Rs………………………………………………………..(…………………………………………
………………………………………………………………………………………………………
………………………………………………………………......)
01. PRICES: Prices are firm and final as per the schedule of Quantity,
Rate and Amount including all taxes and duties and no price
variation is allowed.
02. Running Account Bill shall be submitted by contractor as per the
quantities measured in the presence of our representative and
certified for the quantities of work by our engineer /project manager
on a monthly basis after deducting the recoveries as detailed below.
a). Income Tax at TDS will be deducted at the applicable rate as per
the Income Tax Act and a TDS certificate will be issued.
03. TIME SCHEDULE: The contractor has to start the work w.e.f.
…………………………………. and the entire work is required to be
completed by ……………..
08. T&P: All the required T&P and material will be supplied by M/s Sai
Engineering Foundation. However, in case of loss or damage of any
material issued the same shall the recovered from the bill as per the
prevailing rates.
12. The Contractor shall follow the necessary labour laws for execution
of this work, & shall ensure that the payment to labourers engaged
for this work be made as per Govt. of Himachal Pradesh for
minimum wages Act to different categories of workers.
13. The Contractor shall comply with the rule of ESI, Labour and EPF
Departments and shall maintain all the requisite/relevant records
including all out of state workers entered in nearest Police station
within three days of duty joining.
15. Contractor shall return the duplicate copy of this order to this Office
duly signed on all the pages as a token of having accepted the terms
& conditions. The acceptance copy must be returned to this office
within 03 days of receipt of this order.
16. Welding set, welding rods, Owens, tools, chain blocks, U-clamps,
required nut bolts /scaffolding /steel jack balies ,gas cutter set,
cooking gas, beadings & oxygen cylinder will be supplied by M/s sai
Engineering Foundation.
19. The Contractor while accepting the order should be aware of the
Scope of the work, technical Specifications, Site Conditions, Soil
Conditions, Working Conditions, Climatic Conditions, Availability of
Technicians, labour tradesmen, materials, equipments, power,
water, transport and communication facilities, etc. No claims will be
allowed in case of any misunderstanding and/or non awareness of
these requirements.