1. Prioritize the scale of Hydro Power Plant Development in Nepal at present context
() Micro Hydro (1 to 1000 kW)
() Small Hydro (1 to 25 MW)
() Medium Hydro (25 to 100 MW)
() Big Hydro (100 to 1000 MW)
() Large Hydro (more than 1000 MW)
2. Rank the risk most sensitive to be considered when developing Hydro power
() People / community participation and support
() Financing uncertainty and failure
() Political instability and policy weakness
() Technical weakness and failure to sustain the project
() Environmental challenge to affect the Hydro Power
9. Prioritize the following sub factors under the social factors of Hydro power development
() Fairness on equity allocation of benefits and impacts
() Focusing on Inclusiveness, Gender Empowering and vulnerability
() Project induced impacts like safety, power supply reliability & displacement etc
() Transparency and Governance of the project
() Technical knowhow and social capital building
10. Rate (importance) the following sub factors under Environment with regard to Hydro power
() Terrestrial (land, forest) Environment degradation due to hydro power project
() River morphology, riparian ecology caused (by sediment, flood etc.)
() Impact on water resources (continuity, regularity, quantity and quality)
() Solid waste and pollutions due to project construction and operation
() Water abstraction or damming
11. Prioritize the following sub factors while technically decide the project selection
() Power availability throughout the year
() Available support infrastructure like road, bridge, power grid etc
() Energy demand and availability to satisfy the local communities
() Country capability to implement, maintain and operate the project
() In country materials, accessories, equipments and finance availability
12. Prioritize the following sub factors of Political factors as per their importance with regard to hydro
power development
() Contribution to National Independence of energy availability
() Conflict with (water rights, Trans boundary and International water) and impact on economy, business
deals with other countries
() Conducive hydro power sector policy, strategy and plan
() Attracting foreign investment in the sector development
() Regional (within country) power generation balance
13. Prioritize the Factors to be considered for developing Hydro Power in Nepal
() Technical
() Social
() Environmental
() Economical