Sie sind auf Seite 1von 297

ZXG10 iBSC

Base Station Controller


Performance Counter Manual – Volume I

Version 6.20

ZTE CORPORATION
ZTE Plaza, Keji Road South,
Hi-Tech Industrial Park,
Nanshan District, Shenzhen,
P. R. China
518057
Tel: (86) 755 26771900 800-9830-9830
Fax: (86) 755 26772236
URL: http://support.zte.com.cn
E-mail: doc@zte.com.cn
LEGAL INFORMATION

Copyright © 2006 ZTE CORPORATION.

The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by
contractual confidentiality obligations.

All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.

This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.

ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.

ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.

Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.

The ultimate right to interpret this product resides in ZTE CORPORATION.

Revision History

Date Revision No. Serial No. Reason for Issue


Sep 03, 2008 R1.0 sjzl20083208 First edition
Oct 22, 2008 R1.1 sjzl20083208 Updated
Mar 30, 2009 R1.2 sjzl20083208 Updated
Apr 23, 2009 R1.3 sjzl20083208 Updated
ZTE CORPORATION
Values Your Comments & Suggestions!
Your opinion is of great value and will help us improve the quality of our product
documentation and offer better services to our customers.
Please fax to: (86) 755-26772236; or mail to Technical Delivery Department, ZTE
University, Dameisha, Yantian District, Shenzhen, Guangdong, P.R. China 518083.
Thank you for your cooperation!

Document
ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual – Volume I
Name
Document Revision
Product Version V6.20 R1.3
Number
Equipment
Serial No. sjzl20083208
Installation Date

Presentation:
(Introductions, Procedures, Illustrations, Completeness, Level of Detail, Organization,
Appearance)
… Good … Fair … Average … Poor … Bad … N/A

Your evaluation Accessibility:


of this
(Contents, Index, Headings, Numbering, Glossary)
documentation
… Good … Fair … Average … Poor … Bad … N/A

Intelligibility:
(Language, Vocabulary, Readability & Clarity, Technical Accuracy, Content)
… Good … Fair … Average … Poor … Bad … N/A

Please check the suggestions which you feel can improve this documentation:
… Improve the overview/introduction … Make it more concise/brief
… Improve the Contents … Add more step-by-step procedures/tutorials
… Improve the organization … Add more troubleshooting information
… Include more figures … Make it less technical
Your … Add more examples … Add more/better quick reference aids
suggestions for … Add more detail … Improve the index
improvement of
this … Other suggestions
documentation __________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
# Please feel free to write any comments on an attached sheet.

If you wish to be contacted regarding your comments, please complete the following:
Name Company
Postcode Address
Telephone E-mail
This page is intentionally blank.
Contents

About This Manual ............................................................ i


Purpose ................................................................................ i
Intended Audience ................................................................. i
Prerequisite Skill and Knowledge .............................................. i
What Is in This Manual ........................................................... i
Related Documentation.......................................................... ii
Conventions ........................................................................ iii
How to Get in Touch............................................................. iv

Declaration of RoHS Compliance..................................... v

Chapter 1.......................................................................... 1

PS Basic Measurement (BSC).......................................... 1


Overview ............................................................................. 1
PS Basic Measurement (BSC) Counter Index ............................. 1
C900030001 ........................................................................ 1
C900030002 ........................................................................ 2

Chapter 2.......................................................................... 3

PS Basic Measurement (Cell) .......................................... 3


Overview ............................................................................. 3
PS Basic Measurement (Cell) Counter Index.............................. 3
C900040001 ...................................................................... 12
C900040002 ...................................................................... 13
C900040003 ...................................................................... 14
C900040004 ...................................................................... 15
C900040005 ...................................................................... 15
C900040006 ...................................................................... 16
C900040007 ...................................................................... 16
C900040008 ...................................................................... 17
C900040009 ...................................................................... 17
C900040010 ...................................................................... 17
C900040011.......................................................................18
C900040012.......................................................................19
C900040013.......................................................................19
C900040014.......................................................................20
C900040015.......................................................................20
C900040016.......................................................................21
C900040017.......................................................................21
C900040018.......................................................................21
C900040019.......................................................................21
C900040020.......................................................................22
C900040021.......................................................................22
C900040022.......................................................................23
C900040023.......................................................................24
C900040024.......................................................................24
C900040025.......................................................................24
C900040026.......................................................................26
C900040027.......................................................................27
C900040028.......................................................................27
C900040029.......................................................................27
C900040030.......................................................................28
C900040031.......................................................................28
C900040032.......................................................................28
C900040033.......................................................................29
C900040034.......................................................................29
C900040035.......................................................................29
C900040036.......................................................................30
C900040037.......................................................................30
C900040038.......................................................................30
C900040039.......................................................................31
C900040040.......................................................................31
C900040041.......................................................................31
C900040042.......................................................................32
C900040043.......................................................................32
C900040044.......................................................................32
C900040045.......................................................................33
C900040046.......................................................................33
C900040047.......................................................................33
C900040048.......................................................................34
C900040049.......................................................................34
C900040050 ...................................................................... 35
C900040051 ...................................................................... 35
C900040052 ...................................................................... 36
C900040053 ...................................................................... 37
C900040054 ...................................................................... 37
C900040055 ...................................................................... 38
C900040056 ...................................................................... 38
C900040057 ...................................................................... 39
C900040058 ...................................................................... 39
C900040059 ...................................................................... 40
C900040060 ...................................................................... 40
C900040061 ...................................................................... 41
C900040062 ...................................................................... 42
C900040063 ...................................................................... 42
C900040064 ...................................................................... 43
C900040065 ...................................................................... 44
C900040066 ...................................................................... 44
C900040067 ...................................................................... 45
C900040068 ...................................................................... 45
C900040069 ...................................................................... 46
C900040070 ...................................................................... 46
C900040071 ...................................................................... 47
C900040072 ...................................................................... 48
C900040073 ...................................................................... 48
C900040074 ...................................................................... 49
C900040075 ...................................................................... 50
C900040076 ...................................................................... 50
C900040077 ...................................................................... 51
C900040078 ...................................................................... 51
C900040079 ...................................................................... 52
C900040080 ...................................................................... 52
C900040081 ...................................................................... 53
C900040082 ...................................................................... 53
C900040083 ...................................................................... 54
C900040084 ...................................................................... 54
C900040085 ...................................................................... 54
C900040086 ...................................................................... 55
C900040087 ...................................................................... 55
C900040088 ...................................................................... 56
C900040089.......................................................................56
C900040090.......................................................................56
C900040091.......................................................................57
C900040092.......................................................................57
C900040093.......................................................................58
C900040094.......................................................................58
C900040095.......................................................................59
C900040096.......................................................................59
C900040097.......................................................................59
C900040098.......................................................................60
C900040099.......................................................................60
C900040100.......................................................................60
C900040101.......................................................................61
C900040102.......................................................................61
C900040103.......................................................................62
C900040104.......................................................................62
C900040105.......................................................................62
C900040106.......................................................................63
C900040107.......................................................................63
C900040108.......................................................................63
C900040109.......................................................................64
C900040110.......................................................................65
C900040111.......................................................................65
C900040112.......................................................................66
C900040113.......................................................................67
C900040114.......................................................................67
C900040115.......................................................................68
C900040116.......................................................................68
C900040117.......................................................................69
C900040118.......................................................................69
C900040119.......................................................................70
C900040120.......................................................................70
C900040121.......................................................................71
C900040122.......................................................................72
C900040123.......................................................................72
C900040124.......................................................................73
C900040125.......................................................................73
C900040126.......................................................................74
C900040127.......................................................................74
C900040128 ...................................................................... 75
C900040129 ...................................................................... 75
C900040130 ...................................................................... 76
C900040131 ...................................................................... 76
C900040132 ...................................................................... 77
C900040133 ...................................................................... 77
C900040134 ...................................................................... 78
C900040135 ...................................................................... 78
C900040136 ...................................................................... 78
C900040137 ...................................................................... 79
C900040138 ...................................................................... 79
C900040139 ...................................................................... 79
C900040140 ...................................................................... 80
C900040141 ...................................................................... 80
C900040142 ...................................................................... 81
C900040143 ...................................................................... 82
C900040144 ...................................................................... 82
C900040145 ...................................................................... 83
C900040146 ...................................................................... 84
C900040147 ...................................................................... 85
C900040148 ...................................................................... 85
C900040149 ...................................................................... 86
C900040150 ...................................................................... 87
C900040151 ...................................................................... 88
C900040152 ...................................................................... 88
C900040153 ...................................................................... 89
C900040154 ...................................................................... 89
C900040155 ...................................................................... 90
C900040156 ...................................................................... 91
C900040157 ...................................................................... 91
C900040158 ...................................................................... 92
C900040159 ...................................................................... 92
C900040160 ...................................................................... 94
C900040161 ...................................................................... 94
C900040162 ...................................................................... 95
C900040163 ...................................................................... 95
C900040164 ...................................................................... 96
C900040165 ...................................................................... 97
C900040166 ...................................................................... 97
C900040167.......................................................................98
C900040168.......................................................................98
C900040169.......................................................................99
C900040170.......................................................................99
C900040171.......................................................................99
C900040172..................................................................... 100
C900040173..................................................................... 100
C900040174..................................................................... 100
C900040175..................................................................... 101
C900040176..................................................................... 101
C900040177..................................................................... 101
C900040178..................................................................... 102
C900040179..................................................................... 102
C900040180..................................................................... 102
C900040181..................................................................... 103
C900040182..................................................................... 103
C900040183..................................................................... 103
C900040184..................................................................... 104
C900040185..................................................................... 104
C900040186..................................................................... 104
C900040187..................................................................... 105
C900040188..................................................................... 105
C900040189..................................................................... 105
C900040190..................................................................... 106
C900040191..................................................................... 106
C900040192..................................................................... 107
C900040193..................................................................... 107
C900040194..................................................................... 107
C900040195..................................................................... 108
C900040196..................................................................... 108
C900040197..................................................................... 108
C900040198..................................................................... 109
C900040199..................................................................... 109
C900040200..................................................................... 109
C900040201..................................................................... 110
C900040202..................................................................... 110
C900040203..................................................................... 110
C900040204..................................................................... 111
C900040205..................................................................... 111
C900040206 .................................................................... 111
C900040207 .................................................................... 112
C900040208 .................................................................... 112
C900040209 .................................................................... 112
C900040210 .................................................................... 113
C900040211 .................................................................... 113
C900040212 .................................................................... 113
C900040213 .................................................................... 114
C900040214 .................................................................... 114
C900040215 .................................................................... 114
C900040216 .................................................................... 115
C900040217 .................................................................... 115
C900040218 .................................................................... 115
C900040219 .................................................................... 116
C900040220 .................................................................... 116
C900040221 .................................................................... 116
C900040222 .................................................................... 117
C900040223 .................................................................... 117
C900040224 .................................................................... 117
C900040225 .................................................................... 118

Chapter 3...................................................................... 119

CPU Load Measurement...............................................119


Overview ......................................................................... 119
CPU Load Measurement Counter Index................................. 119
C900050001 .................................................................... 119
C900050002 .................................................................... 120

Chapter 4...................................................................... 121

CS Basic Measurement ................................................121


Overview ......................................................................... 121
CS Basic Measurement Counter Index .................................. 121
C900060001 .................................................................... 131
C900060002 .................................................................... 131
C900060003 .................................................................... 132
C900060004 .................................................................... 133
C900060005 .................................................................... 133
C900060006 .................................................................... 134
C900060007 .................................................................... 135
C900060008..................................................................... 136
C900060009..................................................................... 136
C900060010..................................................................... 137
C900060011..................................................................... 138
C900060012..................................................................... 138
C900060013..................................................................... 141
C900060014..................................................................... 142
C900060015..................................................................... 142
C900060016..................................................................... 143
C900060017..................................................................... 144
C900060018..................................................................... 145
C900060019..................................................................... 145
C900060020..................................................................... 147
C900060021..................................................................... 148
C900060022..................................................................... 149
C900060023..................................................................... 149
C900060024..................................................................... 149
C900060025..................................................................... 150
C900060026..................................................................... 151
C900060027..................................................................... 151
C900060028..................................................................... 152
C900060029..................................................................... 152
C900060030..................................................................... 153
C900060031..................................................................... 154
C900060032..................................................................... 154
C900060033..................................................................... 155
C900060034..................................................................... 155
C900060035..................................................................... 156
C900060036..................................................................... 156
C900060037..................................................................... 157
C900060038..................................................................... 157
C900060039..................................................................... 158
C900060040..................................................................... 158
C900060041..................................................................... 159
C900060042..................................................................... 159
C900060043..................................................................... 160
C900060044..................................................................... 160
C900060045..................................................................... 161
C900060046..................................................................... 162
C900060047 .................................................................... 162
C900060048 .................................................................... 163
C900060049 .................................................................... 164
C900060050 .................................................................... 164
C900060051 .................................................................... 165
C900060052 .................................................................... 166
C900060053 .................................................................... 168
C900060054 .................................................................... 168
C900060055 .................................................................... 169
C900060056 .................................................................... 169
C900060057 .................................................................... 169
C900060058 .................................................................... 170
C900060059 .................................................................... 170
C900060060 .................................................................... 170
C900060061 .................................................................... 171
C900060062 .................................................................... 171
C900060063 .................................................................... 171
C900060064 .................................................................... 171
C900060065 .................................................................... 172
C900060066 .................................................................... 172
C900060067 .................................................................... 172
C900060068 .................................................................... 173
C900060069 .................................................................... 173
C900060070 .................................................................... 173
C900060071 .................................................................... 174
C900060072 .................................................................... 174
C900060073 .................................................................... 174
C900060074 .................................................................... 174
C900060075 .................................................................... 175
C900060076 .................................................................... 175
C900060077 .................................................................... 175
C900060078 .................................................................... 176
C900060079 .................................................................... 176
C900060080 .................................................................... 176
C900060081 .................................................................... 177
C900060082 .................................................................... 177
C900060083 .................................................................... 177
C900060084 .................................................................... 178
C900060085 .................................................................... 178
C900060086..................................................................... 178
C900060087..................................................................... 179
C900060088..................................................................... 179
C900060089..................................................................... 180
C900060090..................................................................... 180
C900060091..................................................................... 180
C900060092..................................................................... 181
C900060093..................................................................... 181
C900060094..................................................................... 182
C900060095..................................................................... 183
C900060096..................................................................... 184
C900060097..................................................................... 184
C900060098..................................................................... 185
C900060099..................................................................... 185
C900060100..................................................................... 186
C900060101..................................................................... 187
C900060102..................................................................... 187
C900060103..................................................................... 188
C900060104..................................................................... 188
C900060105..................................................................... 189
C900060106..................................................................... 189
C900060107..................................................................... 190
C900060108..................................................................... 190
C900060109..................................................................... 190
C900060110..................................................................... 191
C900060111..................................................................... 191
C900060112..................................................................... 192
C900060113..................................................................... 192
C900060114..................................................................... 192
C900060115..................................................................... 193
C900060116..................................................................... 193
C900060117..................................................................... 194
C900060118..................................................................... 194
C900060119..................................................................... 194
C900060120..................................................................... 195
C900060121..................................................................... 196
C900060122..................................................................... 197
C900060123..................................................................... 197
C900060124..................................................................... 197
C900060125 .................................................................... 198
C900060126 .................................................................... 198
C900060127 .................................................................... 199
C900060128 .................................................................... 199
C900060129 .................................................................... 200
C900060130 .................................................................... 201
C900060131 .................................................................... 201
C900060132 .................................................................... 201
C900060133 .................................................................... 202
C900060134 .................................................................... 202
C900060135 .................................................................... 202
C900060136 .................................................................... 203
C900060137 .................................................................... 203
C900060138 .................................................................... 203
C900060139 .................................................................... 204
C900060140 .................................................................... 204
C900060141 .................................................................... 205
C900060142 .................................................................... 205
C900060143 .................................................................... 206
C900060144 .................................................................... 206
C900060145 .................................................................... 207
C900060146 .................................................................... 207
C900060147 .................................................................... 208
C900060148 .................................................................... 208
C900060149 .................................................................... 209
C900060150 .................................................................... 209
C900060151 .................................................................... 209
C900060152 .................................................................... 210
C900060153 .................................................................... 211
C900060154 .................................................................... 211
C900060155 .................................................................... 211
C900060156 .................................................................... 212
C900060157 .................................................................... 212
C900060158 .................................................................... 213
C900060159 .................................................................... 214
C900060160 .................................................................... 214
C900060161 .................................................................... 215
C900060162 .................................................................... 215
C900060163 .................................................................... 215
C900060164..................................................................... 216
C900060165..................................................................... 216
C900060166..................................................................... 217
C900060167..................................................................... 217
C900060168..................................................................... 218
C900060169..................................................................... 218
C900060170..................................................................... 219
C900060171..................................................................... 219
C900060172..................................................................... 220
C900060173..................................................................... 220
C900060174..................................................................... 220
C900060175..................................................................... 221
C900060176..................................................................... 221
C900060177..................................................................... 222
C900060178..................................................................... 222
C900060179..................................................................... 223
C900060180..................................................................... 223
C900060181..................................................................... 224
C900060182..................................................................... 224
C900060183..................................................................... 225
C900060184..................................................................... 225
C900060185..................................................................... 226
C900060186..................................................................... 226
C900060187..................................................................... 226
C900060188..................................................................... 227
C900060189..................................................................... 227
C900060190..................................................................... 228
C900060191..................................................................... 228
C900060192..................................................................... 229
C900060193..................................................................... 229
C900060194..................................................................... 230
C900060195..................................................................... 230
C900060196..................................................................... 231
C900060197..................................................................... 231
C900060198..................................................................... 232
C900060199..................................................................... 232
C900060200..................................................................... 232
C900060201..................................................................... 233
C900060202..................................................................... 233
C900060203 .................................................................... 234
C900060204 .................................................................... 234
C900060205 .................................................................... 235
C900060206 .................................................................... 235
C900060207 .................................................................... 236
C900060208 .................................................................... 236
C900060209 .................................................................... 236
C900060210 .................................................................... 237
C900060211 .................................................................... 237
C900060212 .................................................................... 238
C900060213 .................................................................... 238
C900060214 .................................................................... 239
C900060215 .................................................................... 240
C900060216 .................................................................... 240
C900060217 .................................................................... 241
C900060218 .................................................................... 241
C900060219 .................................................................... 241
C900060220 .................................................................... 242
C900060221 .................................................................... 243
C900060222 .................................................................... 244
C900060223 .................................................................... 244
C900060224 .................................................................... 245
C900060225 .................................................................... 245
C900060226 .................................................................... 246
C900060227 .................................................................... 246
C900060228 .................................................................... 246
C900060229 .................................................................... 247
C900060230 .................................................................... 247
C900060231 .................................................................... 248
C900060232 .................................................................... 248
C900060233 .................................................................... 248
C900060234 .................................................................... 249
C900060235 .................................................................... 249
C900060236 .................................................................... 250
C900060237 .................................................................... 250
C900060238 .................................................................... 250
C900060239 .................................................................... 251
C900060240 .................................................................... 251
C900060241 .................................................................... 252
C900060242..................................................................... 252
C900060243..................................................................... 253
C900060244..................................................................... 253
C900060245..................................................................... 254

Appendix A ...................................................................255

Abbreviations ...............................................................255

Appendix B ...................................................................259

Figures..........................................................................259

Tables ...........................................................................267

Index ............................................................................269
About This Manual

Purpose
This manual provides procedures and guidelines that support the
operation of the ZXG10 iBSC (V6.20).

Intended Audience
This manual is intended for engineers and technicians who
perform operation activities on the ZXG10 iBSC (V6.20).

Prerequisite Skill and Knowledge


To use this manual effectively, users should have a general
understanding of wireless telecommunications technology.
Familiarity with the following is helpful:
„ ZXG10 system and its various components
„ GSM BSS components and processes
„ Local operating procedures

What Is in This Manual


This manual contains three volumes, including the following
sections:

TABLE 1 – M ANUAL SUMMARY

Section Summary
Chapter 1, PS Basic Introduces the detailed information about
Measurement (BSC) counters related to PS basic measurement
(BSC).
Chapter 2, PS Basic Introduces the detailed information about
Measurement (Cell) counters related to PS basic measurement
(Cell).
Chapter 3, CPU Load Introduces the detailed information about

Confidential and Proprietary Information of ZTE CORPORATION i


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual – Volume I

Section Summary
Measurement counters related to CPU load
measurement.
Chapter 4, CS Basic Introduces the detailed information about
Measurement counters related to CS basic
measurement.
Appendix A, Lists all the abbreviations used in this
Abbreviations manual.

Appendix B, Figures Lists all the figures and tables used in this
and Tables manual.

Index Index of terms and definitions appeared in


this manual.

