1 Sanction Details:
Name of Sub Station and name of DDUGJY Project BEHRA,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)

Whether land procurement and handling over to contractor is completed? YES


Name, designation and mobile number of Engineer-in-charge Mr. Santosh Kr Sinha, EEE(Project)- 9304

2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019

3 Up-stream network details:


Name of upstream power substation (wherefrom 33 KV line eminates) LILO of Khandra Lodharia Line
Status of 33 KV Bay in upstream power substation NA
Length of 33 KV line 0.4 K.M. as per Survey
Type of pole, nos. of poles needed 9 Mtr. PSC / H-Beam (13 Mtr.)
Type of Conductor proposed for 33 KV line ACSR Dog
Length of 33 KV line passing through forest NA
Status of Forest clearance- details of application, payment of fee, details to be
submitted NA
Any Right of Way issue involved, give details like route length affected action
taken NA

4 Down-stream network details:


Nos. of 11 KV Bays 4
Length of 11 KV outgoing feeders 40KM
Type of poles, nos. of poles needed 8 Mtr. / H-Beam
Type of conductor proposed Rabbit
Status of Forest clearance- details of application, payment of fee, details to be
submitted
Any Right of Way isue involved, give details like route length affected action
taken

5 Substation approach and area development


Status of approach road to substation from nearby road
Status of levelling of substation area WIP
Who is responsible for area development and construction of substation
approach
Status of storm water drainage , if needed

6A Progress: Approval of civil drawings


Date of Approval of Layout drawing of substation 25.10.2017

Date of Approval of control room, trench, equipment's foundations drawings 06.09.2017


Date of Approval of fencing drawings

6B Progress: Status of Civil Works


Readiness of approach road or likely completion date
Readiness of levelling of substation area or likely completion date WIP
Readiness of Control Room or likely completion date WIP
Readiness of Cable Tranches (indoor & outdoor) or likely completion date
Readiness of equipment foundation or likely completion date
Readiness of fencing or likely completion date or likely completion date
Readiness of Sub Station Sign Board

6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit Quantity

1 Power Transformer Nos. 1


2 Station Transformer Nos. 1
3 33 KV Breaker Nos. 4
4 11 KV Breaker Nos. 10
5 33 KV Control Panel- Transformer Breaker Nos. 1
6 33 KV Control Panel- Feeder Nos. 1
7 11 KV Control Panel- Transformer Breaker Nos. 1
8 11 KV Control Panel- Feeder Nos. 4
9 HT Cable Nos.
10 Control Cables Nos.
11 Earthing Materials MT 3.25
12 ACDB Nos. 1
13 Battery Nos. 1
14 Battery Charger Nos. 1
15 DCDB Nos. 1

6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit Quantity
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line

6D Likely/actual date of substation commissioning:


6E Date of taken over of substation by Project Implementation Agency
GJY
up)

AD, DDUGJY

inha, EEE(Project)- 9304619224

2017
ctric & Engg Co Ltd

Lodharia Line

Survey
eam (13 Mtr.)
Status of Mobilisation
Material Received at site Material Erected
Unit Quantity Unit

m lines:
Status of Mobilisation
Material Received at site Material Erected
Unit Quantity Unit
Sub Station wise Details covered under DDUGJY
(Sub station wise separate sheet to be filled up)
1 Sanction Details:
Name of Sub Station and name of DDUGJY Project BENAGARIYA,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)

Whether land procurement and handling over to contractor is completed? YES


Name, designation and mobile number of Engineer-in-charge Mr. Santosh Kr Sinha, EEE(Project)- 9304

2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019

3 Up-stream network details:


Name of upstream power substation (wherefrom 33 KV line eminates) Nirsa PSS
Status of 33 KV Bay in upstream power substation NA
Length of 33 KV line 13.5 K.M. as per Survey
Type of pole, nos. of poles needed 9 Mtr. PSC / H-Beam (13 Mtr.)
Type of Conductor proposed for 33 KV line ACSR Dog
Length of 33 KV line passing through forest NA
Status of Forest clearance- details of application, payment of fee, details to be
submitted NA
Any Right of Way issue involved, give details like route length affected action
taken NA

4 Down-stream network details:


Nos. of 11 KV Bays 4
Length of 11 KV outgoing feeders 40KM
Type of poles, nos. of poles needed 8 Mtr. / H-Beam
Type of conductor proposed Rabbit
Status of Forest clearance- details of application, payment of fee, details to be
submitted
Any Right of Way isue involved, give details like route length affected action
taken

