CRONOGRAMA DE ADQUISICION DE MATERIALES

PROYECTO "AMPLIACIÓN, MEJORAMIENTO DE LA INFRAESTRUCTURA DE I.E. PAILLARDELLE, DISTRITO DE CORONEL GREGORIO ALBARRACÍN LANCHIPA - TACNA - TACNA"
ENTIDAD MUNICIPALIDAD DISTTRITAL CRNL. GREGORIO ALBARRACIN LANCHIPA
UBICACIÓN DPTO.: TACNA PROV.: TACNA DISTRITO: CRNL. GREGORIO ALBARRACIN LANCHIPA
FECHA TACNA, SEPTIEMBRE 2010

PROGRAMADO PROGRAMADO POR MES


ITEM EQUIPO UND P.U. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
METRADO COSTO
METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO
2.6.22.24 COSTO DE CONSTRUCCION POR ADM. DIRECTA - BIENES 1,191,944.70

1.00 ALAMBRE NEGRO # 8 kg 3.50 1,142.76 4,004.08 571.38 2,002.04 571.38 2,002.04
2.00 ALAMBRE NEGRO # 16 kg 3.50 3,137.16 11,288.15 1,568.58 5,644.08 1,568.58 5,644.08
3.00 CLAVOS PARA MADERA PROMEDIO kg 4.00 1,978.42 7,914.43 989.21 3,957.22 989.21 3,957.22
4.00 FIERRO LISO DE 1/2" m 7.50 287.16 2,153.70 143.58 1,076.85 143.58 1,076.85
5.00 ASTA BANDERA u 120.00 1.00 120.00 1.00 120.00
6.00 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2.90 64,342.81 186,900.54 10,723.80 31,150.09 10,723.80 31,150.09 10,723.80 31,150.09 10,723.80 31,150.09 10,723.80 31,150.09 10,723.80 31,150.09
7.00 ARENA FINA m3 14.30 166.32 2,393.56 27.72 398.93 27.72 398.93 27.72 398.93 27.72 398.93 27.72 398.93 27.72 398.93
8.00 TIERRA DE CHACRA m3 18.00 238.43 4,291.77 39.74 715.30 39.74 715.30 39.74 715.30 39.74 715.30 39.74 715.30 39.74 715.30
9.00 PIEDRA CHANCADA DE 1/2" m3 45.00 450.78 20,284.15 75.13 3,380.69 75.13 3,380.69 75.13 3,380.69 75.13 3,380.69 75.13 3,380.69 75.13 3,380.69
10.00 PIEDRA GRANDE DE 8" m3 28.00 13.34 373.39 4.45 124.46 4.45 124.46 4.45 124.46
11.00 PIEDRA MEDIANA DE 4" m3 20.00 180.43 3,608.67 60.14 1,202.89 60.14 1,202.89 60.14 1,202.89
12.00 PIEDRA GRANDE DE 6" m3 25.00 101.57 2,539.95 33.86 846.65 33.86 846.65 33.86 846.65
13.00 PIEDRA MEDIANA DE 2" m3 14.50 10.60 153.77 3.53 51.26 3.53 51.26 3.53 51.26
14.00 PIEDRA CHANCADA DE 1/4" m3 25.00 17.85 446.74 5.95 148.91 5.95 148.91 5.95 148.91
15.00 AFIRMADO m3 14.30 512.29 7,324.78 170.76 2,441.59 170.76 2,441.59 170.76 2,441.59
16.00 ARENA GRUESA m3 14.30 477.53 6,819.42 159.18 2,273.14 159.18 2,273.14 159.18 2,273.14
17.00 CABLE TW 2.5 mm2 m 0.50 1,312.11 662.42 656.06 331.21 656.06 331.21
18.00 CABLE THW 4 mm2 m 1.50 150.28 226.15 75.14 113.08 75.14 113.08
19.00 CABLE THW 6 mm2 m 1.80 88.64 159.21 44.32 79.61 44.32 79.61
20.00 CABLE THW 10 mm2 m 2.50 613.82 1,537.53 306.91 768.77 306.91 768.77