Related Documentation
The following documentation is related to this manual:
„ ZXG10 iBSC (V6.20) Base Station Controller Documentation
Guide
„ ZXG10 iBSC (V6.20) Base Station Controller Technical
Manual
„ ZXG10 iBSC (V6.20) Base Station Controller Hardware
Manual
„ ZXG10 iBSC (V6.20) Base Station Controller Installation
Manual
„ ZXG10 iBSC (V6.20) Base Station Controller Performance
Counters Manual – Volume II
„ ZXG10 iBSC (V6.20) Base Station Controller Performance
Counters Manual – Volume III
„ ZXG10 iBSC (V6.20) Base Station Controller Performance
Counters Manual – Volume IV
„ ZXG10 iBSC (V6.20) Base Station Controller Performance
Counters Manual – Volume V
„ ZXG10 iBSC (V6.20) Base Station Controller KPI Reference
Manual
„ ZXG10 iBSC (V6.20) Base Station Controller Maintenance
Manual (Routine Maintenance)
„ ZXG10 iBSC (V6.20) Base Station Controller Maintenance
Manual (Troubleshooting)
„ ZXG10 iBSC (V6.20) Base Station Controller Maintenance
Manual (Emergency Maintenance)
„ ZXG10 BSS (V6.20) Base Station Subsystem Alarm Handling
Manual

ii Confidential and Proprietary Information of ZTE CORPORATION


About This Manual

„ ZXG10 BSS (V6.20) Base Station Subsystem Notification


Handling Manual
„ ZXG10 BSS (V6.20) Base Station Subsystem OMM Software
Installation Manual
„ ZXG10 BSS (V6.20) Base Station Subsystem Configuration
Manual (Initial Configuration Guide)
„ ZXG10 BSS (V6.20) Base Station Subsystem Configuration
Manual (Feature Configuration Guide)
„ ZXG10 BSS (V6.20) Base Station Subsystem MML Command
Manual
„ ZXG10 BSS (V6.20) Base Station Subsystem Radio
Parameters Manual
„ ZXG10 BSS (V6.20) Base Station Subsystem Operation
Manual (Diagnosis and Test)
„ ZXG10 BSS (V6.20) Base Station Subsystem Operation
Manual (Signaling Tracing)

Conventions
Typographical ZTE documents employ the following typographical conventions.
Conventions
TABLE 2 - TYPOGRAPHIC AL CONVENTIONS

Typeface Meaning
Italics References to other Manuals and documents.
“Quotes” Links on screens.
Bold Menus, menu options, function names, input
fields, radio button names, check boxes, drop-
down lists, dialog box names, window names.
CAPS Keys on the keyboard and buttons on screens
and company name.
Constant width Text that you type, program code, files and
directory names, and function names.
[] Optional parameters.
{} Mandatory parameters.
| Select one of the parameters that are delimited
by it.
Note: Provides additional information about a
certain topic.
Checkpoint: Indicates that a particular step needs
to be checked before proceeding further.
Tip: Indicates a suggestion or hint to make things
easier or more productive for the reader.

Confidential and Proprietary Information of ZTE CORPORATION iii


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual – Volume I

TABLE 3 - MOUSE OPERATION CONVENTIONS


Mouse
Operation Typeface Meaning
Conventions Click Refers to clicking the primary mouse button (usually
the left mouse button) once.
Double-click Refers to quickly clicking the primary mouse button
(usually the left mouse button) twice.
Right-click Refers to clicking the secondary mouse button
(usually the right mouse button) once.
Drag Refers to pressing and holding a mouse button and
moving the mouse.

How to Get in Touch


The following sections provide information on how to obtain
support for the documentation and the software.
Customer If you have problems, questions, comments, or suggestions
Support regarding your product, contact us by e-mail at
support@zte.com.cn. You can also call our customer support
center at (86) 755 26771900 and (86) 800-9830-9830.
Documentation ZTE welcomes your comments and suggestions on the quality
Support and usefulness of this document. For further questions,
comments, or suggestions on the documentation, you can
contact us by e-mail at doc@zte.com.cn; or you can fax your
comments and suggestions to (86) 755 26772236. You can also
browse our website at http://support.zte.com.cn, which contains
various interesting subjects like documentation, knowledge base,
forum and service request.

iv Confidential and Proprietary Information of ZTE CORPORATION


Declaration of RoHS
Compliance

To minimize the environmental impact and take more


responsibility to the earth we live, this document shall serve as
formal declaration that the ZXG10 iBSC (V6.20) Base Station
Controller manufactured by ZTE CORPORATION is in compliance
with the Directive 2002/95/EC of the European Parliament -
RoHS (Restriction of Hazardous Substances) with respect to the
following substances:
„ Lead (Pb)
„ Mercury (Hg)
„ Cadmium (Cd)
„ Hexavalent Chromium (Cr (VI))
„ PolyBrominated Biphenyls (PBB’s)
„ PolyBrominated Diphenyl Ethers (PBDE’s)
The usage of the above substances in ZXG10 iBSC (V6.20) is
explained in the Table 4.

TABLE 4 – USAGE EXPLANATION OF THE HAZ ARDOUS SUBSTANCES IN ZXG10


IBSC (V6.20)

Hazardous substances
Names of Parts
Pb Hg Cd Cr(VI) PBB’s PBDE’s

System × 0 0 0 0 0
Cables and Assembly 0 0 0 0 0 0
Auxiliary Equipment × × × × × ×

Table Explanation:
0: The usage of the substance in all of the components is less
than the allowed values given by 2002/95/EC standard.
×: The usage of the substance in at least one of the components
is beyond the allowed values given by 2002/95/EC standard.

Confidential and Proprietary Information of ZTE CORPORATION v


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

The ZXG10 iBSC (V6.20) Base Station Controller manufactured


by ZTE CORPORATION meet the requirements of EU
2002/95/EC; however, some assemblies are customized to client
specifications. Addition of specialized, customer-specified
materials or processes, which do not meet the requirements of
EU 2002/95 /EC, may negate RoHS compliance of the assembly.
To guarantee compliance of the assembly, the need for
compliant product must be communicated to ZTE CORPORATION
in written form.
This declaration is issued based on our current level of
knowledge. Since conditions of use are outside our control, ZTE
CORPORATION makes no warranties, express or implied, and
assumes no liability in connection with the use of this
information.

vi Confidential and Proprietary Information of ZTE CORPORATION


Chapter 1

PS Basic Measurement
(BSC)

PS basic measurement (BSC) aims to make a statistic of the


performance related with packet switching service on BSC level.
This chapter describes the definition, usage and measurement
point of various counters.

Overview
PS basic measurement (BSC) consists of statistic of the number
of bytes received from data link and bytes sent to data link.
The measurement takes BSC as the statistics unit.

PS Basic Measurement (BSC)


Counter Index
Table 5 lists counters related to PS basic measurement (BSC).

TABLE 5 – PS BASIC MEASUREMENT (BSC) COUNTERS

Counter ID What It Counts


C900030001 Number of bytes received from data link
C900030002 Number of bytes sent to data link

C900030001
Definition Number of bytes received from data link

Confidential and Proprietary Information of ZTE CORPORATION 1


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description This counter counts the total number of bytes received from all
BRCHs on FR sub-layer.
Usage This counter is used to find out the bytes received from BRCH
and to observe BSC load status.
Measurement FR accumulates all the bytes received from Gb interface BRCH.
Point

C900030002
Definition Number of bytes sent to data link
Description This counter counts the total number of bytes sent from all
BRCHs on FR sub-layer.
Usage This counter is used to find out the bytes sent from BRCH and to
observe BSC load status.
Measurement FR accumulates all the bytes sent from Gb interface BRCH.
Point

2 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2

PS Basic Measurement
(Cell)

PS basic measurement (Cell) collects formation of the PS service


(Cell) performance. This chapter gives detailed information
about the PS basic measurement (Cell).

Overview
PS basic measurement (Cell) involves the ordinary counters
used to measure the PS service performance and status, such as
the uplink (UL) /downlink (DL) TBF counter, the flow counter,
the UL/DL PACCH counter, the UL/DL RLC counter, the UL/DL
GPRS data counter, the UL/DL EGPRS data counter, and the PS
resource counter.
The measurement takes cell as the statistics unit.

PS Basic Measurement (Cell)


Counter Index
Table 6 lists counters related to PS basic measurement (Cell).

TABLE 6 - PS BASIC MEASUREMENT (CELL) COUNTERS

Counter ID What It Counts


Number of GPRS DL TBF establishment success on
C900040001
PACCH
Number of GPRS DL TBF release due to N3105
C900040002
overflow
Number of GPRS DL TBF release due to other
C900040003
reasons
C900040004 Number of GPRS DL TBF forcing release by control

Confidential and Proprietary Information of ZTE CORPORATION 3


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


plane
Number of GPRS DL TBF release due to instance
C900040005
suspension
Number of GPRS DL TBF release due to inner
C900040006
abnormal
C900040007 Number of GPRS DL signaling TBF establishment
C900040008 Number of GPRS DL data TBF establishment
Number of EGPRS DL TBF establishment success on
C900040009
PACCH
Number of EGPRS DL TBF release due to N3105
C900040010
overflow
Number of EGPRS DL TBF release due to other
C900040011
reasons
Number of EGPRS DL TBF forcing release by control
C900040012
plane
Number of EGPRS DL TBF release due to instance
C900040013
suspension
Number of EGPRS DL TBF release due to inner
C900040014
abnormal
C900040015 Number of EGPRS DL signaling TBF establishment
C900040016 Number of EGPRS DL data TBF establishment
Average number of GPRS DL TBF simultaneous
C900040017
establishment
Average number of EGPRS DL TBF simultaneous
C900040018
establishment
Number of GPRS UL data TBF establishment success
C900040019
on PACCH
Number of GPRS UL TBF release due to N3101
C900040020
overflow
Number of GPRS UL TBF release due to N3103
C900040021
overflow
Number of GPRS UL TBF forcing release by control
C900040022
plane
Number of GPRS UL TBF release due to instance
C900040023
suspension
Number of GPRS UL TBF release due to inner
C900040024
abnormal
C900040025 Number of GPRS UL signaling TBF establishment
C900040026 Number of GPRS UL data TBF establishment
Number of EGPRS UL TBF establishment success on
C900040027
PACCH
Number of EGPRS UL TBF release due to N3101
C900040028
overflow

4 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Counter ID What It Counts


Number of EGPRS UL TBF release due to N3103
C900040029
overflow
Number of EGPRS UL TBF forcing release by control
C900040030
plane
Number of EGPRS UL TBF release due to instance
C900040031
suspension
Number of EGPRS UL TBF release due to inner
C900040032
abnormal
C900040033 Number of EGPRS UL signaling TBF establishment
C900040034 Number of EGPRS UL data TBF establishment
Average number of GPRS UL TBF simultaneous
C900040035
establishment
Average number of EGPRS UL TBF simultaneous
C900040036
establishment
Number of GPRS UL signaling TBF release due to
C900040037
N3101 overflow
Number of GPRS UL signaling TBF release due to
C900040038
N3103 overflow
Number of GPRS UL signaling TBF forcing release by
C900040039
control plane
Number of GPRS UL signaling TBF release due to
C900040040
instance suspension
Number of GPRS UL signaling TBF release due to
C900040041
inner abnormal
Number of EGPRS UL signaling TBF release due to
C900040042
N3101 overflow
Number of EGPRS UL signaling TBF release due to
C900040043
N3103 overflow
Number of EGPRS UL signaling TBF forcing release
C900040044
by control plane
Number of EGPRS UL signaling TBF release due to
C900040045
instance suspension
Number of EGPRS UL signaling TBF release due to
C900040046
inner abnormal
C900040047 Number of EGPRS DL LLC frames
Number of discarded EGPRS DL LLC frames due to
C900040048
buffer overflow
Number of discarded EGPRS DL LLC frames due to
C900040049
life time expiration
Number of discarded EGPRS DL LLC frames due to
C900040050
other reasons
C900040051 Number of DL signaling LLC frames
Number of discarded EGPRS DL signaling LLC
C900040052
frames due to buffer overflow

Confidential and Proprietary Information of ZTE CORPORATION 5


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


Number of discarded EGPRS DL signaling LLC
C900040053
frames due to life time expiration
Number of discarded EGPRS DL signaling LLC
C900040054
frames due to other reasons
Number of data blocks transmitted according to
C900040055
given Abis bandwidth
Bytes of effective upper layer protocol data sent on
C900040056
DL PDCH
Bytes of effective upper layer protocol data received
C900040057
on UL PDCH
C900040058 Bytes of LLC frame on GPRS UL data TBF
C900040059 Duration of GPRS UL data TBF
C900040060 Bytes of LLC frame on GPRS DL data TBF
C900040061 Duration of GPRS DL data TBF
Number of effective data blocks received on GPRS
C900040062
UL TBF
C900040063 Number of NACK blocks received on GPRS UL TBF
Number of effective data blocks sent on GPRS DL
C900040064
TBF
C900040065 Number of NACK blocks sent on GPRS DL TBF
C900040066 Bytes of LLC frame on EGPRS UL data TBF
C900040067 Duration of EGPRS UL data TBF
C900040068 Bytes of LLC frame on EGPRS DL data TBF
C900040069 Duration of EGPRS DL data TBF
Number of effective data blocks received on EGPRS
C900040070
UL TBF
C900040071 Number of NACK blocks received on EGPRS UL TBF
Number of effective data blocks sent on EGPRS DL
C900040072
TBF
C900040073 Number of NACK blocks sent on EGPRS DL TBF
C900040074 Number of GPRS DL LLC frames
Number of discarded GPRS DL LLC frames due to
C900040075
buffer overflow
Number of discarded GPRS DL LLC frames due to
C900040076
life time expiration
Number of discarded GPRS DL LLC frames due to
C900040077
other reasons
C900040078 Number of DL dummy control blocks on PACCH
C900040079 Number of UL dummy control blocks on PACCH
Number of DL RLC blocks on PACCH(excluding
C900040080
dummy block)

6 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Counter ID What It Counts


C900040081 Number of DL RLC pending blocks in CS1 on PDTCH
C900040082 Number of DL RLC pending blocks in CS2 on PDTCH
C900040083 Number of DL RLC pending blocks in CS3 on PDTCH
C900040084 Number of DL RLC pending blocks in CS4 on PDTCH
C900040085 Number of DL RLC NACK blocks in CS1 on PDTCH
C900040086 Number of DL RLC NACK blocks in CS2 on PDTCH
C900040087 Number of DL RLC NACK blocks in CS3 on PDTCH
C900040088 Number of DL RLC NACK blocks in CS4 on PDTCH
C900040089 Number of DL RLC new blocks in CS1 on PDTCH
C900040090 Number of DL RLC new blocks in CS2 on PDTCH
C900040091 Number of DL RLC new blocks in CS3 on PDTCH
C900040092 Number of DL RLC new blocks in CS4 on PDTCH
Number of UL RLC blocks excluding dummy blocks
C900040093
on PACCH
C900040094 Number of UL RLC pending blocks in CS1 on PDTCH
C900040095 Number of UL RLC pending blocks in CS2 on PDTCH
C900040096 Number of UL RLC pending blocks in CS3 on PDTCH
C900040097 Number of UL RLC pending blocks in CS4 on PDTCH
C900040098 Number of UL RLC NACK blocks in CS1 on PDTCH
C900040099 Number of UL RLC NACK blocks in CS2 on PDTCH
C900040100 Number of UL RLC NACK blocks in CS3 on PDTCH
C900040101 Number of UL RLC NACK blocks in CS4 on PDTCH
C900040102 Number of UL RLC new blocks in CS1 on PDTCH
C900040103 Number of UL RLC new blocks in CS2 on PDTCH
C900040104 Number of UL RLC new blocks in CS3 on PDTCH
C900040105 Number of UL RLC new blocks in CS4 on PDTCH
C900040106 Number of UL data blocks received on PDTCH
C900040107 Number of DL data blocks sent on PDTCH
C900040108 Number of GPRS DL TBF establishment requests
Number of GPRS DL TBF establishment failure due
C900040109
to database allocation failure
Number of GPRS DL TBF resource reallocation
C900040110
requests due to UL TBF establishment
Number of GPRS DL TBF resource reallocation
C900040111
failure due to UL TBF establishment
Number of GPRS DL TBF resource reallocation
C900040112
requests due to LLC transmission
Number of GPRS DL TBF resource reallocation
C900040113
failure due to LLC transmission

Confidential and Proprietary Information of ZTE CORPORATION 7


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


C900040114 Number of EGPRS DL TBF establishment requests
Number of EGPRS DL TBF establishment failure due
C900040115
to database allocation failure
Number of EGPRS DL TBF resource reallocation
C900040116
requests due to UL TBF establishment
Number of EGPRS DL TBF resource reallocation
C900040117
failure due to UL TBF establishment
Number of EGPRS DL TBF resource reallocation
C900040118
requests due to LLC transmission
Number of EGPRS DL TBF resource reallocation
C900040119
failure due to LLC transmission
C900040120 Number of GPRS UL TBF establishment requests
Number of GPRS UL TBF establishment failure due
C900040121
to database allocation failure
Number of GPRS UL TBF resource reallocation
C900040122
requests due to DL TBF establishment
Number of GPRS UL TBF resource reallocation
C900040123
failure due to DL TBF establishment
Number of GPRS UL TBF resource reallocation
C900040124
requests due to LLC transmission
Number of GPRS UL TBF resource reallocation
C900040125
failure due to LLC transmission
Number of GPRS UL TBF resource reallocation
C900040126
requests for resource request
Number of GPRS UL TBF resource reallocation
C900040127 failure due to database allocation failure for
resource request
C900040128 Number of EGPRS UL TBF establishment requests
Number of EGPRS UL TBF establishment failure due
C900040129
to database allocation failure
Number of EGPRS UL TBF resource reallocation
C900040130
requests due to DL TBF establishment
Number of EGPRS UL TBF resource reallocation
C900040131
failure due to DL TBF establishment
Number of EGPRS UL TBF resource reallocation
C900040132
requests due to LLC transmission
Number of EGPRS UL TBF resource reallocation
C900040133
failure due to LLC transmission
Number of EGPRS UL TBF resource reallocation
C900040134
requests for resource request
Number of EGPRS UL TBF resource reallocation
C900040135
failure due to database allocation failure
C900040136 Number of available PDCH
C900040137 Number of forcing conversation dynamic from PDCH

8 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Counter ID What It Counts


to TCH by BSC
C900040138 Number of PDCH used by TBF in each cell
C900040139 Maximum number of used PDCH
C900040140 Average number of used PDCH
Number of GPRS DL TBF establishment requests
C900040141
before T3192 expiration
Number of GPRS DL TBF establishment using
C900040142
existing DL TBF resource
Number of GPRS DL TBF establishment requests on
C900040143
PACCH
Number of GPRS DL TBF establishment requests on
C900040144
CCCH/PCCCH
Number of EGPRS DL TBF establishment requests
C900040145
before T3192 expiration
Number of EGPRS DL TBF establishment using
C900040146
existing DL TBF resource
Number of EGPRS DL TBF establishment requests
C900040147
on PACCH
Number of EGPRS DL TBF establishment requests
C900040148
on CCCH/PCCCH
Number of GPRS DL signaling TBF release due to
C900040149
N3105 overflow
Number of GPRS DL signaling TBF release due to
C900040150
other reasons
Number of GPRS DL signaling TBF forcing release by
C900040151
control plane
Number of GPRS DL signaling TBF release due to
C900040152
instance suspension
Number of GPRS DL signaling TBF release due to
C900040153
inner abnormal
Number of EGPRS DL signaling TBF release due to
C900040154
N3105 overflow
Number of EGPRS DL signaling TBF release due to
C900040155
other reasons
Number of EGPRS DL signaling TBF forcing release
C900040156
by control plane
Number of EGPRS DL signaling TBF release due to
C900040157
instance suspension
Number of EGPRS DL signaling TBF release due to
C900040158
inner abnormal
Number of GPRS UL TBF establishments in release
C900040159
state
Number of GPRS UL TBF establishment with existing
C900040160
UL resource

Confidential and Proprietary Information of ZTE CORPORATION 9


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


Number of GPRS UL TBF establishment requests on
C900040161
PACCH
Number of EGPRS UL data TBF establishments on
C900040162
PACCH
Number of EGPRS UL TBF establishments in release
C900040163
state
Number of EGPRS UL TBF establishment with
C900040164
existing UL resource
Number of EGPRS UL TBF establishment requests
C900040165
on PACCH
Number of EGPRS UL TBF establishment requests
C900040166
on CCCH/PCCCH
Number of dynamic PDCH preemption for CS
C900040167
service
Number of GPRS UL TBF establishment requests on
C900040168
CCCH/PCCCH
Number of GPRS DL TBF establishment requests on
C900040169
PACCH
Number of EGPRS DL TBF establishment requests
C900040170
on PACCH
Number of GPRS UL TBF establishment requests on
C900040171
PACCH
Number of DL RLC pending blocks in MCS1 on
C900040172
PDTCH
Number of DL RLC pending blocks in MCS2 on
C900040173
PDTCH
Number of DL RLC pending blocks in MCS3 on
C900040174
PDTCH
Number of DL RLC pending blocks in MCS4 on
C900040175
PDTCH
Number of DL RLC pending blocks in MCS5 on
C900040176
PDTCH
Number of DL RLC pending blocks in MCS6 on
C900040177
PDTCH
Number of DL RLC pending blocks in MCS7 on
C900040178
PDTCH
Number of DL RLC pending blocks in MCS8 on
C900040179
PDTCH
Number of DL RLC pending blocks in MCS9 on
C900040180
PDTCH
C900040181 Number of DL RLC NACK blocks in MCS1 on PDTCH
C900040182 Number of DL RLC NACK blocks in MCS2 on PDTCH
C900040183 Number of DL RLC NACK blocks in MCS3 on PDTCH
C900040184 Number of DL RLC NACK blocks in MCS4 on PDTCH

10 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Counter ID What It Counts


C900040185 Number of DL RLC NACK blocks in MCS5 on PDTCH
C900040186 Number of DL RLC NACK blocks in MCS6 on PDTCH
C900040187 Number of DL RLC NACK blocks in MCS7 on PDTCH
C900040188 Number of DL RLC NACK blocks in MCS8 on PDTCH
C900040189 Number of DL RLC NACK blocks in MCS9 on PDTCH
C900040190 Number of DL RLC new blocks in MCS1 on PDTCH
C900040191 Number of DL RLC new blocks in MCS2 on PDTCH
C900040192 Number of DL RLC new blocks in MCS3 on PDTCH
C900040193 Number of DL RLC new blocks in MCS4 on PDTCH
C900040194 Number of DL RLC new blocks in MCS5 on PDTCH
C900040195 Number of DL RLC new blocks in MCS6 on PDTCH
C900040196 Number of DL RLC new blocks in MCS7 on PDTCH
C900040197 Number of DL RLC new blocks in MCS8 on PDTCH
C900040198 Number of DL RLC new blocks in MCS9 on PDTCH
Number of UL RLC pending blocks in MCS1 on
C900040199
PDTCH
Number of UL RLC pending blocks in MCS2 on
C900040200
PDTCH
Number of UL RLC pending blocks in MCS3 on
C900040201
PDTCH
Number of UL RLC pending blocks in MCS4 on
C900040202
PDTCH
Number of UL RLC pending blocks in MCS5 on
C900040203
PDTCH
Number of UL RLC pending blocks in MCS6 on
C900040204
PDTCH
Number of UL RLC pending blocks in MCS7 on
C900040205
PDTCH
Number of UL RLC pending blocks in MCS8 on
C900040206
PDTCH
Number of UL RLC pending blocks in MCS9 on
C900040207
PDTCH
C900040208 Number of UL RLC NACK blocks in MCS1 on PDTCH
C900040209 Number of UL RLC NACK blocks in MCS2 on PDTCH
C900040210 Number of UL RLC NACK blocks in MCS3 on PDTCH
C900040211 Number of UL RLC NACK blocks in MCS4 on PDTCH
C900040212 Number of UL RLC NACK blocks in MCS5 on PDTCH
C900040213 Number of UL RLC NACK blocks in MCS6 on PDTCH
C900040214 Number of UL RLC NACK blocks in MCS7 on PDTCH
C900040215 Number of UL RLC NACK blocks in MCS8 on PDTCH

Confidential and Proprietary Information of ZTE CORPORATION 11


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


C900040216 Number of UL RLC NACK blocks in MCS9 on PDTCH
C900040217 Number of UL RLC new blocks in MCS1 on PDTCH
C900040218 Number of UL RLC new blocks in MCS2 on PDTCH
C900040219 Number of UL RLC new blocks in MCS3 on PDTCH
C900040220 Number of UL RLC new blocks in MCS4 on PDTCH
C900040221 Number of UL RLC new blocks in MCS5 on PDTCH
C900040222 Number of UL RLC new blocks in MCS6 on PDTCH
C900040223 Number of UL RLC new blocks in MCS7 on PDTCH
C900040224 Number of UL RLC new blocks in MCS8 on PDTCH
C900040225 Number of UL RLC new blocks in MCS9 on PDTCH

C900040001
Definition Number of GPRS DL TBF establishment success on PACCH
Description This counter counts the number of successful DL GPRS TBF
establishments on the UL/DL GPRS TBF PACCH.
Measurement When the DL GPRS TBF is established on the UL/DL GPRS TBF
Point PACCH and a message indicating assignment success is sent,
this counter increments. The measurement points are A as
shown in Figure 1 and Figure 2, and A2 as shown in Figure 3.