5 Substation approach and area development


Status of approach road to substation from nearby road
Status of levelling of substation area WIP
Who is responsible for area development and construction of substation
approach
Status of storm water drainage , if needed

6A Progress: Approval of civil drawings


Date of Approval of Layout drawing of substation 25.10.2017

Date of Approval of control room, trench, equipment's foundations drawings 06.09.2017


Date of Approval of fencing drawings

6B Progress: Status of Civil Works


Readiness of approach road or likely completion date
Readiness of levelling of substation area or likely completion date WIP
Readiness of Control Room or likely completion date WIP
Readiness of Cable Tranches (indoor & outdoor) or likely completion date
Readiness of equipment foundation or likely completion date
Readiness of fencing or likely completion date or likely completion date
Readiness of Sub Station Sign Board

6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit Quantity

1 Power Transformer Nos. 1


2 Station Transformer Nos. 1
3 33 KV Breaker Nos. 4
4 11 KV Breaker Nos. 10
5 33 KV Control Panel- Transformer Breaker Nos. 1
6 33 KV Control Panel- Feeder Nos. 1
7 11 KV Control Panel- Transformer Breaker Nos. 1
8 11 KV Control Panel- Feeder Nos. 4
9 HT Cable Nos.
10 Control Cables Nos.
11 Earthing Materials MT 3.25
12 ACDB Nos. 1
13 Battery Nos. 1
14 Battery Charger Nos. 1
15 DCDB Nos. 1

6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit Quantity
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line

6D Likely/actual date of substation commissioning:


6E Date of taken over of substation by Project Implementation Agency
HANBAD, DDUGJY

inha, EEE(Project)- 9304619224

2017
ctric & Engg Co Ltd

r Survey
eam (13 Mtr.)
Status of Mobilisation Materia
l
Material Received at site Erected
Unit Quantity Unit

m lines:
Materia
Status of Mobilisation l
Material Received at site Erected
Unit Quantity Unit
Sub Station wise Details covered under DDUGJY
(Sub station wise separate sheet to be filled up)
1 Sanction Details:
Name of Sub Station and name of DDUGJY Project SONARIYA,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)

Whether land procurement and handling over to contractor is completed? YES


Name, designation and mobile number of Engineer-in-charge Mr. Santosh Kr Sinha, EEE(Project)- 9304

2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019

3 Up-stream network details:


Name of upstream power substation (wherefrom 33 KV line eminates) KASITANR PSS
Status of 33 KV Bay in upstream power substation NA
Length of 33 KV line 12.5 K.M. as per Survey
Type of pole, nos. of poles needed 9 Mtr. PSC / H-Beam (13 Mtr.)
Type of Conductor proposed for 33 KV line ACSR Dog
Length of 33 KV line passing through forest NA
Status of Forest clearance- details of application, payment of fee, details to be
submitted NA
Any Right of Way issue involved, give details like route length affected action
taken NA

4 Down-stream network details:


Nos. of 11 KV Bays 4
Length of 11 KV outgoing feeders 40KM
Type of poles, nos. of poles needed 8 Mtr. / H-Beam
Type of conductor proposed Rabbit
Status of Forest clearance- details of application, payment of fee, details to be
submitted
Any Right of Way isue involved, give details like route length affected action
taken

5 Substation approach and area development


Status of approach road to substation from nearby road
Status of levelling of substation area WIP
Who is responsible for area development and construction of substation
approach
Status of storm water drainage , if needed

6A Progress: Approval of civil drawings


Date of Approval of Layout drawing of substation 25.10.2017

Date of Approval of control room, trench, equipment's foundations drawings 06.09.2017


Date of Approval of fencing drawings

6B Progress: Status of Civil Works


Readiness of approach road or likely completion date
Readiness of levelling of substation area or likely completion date WIP
Readiness of Control Room or likely completion date WIP
Readiness of Cable Tranches (indoor & outdoor) or likely completion date
Readiness of equipment foundation or likely completion date
Readiness of fencing or likely completion date or likely completion date
Readiness of Sub Station Sign Board

6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit Quantity

1 Power Transformer Nos. 1


2 Station Transformer Nos. 1
3 33 KV Breaker Nos. 4
4 11 KV Breaker Nos. 10
5 33 KV Control Panel- Transformer Breaker Nos. 1
6 33 KV Control Panel- Feeder Nos. 1
7 11 KV Control Panel- Transformer Breaker Nos. 1
8 11 KV Control Panel- Feeder Nos. 4
9 HT Cable Nos.
10 Control Cables Nos.
11 Earthing Materials MT 3.25
12 ACDB Nos. 1
13 Battery Nos. 1
14 Battery Charger Nos. 1
15 DCDB Nos. 1

