Sie sind auf Seite 1von 3

(1) Date:

(2) Agency:
(3) Region:
(4) District/ City:

(5) Name of Project (7) Source of Funds (8) Issued Obligated (9) Released CDC/Sub CDC
PD__ of BP Authority #
CONSTRUCTION OF BARANGAY ROAD Sec__Item__

(6) Location:

(10) Project Description: (11) Calendar Days to Complete

(12) Equipment to be Used:


(13) Dimension/Length:
SEE ATTACH PLAN

(14) Technical Personnel Required: (15) Implementation Procedure Adm/Contract

BY CONTRACT
(16) Estimated Cost By Item of Work (Materials and Labor Only)

(16.1) SCOPE OF WORK TO BE DONE (16.2) % of TOTAL (16.3)UNIT (16.4)UNIT (16.5)UNIT (16.6) TOTAL AMOUNT
QUANTITY PRICE

1.) LAYOUT / EXCAVATION

2.) CONSTRUCTION OF BARANGAY ROAD

PREPARED BY: CHECKED BY:

_________________________________ _________________________________
BSCE-3 STUDENT INSTRUCTOR

RECOMMENDING APPROVAL: APPROVED BY:

_________________________________ _________________________________
DIRECTOR, COLLEGE OF ENGINEERING CAMPUS DIRECTOR
SHEETS

Sheet 2 of 2 Sheets

BREAKDOWN OF ESTIMATED EXPENDITURE % 0F TOTAL AMOUNT

I. ESTIMATED COST
A. DIRECT COST:
1. Mobilization/Demolition
2. Materials:
2.1 Supply/Delivery/Hauling
2.2 Testing of Materials

3. Labor (Including Fringe Benefits)


4. Equipment Expenses

B. INDIRECT COST
1. Overhead, Contingency, Miscellaneous, (7% to 1% of
A1 & A4)
2. Profit (3% to 12% of A2 to A4)
3. Comprehensive All Risk Insurance (1.5% of A1 to A4)
4. VAT (10% of A3 to A4)

SUB-TOTAL (CONTRACT COST)

II. ESTIMATED GOVERNMENT EXPENDITURES

1. Engineering and Administration (Overhead(3% of A1


to A4)
2. ROW/Site Acquisition
3. Materials to be furnished by the Government
4. Publication/Ads

SUB-TOTAL:

III. CONTINGENCIES/RESERVES
1. Physical (up to 5% of the Estimated Contract Cost)

2. Price Escalation (up to 12% of the Estimated Contract


Cost)

TOTAL ESTIMATED PROJECT COST

PREPARED BY: CHECKED BY:

_________________________________ _________________________________
BSCE-3 STUDENT INSTRUCTOR

RECOMMENDING APPROVAL: APPROVED BY:

_________________________________ _________________________________
DIRECTOR, COLLEGE OF ENGINEERING CAMPUS DIRECTOR
SHEETS

Sheet 1 of 1 Sheets

Unit No. / Quantity Unit


MATERIALS USED AMOUNT
Men Men Days Rate/Day

I.) LAYOUT/ EXCAVATION


A.) MATERIALS:
1.)
B.) LABOR
2.)

II.) CONSTRUCTION OF BARANGAY ROAD


A.) MATERIALS
1.)
2.)
3.)
4.)
5.)

B.) LABOR

C.) EQUIPMENT EXPENSES

PREPARED BY: CHECKED BY:

_________________________________ _________________________________
BSCE-3 STUDENT INSTRUCTOR

RECOMMENDING APPROVAL: APPROVED BY:

_________________________________ _________________________________
DIRECTOR, COLLEGE OF ENGINEERING CAMPUS DIRECTOR

Das könnte Ihnen auch gefallen