FIGURE 1 – MEASUREMENT POINT OF NUMBER OF REQUESTS FOR


ESTABLISHING GPRS DOWNLINK DAT A TBF BEFORE T3192 OVERTIME

MS BSC SGSN
LLC Frame
RLC Block
LLC Frame
RLC Block
RLC Block(FBI=1)
Start T3193

LLC Frame
Packet Downlink Assignment
A

12 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 2 – MEASUREMENT POINT OF NUMBER OF ESTABLISHED GPRS


DOWNLINK DATA TBF USING EXISTING RESOURCES

MS BSC SGSN

RLC Block
RLC Block
LLC Frame
Packet Downlink Assignment
(Packet Timeslot Reconfigure)
A
RLC Block

FIGURE 3 – MEASUREMENT POINT OF NUMBER OF REQUESTS FOR


ESTABLISHING GPRS DOWNLINK DAT A TBF ON UPLINK GPRS TBF PACCH

MS BSC user BSC control SGSN


plane plane
RLC Block
RLC Block
LLC Frame (no record downlink resource)

A1
Downlink Assign Request
Packet Downlink Assignment Resource Assignment
(Packet Timeslot Reconfigure)

A2

C900040002
Definition Number of GPRS DL TBF release due to N3105 overflow
Description During the DL TBF transmission, the DL block RRBP bit is set to
ask MS to respond with a Packet Downlink Ack/Nack message.
If the specified block of BSC fails to receive response from MS,
then the N3105 counter increments; otherwise, it has a clear. If
no response comes from the MS, then the RRBP bit is set again
to ask MS to respond with a Packet Downlink Ack/Nack
message; if the N3105 counter reaches its maximum value, it is
considered that the radio transmission fails and the DL TBF is
released abnormally.
Measurement When the N3105 counter value exceeds N3105Max, this counter
Point increments. The measurement point is A1, as shown in Figure 4.

Confidential and Proprietary Information of ZTE CORPORATION 13


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 4 – MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RELEASE


DUE TO N3105 OVERFLOW

BSC user
MS
plane

RLC/MAC Block(RRBP)

DOWNLINK ACK

N3105=0
DOWNLINK ACK LOSS

N3105 > N3105Max

A1

C900040003
Definition Number of GPRS DL TBF release due to other reasons
Description When BSC is transmitting the last DL TBF RLC block, set FBI to 1,
set RRBP to ask the MS to respond with a Packet Downlink
Ack/Nack message, and at the same time, activate T3191. If the
specified block receives the MS response, then T3191 will stop
and the DL transmission ends normally. If T3191 overflows, then
it is considered that the radio transmission fails and the DL TBF
is released abnormally.
Measurement The measurement point is A1, as shown in Figure 5.
Point
FIGURE 5 – MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RELEASE
DUE TO OTHER REASONS

MS BSC

RLC Block

Start T3191
DOWNLINK ACK

Normal release

T3191 Timeout
A1

14 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040004
Definition Number of GPRS DL TBF forcing release by control plane

Description When the user plane is transmitting the DL TBF, if a release


request comes from the control plane, then the DL TBF will stop
and be released abnormally.
Measurement When the user plane receives the release request from the
Point control plane, this counter increments. The measurement point
is A, as shown in Figure 6.

FIGURE 6 – MEASUREMENT POINT OF NUMBER OF GPRS DL TBF FORCING


RELEASE BY CONTROL PLANE

C900040005
Definition Number of GPRS DL TBF release due to instance suspension
Description When the user plane is transmitting the DL TBF, at least one
block must be transmitted in every 5 seconds. After a DL TBF
block is transmitted, BSC will start or restart a 5-second DL
block assigning timer. If the timer expires, it is considered that
the user plane has an instance suspension and the DL TBF is
released abnormally.
Measurement When the DL block assigning timer expires, this counter
Point increments. The measurement point is A, as shown in Figure 7.

Confidential and Proprietary Information of ZTE CORPORATION 15


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 7 - MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RELEASE


DUE TO INSTANCE SUSPENSION

C900040006
Definition Number of GPRS DL TBF release due to inner abnormal
Description When the user plane is transmitting the DL TBF, if the message
fails to be sent at the radio interface, the RLC instance fails to be
created, or the resource reassignment fails, the DL TBF will be
released abnormally.
Measurement During the DL TBF transmission, if the message fails to be sent
Point at the radio interface, the RLC instance fails to be created, or the
resource reassignment fails, this counter increments.

C900040007
Definition Number of GPRS DL signaling TBF establishment
Description According to the type of the transmitted UL data, TBF has two
categories: signaling TBF and data TBF.
This counter counts the number of establishments of GPRS DL
TBF for UL signaling transmission. The UL signaling involves
some UL processes such as ATTACH, PDP activation, and routing
area update.
Measurement When the DL TBF is created successfully and the TBF type is
Point GPRS signaling TBF, the counter increments. The measurement
point is similar to those of C900040001 and C901000014.

16 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040008
Definition Number of GPRS DL data TBF establishment
Description According to the type of the transmitted UL data, TBF has two
categories: signaling TBF and data TBF.
This counter counts the number of establishments of GPRS DL
TBF for user data (no-UL-signaling) transmission.
Measurement When the DL TBF is created successfully and the TBF type is
Point GPRS data TBF, the counter increments. The measurement point
is similar to those of C900040001 and C901000014.

C900040009
Definition Number of EGPRS DL TBF establishment success on PACCH
Description This counter counts the number of successful DL EGPRS TBF
establishments on the UL/DL EGPRS TBF PACCH.
Measurement When the DL EGPRS TBF is established on the UL/DL EGPRS TBF
Point PACCH and a message indicating assignment success is sent,
this counter increments. The measurement points are A as
shown in Figure 1 and Figure 2, and A2 as shown in Figure 3.

C900040010
Definition Number of EGPRS DL TBF release due to N3105 overflow
Description „ During the DL TBF transmission, the DL block RRBP bit is set
to ask the MS to respond with a Packet Downlink Ack/Nack
message.
If the specified block of BSC does not receive the MS response,
then the N3105 counter increments; if it does, then it has a
clear; if no response comes from the MS, then the RRBP bit is
set again to ask the MS to respond with a Packet Downlink
Ack/Nack message; if the N3105 counter reaches its maximum
value, it is considered that the radio transmission fails and the
DL TBF is released abnormally.
Measurement When the N3105 counter value exceeds N3105Max, this counter
Point increments. The measurement point is A1, as shown in Figure 8.

Confidential and Proprietary Information of ZTE CORPORATION 17


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 8 – MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF RELEASE


DUE TO N3105 OVERFLOW

C900040011
Definition Number of EGPRS DL TBF release due to other reasons
Description When BSC is transmitting the last DL TBF RLC block, set FBI to 1,
set RRBP to ask the MS to respond with a Packet Downlink
Ack/Nack message, and at the same time, activate T3191. If the
specified block receives the MS response, then T3191 will stop
and the DL transmission ends normally. If T3191 overflows, then
it is considered that the radio transmission fails and the DL TBF
is released abnormally.
Measurement The measurement point is A1, as shown in Figure 9.
Point
FIGURE 9 – MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF RELEASE
DUE TO OTHER REASONS

MS BSC

RLC Block

Start T3191
DOWNLINK ACK

Normal release

T3191 Timeout
A1

Unit Times

18 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040012
Definition Number of EGPRS DL TBF forcing release by control plane
Description When the user plane is transmitting the DL TBF, if a release
request comes from the control plane, then the DL TBF will stop
and be released abnormally.
Measurement When the user plane receives the release request from the
Point control plane, this counter increments. The measurement point
is A, as shown in Figure 10.

FIGURE 10 – MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF FORCING


RELEASE BY CONTROL PLANE

Unit Times

C900040013
Definition Number of EGPRS DL TBF release due to instance suspension
Description When the user plane is transmitting the DL TBF, at least one
block must be transmitted in every 5 seconds. After a DL TBF
block is transmitted, BSC will start or restart a 5-second DL
block assigning timer. If the timer expires, it is considered that
the user plane has an instance suspension and the DL TBF is
released abnormally.
Measurement When the DL block assigning timer expires, this counter
Point increments. The measurement point is A1, as shown in Figure 11.

Confidential and Proprietary Information of ZTE CORPORATION 19


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 11 - MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF RELEASE


DUE TO INSTANCE SUSPENSION

Unit Times

C900040014
Definition Number of EGPRS DL TBF release due to inner abnormal
Description When the user plane is transmitting the DL TBF, if the message
fails to be sent at the radio interface, the RLC instance fails to be
created, or the resource reassignment fails, the DL TBF will be
released abnormally.
Measurement During the DL TBF transmission, if the message fails to be sent
Point at the radio interface, the RLC instance fails to be created, or the
resource reassignment fails, this counter increments.
Unit Times

C900040015
Definition Number of EGPRS DL signaling TBF establishment
Description According to the type of the transmitted UL data, TBF has two
categories: signaling TBF and data TBF.
This counter counts the number of establishments of EGPRS DL
TBF for UL signaling transmission. The UL signaling involves
some UL processes such as ATTACH, PDP activation, and routing
area update.
Measurement When the DL TBF is created successfully and the TBF type is
Point signaling TBF, the counter increments. The measurement point
is similar to those of C900040001 and C901000014.
Unit Times

20 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040016
Definition Number of EGPRS DL data TBF establishment
Description According to the type of the transmitted UL data, TBF has two
categories: signaling TBF and data TBF.
This counter counts the number of establishments of EGPRS DL
TBF for user data (no-UL-signaling) transmission.
Measurement When the DL TBF is created successfully and the TBF type is
Point data TBF, the counter increments. The measurement point is
similar to those of C900040001 and C901000014.
Unit Times

C900040017
Definition Average number of GPRS DL TBF simultaneous establishment
Description This counter counts the average number of DL GPRS TBF
establishments in a cell.
Measurement The counter acquires the measurement value regularly. The
Point number of GPRS TBFs existing in the cell is considered the
average number.
Unit Times

C900040018
Definition Average number of EGPRS DL TBF simultaneous establishment
Description This counter counts the average number of DL EGPRS TBF
establishments in a cell.
Measurement The counter acquires the measurement value regularly. The
Point number of EGPRS TBFs existing in the cell is considered the
average number.
Unit Times

C900040019
Definition Number of GPRS UL data TBF establishment success on PACCH
Description When MS has a DL TBF and the TBF is being transmitted, if the
UL data need to be transmitted but there is no corresponding UL
TBF, then the Packet Downlink Ack message will carry the UL
TBF establishment request. Usually BSS will assign the resource
to MS, and then an UL TBF is established successfully.

Confidential and Proprietary Information of ZTE CORPORATION 21


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Usage The counter counts the number of successful GPRS UL TBF


establishments on PACCH
Measurement The measurement point is A, as shown in Figure 12.
Point
FIGURE 12 - MEASUREMENT POINT OF NUMBER OF GPRS UL DAT A TBF
ESTABLISHM ENT SUCCESS ON P ACCH

Unit Times

C900040020
Definition Number of GPRS UL TBF release due to N3101 overflow
Description After the UL TBF is established, MS will transmit data on the
BSS-assigned UL block. If the specified block of BSS fails to
receive RLC block from MS, N3101 increments. Otherwise,
N3101 will have a clear. When N3101 exceeds the maximum
value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of GPRS UL
TBF due to N3101 overflow.
Measurement The measurement point is N3101 overflow, as A shown in Figure
Point 13.

FIGURE 13 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF RELEASE


DUE TO N3101 OVERFLOW

Unit Times

C900040021
Definition Number of GPRS UL TBF release due to N3103 overflow

22 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Description When BSS receives all UL RLC blocks, it will send MS a Packet
Uplink Ack message in which FAI and RRBP are set. MS will
report Packet Control Ack to the corresponding UL block. If
BSS fails to receive it, N3103 increments. When N3103 exceeds
the maximum value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of GPRS UL
TBF due to N3103 overflow.
Measurement The measurement point is N3103 overflow, as A shown in Figure
Point 14.

FIGURE 14 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF RELEASE


DUE TO N3103 OVERFLOW

Unit Times

C900040022
Definition Number of GPRS UL TBF forcing release by control plane
Description When an UL TBF establishment is held, the control plane may
forcibly release this UL TBF.
Usage The counter counts the number of forced releases of GPRS UL
TBF due to release request from the control plane.
Measurement The measurement point is arrival of the release request, as A
Point shown in Figure 15.

FIGURE 15 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF FORCING


RELEASE BY CONTROL PLANE

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 23


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040023
Definition Number of GPRS UL TBF release due to instance suspension
Description BSS creates an instance for an UL TBF. If the instance is
suspended for some reason, then BSS should release this UL
TBF.
Usage The counter counts the number of abnormal releases of GPRS UL
TBF due to suspension of the instance.
Measurement The measurement point is that UPPB detects suspension of the
Point instance, as A shown in Figure 16.

FIGURE 16 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF RELEASE


DUE TO INSTANCE SUSPENSION

Unit Times

C900040024
Definition Number of GPRS UL TBF release due to inner abnormal
Description TBF is abnormally released due to UPPB internal error.
Usage The counter counts the number of abnormal releases of GPRS UL
TBF due to internal error.
Measurement The measurement point is abnormal UPPB suspension, as B
Point shown in Figure 16.
Unit Times

C900040025
Definition Number of GPRS UL signaling TBF establishment
Description For different purpose, MS may establish two types of TBF:
signaling TBF and data TBF.
Usage The counter counts the number of GPRS UL signaling TBF link
establishments.
Measurement The measurement point is that UPPB access type is signaling TBF.
Point For all 1-step accesses, their type is considered signaling TBF, as

24 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

A1 shown in Figure 17. For the 2-step accesses, the TBF type is
detected as SIGNAL_TBF, as A1 shown in Figure 18.

FIGURE 17 – UL TBF FLOW OF 1-STEP ACCESS

Confidential and Proprietary Information of ZTE CORPORATION 25


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 18 - UL TBF FLOW OF 2-STEP ACCESS

MS BSS

Channel Request/Packet Channel


Request

Immediate Assignment/Packet Uplink


Assignment

Packet Resource Request


A1

Packet Uplink Assignment

Data Block(CV!=0)

Packet Uplink Ack(FAI=0)

Data Block(CV=0)

P_UPLINK_ACK(FAI=1)

P_CTRL_ACK

A2

Unit Times

C900040026
Definition Number of GPRS UL data TBF establishment
Description For different purpose, MS may establish two types of TBF:
signaling TBF and data TBF.
Usage The counter counts the number of GPRS UL data TBF link
establishments.
Measurement The measurement point is when UPPB access type is data TBF.
Point For example, the TBF type is detected as DATA_TBF, as A1
shown in Figure 18.
Unit Times

26 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040027
Definition Number of EGPRS UL TBF establishment success on PACCH
Description When MS has a DL TBF and the TBF is being transmitted, if the
UL data need to be transmitted but there is no corresponding UL
TBF, then the Packet Downlink Ack message will carry the UL
TBF establishment request. Usually BSS will assign the resource
to MS, and then an UL TBF is established successfully.
Usage The counter counts the number of successful EGPRS UL TBF
establishments on PACCH
Measurement The measurement point is A, as shown in Figure 19.
Point
FIGURE 19 - MEASUREMENT POINT OF NUMBER OF EGPRS UL TBF
ESTABLISHM ENT SUCCESS ON P ACCH

Unit Times

C900040028
Definition Number of EGPRS UL TBF release due to N3101 overflow
Description After the UL TBF is established, MS will transmit data on the
BSS-assigned UL block. If the specified block of BSS fails to
receive RLC block from MS, N3101 increments. Otherwise,
N3101 will have a clear. When N3101 exceeds the maximum
value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of EGPRS
UL TBF due to N3101 overflow.
Measurement The measurement point is when N3101 overflow.
Point

Unit Times

C900040029
Definition Number of EGPRS UL TBF release due to N3103 overflow
Description When BSS receives all UL RLC blocks, it will send MS a Packet
Uplink Ack message in which FAI and RRBP are set. MS will

Confidential and Proprietary Information of ZTE CORPORATION 27


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

report Packet Control Ack to the corresponding UL block. If


BSS fails to receive it, N3103 increments. When N3103 exceeds
the maximum value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of EGPRS
UL TBF due to N3103 overflow.
Measurement The measurement point is when N3103 overflow.
Point
Unit
Times

C900040030
Definition Number of EGPRS UL TBF forcing release by control plane
Description When an UL TBF establishment is held, the control plane may
forcibly release this UL TBF.
Usage The counter counts the number of forced releases of EGPRS UL
TBF due to release request from the control plane.
Measurement The measurement point is arrival of the release request.
Point

Unit Times

C900040031
Definition Number of EGPRS UL TBF release due to instance suspension
Description BSS creates an instance for an UL TBF. If the instance is
suspended for some reason, then BSS should release this UL
TBF.
Usage The counter counts the number of abnormal releases of EGPRS
UL TBF due to suspension of the instance.
Measurement The measurement point is that UPPB detects suspension of the
Point instance.

Unit Times

C900040032
Definition Number of EGPRS UL TBF release due to inner abnormal
Description TBF is abnormally released due to UPPB internal error.
Usage The counter counts the number of abnormal releases of EGPRS
UL TBF due to internal error.

28 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Measurement The measurement point is abnormal UPPB suspension.


