Sie sind auf Seite 1von 8

MAIN GEAR BOX ASSEMBLY

Main Parts
1. Input pinion
2. Intermediate Pinion
3. P 3-Shaft gear
A) Bearing NU
B) Bearing NI
C)Thrust Taper Bearing
D) Self Aligning Bearing
E) Gear Box Housing
F) Oil Seals
Time of Completion
Sixteen hours
Extruder Assembly
Main Parts
1. Motor
2. Gear Box
3. Feeder Slip
4. Barrel
5. Screw
6. Screen Charger
7. Melt Pump
8. Die
9. Centrifugal Fan
Time of Completion
45- hours
Water Bath Assembly
Main Parts
1. Base Frame
2. S.S. Tank
3. Rubber Roller
4. S.S. Roller
5. Cool Pipe
6. Suction Pipe
7. Ball Bearing
8. Tray
9. Lever
10. Air Cylinder
11. Air Knife Cover
12. Cylinder Pan
13. Front Plate
Time of completion
48-hours
Recycling and Cutter assembly
Main Parts
1. Air Cylinder
2. Side Plate
3. Lever
4. Ignition Bar
5. Bend Pipe
6. Coupling
7. Rall Shaft
8. Cutter Housing
9. Bearing Housing
10. Cutter Shaft
11. Steel Rollers
12. Blades
13. Motor
14. Gear Box
15. External Worm Wheel
16. Tension Spring
17. Cutter Rail

Time of Completion
8-hours
HOT AIR OVEN ASSEMBLY
Main Part
1. Chart Lever
2. Pulley
3. Flapper
4. Channel
5. Motor
6. Rod
7. Air Cylinder
8. Binding Rubber
9. Glass Wool
10. Heater
Time of Completion
50-hours
HOLDING, STRETCHING AND ANNEALING ASSEMBLY
Main Parts
1. Godets
2. Base Plate
3. Side Plate
4. Front Plate
5. Motor
6. Pulley
7. Bearing
8. Dial Gauge
9. Gear Shaft
10. Gear Box
11. Flat Belt
12. Rubber Rollers
Time of Completion
48-hours

Conclusion
In this end the conclusion could be made that a thorough study of tapeline is made
by which a lot of technical aspects are clearly understood thus this training has
enhanced to helped my technical knowledge and I have clearly understood the
technical aspects which are related to theory position of engineering.
1. Blender Unit (CDMU)
2. Extruder Unit
3. Water Bath Unit
4. Cutter Unit
5. Hot Air Oven Unit
6. Holding Unit
7. Stretching and Annealing Unit
And many other units are thoroughly observed and notified to the best of my
knowledge.

Final Inspection
It is carried out after the final manufacturing and assembling stage. The aim is to
prevent anydefective product from being shipped to a customer.
Inspection can be categorized with respect to the method being
used:MeasurementThese involve determine of numerical values of
characteristic with aid of measurement.GO and NO GO CheckingThis
involves the use of fixed limit gauge in order to find out whether the characteristics
lie above or below a certain valueFunctionality CheckingThis is the testing of
the functionality of a product.Visual InspectionIt involves the use of human eye
to judge whether the color of finish of a particular product.100% InspectionFor
all "A" class items such as shuttle shaft etc. 100% inspection is done and every
piece is checked for its dimensions and functionality.Random samplingSome
machinery parts are selected at random from the batch and are checked for
conformity of the specification.

Das könnte Ihnen auch gefallen