

24X200 For Solider Bracket 43 4385 300 1600.00 1900.00

Printed By:Muhammad Ali

58 of 61 376793817.xlsx / Bracket Strength 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
SOLDIER BRACKETS One Bracket Analysis Form work Analysis for Panel size 4500X3000

UNIT TOTAL UNIT TOTAL


CODE # NO. DESCRIPTION WEIGHT WEIGHT CODE # NO. DESCRIPTION WEIGHT WEIGHT
(KG) (KG) (KG) (KG)
SSX11800-s 3 Superslim Soldier 1800mm 38.80 116.40 GTX14800-s 12+2 GTX Beam (150x65) - 4800mm 26.40 369.60
SSX10720-s 2 Superslim Soldier 720mm 18.74 37.48 GTM00003-s 60 GTX Clamp - Eye Bolt Type 1.00 60.00
SSX10540-s 1 Superslim Soldier 540mm 15.24 15.24 4 Steele Solider 71.00 284.00
SSX10360-s 1 Superslim Soldier 360mm 11.98 11.98 Ply Wood @ 47kg/Sqm or 2.2 PSF 635.00 635.00
Any other Misalliance Like Nail or
PRA70015-s 1 Push Pull Prop Short 1820-3100 16.50 16.50 1 Screw Weight 20.00 20.00
SSM00060-s 2 Super Slim Wall Shear Bracket 5.90 11.80 GTM00005-s 70 GTX to GTX Cleat (Galv) 0.20 14.00
SSM00061-s 1 Super Slim Form Shear Bracket 15.00 15.00 4 Walk Way Bracket 5.31 21.24
SSM00062-s 1 Super Slim Roller Base 28.00 28.00 1 Wt of Planks Lump Sump 50.00 50.00
SSM00063-s 1 Super Slim Roller Form Bracket 3.00 3.00 1 Approximate Wt of Railing Pipe 50.00 50.00
SSM00064-s 1 Super Slim Roller Lock Bracket 2.00 2.00
SSM00065-s 1 Super Slim Roller Handrail 9.00 9.00 Total Approximate Panal 1,503.84
SSM00066-s 1 Super Slim Roll Back Strut 19.50 19.50
SSM00067-s 1 Super Slim Roller Foot Pad 3.60 3.60 Wt at Three Anchor Screw 501.28
BNM21640-s 25 Set Pin M16 x 40 0.08 2.00
BNM00016-s 25 Nut - M16 Hex Gr8.8 0.03 0.75
SSX10046-s 10 Superslim 19mm Pin and R Clip 0.29 2.90
BNM24050-s 2 Bolt - M24 x 50 Gr8.8 0.38 0.76
HTX24200-s 2 Anchor Screw M24 x 200mm 1.17 2.34
BNM24110-s 5 Bolt - M24 x 110 Gr8.8 0.55 2.75
BNM00024-s 5 Nut - M24 Hex Gr8.8 0.10 0.50
SSX10039-s 2 Superslim P/hole Bearing Galv 2.00 4.00
BTX10001-s 4 Rapid Tie Knock on Wing Nut 0.33 1.31
BTM10500-s 2 Rapid Tie Bar 15mm x 500mm 0.72 1.44
BNM16075-s 5 Bolt/Nut - M16 x 75 Gr 8.8 0.20 1.00
BTX10021-s 2 Rapid Tie Standard Waler Plate 1.35 2.70
KPX51790-s 2 Kwikstage Brace - Coupler 1790mm 7.22 14.44
TUX80200-s 2 Scaffold Tube 2.0m 8.73 17.46
SSM00020-s 1 Super Slim End Plate Adaptor 1.00 1.00
BTX10017-s 2 Rapid Tie Hexagon Nut 50mm 0.16 0.32
SIM4 1 Special Suspension Tube Adaptor 4.00 4.00

59 of 61 376793817.xlsx / Analysis for Solider Bracket 01/17/2018


SIM5 1 Special Hanging Bracket 8.00 8.00
1 Standered 2000 10.95 10.95
1 Standered 1500 8.20 8.20

1 Any other Misalliance Pipe or Plate We 40.00 40.00

Total Approximate Weight of One Bracket 416.32

60 of 61 376793817.xlsx / Analysis for Solider Bracket 01/17/2018


Associated Constructors Limited
TRACKER TOWER PROJECT
MK-100 Bracket Analysis Form work Analysis for Panel size 4500X3000

UNIT TOTAL UNIT TOTAL


NO. DESCRIPTION WEIGHT WEIGHT CODE # NO. DESCRIPTION WEIGHT WEIGHT
(KG) (KG) (KG) (KG)
1 MK-100 Bracket 60.00 60.00 GTX14800-s 12+2 GTX Beam (150x65) - 4800mm 26.40 369.60
1 No-2 Push Pull Prop Short 2040-3400 23.60 23.60 GTM00003-s 60 GTX Clamp - Eye Bolt Type 1.00 60.00
1 Coupler Bracing & Folding Pipes 50.00 50.00 4 Steele Solider 63.00 252.00
1 Wt of Planks Lump Sump 50.00 50.00 Ply Wood @ 47kg/Sqm or 2.2 PSF 635.00 635.00
Any other Misalliance Like Nail or
1 Screw Weight 20.00 20.00
Total Approximate Bracket Wt 183.60 GTM00005-s 70 GTX to GTX Cleat (Galv) 0.20 14.00
4 Walk Way Bracket 5.31 21.24
1 Wt of Planks Lump Sump 50.00 50.00
1 Approximate Wt of Railing Pipe 50.00 50.00

Total Approximate Panal 1,471.84

Wt at Three Anchor Screw 490.61

Conclusion

Anchor Screw Screw Panel Load


Total Weight in Kg at one Anchor
Screw Description Safe Safe Total Wt of Each Bracket kg at every
Screw
Remarks
Code # Load KN Load Kg Screw Wt

20X140 For MK-100 Bracket 30 3059 184 490.61 674.61

24X200 For Solider Bracket 43 4385 416 501.28 917.28

61 of 61 376793817.xlsx / Analysis for MK-100 Brack 01/17/2018

Das könnte Ihnen auch gefallen