Point

Unit Times

C900040033
Definition Number of EGPRS UL signaling TBF establishment
Description For different purpose, MS may establish two types of TBF:
signaling TBF and data TBF.
Usage The counter counts the number of EGPRS UL signaling TBF link
establishments.
Measurement The measurement point is that UPPB access type is signaling TBF.
Point

Unit Times

C900040034
Definition Number of EGPRS UL data TBF establishment
Description For different purpose, MS may establish two types of TBF:
signaling TBF and data TBF.
Usage The counter counts the number of EGPRS UL data TBF link
establishments.
Measurement The measurement point is that UPPB access type is data TBF.
Point

Unit Times

C900040035
Definition Average number of GPRS UL TBF simultaneous establishment
Description There may be more than one TBF in the system during the
sampling period. Average number of uplink GPRS TBF
establishing simultaneously = Number of UL GPRS TBFs
established simultaneously in the sampling period / Times of
sampling
Usage This counter counts the average number of UL GPRS TBF
establishing simultaneously.
Measurement When UPPB receives the message informing UL GPRS TBF
Point establishment, the number of TBFs is refreshed and the times of
sampling accumulates.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 29


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040036
Definition Average number of EGPRS UL TBF simultaneous establishment
Description There may be more than one TBF in the system during the
sampling period. Average number of uplink EGPRS TBF
establishing simultaneously = Number of UL EGPRS TBFs
established simultaneously in the sampling period / Times of
sampling
Usage This counter counts the average number of UL EGPRS TBF
establishing simultaneously.
Measurement When UPPB receives the message informing UL EGPRS TBF
Point establishment, the number of TBFs is refreshed and the times of
sampling accumulates.
Unit Times

C900040037
Definition Number of GPRS UL signaling TBF release due to N3101 overflow
Description After the UL TBF is established, MS will transmit data on the
BSS-assigned UL block. If the specified block of BSS fails to
receive RLC block from MS, N3101 increments. Otherwise,
N3101 will have a clear. When N3101 exceeds the maximum
value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of GPRS
signaling UL TBF due to N3101 overflow.
Measurement The measurement point is N3101 overflow.
Point

Unit Times

C900040038
Definition Number of GPRS UL signaling TBF release due to N3103 overflow
Description When BSS receives all UL RLC blocks, it will send MS a Packet
Uplink Ack message in which FAI and RRBP are set. MS will
report Packet Control Ack to the corresponding UL block. If
BSS fails to receive it, N3103 increments. When N3103 exceeds
the maximum value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of GPRS
signaling UL TBF due to N3103 overflow.
Measurement The measurement point is N3103 overflow.
Point

30 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Unit Times

C900040039
Definition Number of GPRS UL signaling TBF forcing release by control
plane
Description When an UL TBF establishment is held, the control plane may
forcibly release this UL TBF.
Usage The counter counts the number of forced releases of GPRS
signaling UL TBF due to release request from the control plane.
Measurement The measurement point is arrival of the release request.
Point

Unit Times

C900040040
Definition Number of GPRS UL signaling TBF release due to instance
suspension
Description BSS creates an instance for an UL TBF. If the instance is
suspended for some reason, then BSS should release this UL
TBF.
Usage The counter counts the number of abnormal releases of GPRS
signaling UL TBF due to suspension of the instance.
Measurement The measurement point is that UPPB detects suspension of the
Point instance.
Unit Times

C900040041
Definition Number of GPRS UL signaling TBF release due to inner abnormal
Description TBF is abnormally released due to UPPB internal error.
Usage The counter counts the number of abnormal releases of GPRS
signaling UL TBF due to internal error.
Measurement The measurement point is abnormal UPPB suspension.
Point

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 31


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040042
Definition Number of EGPRS UL signaling TBF release due to N3101
overflow
Description After the UL TBF is established, MS will transmit data on the
BSS-assigned UL block. If the specified block of BSS fails to
receive RLC block from MS, N3101 increments. Otherwise,
N3101 will have a clear. When N3101 exceeds the maximum
value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of EGPRS
signaling UL TBF due to N3101 overflow.
Measurement The measurement point is N3101 overflow.
Point

Unit Times

C900040043
Definition Number of EGPRS UL signaling TBF release due to N3103
overflow
Description When BSS receives all UL RLC blocks, it will send MS a Packet
Uplink Ack message in which FAI and RRBP are set. MS will
report Packet Control Ack to the corresponding UL block. If
BSS fails to receive it, N3103 increments. When N3103 exceeds
the maximum value, BSS will release UL TBF.
Usage The counter counts the number of abnormal releases of EGPRS
signaling UL TBF due to N3103 overflow.
Measurement The measurement point is N3103 overflow.
Point

Unit Times

C900040044
Definition Number of EGPRS UL signaling TBF forcing release by control
plane
Description When an UL TBF establishment is held, the control plane may
forcibly release this UL TBF.
Usage The counter counts the number of forced releases of EGPRS
signaling UL TBF due to release request from the control plane.
Measurement The measurement point is arrival of the release request.
Point

Unit Times

32 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040045
Definition Number of EGPRS UL signaling TBF release due to instance
suspension
Description BSS creates an instance for an UL TBF. If the instance is
suspended for some reason, then BSS should release this UL
TBF.
Usage The counter counts the number of abnormal releases of EGPRS
signaling UL TBF due to suspension of the instance.
Measurement The measurement point is that UPPB detects suspension of the
Point instance.
Unit Times

C900040046
Definition Number of EGPRS UL signaling TBF release due to inner
abnormal
Description TBF is abnormally released due to UPPB internal error.
Usage The counter counts the number of abnormal releases of EGPRS
signaling UL TBF due to internal error.
Measurement The measurement point is abnormal UPPB suspension.
Point

Unit Times

C900040047
Definition Number of EGPRS DL LLC frames
Description The DL GIPB sends DL UnitData to UPPB through IP packets.
tQoSProfile Tbit in DL UnitData identifies whether data or
signaling is transmitted. UPPB applies to CMP to establish DL TBF
(radio access capacity to carry MS) and according to the CMP
request, establishes EGPRS/GPRS TBF.
Usage The counter counts the number of EGPRS DL LLC frames.
Measurement The measurement point is A, as shown in Figure 20.
Point

Confidential and Proprietary Information of ZTE CORPORATION 33


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 20 - MEASUREMENT POINT OF NUMBER OF EGPRS DL LLC FRAMES

Unit Times

C900040048
Definition Number of discarded EGPRS DL LLC frames due to buffer
overflow
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to acquire buffer, then it will send the LLC Discard
message to SGSN.
Usage The counter counts the number of discarded EGPRS DL LLC
frames due to buffer overflow.
Measurement The measurement point is A, as shown in Figure 21.
Point
FIGURE 21 - MEASUREMENT POINT OF NUMBER OF DISCARDED EGPRS DL
LLC FRAMES DUE TO BUFFER OVERFLOW

Unit Times

C900040049
Definition Number of discarded EGPRS DL LLC frames due to life time
expiration
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to send them before the LLC frame life time expires,
then it will send the LLC Discard message to SGSN.
Usage

34 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

The counter counts the number of discarded EGPRS DL LLC


frames due to life time expiration.
Measurement The measurement point is A, as shown in Figure 22.
Point
FIGURE 22 - MEASUREMENT POINT OF NUMBER OF DISCARDED EGPRS DL
LLC FRAMES DUE TO LIFE TIME EXPIRATION

Unit Times

C900040050
Definition Number of discarded EGPRS DL LLC frames due to other reasons
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to send them for reasons other than the above two in
C900040048 and C900040049, then it will send the LLC
Discard message to SGSN.
Usage The counter counts the number of discarded EGPRS DL LLC
frames due to other reasons than the above two in C900040048
and C900040049.
Measurement The measurement point is A, as shown in Figure 23.
Point
FIGURE 23 - MEASUREMENT POINT OF NUMBER OF DISCARDED EGPRS DL
LLC FRAMES DUE TO OTHER REASONS

Unit Times

C900040051
Definition Number of DL signaling LLC frames

Confidential and Proprietary Information of ZTE CORPORATION 35


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description The DL GIPB sends DL UnitData to UPPB through IP packets.


tQoSProfile Tbit in DL UnitData identifies whether data or
signaling is transmitted. UPPB applies to the control plane to
establish DL TBF (radio access capacity to carry MS) and
according to the request of the control plane, establishes
EGPRS/GPRS TBF.
Usage The counter counts the number of DL signaling LLC frames.
Measurement The measurement point is A, as shown in Figure 24.
Point
FIGURE 24 - MEASUREMENT POINT OF NUMBER OF DL SIGNALING LLC
FRAMES

Unit Times

C900040052
Definition Number of discarded EGPRS DL signaling LLC frames due to
buffer overflow
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to acquire buffer, then it will send the LLC Discard
message to SGSN.
Usage The counter counts the number of discarded EGPRS DL signaling
LLC frames due to buffer overflow.
Measurement The measurement point is A, as shown in Figure 25.
Point

FIGURE 25 - MEASUREMENT POINT OF NUMBER OF DISCARDED EGPRS DL


SIGNALING LLC FRAMES DUE TO BUFFER OVERFLOW

36 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Unit Times

C900040053
Definition Number of discarded EGPRS DL signaling LLC frames due to life
time expiration
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to send them before the LLC frame life time expires,
then it will send the LLC Discard message to SGSN.
Usage The counter counts the number of discarded EGPRS DL signaling
LLC frames due to life time expiration.
Measurement The measurement point is A, as shown in Figure 26.
Point
FIGURE 26 - MEASUREMENT POINT OF NUMBER OF DISCARDED EGPRS DL
SIGNALING LLC FRAMES DUE TO LIFE TIME EXPIRATION

Unit Times

C900040054
Definition Number of discarded EGPRS DL signaling LLC frames due to
other reasons
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to send them for reasons other than the above two in
C900040052 and C900040053, then it will send the LLC
Discard message to SGSN.
Usage The counter counts the number of discarded EGPRS DL signaling
LLC frames due to other reasons than the above two in
C900040052 and C900040053.
Measurement The measurement point is A, as shown in Figure 27.
Point

Confidential and Proprietary Information of ZTE CORPORATION 37


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 27 - MEASUREMENT POINT OF NUMBER OF DISCARDED EGPRS DL


SIGNALING LLC FRAMES DUE TO OTHER REASONS

Unit Times

C900040055
Definition Number of data blocks transmitted according to given Abis
bandwidth
Description Because the bandwidth carrying the Abis-interface (TS) timeslot
is limited, PS may need 1 or more Abis TSs for specific RLC
coding modes. If the number of Abis TSs bond to the channel is
definite, the RLC coding mode is also definite for the channel.
Usage The counter counts the number of data blocks transmitted
according to given Abis bandwidth.
Measurement During the DL PCU frame transmission, if the number of Abis
Point TSs required by the coding mode equals that of Abis TSs bond to
the channel, the counter increments.
Unit Times

C900040056
Definition Bytes of effective upper layer protocol data sent on DL PDCH
Description UPPB divides the DL LLC frame into RLC blocks and sends them
to MS. After correctly receiving those RLC blocks, MS will
recompose the LLC frame. UPPB acquires the information about
MS reception by setting RRBP to let MS report the Packet
Downlink Ack / EGPRS Packet Downlink Ack message.
Usage The counter counts the bytes of effective upper layer protocol
data sent on DL PDCH.
Measurement The measurement point is A, as shown in Figure 28.
Point

38 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 28 - MEASUREMENT POINT OF TOTAL BYTES OF EFFECTIVE UPPER


LAYER PROTOCOL DAT A SENT ON DL PDCH

MS BSS
downlink RLC blocks & not setting RRBP

downlink RLC blocks & setting RRBP

Packet Downlink Ack/Egprs Packet


Downlink Ack

A
Unit Byte

C900040057
Definition Bytes of effective upper layer protocol data received on UL PDCH
Description After receiving the RLC blocks reported by MS, UPPB composes
them into the LLC frame and sends it to SGSN. At same time,
UPPB sends the Packet Uplink Ack message to MS by a certain
rule.
Usage The counter counts the bytes of effective upper layer protocol
data received on UL PDCH.
Measurement The measurement point is A, as shown in Figure 29.
Point
FIGURE 29 - MEASUREMENT POINT OF TOTAL BYTES OF EFFECTIVE UPPER
LAYER PROTOCOL DAT A RECEIVED ON UL PDCH

Unit Byte

C900040058
Definition Bytes of LLC frame on GPRS UL data TBF
Description After receiving the RLC blocks reported by MS, UPPB composes
them into the LLC frame and sends it to SGSN. At same time,
UPPB sends the Packet Uplink Ack message to MS by a certain
rule.
Usage The counter counts the bytes carried by GPRS UL data TBF LLC
frame.

Confidential and Proprietary Information of ZTE CORPORATION 39


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement The measurement point is A, as shown in Figure 30.


Point

FIGURE 30 - MEASUREMENT POINT OF BYTES OF LLC FRAME ON GPRS UL


DATA TBF

Unit Byte

C900040059
Definition Duration of GPRS UL data TBF
Description The duration starts when BSS receives the UL access from MS
and ends when BSS receives the data block (CV=0) and all the
other blocks have arrived.
Usage The counter counts the duration of GPRS UL data TBF.
Measurement The duration lasts from UPPB’s reception of UL TBF
Point establishment request to transmission of Packet Uplink Ack
with FAI set. The measurement point is A, as shown in Figure 31.

FIGURE 31 - MEASUREMENT POINT OF DURATION OF GPRS UL DATA TBF

Unit Ms

C900040060
Definition Bytes of LLC frame on GPRS DL data TBF
Description UPPB divides the DL LLC frame into RLC blocks and sends them
to MS. Besides. UPPB sets RRBP by a certain rule. Then MS

40 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

reports Packet Downlink Ack/EGPRS Packet Downlink Ack in


the specific UL block.
Usage The counter counts the bytes of LLC frame on GPRS DL data TBF.
Measurement The measurement point is A, as shown in Figure 32.
Point

FIGURE 32 - MEASUREMENT POINT OF BYTES OF LLC FRAME ON GPRS DL


DATA TBF

Unit Byte

C900040061
Definition Duration of GPRS DL data TBF
Description The duration lasts from BSS’s reception of the UL TBF
establishment request to its reception of Packet Downlink
Ack/EGPRS Packet Downlink Ack (Packet Control Ack in non-
reply mode) with FAI=1 sent from MS.
Usage The counter counts the duration of GPRS DL data TBF.
Measurement The measurement point is A, as shown in Figure 33.
Point
FIGURE 33 - MEASUREMENT POINT OF DURATION OF GPRS DL DATA TBF

Unit Ms

Confidential and Proprietary Information of ZTE CORPORATION 41


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040062
Definition Number of effective data blocks received on GPRS UL TBF
Description During the TBF transmission, MS divides the UL LLC frame into
RLC blocks and sends them to BSS. Only when BSS receives all
these RLC blocks can it recompose the LLC frame.
Usage The counter counts the number of effective data blocks received
on GPRS UL TBF
Measurement The measurement point is A, as shown in Figure 34.
Point
FIGURE 34 - MEASUREMENT POINT OF NUMBER OF EFFECTIVE DATA BLOCKS
RECEIVED ON GPRS UL TBF

Unit Times

C900040063
Definition Number of NACK blocks received on GPRS UL TBF
Description During the TBF transmission, MS divides the UL LLC frame into
RLC blocks and sends them to BSS. Only when BSS correctly
receives all these RLC blocks can it recompose the LLC frame.
BBS informs MS of the RLC block reception through Packet
Uplink Ack. For the reply mode, if any RLC block is lost, MS
should transmit again.
Usage The counter counts the number of NACK blocks received on
GPRS UL TBF
Measurement Then counter increments when BSS correctly receives a NACK
Point block. The measurement point is A, as shown in Figure 35.

42 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 35 - MEASUREMENT POINT OF NUMBER OF NACK BLOCKS RECEIVED


ON GPRS UL TBF

Unit Times

C900040064
Definition Number of effective data blocks sent on GPRS DL TBF
Description During the TBF transmission, BSS divides the UL LLC frame into
RLC blocks and sends them to MS. Only when MS correctly
receives all these RLC blocks can it recompose the LLC frame.
MS informs BSS of the RLC block reception through Packet
DownLink Ack/EGPRS Packet Downlink Ack.
Usage The counter counts the number of effective data blocks sent on
GPRS DL TBF
Measurement Then counter increments when Packet DownLink Ack/EGPRS
Point Packet Downlink Ack indicates that MS have correctly received
the RLC block. The measurement point is A1, as shown in Figure
36.

FIGURE 36 - MEASUREMENT POINT OF NUMBER OF EFFECTIVE DATA BLOCKS


SENT ON GPRS DL TBF

MS BSC SGSN

LLC Frame
RLC Block
A1
Packet Downlink Ack
Bitmap indicates some data
blocks fail to arrive
RLC Block(NACK)
A2
LLC Frame
RLC Block

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 43


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040065
Definition Number of NACK blocks sent on GPRS DL TBF
Description During the TBF transmission, BSS divides the UL LLC frame into
RLC blocks and sends them to MS. Only when MS correctly
receives all these RLC blocks can it recompose the LLC frame.
MS informs BSS of the RLC block reception through Packet
DownLink Ack/EGPRS Packet Downlink Ack.
Usage The counter counts the number of NACK blocks sent on GPRS DL
TBF.
Measurement Then counter increments when Packet DownLink Ack/EGPRS
Point Packet Downlink Ack indicates that MS fails to receive the RLC
block. The measurement point is A2, as shown in Figure 37.

FIGURE 37 - MEASUREMENT POINT OF NUMBER OF NACK BLOCKS SENT ON


GPRS DL TBF

MS BSC SGSN

LLC Frame
RLC Block
A1
Packet Downlink Ack
Bitmap indicates some data
blocks fail to arrive
RLC Block(NACK)
A2
LLC Frame
RLC Block

Unit Times

C900040066
Definition Bytes of LLC frame on EGPRS UL data TBF
Description After receiving the RLC blocks reported by MS, UPPB composes
them into the LLC frame and sends it to SGSN. At same time,
UPPB sends the Packet Uplink Ack message to MS by a certain
rule.
Usage The counter counts the bytes of LLC frame on EGPRS UL data
TBF.
Measurement The measurement point is A, as shown in Figure 38.
Point

44 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 38 - MEASUREMENT POINT OF BYTES OF LLC FRAME ON EGPRS UL


DATA TBF

Unit Byte

C900040067
Definition Duration of EGPRS UL data TBF
Description The duration starts when BSS receives the UL access from MS
and ends when BSS receives the data block (CV=0) and all the
other blocks have arrived.
Usage The counter counts the duration of EGPRS UL data TBF.
Measurement The duration lasts from UPPB’s reception of UL TBF
Point establishment request to transmission of Packet Uplink Ack
with FAI set. The measurement point is A, as shown in Figure 39.

FIGURE 39 - MEASUREMENT POINT OF DURATION OF EGPRS UL DATA TBF

Unit Ms

C900040068
Definition Bytes of LLC frame on EGPRS DL data TBF
Description UPPB divides the DL LLC frame into RLC blocks and sends them
to MS. Besides. UPPB sets RRBP by a certain rule. Then MS
reports Packet Downlink Ack/EGPRS Packet Downlink Ack in
the specific UL block.
Usage The counter counts the bytes of LLC frame on EGPRS DL data
TBF.

Confidential and Proprietary Information of ZTE CORPORATION 45


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement The measurement point is A, as shown in Figure 40.


Point
FIGURE 40 - MEASUREMENT POINT OF BYTES OF LLC FRAME ON EGPRS DL
DATA TBF

Unit Byte

C900040069
Definition Duration of EGPRS DL data TBF
Description The duration lasts from BSS’s reception of the UL TBF
establishment request to its reception of Packet Downlink
Ack/EGPRS Packet Downlink Ack (Packet Control Ack in non-
reply mode) with FAI=1 sent from MS.
Usage The counter counts the duration of EGPRS DL data TBF.
Measurement The measurement point is A, as shown in Figure 41.
Point
FIGURE 41 - MEASUREMENT POINT OF DURATION OF EGPRS DL DATA TBF

Unit Ms

C900040070
Definition Number of effective data blocks received on EGPRS UL TBF
Description

46 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

During the TBF transmission, MS divides the UL LLC frame into


RLC blocks and sends them to BSS. Only when BSS receives all
these RLC blocks can it recompose the LLC frame.
Usage The counter counts the number of effective data blocks received
on EGPRS UL TBF.
Measurement The measurement point is A, as shown in Figure 42.
Point
FIGURE 42 - MEASUREMENT POINT OF NUMBER OF EFFECTIVE DATA BLOCKS
RECEIVED ON EGPRS UL TBF

Unit Times

C900040071
Definition Number of NACK blocks received on EGPRS UL TBF
Description During the TBF transmission, MS divides the UL LLC frame into
RLC blocks and sends them to BSS. Only when BSS correctly
receives all these RLC blocks can it recompose the LLC frame.
BBS informs MS of the RLC block reception through Packet
Uplink Ack. For the reply mode, if any RLC block is lost, MS
should transmit again.
Usage The counter counts the number of NACK blocks received on
EGPRS UL TBF.
Measurement Then counter increments when BSS correctly receives a NACK
Point block. The measurement point is A, as shown in Figure 43.

FIGURE 43 - MEASUREMENT POINT OF NUMBER OF NACK BLOCKS RECEIVED


ON EGPRS UL TBF

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 47


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040072
Definition Number of effective data blocks sent on EGPRS DL TBF
Description During the TBF transmission, BSS divides the UL LLC frame into
RLC blocks and sends them to MS. Only when MS correctly
receives all these RLC blocks can it recompose the LLC frame.
MS informs BSS of the RLC block reception through Packet
DownLink Ack/EGPRS Packet Downlink Ack.
Usage The counter counts the number of effective data blocks sent on
EGPRS DL TBF.
Measurement Then counter increments when Packet DownLink Ack/EGPRS
Point Packet Downlink Ack indicates that MS have correctly received
the RLC block. The measurement point is A1, as shown in Figure
44.

FIGURE 44 - MEASUREMENT POINT OF NUMBER OF EFFECTIVE DATA BLOCKS


SENT ON EGPRS DL TBF

MS BSC SGSN

LLC Frame
RLC Block
A1
Packet Downlink Ack
Bitmap indicates some data
blocks fail to arrive
RLC Block(NACK)
A2
LLC Frame
RLC Block

Unit Times

C900040073
Definition Number of NACK blocks sent on EGPRS DL TBF
Description During the TBF transmission, BSS divides the UL LLC frame into
RLC blocks and sends them to MS. Only when MS correctly
receives all these RLC blocks can it recompose the LLC frame.
MS informs BSS of the RLC block reception through Packet
DownLink Ack/EGPRS Packet Downlink Ack.
Usage The counter counts the number of NACK blocks sent on EGPRS
DL TBF.
Measurement
Point

48 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Then counter increments when Packet DownLink Ack/EGPRS


Packet Downlink Ack indicates that MS fails to receive the RLC
block. The measurement point is A2, as shown in Figure 45.