21.00 CABLE THW 16 mm2 m 3.00 4.37 13.10 2.19 6.55 2.19 6.55
22.00 CABLE THW 25 mm2 m 4.00 281.03 1,124.10 140.52 562.05 140.52 562.05
23.00 CABLE THW 35 mm2 m 4.80 21.63 103.74 10.82 51.87 10.82 51.87
24.00 INODORO DE LOZA BLANCO TQUE. BAJO (INC. ACCESORIOS) u 180.00 8.00 1,440.00 8.00 1,440.00
25.00 INODORO DE LOZA BLANCO TQUE. BAJO PARA NIÑOS (INC. ACCESORIOS) u 170.00 4.00 680.00 4.00 680.00
26.00 LAVATORIO DE LOSA BLANCA DE 1RA (INC. ACCESORIOS) u 150.00 8.00 1,200.00 8.00 1,200.00
27.00 URINARIO DE LOSA BLANCA DE 1RA (INC. ACCESORIOS) u 135.00 4.00 540.00 4.00 540.00
28.00 ACCESORIOS PARA EQUIPO DE BOMBEO jgo 50.00 1.00 50.00 1.00 50.00
29.00 REGISTRO DE BRONCE DE 2" u 6.00 2.00 12.00 1.00 6.00 1.00 6.00
30.00 REGISTRO DE BRONCE DE 4" u 15.00 6.00 90.00 3.00 45.00 3.00 45.00
31.00 SUMIDERO CROMADO DE 2" u 8.00 7.00 56.00 3.50 28.00 3.50 28.00
32.00 GRIFO DE BRONCE 1/2" u 15.00 19.00 285.00 9.50 142.50 9.50 142.50
33.00 REFLECTOR DE 400 W jgo 4.00 32.00 128.00 32.00 128.00
34.00 LUMINARIA DE 2 FLUORESCENTES SIMILAR A BE-2X36w JOSFEL jgo 100.00 51.00 5,100.00 51.00 5,100.00
35.00 LUMINARIA DE 2 FLUORESCENTES SIMILAR A BE-2X36w JOSFEL- CON ADOSAMIENTO A CIELORASO jgo 100.00 8.00 800.00 8.00 800.00
36.00 LUMINARIA DE 1 FLUORESCENTE SIMILAR A BE-1X18w JOSFEL jgo 60.00 9.00 540.00 9.00 540.00
37.00 LUMINARIA DE 2 FLUORESCENTES SIMILAR A BE-2X58w JOSFEL- CON ADOSAMIENTO A CIELORASO jgo 120.00 15.00 1,800.00 15.00 1,800.00
38.00 BRAQUET EMPOTRADO A TECHO PROVISTA DE LAMPARA DE 2x18W SIMILAR A ALPHA SPOT P/EMPOT.H-205 COLOR BLANCO jgo 80.00 35.00 2,800.00 35.00 2,800.00
39.00 LUMINARIA DE 1 FLUORESCENTE ADOSADA A PARED SIM. A BPL 1X18W jgo 80.00 3.00 240.00 3.00 240.00
40.00 LUMINARIA PARA FAROLA 2X70 W. jgo 120.00 12.00 1,440.00 12.00 1,440.00
41.00 FAROLA ESFERICA CON LUMINARIA 70 W. u 125.00 24.00 3,000.00 24.00 3,000.00
42.00 POZO DE TIERRA R<15 Omhs glb 150.00 4.00 600.00 2.00 300.00 2.00 300.00
43.00 TABLERO GABINETE METAL BARRA BRONCE 12 POLOS u 550.00 5.00 2,750.00 2.50 1,375.00 2.50 1,375.00
44.00 TABLERO GABINETE METAL BARRA BRONCE 8 POLOS u 450.00 10.00 4,500.00 5.00 2,250.00 5.00 2,250.00
45.00 CAJA OCTOGONAL DE FºGº 100X50 MM u 2.00 121.00 242.00 60.50 121.00 60.50 121.00
46.00 CAJA DE F° G° DE 100X55X50 MM u 2.10 111.00 233.10 55.50 116.55 55.50 116.55
47.00 CAJA GALVANIZADA 150 X 150 X 75 mm u 56.00 4.00 224.00 2.00 112.00 2.00 112.00
48.00 CAJA GALVANIZADA 250 X 250 X 100 mm u 70.00 1.00 70.00 0.50 35.00 0.50 35.00
49.00 PLACA DE ALUMINIO ANONIZADO 1 HUECO u 6.70 33.00 221.10 16.50 110.55 16.50 110.55
