Sie sind auf Seite 1von 4

Indo-US workshop on

Highway and Airport Pavement Engineering: Challenges and Opportunities


(HiPAVE) (30 -31 July, 2010)
Transportation Engineering Division, Civil Engineering Department
&
RCG School of Infrastructure Design and Management, Indian Institute of Technology Kharagpur, India

July 26, 2010


Dear Participant,

Hope you are in the final stage of your preparation for traveling to IIT Kharagpur. We are sure that
you will be benefited from attending the Indo-US workshop and we shall try our best to make your
stay on our campus as comfortable as possible. The following information may be useful to you.

Reaching Kharagpur by Rail from Kolkata


(i) If you are arriving at Kolkata by air, take a pre-paid taxi from airport to Howrah station (17km,
approx fare Rs. 230/-; approx. journey time 50 to 70 minutes). Air conditioned bus is also available
from exit door of airport to Howrah station (fare is Rs.40/-) at a frequency of one per hour.
(ii) A large number of express and passenger trains are available to travel to Kharagpur from Howrah
station. Express train takes about 1Hr 45 minutes. Passenger train may take 2.5 Hrs to 3.0 Hrs.
(List of Trains between Howrah and Kharagpur is enclosed with this letter)

Reaching IIT Campus from Kharagpur Railway Station


You may take Cycle Rickshaw (App. fare Rs. 40/-) OR Auto (App. Fare Rs. 70/-) OR Taxi (App. Fare
Rs. 90/-). You can mention the name of the Guesthouse to the rickshaw/auto/taxi driver. Distance
from station to guest house is about 4 km.

Accommodation
Your accommodation has been arranged (on payment basis) in guesthouses of IIT Kharagpur
campus. Details will be sent to you by 7.00 PM(26.7.2010). Please check your email today evening.

Food
Breakfast has been arranged in the guesthouse. Lunch and dinner have been arranged at workshop
venue (Foyer of Vikramshila complex near Kalidasa auditorium).

Transport
Transport will be available at the guest-house at 8:15AM on 30-07-2010 and at 8:45AM on 31-07-
2010 to bring you to workshop venue (Kalidasa Auditorium, Ramanujam complex). Similarly transport
will be arranged for dropping you at guest houses after the completion of the programme on each day
(10.00PM and 8.45 PM respectively).

Registration/Inaugural Function/Venue for Lectures


As per details given in the schedule (enclosed herewith)

If you have not sent us your registration fee, you may please bring the draft and deposit the same at
the time of registration.

Please do not hesitate to contact us for any additional information, if necessary.

Be prepared for some rain at Kharagpur !!!

With best wishes,

(K. Sudhakar Reddy) (M. Amaranatha Reddy)