FIGURE 45 - MEASUREMENT POINT OF NUMBER OF NACK BLOCKS SENT ON


EGPRS DL TBF

MS BSC SGSN

LLC Frame
RLC Block
A1
Packet Downlink Ack
Bitmap indicates some data
blocks fail to arrive
RLC Block(NACK)
A2
LLC Frame
RLC Block

Unit Times

C900040074
Definition Number of GPRS DL LLC frames
Description The DL GIPB sends DL UnitData to UPPB through IP packets.
tQoSProfile Tbit in DL UnitData identifies whether data or
signaling is transmitted. UPPB applies to CMP to establish DL TBF
(radio access capacity to carry MS) and according to the CMP
request, establishes EGPRS/GPRS TBF.
Usage The counter counts the number of GPRS DL LLC frames.
Measurement The measurement point is A, as shown in Figure 46.
Point
FIGURE 46 - MEASUREMENT POINT OF NUMBER OF GPRS DL LLC FRAMES

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 49


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040075
Definition Number of discarded GPRS DL LLC frames due to buffer overflow
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to acquire buffer, then it will send the LLC Discard
message to SGSN.
Usage The counter counts the number of discarded GPRS DL LLC
frames due to buffer overflow.
Measurement The measurement point is A, as shown in Figure 47.
Point
FIGURE 47 - MEASUREMENT POINT OF NUMBER OF DISCARDED GPRS DL
LLC FRAMES DUE TO BUFFER OVERFLOW

Unit Times

C900040076
Definition Number of discarded GPRS DL LLC frames due to life time
expiration
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to send them before the LLC frame life time expires,
then it will send the LLC Discard message to SGSN.
Usage The counter counts the number of discarded GPRS DL LLC
frames due to life time expiration.
Measurement The measurement point is A, as shown in Figure 48.
Point
FIGURE 48 - MEASUREMENT POINT OF NUMBER OF DISCARDED GPRS DL
LLC FRAMES DUE TO LIFE TIME EXPIRATION

50 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Unit Times

C900040077
Definition Number of discarded GPRS DL LLC frames due to other reasons
Description The DL GIPB sends DL UnitData to UPPB through IP packets. If
UPPB fails to send them for reasons other than the above two in
C900040075 and C900040076, then it will send the LLC
Discard message to SGSN.
Usage The counter counts the number of discarded GPRS DL LLC
frames due to other reasons than the above two in C900040075
and C900040076.
Measurement The measurement point is A, as shown in Figure 49.
Point

FIGURE 49 - MEASUREMENT POINT OF NUMBER OF DISCARDED GPRS DL


LLC FRAMES DUE TO OTHER REASONS

Unit Times

C900040078
Definition Number of DL dummy control blocks on PACCH
Description If there is no other RLC/MAC block available in the network, BSS
will transmit the DUMMY blocks to MS for UL transmission.
The counter counts the number of DL dummy control blocks sent
by BSC on PACCH in the packet transmission mode.
Measurement If the DL control block sent from BTS to MS is a DL Dummy
Point control block, the counter increments. The measurement point is
A, as shown in Figure 50.

Confidential and Proprietary Information of ZTE CORPORATION 51


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 50 - MEASUREMENT POINT OF NUMBER OF DL DUMMY CONTROL


BLOCKS ON PACCH

MS BSS

Packet Downlink Dummy Control


A

Unit Times

C900040079
Definition Number of UL dummy control blocks on PACCH
Description Similar to C900040078, this counter counts the number of UL
dummy control blocks sent by BSC on PACCH in the packet
transmission mode.
Measurement If the DL control block sent from BTS to MS is an UL Dummy
Point control block, the counter increments. The measurement point is
A, as shown in Figure 51.

FIGURE 51 - MEASUREMENT POINT OF NUMBER OF UL DUMMY CONTROL


BLOCKS ON PACCH

MS BSS

Packet Uplink Dummy Control


A

Unit Times

C900040080
Definition Number of DL RLC blocks on PACCH(excluding dummy block)
Description This counter counts the number of DL RLC blocks expect DUMMY
blocks sent from BSC to MS through BTS on PACCH.
Usage The counter counts the number of DL RLC blocks expect DUMMY
blocks sent by BSC on PACCH.
Measurement
Point

52 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

When BSC sends a DL control block (except DUMMY block) to MS


through BTS, the counter increments. The measurement point is
A, as shown in Figure 52.

FIGURE 52 - MEASUREMENT POINT OF NUMBER OF DL RLC BLOCKS ON


P AC C H ( E X C L U D I N G D U M M Y B L O C K )

Unit Times

C900040081
Definition Number of DL RLC pending blocks in CS1 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of CS1.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of CS1.
Measurement When BSC sends a pending RLC block whose coding method is
Point CS1 to MS, the counter increments. The measurement point is A,
as shown in Figure 53.

FIGURE 53 - MEASUREMENT POINT OF NUMBER OF DL RLC PENDING BLOCKS


ON PDTCH

Unit Times

C900040082
Definition Number of DL RLC pending blocks in CS2 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of CS2.

Confidential and Proprietary Information of ZTE CORPORATION 53


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of CS2.
Measurement When BSC sends a pending RLC block whose coding method is
Point CS2 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040083
Definition Number of DL RLC pending blocks in CS3 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of CS3.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of CS3.
Measurement When BSC sends a pending RLC block whose coding method is
Point CS3 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040084
Definition Number of DL RLC pending blocks in CS4 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of CS4.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of CS4.
Measurement When BSC sends a pending RLC block whose coding method is
Point CS4 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040085
Definition Number of DL RLC NACK blocks in CS1 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of CS1.

54 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Usage This counter counts the number of DL retransmitted RLC blocks


sent on PDTCH, with coding method of CS1.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is CS1 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 54.

FIGURE 54 - MEASUREM ENT POINT OF NUMBER OF DL RLC N ACK BLOCKS


ON PDTCH

Unit Times

C900040086
Definition Number of DL RLC NACK blocks in CS2 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of CS2.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of CS2.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is CS2 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 54.
Unit Times

C900040087
Definition Number of DL RLC NACK blocks in CS3 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of CS3.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of CS3.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is CS3 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 54.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 55


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040088
Definition Number of DL RLC NACK blocks in CS4 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of CS4.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of CS4.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is CS4 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 54.
Unit Times

C900040089
Definition Number of DL RLC new blocks in CS1 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
CS1.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of CS1.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of CS1) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.

FIGURE 55 – MEASUREMENT POINT OF NUMBER OF DL RLC NEW BLOCKS ON


PDTCH

Unit Times

C900040090
Definition Number of DL RLC new blocks in CS2 on PDTCH
Description

56 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

After BSC receives DownLink Ack message, it decides whether


to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
CS2.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of CS2.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of CS2) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040091
Definition Number of DL RLC new blocks in CS3 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
CS3.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of CS3.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of CS3) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040092
Definition Number of DL RLC new blocks in CS4 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
CS4.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of CS4.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of CS4) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 57


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040093
Definition Number of UL RLC blocks excluding dummy blocks on PACCH
Description This counter counts the number of UL RLC blocks expect DUMMY
blocks sent from MS to BSC through BTS on PACCH.
Usage The counter counts the number of uplink RLC blocks expect
DUMMY blocks received by BSC on PACCH.
Measurement When BSC receives an UL control block (except the DUMMY
Point block) from MS, the counter increments. The measurement point
is A, as shown in Figure 56.

FIGURE 56 - MEASUREMENT POINT OF NUMBER OF UL RLC BLOCKS


EXCLUDING DUMMY BLOCKS ON P ACCH

Unit Times

C900040094
Definition Number of UL RLC pending blocks in CS1 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS1-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS1-coded pending
RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS1-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.

FIGURE 57 - MEASUREMENT POINT OF NUMBER OF UL RLC PENDING BLOCKS


ON PDTCH

MS BTS BSC
UL pending RLC block
RLC block (coding scheme can be
CS1 ~ CS4, MCS1 ~
MCS9)
A

Unit Times

58 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040095
Definition Number of UL RLC pending blocks in CS2 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS2-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS2-coded pending
RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS2-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040096
Definition Number of UL RLC pending blocks in CS3 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS3-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS3-coded pending
RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS3-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040097
Definition Number of UL RLC pending blocks in CS4 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS4-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS4-coded pending
RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS4-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 59


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040098
Definition Number of UL RLC NACK blocks in CS1 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS1-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS1-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS1-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.

FIGURE 58 - MEASUREM ENT POINT OF NUMBER OF UL RLC N ACK BLOCKS


ON PDTCH

Unit Times

C900040099
Definition Number of UL RLC NACK blocks in CS2 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS2-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS2-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS2-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040100
Definition Number of UL RLC NACK blocks in CS3 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending

60 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

RLC block. This counter counts the number of useful UL CS3-


coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS3-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS3-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040101
Definition Number of UL RLC NACK blocks in CS4 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS4-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS4-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS4-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040102
Definition Number of UL RLC new blocks in CS1 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS1-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS1-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS1-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.

Confidential and Proprietary Information of ZTE CORPORATION 61


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 59 – MEASUREMENT POINT OF NUMBER OF UL RLC NEW BLOCKS ON


PDTCH

Unit Times

C900040103
Definition Number of UL RLC new blocks in CS2 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS2-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS2-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS2-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040104
Definition Number of UL RLC new blocks in CS3 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS3-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS3-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS3-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040105
Definition Number of UL RLC new blocks in CS4 on PDTCH
Description

62 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

After receiving UL data block, BSC decides whether it is


retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL CS4-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL CS4-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives CS4-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040106
Definition Number of UL data blocks received on PDTCH
Description When MS transmits UL RLC blocks to BSC through BTS, this
counter counts the number of data blocks received by BSC,
including the retransmitted RLC blocks, blocks to be confirmed
and the first-transmitted blocks.
Usage The counter counts the number of data blocks received by UL
PDTCH.
Measurement When MS transmits an UL RLC block to BSC through BTS
Point (including the retransmitted RLC blocks, blocks to be confirmed
and the first-transmitted blocks), this counter increments.
Unit Times

C900040107
Definition Number of DL data blocks sent on PDTCH
Description When BSC transmits DL RLC blocks to BTS, this counter counts
the number of data blocks sent from BSC, including the
retransmitted RLC blocks, blocks to be confirmed and the first-
transmitted blocks.
Usage The counter counts the number of data blocks sent by DL PDTCH.
Measurement When BSC transmits a DL RLC block to BTS (including the
Point retransmitted RLC blocks, blocks to be confirmed and the first-
transmitted blocks), this counter increments.
Unit Times

C900040108
Definition Number of GPRS DL TBF establishment requests
Description

Confidential and Proprietary Information of ZTE CORPORATION 63


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

The counter counts the number of GPRS DL TBF establishment


requests received by PS control plane when BSC attempts to
establish DL GPRS TBFs. It is the sum of CCCH/PCCCH requests
(C901170002) and PACCH requests (C901170003).
Usage The counter collects information about the frequency of DL
establishment requests received by PS control plane when BSC
attempts to establish DL GPRS TBFs.
Measurement This counter increments in the following two cases:
Point
„ When PS control plane receives a DL TBF establishment
request from PS user plane, this counter increments.
„ When UL GPRS TBF exists and DL GPRS TBF is to be
established, if PS control plane receives the DL assignment
message from PS user plane, this counter increments.
Unit Times

C900040109
Definition Number of GPRS DL TBF establishment failure due to database
allocation failure
Description The counter counts the number of GPRS DL TBF establishment
failure due to database allocation failure.
Usage The counter collects information about the frequency of channel
allocation failures when BSC attempts to establish DL GPRS TBFs.
Measurement This counter increments in the following two cases:
Point
„ When PS control plane receives the DL TBF establishment
request from PS user plane, it will apply to database for
resources. If it fails to obtain the resources, this counter
increments. The measurement point is A, as shown in Figure
60.

FIGURE 60 - MEASUREMENT POINT OF ALLOCATION F AILURES AFTER


RECEIVING DL TBF ESTABLISHMENT REQUEST

„ When MS has already established an UL GPRS TBF and DL


GPRS TBF is to be established, if PS control plane receives
the DL TBF assignment message from PS user plane, it will

64 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

apply to database for resources. If it fails to obtain the


resources, this counter increments. The measurement point
is A, as shown in Figure 61.

FIGURE 61 - MEASUREMENT POINT OF ALLOCATION F AILURES AFTER


RECEIVING DL TBF ASSIGNMENT MESSAGE

Unit Times

C900040110
Definition Number of GPRS DL TBF resource reallocation requests due to
UL TBF establishment
Description The counter counts the number of GPRS DL TBF resource
reallocation requests due to UL TBF establishment.
Usage The counter collects information about the frequency of GPRS DL
TBF resource reallocation requests.
Measurement When MS has already established a DL GPRS TBF, if PS control
Point plane receives an UL TBF assignment message from PS user
plane, this counter increments. The measurement point is A, as
shown in Figure 62.

FIGURE 62 - MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RESOURCE


REALLOCATION REQUESTS DUE TO UL TBF ESTABLISHMENT

PS control
PS user plane plane

UL TBF assignment

Unit Times

C900040111
Definition Number of GPRS DL TBF resource reallocation failure due to UL
TBF establishment

Confidential and Proprietary Information of ZTE CORPORATION 65


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description If MS has already established a DL GPRS TBF and it needs to


establish an UL TBF on PACCH, PS control plane should apply to
database for resources. The counter counts the number of DL
resource reallocation failures caused by failed UL TBF
establishment allocation.
Usage The counter collects information about the frequency of GPRS DL
resource reallocation failures caused by failed UL TBF
establishment allocation.
Measurement When MS has already established a DL GPRS TBF, if PS control
Point plane receives an UL TBF assignment message from PS user
plane, it will apply to database for resources. If it fails to obtain
the resources, this counter increments. The measurement point
is A, as shown in Figure 63.

FIGURE 63 - MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RESOURCE


REALLOCATION FAILURE DUE TO UL TBF ESTABLISHMENT

Unit Times

C900040112
Definition Number of GPRS DL TBF resource reallocation requests due to
LLC transmission
Description This counter counts the number of resource reallocation requests
that PS control plane receives from PS user plane caused by
UL/DL LLC frame changes during the DL GPRS TBF transmission.
Usage This counter collects information about the frequency of resource
reallocation requests received by PS control plane during the DL
GPRS TBF transmission.
Measurement When PS control plane receives a resource reallocation request
Point from PS user plane, if the current DL GPRS TBF exists, this
counter increments. The measurement point is A, as shown in
Figure 64.

66 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 64 - MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RESOURCE


REALLOCATION REQUESTS DUE TO LLC TRANSMISSION

PS user plane PS control plane

Resource reallocation request


A

Unit Times

C900040113
Definition Number of GPRS DL TBF resource reallocation failure due to LLC
transmission
Description During the DL GPRS TBF transmission, because UL/DL LLC frame
changes, PS user plane sends a resource reallocation request to
PS control plane. After receiving the request, PS control plane
applies to database for resources. This counter counts the
number of failed resource allocations.
Usage This counter collects information about the frequency of failed
resource allocations during the DL GPRS TBF transmission after
PS control plane receives the resource reallocation request and
applies to database for resources.
Measurement After PS control plane receives a resource reallocation request
Point from PS user plane and applies to database for resources, if it
fails to obtain the resources, this counter increments, as A
shown in Figure 65.

FIGURE 65 - MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RESOURCE


REALLOCATION FAILURE DUE TO LLC TRANSMISSION

Unit Times

C900040114
Definition Number of EGPRS DL TBF establishment requests
Description

Confidential and Proprietary Information of ZTE CORPORATION 67


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

The counter counts the number of EGPRS downlink TBF


establishment requests received by control plane. It is the sum
of CCCH/PCCCH requests (C901180002) and PACCH requests
(C901180003).
Usage The counter collects information about the frequency of DL
establishment requests received by the control plane when BSC
attempts to establish DL EGPRS TBFs.
Measurement This counter increments in the following two cases:
Point
„ When PS control plane receives a DL TBF establishment
request from PS user plane, this counter increments.
„ When UL EGPRS TBF exists and DL EGPRS TBF is to be
established, if PS control plane receives the DL assignment
message from PS user plane, this counter increments.
Unit Times

C900040115
Definition Number of EGPRS DL TBF establishment failure due to database
allocation failure
Description The counter counts the number of channel allocation failures
when BSC attempts to establish DL EGPRS TBFs and RANPS
applies to database for resources.
Usage The counter collects information about the frequency of channel
allocation failures when BSC attempts to establish DL EGPRS
TBFs and RANPS applies to database for resources.
Measurement This counter increments in the following two cases:
Point
„ When PS control plane receives the DL TBF establishment
request from PS user plane, it will apply to database for
resources. If it fails to obtain the resources, this counter
increments. The measurement point is A, as shown in Figure
60.
„ When UL EGPRS TBF exists and DL EGPRS TBF is to be
established, if PS control plane receives the DL TBF
assignment message from PS user plane, it will apply to
database for resources. If it fails to obtain the resources, this
counter increments. The measurement point is A, as shown
in Figure 61.
Unit Times

C900040116
Definition Number of EGPRS DL TBF resource reallocation requests due to
UL TBF establishment
Description

68 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

The counter counts the number of EGPRS downlink TBF resource


reallocation requests (concurrent PACCH UL TBF establishment
request).
Usage The counter collects information about the frequency of EGPRS
downlink TBF resource reallocation requests.
Measurement When MS has already established a DL EGPRS TBF, if PS control
Point plane receives an UL TBF assignment message from PS user
plane, this counter increments. The measurement point is A, as
shown in Figure 62.
Unit Times

C900040117
Definition Number of EGPRS DL TBF resource reallocation failure due to UL
TBF establishment
Description If MS has already established a DL EGPRS TBF and it needs to
establish an UL TBF on PACCH, PS control plane should apply to
database for resources. The counter counts the number of DL
resource reallocation failures caused by failed UL TBF
establishment allocation.
Usage The counter collects information about the frequency of EGPRS
DL resource reallocation failures caused by failed UL TBF
establishment allocation.
Measurement When MS has already established a DL EGPRS TBF, if PS control
Point plane receives an UL TBF assignment message from PS user
plane, it will apply to database for resources. If it fails to obtain
the resources, this counter increments. The measurement point
is A, as shown in Figure 63.
Unit Times

C900040118
Definition Number of EGPRS DL TBF resource reallocation requests due to
LLC transmission
Description This counter counts the number of resource reallocation requests
that PS control plane receives from PS user plane caused by
UL/DL LLC frame changes during the DL EGPRS TBF
transmission.
Usage This counter collects information about the frequency of resource
reallocation requests received by PS control plane during the DL
EGPRS TBF transmission.
Measurement When PS control plane receives a resource reallocation request
Point from PS user plane, if the current DL EGPRS TBF exists, this
counter increments, as A shown in Figure 64.

Confidential and Proprietary Information of ZTE CORPORATION 69


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Unit Times

C900040119
Definition Number of EGPRS DL TBF resource reallocation failure due to
LLC transmission
Description During the DL EGPRS TBF transmission, because UL/DL LLC
frame changes, PS user plane sends a resource reallocation
request to PS control plane. After receiving the request, PS
control plane applies to database for resources. This counter
counts the number of failed resource allocations.
Usage This counter collects information about the frequency of failed
resource allocations during the DL EGPRS TBF transmission after
PS control plane receives the resource reallocation request and
applies to database for resources.
Measurement After PS control plane receives a resource reallocation request
Point from PS user plane and applies to database for resources, if it
fails to obtain the resources, this counter increments, as A
shown in Figure 65.
Unit Times

C900040120
Definition Number of GPRS UL TBF establishment requests
Description The counter counts the number of all channel requests when MS
attempts to establish GPRS UL TBFs. It is the sum of CCCH
requests (C901190002), PCCCH requests (C901190004) and
PACCH requests (C901190006).
Usage The counter collects information about the frequency of channel
requests when MS attempts to establish GPRS services.
Measurement This counter increments in the following three cases:
Point
„ When BSC receives a CCCH request originated by MS, this
counter increments.
„ When BSC receives a PCCCH request originated by MS, this
counter increments.
„ When BSC receives a PACCH request originated by MS and
user plane sends a resource request to control plane, this
counter increments.
Unit Times

70 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040121
Definition Number of GPRS UL TBF establishment failure due to database
allocation failure
Description The counter counts the number of GPRS UL TBF establishment
channel allocation failures.
Usage The counter collects information about the frequency of channel
allocation failures when the system attempts to establish UL
GPRS TBFs.
Measurement This counter increments in the following three cases:
Point
„ When PS control plane receives a CCCH request from MS, it
will apply to database for resources. If it fails to obtain the
resources, this counter increments. The measurement point
is A, as shown in Figure 66.

FIGURE 66 - MEASUREMENT POINT OF ALLOCATION F AILURES AFTER


RECEIVING CCCH REQUEST

„ When PS control plane receives a PCCCH request from MS, it


will apply to database for resources. If it fails to obtain the
resources, this counter increments. The measurement point
is A, as shown in Figure 67.