50.00 PLACA DE ALUMINIO ANONIZADO 2 HUECOS u 7.50 109.00 817.50 54.50 408.75 54.50 408.75
51.00 PLACA DE ALUMINIO ANONIZADO 3 HUECOS u 8.50 2.00 17.00 1.00 8.50 1.00 8.50
52.00 DADO TOMACORRIENTE BIPOLAR 15 A / 220 V pza 5.30 198.00 1,049.40 99.00 524.70 99.00 524.70
53.00 DADO INTERRUPTOR 15 A - 220 V pza 6.50 59.00 383.50 29.50 191.75 29.50 191.75
54.00 ASFALTO RC-250 gal 85.00 39.49 3,356.36 19.75 1,678.18 19.75 1,678.18
55.00 LADRILLO DE TECHO 30x30x15 cm u 2.85 7,377.65 21,008.73 2,459.22 7,002.91 2,459.22 7,002.91 2,459.22 7,002.91
56.00 LADRILLO PASTELERO 20 X 20 X 2.5 cm u 0.70 31,202.86 21,842.00 10,400.95 7,280.67 10,400.95 7,280.67 10,400.95 7,280.67
57.00 LADRILLO K.K. DE ARCILLA 14X24X10 CM. m2 1.05 72,332.42 75,949.05 24,110.81 25,316.35 24,110.81 25,316.35 24,110.81 25,316.35
58.00 CEMENTO PORTLAND TIPO I (42.5 kg) bls 19.50 11,465.95 223,614.79 1,910.99 37,269.13 1,910.99 37,269.13 1,910.99 37,269.13 1,910.99 37,269.13 1,910.99 37,269.13 1,910.99 37,269.13
59.00 GARGOLA DE CONCRETO u 40.00 18.00 720.00 6.00 240.00 6.00 240.00 6.00 240.00
60.00 PLANCHA DE ETERNIT GRAN ONDA COLOR GRISS (INCLUIDO ACCESORIOS) pl 25.00 248.67 6,219.74 82.89 2,073.25 82.89 2,073.25 82.89 2,073.25
61.00 CAJA DE CONCRETO DE 30X30 CM u 35.00 4.00 140.00 4.00 140.00
62.00 CAJA DE CONCRETO DE 50X50 CM u 40.00 1.00 40.00 1.00 40.00
63.00 CERRADURA DE TRES GOLPES u 55.00 16.00 880.00 16.00 880.00
64.00 BISAGRA ALUMINIZADA 2 1/2" X 2 1/2" u 3.50 268.00 938.00 268.00 938.00
65.00 BISAGRA ALUMINIZADA 4" X 4" u 5.00 84.00 420.00 84.00 420.00
66.00 BISAGRA VAIVEN BATIENTE 4" X 4" u 7.50 4.00 30.00 4.00 30.00
67.00 CERRADURA TIPO PERILLA pza 20.00 34.00 680.00 34.00 680.00
68.00 CINTA SEÑALADORA AMARILLA pza 5.00 1,269.08 6,345.40 1,269.08 6,345.40
69.00 CINTA TEFLON rll 1.50 125.64 190.95 125.64 190.95
70.00 YESO EN BOLSAS DE 18 kg bls 11.50 276.11 3,204.86 276.11 3,204.86
71.00 CERA PARA PISO gal 12.00 1.14 13.73 1.14 13.73
72.00 CESPED m2 18.00 4,569.43 82,249.78 4,569.43 82,249.78
73.00 PORCELANA kg 5.00 323.07 1,615.29 323.07 1,615.29
74.00 RODOPLAST PARA BORDE DE MAYOLICAS m 3.00 3.53 10.60 3.53 10.60
75.00 PEGAMENTO LIQUIDO Y/O SILICONA NEGRA gal 79.00 1.26 98.11 1.26 98.11
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO "AMPLIACIÓN, MEJORAMIENTO DE LA INFRAESTRUCTURA DE I.E. PAILLARDELLE, DISTRITO DE CORONEL GREGORIO ALBARRACÍN LANCHIPA - TACNA - TACNA"
ENTIDAD MUNICIPALIDAD DISTTRITAL CRNL. GREGORIO ALBARRACIN LANCHIPA
UBICACIÓN DPTO.: TACNA PROV.: TACNA DISTRITO: CRNL. GREGORIO ALBARRACIN LANCHIPA
