2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019
6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit Quantity
6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit Quantity
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line
AD, DDUGJY
2017
ctric & Engg Co Ltd
Lodharia Line
Survey
eam (13 Mtr.)
Status of Mobilisation
Material Received at site Material Erected
Unit Quantity Unit
m lines:
Status of Mobilisation
Material Received at site Material Erected
Unit Quantity Unit
Sub Station wise Details covered under DDUGJY
(Sub station wise separate sheet to be filled up)
1 Sanction Details:
Name of Sub Station and name of DDUGJY Project BENAGARIYA,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)
2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019
6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit Quantity
6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit Quantity
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line
2017
ctric & Engg Co Ltd
r Survey
eam (13 Mtr.)
Status of Mobilisation Materia
l
Material Received at site Erected
Unit Quantity Unit
m lines:
Materia
Status of Mobilisation l
Material Received at site Erected
Unit Quantity Unit
Sub Station wise Details covered under DDUGJY
(Sub station wise separate sheet to be filled up)
1 Sanction Details:
Name of Sub Station and name of DDUGJY Project SONARIYA,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)
2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019
6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit Quantity
6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit Quantity
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line
NBAD, DDUGJY
2017
ctric & Engg Co Ltd
r Survey
eam (13 Mtr.)
S
t
a
t
u
s
o
f
I
n
s
p
e
c
t
i
o
n
b
y
R
Q
M
(
Y
e
s
/
Whether inspection N
Requisition raised for RQM o
Status of Mobilisation Inspection (Yes/No) )
Material Received at site Material Erected
Unit Quantity Unit Quantity
m lines:
Status of Mobilisation Remarks
Material Received at site Material Erected
Unit Quantity Unit Quantity
Sub Station wise Details covered under DDUGJY
(Sub station wise separate sheet to be filled up)
1 Sanction Details:
Name of Sub Station and name of DDUGJY Project MANIYADIH,DHANBAD, DDUGJY
Type of Substation-outdoor/partly outdoor/fully indoor Outdoor
Capacity of Süb Station (MVA) 1 X 5 MVA
Arrangement of supply (LILO/Radial)
Location of Sub Station (GPS Coordinates)
2 Substation Contract:
Date of award of work 09.05.2017
Letter of Award No. and date 60/RE Dt09.06.2017
Agency name M/s Techno Electric & Engg Co Ltd
Value (Tentative) NA
Schedule Completion period 09.04.2019
6C Progress: Materials mobilisation, receipt at site and erection thereof of substatin equipment
SI. Equipment As per scope
No.
Unit
6D
SI. Progress Materials mobilisation, receipt at site and erection thereof of upstram and downstream lines:
No. Equipment As per scope
Unit
1 Poles for 33 KV Line Nos.
2 Poles for 11 KV Line
3 Conductors for 33 KV Line
4 Conductors for 11 KV Line
5 Erection of 33 KV Poles
6 Erection of 11 KV Poles
7 Stringing of 33 KV Line
8 Stringing of 11 KV Line
ANIYADIH,DHANBAD, DDUGJY
utdoor
X 5 MVA
O
r. Santosh Kr Sinha, EEE(Project)- 9304619224
9.05.2017
0/RE Dt09.06.2017
/s Techno Electric & Engg Co Ltd
A
9.04.2019
A
A
A
Mtr. PSC / H-Beam (13 Mtr.)
CSR Dog
A
A
A
Mtr. / H-Beam
abbit
Whether
inspection
Requisition
raised for
quipment RQM
Inspection
As per scope Status of Mobilisation (Yes/No)
Quantity Material Received at site Material Erected
Unit Quantity Unit Quantity
1
1
4
10
1
1
1
4
3.25
1
1
1
1
d downstream lines:
As per scope Status of Mobilisation Remarks
Quantity Material Received at site Material Erected
Unit Quantity Unit Quantity