FIGURE 67 - MEASUREMENT POINT OF ALLOCATION F AILURES AFTER


RECEIVING PCCCH REQUEST

„ When MS has already established a DL GPRS TBF, if PS


control plane receives an UL TBF assignment message from
PS user plane, it will apply to database for resources. If it
fails to obtain the resources, this counter increments. The
measurement point is A, as shown in Figure 68.

Confidential and Proprietary Information of ZTE CORPORATION 71


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 68 - MEASUREMENT POINT OF ALLOCATION F AILURES (DL GPRS


TBF EXISTS)

Unit Times

C900040122
Definition Number of GPRS UL TBF resource reallocation requests due to
DL TBF establishment
Description The counter counts the number of RS UL TBF resource
reallocation requests due to DL TBF establishment.
Usage The counter collects information about the frequency of GPRS UL
TBF resource reallocation requests.
Measurement When MS has already established an UL GPRS TBF, if PS control
Point plane receives a DL TBF assignment message from PS user
plane, this counter increments. The measurement point is A, as
shown in Figure 69.

FIGURE 69 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF RESOURCE


REALLOCATION REQUESTS DUE TO DL TBF ESTABLISHMENT

Unit Times

C900040123
Definition Number of GPRS UL TBF resource reallocation failure due to DL
TBF establishment
Description If MS has already established an UL GPRS TBF and it needs to
establish a DL TBF on PACCH, PS control plane should apply to

72 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

database for resources. The counter counts the number of UL


resource reallocation failures caused by failed DL TBF
establishment allocation.
Usage The counter collects information about the frequency of GPRS UL
resource reallocation failures caused by failed DL TBF
establishment allocation.
Measurement When MS has already established an UL GPRS TBF, if PS control
Point plane receives a DL TBF assignment message from PS user
plane, it will apply to database for resources. If it fails to obtain
the resources, this counter increments. The measurement point
is A, as shown in Figure 61.
Unit Times

C900040124
Definition Number of GPRS UL TBF resource reallocation requests due to
LLC transmission
Description This counter counts the number of resource reallocation requests
that PS control plane receives from PS user plane caused by
UL/DL LLC frame changes during the UL GPRS TBF transmission.
Usage This counter collects information about the frequency of resource
reallocation requests received by PS control plane during the UL
GPRS TBF transmission.
Measurement When PS control plane receives a resource reallocation request
Point from PS user plane, if the current UL GPRS TBF exists, this
counter increments. The measurement point is A, as shown in
Figure 64.
Unit Times

C900040125
Definition Number of GPRS UL TBF resource reallocation failure due to LLC
transmission
Description During the UL GPRS TBF transmission, because UL/DL LLC frame
changes, PS user plane sends a resource reallocation request to
PS control plane. After receiving the request, PS control plane
applies to database for resources. This counter counts the
number of failed resource allocations.
Usage This counter collects information about the frequency of failed
resource allocations during the UL GPRS TBF transmission after
PS control plane receives the resource reallocation request and
applies to database for resources.
Measurement After PS control plane receives a resource reallocation request
Point from PS user plane and applies to database for resources, if it

Confidential and Proprietary Information of ZTE CORPORATION 73


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

fails to obtain the resources, this counter increments, as A


shown in Figure 65.
Unit Times

C900040126
Definition Number of GPRS UL TBF resource reallocation requests for
resource request
Description This counter counts the number of resource allocation requests
that PS control plane receives from MS during the UL GPRS TBF
transmission.
Usage This counter collects information about the frequency of resource
allocation requests received by PS control plane during the UL
GPRS TBF transmission (including 2-step UL access and UL TBF
transmission).
Measurement When PS control plane receives a resource allocation request
Point from PS user plane, this counter increments, as A shown in
Figure 70.

FIGURE 70 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF RESOURCE


REALLOCATION REQUESTS FOR RESOURCE REQUEST
PS control PS user
plane plane
Resource allocation request

Unit Times

C900040127
Definition Number of GPRS UL TBF resource reallocation failure due to
database allocation failure for resource request
Description During the UL GPRS TBF transmission, after receiving the
resource allocation request from MS, PS control plane applies to
database for resources. This counter counts the number of failed
resource allocations.
Usage This counter collects information about the frequency of failed
resource allocations during the UL GPRS TBF transmission
(including 2-step UL access and UL TBF transmission) after PS
control plane receives the resource allocation request from MS
and applies to database for resources.
Measurement After PS control plane receives a resource reallocation request
Point from MS and applies to database for resources, if it fails to

74 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

obtain the resources, this counter increments, as A shown in


Figure 71.

FIGURE 71 – FAILING TO REQUEST FOR RESOURCE FROM DAT AB ASE

Unit Times

C900040128
Definition Number of EGPRS UL TBF establishment requests
Description The counter counts the number of all channel requests when MS
attempts to establish EDGE UL TBFs. It is the sum of CCCH
requests (C901200003), PCCCH requests (C901200005) and
PACCH requests (C901200006).
Usage The counter collects information about the frequency of channel
requests when MS attempts to establish EDGE services.
Measurement This counter increments in the following three cases:
Point
„ When BSC receives an EDGE CCCH request originated by MS,
this counter increments.
„ When BSC receives an EDGE PCCCH request originated by
MS, this counter increments.
„ When BSC receives an EDGE PACCH request originated by
MS and user plane sends a resource request to control plane,
this counter increments.
Unit Times

C900040129
Definition Number of EGPRS UL TBF establishment failure due to database
allocation failure
Description The counter counts the number of EGPRS UL TBF establishment
channel allocation failures.
Usage The counter collects information about the frequency of channel
allocation failures when the system attempts to establish UL
EGPRS TBFs.

Confidential and Proprietary Information of ZTE CORPORATION 75


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement This counter increments in the following two cases:


Point
„ When PS control plane receives an EGPRS channel request
on CCCH or an EGPRS Packet channel request on PCCCH
from MS, it will apply to database for resources. If it fails to
obtain the resources, this counter increments. The
measurement point is A, as shown in Figure 72.

FIGURE 72 – MEASUREMENT POINT OF NUMBER OF EGPRS UPLINK TBF


ESTABLISHMENT CHANNEL ALLOCATION FAILURES

„ When MS has already established a DL EGPRS TBF, if PS


control plane receives an UL TBF assignment message from
PS user plane, it will apply to database for resources. If it
fails to obtain the resources, this counter increments. The
measurement point is A, as shown in Figure 68.
Unit Times

C900040130
Definition Number of EGPRS UL TBF resource reallocation requests due to
DL TBF establishment
Description The counter counts the number of EGPRS UL TBF resource
reallocation requests due to DL TBF establishment.
Usage The counter collects information about the frequency of EGPRS
UL TBF resource reallocation requests.
Measurement
When MS has already established an UL EGPRS TBF, if PS control
Point
plane receives a DL TBF assignment message from PS user
plane, this counter increments. The measurement point is A, as
shown in Figure 69.

Unit Times

C900040131
Definition Number of EGPRS UL TBF resource reallocation failure due to DL
TBF establishment
Description

76 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

If MS has already established an UL EGPRS TBF and it needs to


establish a DL TBF on PACCH, PS control plane should apply to
database for resources. The counter counts the number of UL
resource reallocation failures caused by failed DL TBF
establishment allocation.
Usage The counter collects information about the frequency of EGPRS
UL resource reallocation failures caused by failed DL TBF
establishment allocation.
Measurement When MS has already established an UL EGPRS TBF, if PS control
Point plane receives a DL TBF assignment message from PS user
plane, it will apply to database for resources. If it fails to obtain
the resources, this counter increments. The measurement point
is A, as shown in Figure 61.
Unit Times

C900040132
Definition Number of EGPRS UL TBF resource reallocation requests due to
LLC transmission
Description This counter counts the number of resource reallocation requests
that PS control plane receives from PS user plane caused by
UL/DL LLC frame changes during the UL EGPRS TBF transmission.
Usage This counter collects information about the frequency of resource
reallocation requests received by PS control plane during the UL
EGPRS TBF transmission.
Measurement When PS control plane receives a resource reallocation request
Point from PS user plane, this counter increments, as A shown in
Figure 64.
Unit Times

C900040133
Definition Number of EGPRS UL TBF resource reallocation failure due to
LLC transmission
Description During the UL EGPRS TBF transmission, because UL/DL LLC
frame changes, PS user plane sends a resource reallocation
request to PS control plane. After receiving the request, PS
control plane applies to database for resources. This counter
counts the number of failed resource allocations.
Usage This counter collects information about the frequency of failed
resource allocations during the UL EGPRS TBF transmission after
PS control plane receives the resource reallocation request and
applies to database for resources.
Measurement After PS control plane receives a resource reallocation request
Point from PS user plane and applies to database for resources, if it

Confidential and Proprietary Information of ZTE CORPORATION 77


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

fails to obtain the resources, this counter increments, as A


shown in Figure 65.
Unit Times

C900040134
Definition Number of EGPRS UL TBF resource reallocation requests for
resource request
Description This counter counts the number of resource allocation requests
that PS control plane receives from MS during the UL EGPRS TBF
transmission.
Usage This counter collects information about the frequency of resource
allocation requests received by PS control plane during the UL
EGPRS TBF transmission (including 2-step UL access and UL TBF
transmission).
Measurement When PS control plane receives a resource allocation request
Point from PS user plane, this counter increments, as A shown in
Figure 70.
Unit Times

C900040135
Definition Number of EGPRS UL TBF resource reallocation failure due to
database allocation failure
Description During the UL EGPRS TBF transmission, after receiving the
resource allocation request from MS, PS control plane applies to
database for resources. This counter counts the number of failed
resource allocations.
Usage This counter collects information about the frequency of failed
resource allocations during the UL EGPRS TBF transmission
(including 2-step UL access and UL TBF transmission) after PS
control plane receives the resource allocation request from MS
and applies to database for resources.
Measurement After PS control plane receives a resource reallocation request
Point from MS and applies to database for resources, if it fails to
obtain the resources, this counter increments, as A shown in
Figure 71.
Unit Times

C900040136
Definition Number of available PDCH
Description

78 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

This counter counts the number of available PDCH in a cell. The


PDCH that can be assigned include dynamic and static PDCH
both idle and occupied.
Usage This counter is used to find out the number of available PDCH in
the serving cell.
Measurement The counter’s value can be obtained by querying the database
Point when periodic measurement data is reported.
Unit Times

C900040137
Definition Number of forcing conversation dynamic from PDCH to TCH by
BSC
Description iBSC supports dynamic radio channel function. The counter
records number of times of reclaiming dynamic PDCH in idle
state so as to use them as TCH/F.
Usage This counter is used to find out the busy level and density of PS
service in the serving cell and use it as reference to decide
whether to set static PDCH or not.
Measurement The counter increments when dynamic PDCH is idle and the
Point database starts reclaiming dynamic PDCH.
Unit Times

C900040138
Definition Number of PDCH used by TBF in each cell
Description This counter counts the sum of PDCH used by all TBF in the
serving cell.
Usage This counter is used to find out the condition of multi-timeslot
allocation in the serving cell.
Measurement The counter’s value can be obtained by querying the database
Point when periodic measurement data is reported.
Unit Times

C900040139
Definition Maximum number of used PDCH
Description This counter records the maximum number of used PDCH in a
cell within the measurement period. It reflects the occupancy
and busy level of PDCH.
Usage

Confidential and Proprietary Information of ZTE CORPORATION 79


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

This counter is used to find out the busy level of the cell TCH/F
channel. It could be used as a reference for whether to increase
PDCH channel configuration.
Measurement This counter increments in the following three cases:
Point
„ Request for database
„ Release database
„ Report periodic measurement data
Unit Times

C900040140
Definition Average number of used PDCH
Description This counter records the average number of used PDCH in a cell
within the measurement period.
Usage This counter is used to find out the busy level of the cell TCH/F
channel. It could be used as a reference for whether to increase
PDCH channel configuration.
Measurement This counter increments in the following three cases:
Point
„ Request for database
„ Release database
„ Report periodic measurement data
Unit Times

C900040141
Definition Number of GPRS DL TBF establishment requests before T3192
expiration
Description During the running of T3193 of DL GPRS TBF, BSC receives DL
LLC frame again, then it performs DL assignment on PACCH of
the DL TBF.
This counter counts the number of times of establishing new DL
TBF.
Measurement After the DL GPRS TBF transmits all LLC frames and the DL RLC
Point block with FBI = 1, T3193 is started. During T3193 running,
when BSC receives new LLC frame and sends DL assignment,
this counter increments.
The measurement point is A, as shown in Figure 73.

80 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 73 –MEASUREMENT POINT OF NUMBER OF GPRS DL TBF


ESTABLISHMENT REQUESTS BEFORE T3192 EXPIRATION

MS BSC SGSN
LLC Frame
RLC Block
LLC Frame
RLC Block
RLC Block(FBI=1)
Start T3193

LLC Frame
Packet Downlink Assignment
A

Unit Times

C900040142
Definition Number of GPRS DL TBF establishment using existing DL TBF
resource
Description When establishing EGPRS DL TBF under UL transmission status,
the user plane needs not to request control plane for DL
resource if having saved DL TBF resource of last time. It uses
the existing resource for DL assignment. This counter records
the number of GPRS DL TBF establishment using existing DL TBF
resource.
Measurement
During the UL GPRS TBF transmission, when BSC receives the
Point
DL LLC frame, it uses the existing resource to establish DL GPRS
TBF. The measurement point is as A, as shown in Figure 74.

FIGURE 74 –MEASUREMENT POINT OF GPRS DL TBF ESTABLISHMENT USING


EXISTING DL TBF RESOURCE

MS BSC SGSN

RLC Block
RLC Block
LLC Frame
Packet Downlink Assignment
(Packet Timeslot Reconfigure)
A
RLC Block

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 81


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040143
Definition Number of GPRS DL TBF establishment requests on PACCH
Description Under UL transmission status, it is necessary to establish DL TBF
transmission when user plane receives DL LLC Frame from SGSN.
If user plane has not saved DL TBF resource, then user plane
requests control plane for resource.
This counter counts the number of times of requesting control
plane for resource to establish GPRS DL TBF on PACCH.

Note:
Here, user plane refers to the UPPB of iBSC, and control plane
refers to the CMP of iBSC.

Measurment The measurement point is as A1, as shown in Figure 75.


Point
FIGURE 75 –MEASUREMENT POINT OF NUMBER OF GPRS DL TBF
ESTABLISHM ENT REQUESTS ON P ACCH

MS BSC user plane BSC control plane SGSN

RLC Block
RLC Block
LLC Frame (no record downlink resource)

A1
Downlink Assign Request
Packet Downlink Assignment Resource Assignment
(Packet Timeslot Reconfigure)

A2

Unit Times

C900040144
Definition Number of GPRS DL TBF establishment requests on
CCCH/PCCCH
Description When MS is in packet idle status, after BSC receives DL LLC
frame from SGSN, BSC initiates the process of establishing DL
TBF which is assigned on CCCH or PCCCH. BSC user plane first
sends the request for DL establishment to BSC control plane.
Measurement
Under MS’s packet idle status, when BSC sends the request for
Point
DL resource to BSC control plane after receiving LLC frame from
SGSN, the counter increments.
The measurement point is as A1, as shown in Figure 76.

82 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 76 –MEASUREMENT POINT OF NUMBER OF GPRS DL TBF


ESTABLISHMENT REQUESTS ON CCCH/PCCCH

Unit Times

C900040145
Definition Number of EGPRS DL TBF establishment requests before T3192
expiration
Description During the running of T3193 of DL EGPRS TBF, BSC receives DL
LLC frame again, then it performs DL assignment on PACCH of
the DL TBF.
This counter counts the number of times of establishing new DL
TBF.
Measurement After the DL EGPRS TBF transmits all LLC frames and the DL RLC
Point block with FBI = 1, T3193 is started. During T3193 running,
when BSC receives new LLC frame and sends DL assignment,
this counter increments.
The measurement point is A, as shown in Figure 77.

Confidential and Proprietary Information of ZTE CORPORATION 83


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 77 –MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF


ESTABLISHMENT REQUESTS BEFORE T3192 EXPIRATION

MS BSC SGSN
LLC Frame
RLC Block
LLC Frame
RLC Block
RLC Block(FBI=1)
Start T3193

LLC Frame
Packet Downlink Assignment
A

Unit Times

C900040146
Definition Number of EGPRS DL TBF establishment using existing DL TBF
resource
Description When establishing EGPRS DL TBF under UL transmission status,
the user plane needs not to request control plane for DL
resource if having saved DL TBF resource of last time. It uses
the existing resource for DL assignment. This counter records
the number of EGPRS DL TBF establishment using existing DL
TBF resource.
Measurement During the UL EGPRS TBF transmission, when BSC receives the
Point DL LLC frame, it uses the existing resource to establish DL GPRS
TBF.
The measurement point is A, as shown in Figure 78.

FIGURE 78 –MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF


ESTABLISHMENT USING EXISTING DL TBF RESOURCE

MS BSC SGSN

RLC Block
RLC Block
LLC Frame
Packet Downlink Assignment
(Packet Timeslot Reconfigure)
A
RLC Block

Unit Times

84 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040147
Definition Number of EGPRS DL TBF establishment requests on PACCH
Description Under UL transmission status, it is necessary to establish DL TBF
transmission when user plane receives DL LLC Frame from SGSN.
If user plane has not saved DL TBF resource, then user plane
requests control plane for resource.
This counter counts the number of times of requesting control
plane for resource to establish EGPRS DL TBF on PACCH.
Measurement The measurement point is A1, as shown in Figure 79.
Point
FIGURE 79 –MEASUREMENT POINT OF NUMBER OF GPRS DL TBF
ESTABLISHM ENT REQUESTS ON P ACCH

MS BSC user plane BSC control plane SGSN

RLC Block
RLC Block
LLC Frame (no record downlink resource)

A1
Downlink Assign Request
Packet Downlink Assignment Resource Assignment
(Packet Timeslot Reconfigure)

A2

Unit Times

C900040148
Definition Number of EGPRS DL TBF establishment requests on
CCCH/PCCCH
Description When MS is in packet idle status, after BSC receives DL LLC
frame from SGSN, BSC initiates the process of establishing DL
TBF which is assigned on CCCH or PCCCH. BSC user plane first
sends the request for DL establishment to BSC control plane.
Measurement Under MS’s packet idle status, when BSC sends the request for
Point DL resource to BSC control plane after receiving LLC frame from
SGSN, the counter increments. The measurement point is A1, as
shown in Figure 80.

Confidential and Proprietary Information of ZTE CORPORATION 85


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 80 – NORM AL CCCH/PCCCH DL TBF ESTABLISHMENT PROCESS

Unit Times

C900040149
Definition Number of GPRS DL signaling TBF release due to N3105
overflow
Description During the GPRS signaling DL TBF transmission, the DL block
RRBP bit is set to ask MS to respond with a Packet Downlink
Ack/Nack message.
If the specified block of BSC fails to receive response from MS,
then the N3105 counter increments; otherwise, it has a clear. If
no response comes from the MS, then the RRBP bit is set again
to ask MS to respond with a Packet Downlink Ack/Nack
message; if the N3105 counter reaches its maximum value, it is
considered that the radio transmission fails and the GPRS
signaling DL TBF is released abnormally.
Measurement When the N3105 counter value exceeds N3105Max, this counter
Point increments. The measurement point is A1, as shown in Figure 81.

86 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 81 – MEASUREMENT POINT OF NUMBER OF GPRS DL SIGNALING


TBF RELEASE DUE TO N3105 OVERFLOW

Unit Times

C900040150
Definition Number of GPRS DL signaling TBF release due to other reasons
Description When BSC is transmitting the last RLC block of GPRS signaling
DL TBF, set FBI to 1, set RRBP to ask the MS to respond with a
Packet Downlink Ack/Nack message, and at the same time,
activate T3191. If the specified block receives the MS response,
then T3191 will stop and the DL transmission ends normally. If
T3191 overflows, then it is considered that the radio
transmission fails and the GPRS signaling DL TBF is released
abnormally.
Measurement The measurement point is A1, as shown in Figure 82.
Point
FIGURE 82 – MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RELEASE
DUE TO OTHER REASONS

MS BSC

RLC Block

Start T3191
DOWNLINK ACK

Normal release

T3191 Timeout
A1

Confidential and Proprietary Information of ZTE CORPORATION 87


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Unit Times

C900040151
Definition Number of GPRS DL signaling TBF forcing release by control
plane
Description When the user plane is transmitting the GPRS signaling DL TBF,
if a release request comes from the control plane, then the GPRS
signaling DL TBF will stop and be released abnormally.
Measurement When the user plane receives the release request from the
Point control plane, this counter increments. The measurement point
is A, as shown in Figure 83.

FIGURE 83 – MEASUREMENT POINT OF NUMBER OF GPRS DL TBF FORCING


RELEASE BY CONTROL PLANE

Unit Times

C900040152
Definition Number of GPRS DL signaling TBF release due to instance
suspension
Description When the user plane is transmitting the GPRS signaling DL TBF,
at least one block must be transmitted in every 5 seconds. After
a DL TBF block is transmitted, BSC will start or restart a 5-
second DL block assigning timer. If the timer expires, it is
considered that the user plane has an instance suspension and
the GPRS signaling DL TBF is released abnormally.
Measurement When the DL block assigning timer expires, this counter
Point increments. The measurement point is A, as shown in Figure 84.