6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit Quantity
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line

6D Likely/actual date of substation commissioning:


6E Date of taken over of substation by Project Implementation Agency
overed under DDUGJY
e sheet to be filled up)

NBAD, DDUGJY

inha, EEE(Project)- 9304619224

2017
ctric & Engg Co Ltd

r Survey
eam (13 Mtr.)
S
t
a
t
u
s

o
f

I
n
s
p
e
c
t
i
o
n

b
y

R
Q
M

(
Y
e
s
/
Whether inspection N
Requisition raised for RQM o
Status of Mobilisation Inspection (Yes/No) )
Material Received at site Material Erected
Unit Quantity Unit Quantity

m lines:
Status of Mobilisation Remarks
Material Received at site Material Erected
Unit Quantity Unit Quantity
Sub Station wise Details covered under DDUGJY
(Sub station wise separate sheet to be filled up)
1 Sanction Details:
Name of Sub Station and name of DDUGJY Project MANIYADIH,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)

Whether land procurement and handling over to contractor is completed? NO


Name, designation and mobile number of Engineer-in-charge Mr. Santosh Kr Sinha, EEE(Project)- 930

2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019

3 Up-stream network details:


Name of upstream power substation (wherefrom 33 KV line eminates) NA
Status of 33 KV Bay in upstream power substation NA
Length of 33 KV line NA
Type of pole, nos. of poles needed 9 Mtr. PSC / H-Beam (13 Mtr.)
Type of Conductor proposed for 33 KV line ACSR Dog
Length of 33 KV line passing through forest NA
Status of Forest clearance- details of application, payment of fee, details to be
submitted NA
Any Right of Way issue involved, give details like route length affected action
taken NA

4 Down-stream network details:


Nos. of 11 KV Bays NA
Length of 11 KV outgoing feeders NA
Type of poles, nos. of poles needed 8 Mtr. / H-Beam
Type of conductor proposed Rabbit
Status of Forest clearance- details of application, payment of fee, details to be
submitted
Any Right of Way isue involved, give details like route length affected action
taken

5 Substation approach and area development


Status of approach road to substation from nearby road
Status of levelling of substation area
Who is responsible for area development and construction of substation
approach
Status of storm water drainage , if needed

6A Progress: Approval of civil drawings


Date of Approval of Layout drawing of substation

Date of Approval of control room, trench, equipment's foundations drawings


Date of Approval of fencing drawings

6B Progress: Status of Civil Works


Readiness of approach road or likely completion date
Readiness of levelling of substation area or likely completion date
Readiness of Control Room or likely completion date
Readiness of Cable Tranches (indoor & outdoor) or likely completion date
Readiness of equipment foundation or likely completion date
Readiness of fencing or likely completion date or likely completion date
Readiness of Sub Station Sign Board

6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit

1 Power Transformer Nos.


2 Station Transformer Nos.
3 33 KV Breaker Nos.
4 11 KV Breaker Nos.
5 33 KV Control Panel- Transformer Breaker Nos.
6 33 KV Control Panel- Feeder Nos.
7 11 KV Control Panel- Transformer Breaker Nos.
8 11 KV Control Panel- Feeder Nos.
9 HT Cable Nos.
10 Control Cables Nos.
11 Earthing Materials MT
12 ACDB Nos.
13 Battery Nos.
14 Battery Charger Nos.
15 DCDB Nos.

6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line

6D Likely/actual date of substation commissioning:


6E Date of taken over of substation by Project Implementation Agency
tails covered under DDUGJY
parate sheet to be filled up)

ANIYADIH,DHANBAD, DDUGJY
utdoor
X 5 MVA

O
r. Santosh Kr Sinha, EEE(Project)- 9304619224

9.05.2017
0/RE Dt09.06.2017
/s Techno Electric & Engg Co Ltd
A
9.04.2019

A
A
A
Mtr. PSC / H-Beam (13 Mtr.)
CSR Dog
A

A
A
Mtr. / H-Beam
abbit
Whether
inspection
Requisition
raised for
quipment RQM
Inspection
As per scope Status of Mobilisation (Yes/No)
Quantity Material Received at site Material Erected
Unit Quantity Unit Quantity
1
1
4
10
1
1
1
4

3.25
1
1
1
1

d downstream lines:
As per scope Status of Mobilisation Remarks
Quantity Material Received at site Material Erected
Unit Quantity Unit Quantity