FECHA TACNA, SEPTIEMBRE 2010

PROGRAMADO PROGRAMADO POR MES


ITEM EQUIPO UND P.U. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
METRADO COSTO
METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO
76.00 SELLO PREFORMADO CINTA FLEXIBLE SIKALON m 58.00 367.91 21,338.75 367.91 21,338.75
77.00 MASILLA PARA VIDRIO kg 2.00 9.00 18.00 9.00 18.00
78.00 ALFOMBRA TAPIZON m2 34.00 553.33 18,813.19 553.33 18,813.19
79.00 PEGAMENTO PARA PVC gal 85.00 13.11 1,112.36 13.11 1,112.36
80.00 ESPUMA PLASTICA DE ALTA DENSIDAD DE ESPESOR DE 1" m2 10.00 17.80 178.70 17.80 178.70
81.00 ASPERSOR DE 1/2" u 20.00 4.00 80.00 4.00 80.00
82.00 ACCESORIOS PARA INSTALACION DE RED DE AGUA glb 50.00 4.00 200.00 4.00 200.00
83.00 TUBO PVC SAL 2" X 3M pza 9.00 13.09 117.85 13.09 117.85
84.00 TUBO PVC SAL 4" X 3M pza 20.00 11.69 233.80 11.69 233.80
85.00 HORMIGON m3 40.00 965.02 38,595.83 965.02 38,595.83
86.00 COLA SINTETICA gal 26.20 68.37 1,789.49 68.37 1,789.49
87.00 TEROKAL gal 35.00 15.07 526.98 15.07 526.98
88.00 LIJA PARA CONCRETO hja 1.80 669.47 1,194.60 669.47 1,194.60
89.00 LIJA PARA MADERA u 1.50 199.69 299.39 199.69 299.39
90.00 AGUA m3 3.80 723.82 2,715.81 723.82 2,715.81
91.00 PRUEBAS ELECTRICAS u 1,500.00 1.00 1,500.00 1.00 1,500.00
92.00 CERCO DE MALLA CON TUBOS m 85.00 187.09 15,902.65 187.09 15,902.65
93.00 TRANSPORTE DE EQUIPOS glb 6,500.00 1.00 6,500.00 1.00 6,500.00
94.00 TRANSPORTE DE MATERIALES glb 20,000.00 1.00 20,000.00 1.00 20,000.00
95.00 LOSETA GRANITICA DE COLORES m2 45.00 1,439.16 64,762.27 479.72 21,587.42 479.72 21,587.42 479.72 21,587.42
96.00 PEGAMENTO PARA CERAMICO (Bolsa 25 Kg) bls 23.00 290.52 6,682.65 96.84 2,227.55 96.84 2,227.55 96.84 2,227.55
97.00 CERAMICO DE 30 X 30 CM ANTIDESLIZANTE m2 30.00 814.51 24,435.15 271.50 8,145.05 271.50 8,145.05 271.50 8,145.05
98.00 CERAMICO DE 40 X 40 CM ANTIDESLIZANTE m2 32.00 53.76 1,720.32 17.92 573.44 17.92 573.44 17.92 573.44
99.00 CERAMICO DE 40 X 40 CM RUSTICO m2 34.00 42.54 1,446.21 14.18 482.07 14.18 482.07 14.18 482.07
100.00 CERAMICO DE 30 X 30 CM m2 27.00 101.64 2,744.28 33.88 914.76 33.88 914.76 33.88 914.76
101.00 PARQUET GUAYACAN m2 45.00 60.06 2,702.70 20.02 900.90 20.02 900.90 20.02 900.90
102.00 MADERA TORNILLO p2 4.65 25,225.80 117,309.84 4,204.30 19,551.64 4,204.30 19,551.64 4,204.30 19,551.64 4,204.30 19,551.64 4,204.30 19,551.64 4,204.30 19,551.64
103.00 MADERA CEDRO p2 4.80 7,231.47 34,711.06 1,205.25 5,785.18 1,205.25 5,785.18 1,205.25 5,785.18 1,205.25 5,785.18 1,205.25 5,785.18 1,205.25 5,785.18