88 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 84 - MEASUREMENT POINT OF NUMBER OF GPRS DL TBF RELEASE


DUE TO INSTANCE SUSPENSION

Unit Times

C900040153
Definition Number of GPRS DL signaling TBF release due to inner abnormal
Description When the user plane is transmitting the GPRS signaling DL TBF,
if the message fails to be sent at the radio interface, the RLC
instance fails to be created, or the resource reassignment fails,
the GPRS signaling DL TBF will be released abnormally.
Measurement During the transmission of GPRS signaling DL TBF, if the
Point message fails to be sent at the radio interface, the RLC instance
fails to be created, or the resource reassignment fails, this
counter increments.
Unit Times

C900040154
Definition Number of EGPRS DL signaling TBF release due to N3105
overflow
Description During the transmission of EGPRS signaling DL TBF, the DL block
RRBP bit is set to ask the MS to respond with a Packet
Downlink Ack/Nack message.
If the specified block of BSC does not receive the MS response,
then the N3105 counter increments; if it does, then it has a
clear; if no response comes from the MS, then the RRBP bit is
set again to ask the MS to respond with a Packet Downlink
Ack/Nack message; if the N3105 counter reaches its maximum

Confidential and Proprietary Information of ZTE CORPORATION 89


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

value, it is considered that the radio transmission fails and the


DL TBF is released abnormally.
Measurement When the N3105 counter value exceeds N3105Max, this counter
Point increments. The measurement point is A1, as shown in Figure 85.

FIGURE 85 – MEASUREMENT POINT OF NUMBER OF EGPRS DL SIGNALING


TBF RELEASE DUE TO N3105 OVERFLOW

Unit Times

C900040155
Definition Number of EGPRS DL signaling TBF release due to other reasons
Description When BSC is transmitting the last RLC block of EGPRS signaling
DL TBF, set FBI to 1, set RRBP to ask the MS to respond with a
Packet Downlink Ack/Nack message, and at the same time,
activate T3191.
If the specified block receives the MS response, then T3191 will
stop and the DL transmission ends normally. If T3191 overflows,
then it is considered that the radio transmission fails and the
EGPRS signaling DL TBF is released abnormally.
Measurement The measurement point is A1, as shown in Figure 86.
Point

90 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 86 – MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF RELEASE


DUE TO OTHER REASONS

Unit Times

C900040156
Definition Number of EGPRS DL signaling TBF forcing release by control
plane
Description When the user plane is transmitting the EGPRS signaling DL TBF,
if a release request comes from the control plane, then the
EGPRS signaling DL TBF will stop and be released abnormally.
Measurement When the user plane receives the release request from the
Point control plane, this counter increments. The measurement point
is A, as shown in Figure 87.

FIGURE 87 – MEASUREMENT POINT OF NUMBER OF EGPRS DL TBF FORCING


RELEASE BY CONTROL PLANE

Unit Times

C900040157
Definition Number of EGPRS DL signaling TBF release due to instance
suspension

Confidential and Proprietary Information of ZTE CORPORATION 91


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description When the user plane is transmitting the EGPRS signaling DL TBF,
at least one block must be transmitted in every 5 seconds. After
a DL TBF block is transmitted, BSC will start or restart a 5-
second DL block assigning timer. If the timer expires, it is
considered that the user plane has an instance suspension and
the EGPRS signaling DL TBF is released abnormally.
Measurement When the DL block assigning timer expires, this counter
Point increments. The measurement point is A1, as shown in Figure 88.

FIGURE 88 - MEASUREMENT POINT OF NUMBER OF NUMBER OF EGPRS DL


TBF RELEASE DUE TO INSTANCE SUSPENSION

Unit Times

C900040158
Definition Number of EGPRS DL signaling TBF release due to inner
abnormal
Description When the user plane is transmitting the EGPRS signaling DL TBF,
if the message fails to be sent at the radio interface, the RLC
instance fails to be created, or the resource reassignment fails,
the EGPRS signaling DL TBF will be released abnormally.
Measurement During the transmission of EGPRS signaling DL TBF, if the
Point message fails to be sent at the radio interface, the RLC instance
fails to be created, or the resource reassignment fails, this
counter increments.
Unit Times

C900040159
Definition Number of GPRS UL TBF establishments in release state

92 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Description If both MS and BSS support reestablishment in released state,


BSS sets RRBP and sends Packet UL Ack message (FAI =1 and
TBF Est = 1) to MS after receiving all RLC blocks from MS.
If MS has no new data to send, MS returns Packet Ctrl Ack
message to BSS.
If MS has new data to send but no DL TBF is available, then TBF
should be reestablished, with the following two cases to be
considered:
„ If system message indicates that Packet Control Ack is of
AB mode, then MS sends Packet Control Ack message
(Ctrl Ack bit is ‘00’) to BSS, and BSS specifies single block
resource for MS by Packet UL Assign message. Subsequent
flow is same as that of TWO STEP access.
„ If system message indicates that Packet Control Ack is of
RLC/MAC mode, then MS sends Packet Resource Request
message to BSS. Subsequent flow is same as that of TWO
STEP access.
Usage This counter records the number of reestablishment times of MS
in released state.
Measurement The measurement is A, as shown in Figure 89 and Figure 90.
Point
FIGURE 89 – MEASUREMENT POINT ON NUMBER OF GPRS UL TBF
REESTABLISHMENTS IN RELEASED STATE (1)

FIGURE 90 - MEASUREMENT POINT ON NUMBER OF GPRS UL TBF


REESTABLISHMENTS IN RELEASED STATE (2)

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 93


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040160
Definition Number of GPRS UL TBF establishment with existing UL resource
Description To accelerate TBF establishment, UPPB caches MS’s UL/DL
resource within a period of time. When MS attempts to establish
new UL TBF on PACCH, relevant resource is directly assigned to
MS if there is resource as indicated by UPPB; otherwise, MS
sends request for resource to CMP.
Usage This counter records the number of reestablishing UL GPRS TBF
in released state without having to request for resource.
Measurement The measurement is A, as shown in Figure 91.
Point
FIGURE 91 - MEASUREMENT POINT OF GPRS UL TBF ESTABLISHMENTS WITH
EXISTING UL RESOURCE

Unit Times

C900040161
Definition Number of GPRS UL TBF establishment requests on PACCH
Description When MS has DL TBF and the TBF is in transmission status, if
MS has UL data to send but no UL TBF is available, MS sends
Packet DL Ack message together with UL TBF establishment
request. This counter counts the number of resource re-
applications after receiving this request.
Usage This counter records the number of requests for establishing UL
GPRS TBF on PACCH.
Measurement The measurement is A, as shown in Figure 92.
Point

94 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 92 – MEASUREMENT POINT OF NUMBER OF REQUESTS FOR


ESTABLISHING UL GPRS TBF ON P ACCH

Unit Times

C900040162
Definition Number of EGPRS UL data TBF establishments on PACCH
Description When there is available DL TBF, MS sends Packet DL Ack
message with UL TBF establishment request. When there is a
request to establish UL TBF on PACCH and the TBF type is
EGPRS, the counter increments.
Usage This counter records the number of times of establishing EGPRS
UL TBF on PACCH.
Measurement When Packet DL Ack message with UL TBF establishment
Point request is received, and the TBF type is EGPRS, the counter
increments.
Unit Times

C900040163
Definition Number of EGPRS UL TBF establishments in release state
Description If both MS and BSS support reestablishment in released state,
BSS sets RRBP and sends Packet UL Ack message (FAI =1 and
TBF Est = 1) to MS after receiving all RLC blocks from MS.
If MS has no new data to send, MS returns Packet Ctrl Ack
message to BSS.
If MS has new data to send but no DL TBF is available, then TBF
should be reestablished, with the following two cases to be
considered:
„ If system message indicates that Packet Control Ack is of
AB mode, then MS sends Packet Control Ack message
(Ctrl Ack bit is ‘00’) to BSS, and BSS specifies single block
resource for MS by Packet UL Assign message. Subsequent
flow is same as that of TWO STEP access.

Confidential and Proprietary Information of ZTE CORPORATION 95


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

„ If system message indicates that Packet Control Ack is of


RLC/MAC mode, then MS sends Packet Resource Request
message to BSS. Subsequent flow is same as that of TWO
STEP access.
Usage This counter records the number of reestablishment times of MS
in released state.
Measurement The measurement is A, as shown in Figure 93 and Figure 94.
Point
FIGURE 93 – MEASUREMENT POINT ON NUMBER OF EGPRS UL TBF
REESTABLISHMENTS IN RELEASED STATE (1)

FIGURE 94 - MEASUREMENT POINT ON NUMBER OF EGPRS UL TBF


REESTABLISHMENTS IN RELEASED STATE (2)

Unit Times

C900040164
Definition Number of EGPRS UL TBF establishment with existing UL
resource
Description To accelerate TBF establishment, UPPB caches MS’s UL/DL
resource within a period of time. When MS attempts to establish
new UL TBF on PACCH, relevant resource is directly assigned to
MS if there is resource as indicated by UPPB; otherwise, MS
sends request for resource to CMP.
Usage This counter records the number of reestablishing UL EGPRS TBF
in released state without having to request for resource.
Measurement The measurement is A, as shown in Figure 95.
Point

96 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

FIGURE 95 - MEASUREMENT POINT OF EGPRS UL TBF ESTABLISHMENTS


WITH EXISTING UL RESOURCE

Unit Times

C900040165
Definition Number of EGPRS UL TBF establishment requests on PACCH
Description When MS has DL TBF and the TBF is in transmission status, if
MS has UL data to send but no UL TBF is available, MS sends
Packet DL Ack message together with UL TBF establishment
request. This counter counts the number of resource re-
applications after receiving this request.
Usage This counter records the number of requests for establishing UL
EGPRS TBF on PACCH.
Measurement The measurement is A, as shown in Figure 96.
Point
FIGURE 96 – MEASUREMENT POINT OF NUMBER OF REQUESTS FOR
ESTABLISHING UL EGPRS TBF ON P ACCH

Unit Times

C900040166
Definition Number of EGPRS UL TBF establishment requests on
CCCH/PCCCH
Description When MS has new data to transmit but no corresponding UL/DL
TBF is available, MS initiates UL TBF establishment flow,

Confidential and Proprietary Information of ZTE CORPORATION 97


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

depending on whether the cell configures PBCCH on


CCCH/PCCCH.
Usage This counter records the number of requests for establishing
EGPRS UL TBF on CCCH/PCCCH.
Measurement The measurement point is A, as shown in Figure 97.
Point
FIGURE 97 – MEASUREMENT POINT OF NUMBER OF EGPRS UL TBF
ESTABLISHMENT REQUESTS ON CCCH/PCCCH

Unit Times

C900040167
Definition Number of dynamic PDCH preemption for CS service
Description This counter counts the number of times of PDCH being
preempted when the service instance is performing CS service
but fails to request for the radio channel.
Usage This counter is used to find out the busy extent of PS service
and CS service in the current cell. It can be used as reference
for expanding radio channel configuration, so as to meet
requirements of both CS and PS services.
Measurement The counter increments when the following conditions are
Point satisfied:
„ When the service instance is performing CS service but fails
to request for the radio channel
„ The database initiates the dynamic PDCH collection
Unit Times

C900040168
Definition Number of GPRS UL TBF establishment requests on
CCCH/PCCCH
Description When MS has new data to transmit but no corresponding UL/DL
TBF is available, MS initiates UL TBF establishment flow,
depending on whether the cell configures PBCCH on
CCCH/PCCCH.
Usage This counter records the number of requests for establishing
GPRS UL TBF on CCCH/PCCCH.

98 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Measurement The measurement point is A, as shown in Figure 98.


Point
FIGURE 98 - MEASUREMENT POINT OF NUMBER OF GPRS UL TBF
ESTABLISHMENT REQUESTS ON CCCH/PCCCH

Unit Times

C900040169
Definition Number of GPRS DL TBF establishment requests on PACCH
Description When UL TBF exists, and there is DL data to be sent through
SGSN, a request will be sent to establish DL TBF on PACCH. This
counter increments upon the request and the TBF type is GPRS.
Usage This counter counts the number of requests to establish GPRS
DL TBF on PACCH.
Measurement When a request is sent to establish DL TBF on PACCH and the
Point TBF type is GPRS, this counter increments.
Unit Times

C900040170
Definition Number of EGPRS DL TBF establishment requests on PACCH
Description When UL TBF exists, and there is DL data to be sent through
SGSN, a request will be sent to establish DL TBF on PACCH. This
counter increments upon the request and the TBF type is EGPRS.
Usage This counter counts the number of requests to establish EGPRS
DL TBF on PACCH.
Measurement When a request is sent to establish DL TBF on PACCH and the
Point TBF type is EGPRS, this counter increments.
Unit Times

C900040171
Definition Number of GPRS UL TBF establishment requests on PACCH
Description When there is available DL TBF, MS sends Packet DL Ack
message with UL TBF establishment request. When there is a

Confidential and Proprietary Information of ZTE CORPORATION 99


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

request to establish UL TBF on PACCH and the TBF type is GPRS,


the counter increments.
Usage This counter records the number of requests to establish GPRS
UL TBF on PACCH.
Measurement When Packet DL Ack message with UL TBF establishment
Point request is received, and the TBF type is GPRS, this counter
increments.
Unit Times

C900040172
Definition Number of DL RLC pending blocks in MCS1 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS1.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS1.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS1 to MS, the counter increments. The measurement point is
A, as shown in Figure 53.
Unit Times

C900040173
Definition Number of DL RLC pending blocks in MCS2 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS2.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS2.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS2 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040174
Definition Number of DL RLC pending blocks in MCS3 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new

100 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

data blocks. This counter counts the number of DL pending RLC


blocks from BSC to MS, with coding method of MCS3.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS3.

Measurement When BSC sends a pending RLC block whose coding method is
Point MCS3 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040175
Definition Number of DL RLC pending blocks in MCS4 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS4.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS4.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS4 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040176
Definition Number of DL RLC pending blocks in MCS5 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS5.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS5.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS5 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040177
Definition Number of DL RLC pending blocks in MCS6 on PDTCH

Confidential and Proprietary Information of ZTE CORPORATION 101


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description After BSC receives DownLink Ack message, it decides whether


to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS6.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS6.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS6 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040178
Definition Number of DL RLC pending blocks in MCS7 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS7.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS7.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS7 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040179
Definition Number of DL RLC pending blocks in MCS8 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS8.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS8.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS8 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040180
Definition Number of DL RLC pending blocks in MCS9 on PDTCH

102 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Description After BSC receives DownLink Ack message, it decides whether


to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL pending RLC
blocks from BSC to MS, with coding method of MCS9.
Usage This counter counts the number of DL pending RLC blocks sent
on PDTCH, with coding method of MCS9.
Measurement When BSC sends a pending RLC block whose coding method is
Point MCS9 to MS via BTS, the counter increments. The measurement
point is A, as shown in Figure 53.
Unit Times

C900040181
Definition Number of DL RLC NACK blocks in MCS1 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS1.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS1.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS1 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040182
Definition Number of DL RLC NACK blocks in MCS2 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS2.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS2.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS2 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040183
Definition Number of DL RLC NACK blocks in MCS3 on PDTCH

Confidential and Proprietary Information of ZTE CORPORATION 103


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description After BSC receives DownLink Ack message, it decides whether


to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS3.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS3.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS3 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040184
Definition Number of DL RLC NACK blocks in MCS4 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS4.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS4.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS4 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040185
Definition Number of DL RLC NACK blocks in MCS5 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS5.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS5.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS5 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040186
Definition Number of DL RLC NACK blocks in MCS6 on PDTCH

104 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Description After BSC receives DownLink Ack message, it decides whether


to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS6.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS6.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS6 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040187
Definition Number of DL RLC NACK blocks in MCS7 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS7.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS7.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS7 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040188
Definition Number of DL RLC NACK blocks in MCS8 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS8.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS8.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS8 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040189
Definition Number of DL RLC NACK blocks in MCS9 on PDTCH

Confidential and Proprietary Information of ZTE CORPORATION 105


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description After BSC receives DownLink Ack message, it decides whether


to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL retransmitted
RLC blocks from BSC to MS, with coding method of MCS9.
Usage This counter counts the number of DL retransmitted RLC blocks
sent on PDTCH, with coding method of MCS9.
Measurement When BSC sends retransmitted RLC block whose coding method
Point is MCS9 to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 54.
Unit Times

C900040190
Definition Number of DL RLC new blocks in MCS1 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS1.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS1
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS1) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040191
Definition Number of DL RLC new blocks in MCS2 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS2.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS2.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS2) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

106 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

C900040192
Definition Number of DL RLC new blocks in MCS3 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS3.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS3.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS3) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040193
Definition Number of DL RLC new blocks in MCS4 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS4.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS4.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS4) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040194
Definition Number of DL RLC new blocks in MCS5 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS5.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS5.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS5) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.

Confidential and Proprietary Information of ZTE CORPORATION 107


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Unit Times

C900040195
Definition Number of DL RLC new blocks in MCS6 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS6.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS6.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS6) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040196
Definition Number of DL RLC new blocks in MCS7 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS7.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS7.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS7) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040197
Definition Number of DL RLC new blocks in MCS8 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS8.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS8.

108 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Measurement When BSC sends first-transmitted RLC block (with coding


Point method of MCS8) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040198
Definition Number of DL RLC new blocks in MCS9 on PDTCH
Description After BSC receives DownLink Ack message, it decides whether
to send pending RLC block, to resend RLC block or to send new
data blocks. This counter counts the number of DL first-
transmitted RLC blocks from BSC to MS, with coding method of
MCS9.
Usage The counter is used to review the status of DL first-transmitted
RLC blocks sent by BSC on PDTCH, with coding method of MCS9.
Measurement When BSC sends first-transmitted RLC block (with coding
Point method of MCS9) to MS via BTS, the counter increments. The
measurement point is A, as shown in Figure 55.
Unit Times

C900040199
Definition Number of UL RLC pending blocks in MCS1 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS1-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS1-coded
pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS1-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040200
Definition Number of UL RLC pending blocks in MCS2 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS2-
coded pending RLC blocks received on PDTCH.
Usage

Confidential and Proprietary Information of ZTE CORPORATION 109


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

This counter counts the number of useful UL MCS2-coded


pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS2-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040201
Definition Number of UL RLC pending blocks in MCS3 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS3-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS3-coded
pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS3-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040202
Definition Number of UL RLC pending blocks in MCS4 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS4-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS4-coded
pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS4-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040203
Definition Number of UL RLC pending blocks in MCS5 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS5-
coded pending RLC blocks received on PDTCH.

110 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Usage This counter counts the number of useful UL MCS5-coded


pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS5-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040204
Definition Number of UL RLC pending blocks in MCS6 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS6-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS6-coded
pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS6-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040205
Definition Number of UL RLC pending blocks in MCS7 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS7-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS7-coded
pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS7-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040206
Definition Number of UL RLC pending blocks in MCS8 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS8-
coded pending RLC blocks received on PDTCH.

Confidential and Proprietary Information of ZTE CORPORATION 111


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Usage This counter counts the number of useful UL MCS8-coded


pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS8-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040207
Definition Number of UL RLC pending blocks in MCS9 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS9-
coded pending RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS9-coded
pending RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS9-coded UL pending RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 57.
Unit Times

C900040208
Definition Number of UL RLC NACK blocks in MCS1 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS1-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS1-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS1-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040209
Definition Number of UL RLC NACK blocks in MCS2 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS2-
coded retransmitted RLC blocks received on PDTCH.

112 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

Usage This counter counts the number of useful UL MCS2-coded


retransmitted RLC blocks received by BSC on PDTCH.

Measurement When BSC receives MCS2-coded UL retransmitted RLC block, the


Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040210
Definition Number of UL RLC NACK blocks in MCS3 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS3-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS3-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS3-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040211
Definition Number of UL RLC NACK blocks in MCS4 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS4-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS4-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS4-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040212
Definition Number of UL RLC NACK blocks in MCS5 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending

Confidential and Proprietary Information of ZTE CORPORATION 113


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

RLC block. This counter counts the number of useful UL MCS5-


coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS5-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS5-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040213
Definition Number of UL RLC NACK blocks in MCS6 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS6-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS6-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS6-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040214
Definition Number of UL RLC NACK blocks in MCS7 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS7-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS7-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS7-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040215
Definition Number of UL RLC NACK blocks in MCS8 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending

114 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

RLC block. This counter counts the number of useful UL MCS8-


coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS8-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS8-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040216
Definition Number of UL RLC NACK blocks in MCS9 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS9-
coded retransmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS9-coded
retransmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS9-coded UL retransmitted RLC block, the
Point counter increments. The measurement point is A, as shown in
Figure 58.
Unit Times

C900040217
Definition Number of UL RLC new blocks in MCS1 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS1-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS1-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS1-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040218
Definition Number of UL RLC new blocks in MCS2 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending

Confidential and Proprietary Information of ZTE CORPORATION 115


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

RLC block. This counter counts the number of useful UL MCS2-


coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS2-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS2-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040219
Definition Number of UL RLC new blocks in MCS3 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS3-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS3-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS3-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040220
Definition Number of UL RLC new blocks in MCS4 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS4-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS4-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS4-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040221
Definition Number of UL RLC new blocks in MCS5 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending

116 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 2 - PS Basic Measurement (Cell)

RLC block. This counter counts the number of useful UL MCS5-


coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS5-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS5-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040222
Definition Number of UL RLC new blocks in MCS6 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS6-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS6-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS6-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040223
Definition Number of UL RLC new blocks in MCS7 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS7-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS7-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS7-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040224
Definition Number of UL RLC new blocks in MCS8 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending

Confidential and Proprietary Information of ZTE CORPORATION 117


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

RLC block. This counter counts the number of useful UL MCS8-


coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS8-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS8-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

C900040225
Definition Number of UL RLC new blocks in MCS9 on PDTCH
Description After receiving UL data block, BSC decides whether it is
retransmitted RLC block, first-transmitted RLC block or pending
RLC block. This counter counts the number of useful UL MCS9-
coded first-transmitted RLC blocks received on PDTCH.
Usage This counter counts the number of useful UL MCS9-coded first-
transmitted RLC blocks received by BSC on PDTCH.
Measurement When BSC receives MCS9-coded UL first-transmitted RLC block,
Point the counter increments. The measurement point is A, as shown
in Figure 59.
Unit Times

118 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 3

CPU Load Measurement

CPU load measurement aims to make a statistic of the


performance related with circuit switching service on BSC level.
This chapter describes the definition, usage and measurement
point of various counters.