Mobile: 09434021517 Mobile:
09434737788
Trains between Howrah and Kharagpur
Kharagpur - Howrah Howrah - Kharagpur
Kharagpur Howrah Train Howrah Kharagpur
Train No. Name of the Train Dep. Arr. No. Name of the Train Dep. Arr.
316 Adra Chakradharpur Pgr. 1.40 4.20 MH-101 Midnapur Passenger 2.25 04.58
2129 Azad Hind Express 1.50 3.50 MEMU-1 MEMU-1 2.45 05.05
2840 Chennai Mail 1.55 4.00 K-103 MEMU-103 3.20 06.00
2838 Puri Express 2.45 4.50 MH-105 Midnapur Passenger 4.10 06.55
K-102 KGP Passenger 2.50 5.35 MH-107 Midnapur Passenger 5.30 08.17
8006 Koraput Express 3.30 6.25 2883 Rupashi Bangla Exp. 6.00 07.40
2809 Mumbai Mail 3.45 5.50 2821 Dhauli Express 6.00 07.40
Tata Jan Sat. Exp.(Ex-
2864 Yesvantpur Exp. 4.00 6.10 2021 Sun) 6.20 07.58
8616 Hatia Express 4.25 6.35 MH-109 Midnapur Passenger 6.32 09.18
MH-104 Midnapur Passenger 4.40 7.25 2871 Ispat Express 6.55 08.35
K-106 KGP Passenger 5.30 8.20 K-111 KGP Passenger 7.15 10.05
8410 Sri Jagannath Express 6.00 8.10 2703 Falaknuma Express 7.25 09.05
MH-108 Midnapur Passenger 6.17 8.55 MH-113 Midnapur Passenger 8.12 10.57
MH-110 Midnapur Passenger 7.03 9.35 K-115 KGP Passenger 8.52 11.32
LK-2 LK-2 7.10 9.55 MH-117 Midnapur Passenger 9.45 12.27
MEMU-2 MEMU-2 7.30 9.45 K-119 KGP Passenger 10.40 13.30
K-112 KGP Passenger 7.35 9.50 8645 East Coast Express 11.45 13.50
464 Adra Howrah Passenger 7.47 10.05 MH-121 Midnapur Passenger 12.15 15.00
MH-114 Midnapur Passenger 8.13 11.05 MH-123 Midnapur Passenger 13.30 16.20
Bhu.Jan Sat. Exp.(Ex-
2814 Steel Super Fast Express 8.20 10.20 2073 Sun) 13.40 15.20
468 Bhadrak Passenger 8.55 11.25 2860 Gitanjali Express 14.00 15.45
2828 Purulia Express 9.22 11.20 K-125 KGP Passenger 14.20 17.10
2842 Coromandal Express 9.45 11.50 2841 Coromandal Express 14.50 16.30
MH-116 Midnapur Passenger 9.55 12.35 467 Bhadrak Passenger 15.30 18.05
2859 Gitanjali Express 10.30 12.30 MH-127 Midnapur Passenger 16.00 18.12
K-118 KGP Passenger 10.50 13.35 2827 Purulia Express 16.50 18.30
2074 Bhu.Jan Sat. Exp.(Ex-Sun) 10.55 12.50 MH-129 Midnapur Passenger 17.10 19.35
Steel Super Fast
2833 Ahmedabad Exp 11.30 13.30 2813 Express 17.30 19.11
K-120 KGP Passenger 11.45 14.30 M-131 MEMU-131 17.35 20.30
MH-122 Midnapur Passenger 12.30 15.10 463 Howrah Adra Passenger 17.45 20.00
MH-124 Midnapur Passenger 13.30 16.15 MH-133 Midnapur Passenger 18.20 20.40
8646 East Coast Express 13.30 15.55 LK-1 LK-1 18.25 21.10
K-126 KGP Passenger 14.20 17.00 8409 Sri Jagannath Express 19.00 20.47
2704 Falaknuma Express 15.35 17.45 MH-135 Midnapur Passenger 19.25 21.50
MH-128 Midnapur Passenger 15.40 18.25 MH-137 Midnapur Passenger 20.00 22.45
MH-130 Midnapur Passenger 16.35 19.15 2810 Mumbai Mail 20.15 22.00
2872 Ispat Express 16.40 18.45 2863 Yesvantpur Exp. 20.35 22.15
M-132 MEMU-132 TATA 17.45 20.55 8005 Koraput Express 21.35 23.55
2822 Dhauli Express 18.08 20.15 K-139 KGP Passenger 21.40 00.30
MH-134 Midnapur Passenger 18.25 21.15 2130 Azad Hind Express 21.55 23.40
2022 Tata Jan Sat. Exp.(Ex-Sun) 18.55 20.50 8615 Hatia Express 22.20 00.10
2884 Rupashi Bangla Exp. 19.17 21.15 2837 Puri Express 22.35 00.20
MH-136 Midnapur Passenger 19.40 22.30 315 Adra Chakradharpur Pgr. 23.05 01.40
M-138 MEMU-138 BHADRAK 20.20 22.50 2839 Chennai Mail 23.45 01.25
MH-140 Midnapur Passenger 21.05 23.45 201 Howrah Puri Passenger 23.50 03.00
202 Santragachhi 22.35 1.45 2834 Ahmedabad Express 23.55 02.05
Indo-US Workshop on Highway and Airport Pavement Engineering:
Challenges and Opportunities (HiPAVE)