104.00 TRIPLAY LUPUNA DE 4' X 8' X 4 mm pl 32.00 37.17 1,189.38 6.20 198.23 6.20 198.23 6.20 198.23 6.20 198.23 6.20 198.23 6.20 198.23
105.00 TRIPLAY DE 8 mm m2 25.00 59.04 1,476.00 9.84 246.00 9.84 246.00 9.84 246.00 9.84 246.00 9.84 246.00 9.84 246.00
106.00 TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24" u 38.00 14.00 532.00 14.00 532.00
107.00 TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X 24" pza 38.00 14.00 532.00 14.00 532.00
108.00 TIJERAL METALICO SEGUN DETALLE glb 1,600.00 6.00 9,600.00 6.00 9,600.00
109.00 CORREA METALICA SEGUN DETALLE glb 250.00 72.00 18,000.00 72.00 18,000.00
110.00 BREA INDUSTRIAL kg 25.00 1.64 41.18 0.55 13.73 0.55 13.73 0.55 13.73
111.00 PINTURA ESMALTE SINTETICO gal 32.00 0.43 13.82 0.14 4.61 0.14 4.61 0.14 4.61
112.00 PINTURA LATEX gal 19.00 234.12 4,474.94 78.04 1,491.65 78.04 1,491.65 78.04 1,491.65
113.00 PINTURA IMPRIMANTE gal 19.00 234.12 4,474.94 78.04 1,491.65 78.04 1,491.65 78.04 1,491.65
114.00 PINTURA ESMALTE gal 27.00 27.95 771.84 9.32 257.28 9.32 257.28 9.32 257.28
115.00 CALAMINA GALVANIZADA ZINC 28 CANALES 1.83 X 0.830 m X 0.4 mm pl 11.61 44.80 520.24 44.80 520.24
116.00 PUERTA METALICA TIPO MAMPARA m2 350.00 3.64 1,274.00 3.64 1,274.00
117.00 VENTANA METALICA TIPO SISTEMA m2 140.00 3.17 443.80 3.17 443.80
118.00 POSTE DE ALUMBRADO INTERIOR, ALTURA=9.00 M. DE CªAª u 450.00 8.00 3,600.00 8.00 3,600.00
119.00 POSTE DE ALUMBRADO INTERIOR, ALTURA=6.50 M. DE CªAª u 380.00 8.00 3,040.00 8.00 3,040.00
120.00 TRAMPA "P" PVC SAL DE 2" u 11.50 10.00 115.00 10.00 115.00
121.00 TAPA DE CONCRETO DE 30X30 CM. u 35.00 4.00 140.00 4.00 140.00
122.00 TAPA DE CONCRETO DE 50X50 CM. u 40.00 1.00 40.00 1.00 40.00
123.00 TUBERIA PVC-CLASE 10 SP 1/2" x 5m. m 2.90 119.61 347.15 59.81 173.58 59.81 173.58
124.00 CURVA PVC-P (ELEC.) 15 mm u 1.25 212.00 265.00 106.00 132.50 106.00 132.50
125.00 CURVA PVC-P (ELEC.) 25 mm u 2.10 5.00 10.50 2.50 5.25 2.50 5.25
126.00 CURVA PVC-P (ELEC.) 35 mm u 2.50 12.00 30.00 6.00 15.00 6.00 15.00
127.00 UNION SIMPLE PVC-P (ELECT.) 15 mm u 1.25 165.00 206.25 82.50 103.13 82.50 103.13
128.00 UNION SIMPLE PVC-P (ELECT.) 20 mm u 1.50 68.00 102.00 34.00 51.00 34.00 51.00
129.00 UNION SIMPLE PVC-P (ELECT.) 25 mm u 2.10 7.00 14.70 3.50 7.35 3.50 7.35
130.00 UNION SIMPLE PVC-P (ELECT.) 35 mm u 2.50 22.00 55.00 11.00 27.50 11.00 27.50
131.00 CONECTOR PVC-P 15 mm u 1.25 152.00 190.00 76.00 95.00 76.00 95.00
132.00 CONECTOR PVC-P 20 mm u 1.50 50.00 75.00 25.00 37.50 25.00 37.50
133.00 CONECTOR PVC-P 25 mm u 2.10 6.00 12.60 3.00 6.30 3.00 6.30