Schedule
(Venue: Kalidas Auditorium, IIT Kharagpur)
Day -1 (30-07-2010)
8.30AM to 9.30AM Registration (Outside Kalidas Auditorium)
9.30AM to 10.30 AM Inauguration - Kalidas Auditorium
10.30AM to 11.00AM High Tea (Outside Kalidas Auditorium)
Technical Session – I
Key-Note Lectures
Role of Research in Long Life Highway Prof. Soheil Nazarian
11.00AM to 11.30AM
and Airport Pavements UTEP, El Paso, TX,USA
11.30AM to 12.00AM Improved Flexible Pavement Design Prof. B.B. Pandey, IITKGP
Invited Lectures
Accelerated Damage to Pavements by
Dr S. Gangopadhyay
12.00AM to12.20 PM Overloading – Issues and Possible
Director, CRRI, New Delhi
Remedies
Human Resource Development Needs in
Prof. A. Veeraragavan
12.20PM to 12.40PM Road Sector in India – Issues and
IIT Madras
Concerns
Network-level Pavement Management Sri K. Sitaramanjaneyulu
12.40PM to 12.50PM
System in India CRRI, New Delhi
12.50PM to 1.00 PM Interaction Session
1:00PM to 2:00PM LUNCH (Vikramsila Foyer)
Technical Session – II
Use of Accelerated Pavement Testing Dr. Sunil Bose
2:00PM to 2:20PM
Facility for Road Development in India CRRI, New Delhi
Flexible Pavement Failure
Sri M N Nagabhushana
2:20PM to 2:40PM Investigation-Some Typical Case
CRRI, New Delhi
Studies
Hot, Warm, Half-Warm and Cold Prof. BB Pandey
2:40PM to 3:00PM
Bituminous Mixes IIT, Kharagpur
Mr. Con Sinadinaos
3:00PM to 3:20PM Advances in Asphalt Mix Evaluation
Australia
3:20PM to 3:35PM Interaction Session
3:35PM to 4:00PM TEA
4:00PM to 4:20PM Technical Presentation M/s Alchemist
4:20PM to 4:40PM Technical Presentation M/s Romix Technologies
4:40PM to 5:00PM Technical Presentation M/s Ultra Technologies
7:00PM CULTURAL PROGRAMME (Kalidas Auditorium)
8:30PM DINNER (Vikramsila Foyer)
Indo-US Workshop on Highway and Airport Pavement Engineering:
Challenges and Opportunities (HiPAVE)

Schedule
(Venue: Kalidas Auditorium, IIT Kharagpur)
Day -2 (31-07-2010)
Technical Session – III
Key-Note Lectures
Uncertainty Modeling and Reliability in
Prof. Carlos M. Ferregut
9:00AM to 9:30AM Remaining Life Estimation of
UTEP, El Paso, USA
Pavements
Pavement Design for National Highway Prof. S.K. Rao
9:30AM to 10:00AM Projects GMR Group
10:30AM to 10.50AM Indo-US Science and Technology Dr A. Mitra, IUUSTF
10:50AM to 11:10AM TEA
Invited Lectures
Unmodified Binder Specifications for Dr. Murali Krishnan
11:10AM to 11:30AM
Better Pavements IIT, Madras
Modified Binders – Their Suitability in Dr Vivek Tandon
11:30AM to 11:50AM
Roadway Infrastructure UTEP, El Paso, USA
Characterization of Polymer Modified
11:50AM to 12:10PM Prof. M. Panda, NITRKL
Binders
12:10PM to 12:30PM Refinery Processing of Bitumen Dr. P. Senthivel, BPCL
12:30PM to 12:40PM Research Needs of Indian Road Industry Sri. Subbhiya R, L&T
12:40PM to 1:00PM Interaction Session
1:00PM to 2:00PM LUNCH (Vikramsila Foyer)
Technical Session – IV
Sustainable Pavements – the Time to Dr. Rajib B. Mallick
2:00PM to 2:20PM
Start is NOW WPI, Worcester, USA
In Quest of an Optimal Bituminous Dr. Animesh Das
2:20PM to 2:40PM
Pavement Design IIT, Kanpur
Design and construction of runway – A Lt. Col. Tipnis
2:40PM to 3:00PM
Case Study of Mumbai Airport ECC Division, L&T
Top-Down Cracking in Bituminous Prof. K S Reddy &
3:00PM to 3:20PM
Pavements R. Sridhar, IIT, Kharagpur
Rutting Characteristics of Bituminous Dr. MA Reddy
3:20PM to 3:40PM
Mixes IIT, Kharagpur
3:40PM to 4:00PM Interaction Session
3:35PM to 4:00PM TEA
4:00PM to 4:45PM PANEL DISCUSSION
4:45PM to 5:15PM VALEDICTORY FUNCTION
5:15PM to 7:00PM FELICITATION of Prof. SK Rao and Prof BB Pandey
7:00PM DINNER (Vikramsila Foyer)

Das könnte Ihnen auch gefallen