134.00 CONECTOR PVC-P 35 mm u 2.50 5.00 12.50 2.50 6.25 2.50 6.25
135.00 CODO PVC SAP 1/2" X 90° u 1.50 38.00 57.00 19.00 28.50 19.00 28.50
136.00 TEE PVC SAP P/AGUA DE 1/2" u 2.00 10.00 20.00 5.00 10.00 5.00 10.00
137.00 TEE PVC SAP P/AGUA DE 1" u 4.50 10.00 45.00 5.00 22.50 5.00 22.50
138.00 UNION UNIVERSAL PVC SAP 1/2" pza 8.00 22.00 176.00 11.00 88.00 11.00 88.00
139.00 CODO DE 90 PVC SAL DE 2" u 4.50 19.00 85.50 9.50 42.75 9.50 42.75
140.00 CODO DE 90 PVC SAL DE 4" u 6.00 6.00 36.00 3.00 18.00 3.00 18.00
141.00 TEE PVC SAL 4" X 4" pza 8.00 20.00 160.00 10.00 80.00 10.00 80.00
142.00 REDUCCION R PVC SAP P/AGUA 1" A 1/2" u 2.00 11.00 22.00 5.50 11.00 5.50 11.00
143.00 CODO DE 90° PVC SAP P/AGUA DE 1/2" u 2.00 10.00 20.00 5.00 10.00 5.00 10.00
144.00 CODO DE 90° PVC SAP P/AGUA DE 1" u 4.50 10.00 45.00 5.00 22.50 5.00 22.50
145.00 TUBERIA PVC-CLASE 10 SP 1" x 5m m 4.60 454.23 2,089.46 227.12 1,044.73 227.12 1,044.73
146.00 TEE PVC SAL 2" X 2" pza 6.50 2.00 13.00 1.00 6.50 1.00 6.50
147.00 YEE PVC SAL DE 4" X 2" pza 7.50 14.00 105.00 7.00 52.50 7.00 52.50
148.00 TUBERIA PVC SAP (ELECT.) 15 mm tub 4.50 44.32 199.45 22.16 99.73 22.16 99.73
149.00 TUBERIA PVC SAP (ELECT.) 20 mm tub 3.00 257.57 772.72 128.79 386.36 128.79 386.36
150.00 TUBERIA PVC SAP (ELECT.) 25 mm tub 4.50 7.65 34.43 3.83 17.22 3.83 17.22
151.00 TUBERIA PVC SAP (ELECT.) 35 mm tub 7.00 70.21 491.49 35.11 245.75 35.11 245.75
152.00 CURVA PVC-P (ELEC.) 20 mm u 1.50 105.00 157.50 52.50 78.75 52.50 78.75
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO "AMPLIACIÓN, MEJORAMIENTO DE LA INFRAESTRUCTURA DE I.E. PAILLARDELLE, DISTRITO DE CORONEL GREGORIO ALBARRACÍN LANCHIPA - TACNA - TACNA"
ENTIDAD MUNICIPALIDAD DISTTRITAL CRNL. GREGORIO ALBARRACIN LANCHIPA
UBICACIÓN DPTO.: TACNA PROV.: TACNA DISTRITO: CRNL. GREGORIO ALBARRACIN LANCHIPA
FECHA TACNA, SEPTIEMBRE 2010

PROGRAMADO PROGRAMADO POR MES


ITEM EQUIPO UND P.U. MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
METRADO COSTO
METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO METRADO COSTO
153.00 UNION SIMPLE PVC-SAP CLASE 10 SP-1" u 2.50 77.87 194.67 38.94 97.34 38.94 97.34
154.00 UNION SIMPLE PVC-SAP CLASE 10 SP-1/2" u 0.50 32.04 16.04 16.02 8.02 16.02 8.02
155.00 VALVULA COMPUERTA DE BRONCE DE 1/2" u 35.00 11.00 385.00 5.50 192.50 5.50 192.50
156.00 VIDRIO SEMIDOBLE INCOLORO p2 12.00 189.03 2,268.38 94.52 1,134.19 94.52 1,134.19

COSTO DIRECTO (INCLUYE IGV 18%) 1,191,944.70 158,688.04 471,260.48 185,907.36 178,698.46 98,695.18 98,695.18 - -