Overview
CPU load measurement consists of statistic of the average value
and peak value of CPU load.
The measurement takes BSC as the statistics unit.

CPU Load Measurement Counter


Index
Table 7 lists counters related to CPU load measurement.

TABLE 7 – CPU LOAD MEASUREMENT COUNTERS

Counter ID What It Counts


C900050001 Average load of the processor
C900050002 Peak value of the processor load

C900050001
Definition Average load of the processor
Description This counter counts the average load of the main processor
during measurement period.

Confidential and Proprietary Information of ZTE CORPORATION 119


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement After a collection period ends, calculation will be executed


Point according to the sampling load of the main processor.
Unit Percent

C900050002
Definition Peak value of the processor load
Description This counter counts the peak value of the main processor load
during measurement period.
Measurement The measurement point is the peak value of the sampling main
Point processor load during collection period.
Unit Percent

120 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4

CS Basic Measurement

This chapter contains detailed information about counters


related to CS basic measurement.

Overview
CS basic measurement involves counters that are used to
evaluate the circuit switching service performance and status.
These counters are often used in measurement related to radio
access, SDCCH, TCH, SAPI3, call drop, handover, Abis interface
message statistics, and radio resource availability.
The measurement takes cell as the statistics unit.

CS Basic Measurement Counter


Index
Table 8 lists counters related to CS basic measurement.

TABLE 8 – CS BASIC MEASUREMENT COUNTERS

Counter ID What It Counts


C900060001 Number of MTC access attempts
C900060002 Number of MTC access success
C900060003 Number of SDCCH seizure attempts for assignment
C900060004 Number of SDCCH seizure success for assignment
C900060005 Number of SDCCH seizure failure for assignment
C900060006 Number of SDCCH seizure attempts for handover
C900060007 Number of SDCCH seizure failure for handover
C900060008 Number of SDCCH allocation success for assignment
C900060009 Number of SDCCH allocation failure for assignment

Confidential and Proprietary Information of ZTE CORPORATION 121


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


Number of signaling TCH/F seizure attempts for
C900060010
assignment
Number of signaling TCH/F seizure failure for
C900060011
assignment
Number of signaling TCH/F seizure attempts for
C900060012
handover
Number of signaling TCH/F seizure failure for
C900060013
handover
Number of signaling TCH/F allocation success for
C900060014
assignment
Number of signaling TCH/F allocation failure for
C900060015
assignment
Number of signaling TCH/F allocation failure for
C900060016
handover
Number of signaling TCH/F assignment success for
C900060017
assignment
Number of signaling TCH/F assignment failure for
C900060018
assignment
C900060019 Number of voice TCH/F seizure attempts
C900060020 Number of voice TCH/F seizure failure
C900060021 Number of voice TCH/F seizure attempts for handover
C900060022 Number of voice TCH/F seizure failure for handover
Number of TCH/F allocation success for assignment
C900060023
(speech version1)
Number of TCH/F allocation failure for assignment
C900060024
(speech version1)
Number of TCH/F allocation success for assignment
C900060025
(speech version2)
Number of TCH/F allocation success for assignment
C900060026
(speech version3)
Number of TCH/F allocation failure for assignment
C900060027
(speech version3)
C900060028 Number of voice TCH/F assignment success
Number of voice TCH/F assignment failure for
C900060029
assignment
Number of data TCH/F seizure attempts for
C900060030
assignment
C900060031 Number of data TCH/F seizure failure for assignment
C900060032 Number of data TCH/F seizure attempts for handover
C900060033 Number of data TCH/F seizure failure for handover
Number of data TCH/F allocation success for
C900060034
assignment

122 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Counter ID What It Counts


Number of data TCH/F allocation failure for
C900060035
assignment
C900060036 Number of data TCH/F assignment success
C900060037 Number of data TCH/F assignment failure
Number of signaling TCH/H seizure attempts for
C900060038
assignment
Number of signaling TCH/H seizure failure for
C900060039
assignment
Number of signaling TCH/H seizure attempts for
C900060040
handover
Number of signaling TCH/H seizure failure for
C900060041
handover
Number of voice TCH/H seizure attempts for
C900060042
assignment
C900060043 Number of voice TCH/H seizure failure for assignment
Number of voice TCH/H seizure attempts for
C900060044
handover
C900060045 Number of voice TCH/H seizure failure for handover
Number of data TCH/H seizure attempts for
C900060046
assignment
C900060047 Number of data TCH/H seizure failure for assignment
C900060048 Number of data TCH/H seizure attempts for handover
C900060049 Number of data TCH/H seizure failure for handover
Number of SAPI3 link establishment requests on
C900060050
SDCCH (MO-SM)
Number of SAPI3 link establishment requests on
C900060051
SDCCH (MT-SM)
C900060052 Number of SDCCH drops due to handover failure
C900060053 Number of SDCCH drops
C900060054 Number of TCH/F drops
C900060055 Number of TCH/H drops
Average number of idle TCH/F with interference band
C900060056
1
Average number of idle TCH/F with interference band
C900060057
2
Average number of idle TCH/F with interference band
C900060058
3
Average number of idle TCH/F with interference band
C900060059
4
Average number of idle TCH/F with interference band
C900060060
5

Confidential and Proprietary Information of ZTE CORPORATION 123


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


Average number of idle TCH/H with interference band
C900060061
1
Average number of idle TCH/H with interference band
C900060062
2
Average number of idle TCH/H with interference band
C900060063
3
Average number of idle TCH/H with interference band
C900060064
4
Average number of idle TCH/H with interference band
C900060065
5
C900060066 Number of samples with UL RQ = 0
C900060067 Number of samples with UL RQ = 1
C900060068 Number of samples with UL RQ = 2
C900060069 Number of samples with UL RQ = 3
C900060070 Number of samples with UL RQ = 4
C900060071 Number of samples with UL RQ = 5
C900060072 Number of samples with UL RQ = 6
C900060073 Number of samples with UL RQ = 7
C900060074 Number of samples with DL RQ = 0
C900060075 Number of samples with DL RQ = 1
C900060076 Number of samples with DL RQ = 2
C900060077 Number of samples with DL RQ = 3
C900060078 Number of samples with DL RQ = 4
C900060079 Number of samples with DL RQ = 5
C900060080 Number of samples with DL RQ = 6
C900060081 Number of samples with DL RQ = 7
Number of TCH/F handover attempts due to UL
C900060082
strength
Number of TCH/F handover attempts due to DL
C900060083
strength
Number of TCH/F handover attempts due to UL
C900060084
quality
Number of TCH/F handover attempts due to DL
C900060085
quality
Number of TCH/F handover attempts due to UL
C900060086
interference
Number of TCH/F handover attempts due to DL
C900060087
interference
C900060088 Number of TCH/F handover attempts due to good C/I
C900060089 Number of TCH/F handover attempts due to bad C/I
C900060090 Number of TCH/F handover attempts due to PBGT

124 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Counter ID What It Counts


C900060091 Number of TCH/F handover attempts due to large TA
Number of TCH/F handover attempts due to other
C900060092
reasons
Number of BSC-controlled inter-cell outgoing
C900060093
handover
Number of BSC-controlled inter-cell outgoing
C900060094
handover success
C900060095 Number of MSC-controlled outgoing handover
C900060096 Number of MSC-controlled outgoing handover success
Number of BSC-controlled inter-cell incoming
C900060097
handover
Number of BSC-controlled inter-cell incoming
C900060098
handover success
C900060099 Number of MSC-controlled incoming handover
Number of MSC-controlled incoming handover due to
C900060100
forced release
Number of MSC-controlled incoming handover due to
C900060101
queue
Number of MSC-controlled incoming handover
C900060102
success
Number of incoming handover from undefined layer
C900060103
(GSM900) to current layer(GSM1800)
Number of incoming handover success from
C900060104
undefined layer(GSM900) to current layer (GSM1800)
Number of incoming handover from undefined layer
C900060105
(GSM1800) to current layer (GSM900)
Number of incoming handover success from
C900060106
undefined layer(GSM1800) to current layer(GSM900)
Number of incoming handover from the same layer
C900060107
GSM900 to GSM1800
Number of incoming handover success from the same
C900060108
layer GSM900 to GSM1800
Number of incoming handover from GSM900 to
C900060109
GSM1800 from the upper layer
Number of incoming handover success from GSM900
C900060110
to GSM1800 in the upper layer
Number of incoming handover from GSM900 to
C900060111
GSM1800 in the lower layer
Number of incoming handover success from GSM900
C900060112
to GSM1800 in the lower layer
Number of incoming handover from GSM1800 to
C900060113
GSM900 from the same layer
Number of incoming handover success from GSM1800
C900060114
to GSM900 from the same layer

Confidential and Proprietary Information of ZTE CORPORATION 125


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


Number of incoming handover from GSM1800 to
C900060115
GSM900 from the upper layer
Number of incoming handover success from GSM1800
C900060116
to GSM900 from the upper layer
Number of incoming handover from GSM1800 to
C900060117
GSM900 from the lower layer
Number of incoming handover success from GSM1800
C900060118
to GSM900 from the lower layer
C900060119 Number of Intra-cell handover
C900060120 Number of Intra-cell handover success
C900060121 Maximum number of busy TCH/H
C900060122 Average number of available SDCCH
C900060123 Average number of unavailable SDCCH
C900060124 SDCCH busy time
C900060125 Average number of available radio channel
C900060126 Average number of unavailable radio channel
C900060127 TCH/H busy time
C900060128 Maximum number of busy TCH/F
C900060129 TCH/F busy time
C900060130 Number of healthy TRXs
C900060131 Number of CM service requests of MOC
Number of SAPI3 link establishment success on
C900060132
SDCCH (MT-SM)
C900060133 Number of available defined SDCCH
C900060134 Number of available defined TCH/F
C900060135 Number of signaling TCH/H assignment failure
C900060136 Number of MOC access attempts
C900060137 Number of wireless access due to paging responses
Number of TCH/F allocation failure due to BTS
C900060138
connection failure for assignment (speech version1)
Number of TCH/F allocation failure due to BIU
C900060139
connection failure for assignment (speech version1)
Number of TCH/F allocation failure due to TCU
C900060140
connection failure for assignment (speech version1)
Number of TCH/F allocation failure due to channel
C900060141
activation failure for assignment (speech version2)
Number of TCH/F allocation failure due to BTS
C900060142
connection failure for assignment (speech version2)
Number of TCH/F allocation failure due to BIU
C900060143
connection failure for assignment (speech version2)

126 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Counter ID What It Counts


Number of TCH/F allocation failure due to TCU
C900060144
connection failure for assignment (speech version2)
Number of TCH/F allocation failure due to BTS
C900060145
connection failure for assignment (speech version3)
Number of TCH/F allocation failure due to BIU
C900060146
connection failure for assignment (speech version3)
Number of TCH/F allocation failure due to TCU
C900060147
connection failure for assignment (speech version3)
Number of TCH/F allocation failure due to BTS
C900060148
connection failure for assignment (speech version3)
Number of data TCH/F allocation failure due to BIU
C900060149
connection failure for assignment
Number of data TCH/F allocation failure due to TCU
C900060150
connection failure for assignment
C900060151 Number of voice TCH/H drops due to handover failure
C900060152 Number of Abis interface paging command messages
C900060153 Number of Abis CS paging messages
C900060154 Number of Abis PS paging messages
C900060155 Number of available defined TCH/H
Number of TCH/F allocation failure due to channel
C900060156
activation failure for handover(speech version1)
Number of TCH/F allocation failure due to BTS
C900060157
connection failure for handover (speech version1)
Number of TCH/F allocation failure due to BIU
C900060158
connection failure for handover (speech version1)
Number of TCH/F allocation failure due to TCU
C900060159
connection failure for handover (speech version1)
Number of TCH/F allocation failure due to channel
C900060160
activation failure for handover(speech version2)
Number of TCH/F allocation failure due to BTS
C900060161
connection failure for handover (speech version2)
Number of TCH/F allocation failure due to BIU
C900060162
connection failure for handover (speech version2)
Number of TCH/F allocation failure due to TCU
C900060163
connection failure for handover (speech version2)
Number of TCH/F allocation failure due to channel
C900060164
activation failure for handover(speech version3)
Number of TCH/F allocation failure due to BTS
C900060165
connection failure for handover (speech version3)
Number of TCH/F allocation failure due to BIU
C900060166
connection failure for handover (speech version3)
Number of TCH/F allocation failure due to TCU
C900060167
connection failure for handover (speech version3)

Confidential and Proprietary Information of ZTE CORPORATION 127


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


C900060168 Number of Voice TCH/F handover success
Number of data TCH/F allocation failure due to
C900060169
channel activation failure for handover
Number of TCH/F allocation failure due to BTS
C900060170
connection failure for handover
Number of TCH/F allocation failure due to BIU
C900060171
connection failure for handover
Number of TCH/F allocation failure due to TCU
C900060172
connection failure for handover
C900060173 Number of data TCH/F handover success
Number of signaling TCH/H allocation failure for
C900060174
assignment
Number of TCH/H allocation failure due to channel
C900060175
activation failure for assignment (speech version1)
Number of TCH/H allocation failure due to BTS
C900060176
connection failure for assignment (speech version1)
Number of TCH/H allocation failure due to BIU
C900060177
connection failure for assignment (speech version1)
Number of TCH/H allocation failure due to TCU
C900060178
connection failure for assignment (speech version1)
Number of TCH/H allocation failure due to channel
C900060179
activation failure for handover (speech version1)
Number of TCH/H allocation failure due to BTS
C900060180
connection failure for handover (speech version1)
Number of TCH/H allocation failure due to BIU
C900060181
connection failure for handover (speech version1)
Number of TCH/H allocation failure due to TCU
C900060182
connection failure for handover (speech version1)
Number of TCH/H allocation failure due to channel
C900060183
activation failure for assignment (speech version2)
Number of TCH/H allocation failure due to BTS
C900060184
connection failure for assignment (speech version2)
Number of TCH/H allocation failure due to BIU
C900060185
connection failure for assignment (speech version2)
Number of TCH/H allocation failure due to TCU
C900060186
connection failure for assignment (speech version2)
Number of TCH/H allocation failure due to channel
C900060187
activation failure for handover (speech version2)
Number of TCH/H allocation failure due to BTS
C900060188
connection failure for handover (speech version2)
Number of TCH/H allocation failure due to BIU
C900060189
connection failure for handover (speech version2)
Number of TCH/H allocation failure due to TCU
C900060190
connection failure for handover (speech version2)

128 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Counter ID What It Counts


Number of TCH/H allocation failure due to channel
C900060191
activation failure for assignment (speech version3)
Number of TCH/H allocation failure due to BTS
C900060192
connection failure for assignment (speech version3)
Number of TCH/H allocation failure due to BIU
C900060193
connection failure for assignment (speech version3)
Number of TCH/H allocation failure due to TCU
C900060194
connection failure for assignment (speech version3)
Number of TCH/H allocation failure due to channel
C900060195
activation failure for handover (speech version3)
Number of TCH/H allocation failure due to BTS
C900060196
connection failure for handover (speech version3)
Number of TCH/H allocation failure due to BIU
C900060197
connection failure for handover (speech version3)
Number of TCH/H allocation failure due to TCU
C900060198
connection failure for handover (speech version3)
C900060199 Number of Voice TCH/H assignment success
C900060200 Number of Voice TCH/H assignment failure
C900060201 Number of Voice TCH/H handover success
Number of data TCH/H allocation failure due to
C900060202
channel activation failure for assignment
Number of data TCH/H allocation failure due to BTS
C900060203
connection failure for assignment
Number of data TCH/H allocation failure due to BIU
C900060204
connection failure for assignment
Number of data TCH/H allocation failure due to TCU
C900060205
connection failure for assignment
Number of data TCH/H allocation failure due to
C900060206
channel activation failure for handover
Number of data TCH/H allocation failure due to BTS
C900060207
connection failure for handover
Number of data TCH/H allocation failure due to BIU
C900060208
connection failure for handover
Number of data TCH/H allocation failure due to TCU
C900060209
connection failure for handover
C900060210 Number of data TCH/H assignment success
C900060211 Number of data TCH/H assignment failure
C900060212 Number of data TCH/H handover success
Number of BSC-controlled incoming handover due to
C900060213
forced release
Number of BSC-controlled incoming handover due to
C900060214
queues

Confidential and Proprietary Information of ZTE CORPORATION 129


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Counter ID What It Counts


Number of BSC-controlled incoming handover due to
C900060215
forced handover
Number of MSC-controlled incoming handover due to
C900060216
forced handover
C900060217 Number of unavailable defined TCH/H
C900060218 Number of unavailable defined TCH/F
Number of signaling TCH/F drops due to handover
C900060219
failure
C900060220 Number of voice TCH/F drops due to handover failure
C900060221 Number of data TCH/F drops due to handover failure
Number of signaling TCH/H drops due to handover
C900060222
failure
C900060223 Number of data TCH/H drops due to handover failure
Number of TCH/H handover attempts due to UL
C900060224
strength
Number of TCH/H handover attempts due to DL
C900060225
strength
Number of TCH/H handover attempts due to UL
C900060226
quality
Number of TCH/H handover attempts due to DL
C900060227
quality
Number of TCH/H handover attempts due to UL
C900060228
interference
Number of TCH/H handover attempts due to DL
C900060229
interference
C900060230 Number of TCH/H handover attempts due to good C/I
C900060231 Number of TCH/H handover attempts due to bad C/I
C900060232 Number of TCH/H handover attempts due to PBGT
C900060233 Number of TCH/H handover attempts due to large TA
Number of TCH/H handover attempts due to other
C900060234
reasons
C900060235 Number of signaling TCH/H assignment success
C900060236 Number of MOC access success
C900060237 Number of dual band outgoing handover
C900060238 Number of dual band outgoing handover success
C900060239 Number of dual band incoming handover
C900060240 Number of dual band incoming handover success
C900060241 Number of SDCCH assignment attempts
C900060242 Number of SDCCH assignments success
C900060243 Number of SDCCH assignment failure
C900060244 Number of voice TCH/F drops due to radio link failure

130 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Counter ID What It Counts


C900060245 Number of voice TCH/H drops due to radio link failure

C900060001
Definition Number of MTC access attempts
Description This counter counts the number of channel requests due to MTC
random access. When MS sends the CHL_REQ message to BSC
through BTS to request for radio channel, if TA does not exceed
the cell range and the access reason is “MTC”, the counter
increments.
Usage This counter is used to find out the frequency of channel request
due to MTC.
Measurement The counter counts when MS requests for channel from BSC and
Point TA does not exceed the cell range. The measurement point is A1,
as shown in Figure 99.

FIGURE 99 – RADIO ACCESS FLOW

MS BTS BSC
CHL_REQ
CHL_RQD

A1

A2
CHL_ACT

CHL_ACT_ACK

A3

IMM_ASS_ CMD
IMM_ASS
SABM
EST_IND

A4

Unit Times

C900060002
Definition Number of MTC access success
Description This counter counts the number of MS successfully accessing the
channel assigned in the immediate assignment message (the

Confidential and Proprietary Information of ZTE CORPORATION 131


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

access reason is due to MTC). The counter increments when the


following two conditions are satisfied:
„ MS receives the IMM_ASS message from BSC and
successfully accesses the channel.
„ BSC receives the EST_IND message from MS.
Usage This counter is used to find out the frequency of MS access
success due to MTC.
Measurement This counter counts when BSC receives the EST_IND message.
Point The measurement point is A4, as shown in Figure 99.
Unit Times

C900060003
Definition Number of SDCCH seizure attempts for assignment
Description SDCCH channel allocation attempt is activated by the MS
channel request message CHL_REQ. After BSC receives this
message, it attempts to allocate channel for the request.
„ If allocation and occupation succeed, C900060003 and
C900060004 accumulate simultaneously.
„ If occupation fails and the failure is due to transceiver fault,
C900060003, C900060004, and C900060005 do not change.
„ For failures in other cases, C900060003 and C900060005
accumulate simultaneously.
Usage This counter counts the number of SDCCH channel occupation
attempts during assignment, including the number of occupation
success (C900060004) and the number of occupation failure
(C900060005).
Measurement This counter counts when BSC completes requesting for channel
Point (due to assignment) (C900060004 + C900060005). The
measurement point is A1, as shown in Figure 100.

132 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 100 – IMMEDIATE ASSIGNMENT FLOW

MS BTS BSC
CHL_REQ
CHL_RQD

A1

CHL_ACT

CHL_ACT_ACK

IMM _ASS _CMD

A2
IMM_ASS
SABM
EST_IND

A3

Unit Times

C900060004
Definition Number of SDCCH seizure success for assignment
Description SDCCH channel allocation attempt is activated by the MS
channel request message CHL_REQ. After BSC receives this
message, it attempts to allocate channel for the request. This
counter accumulates when allocation and occupation succeed.
Usage This counter counts the number of successful SDCCH channel
occupations during assignment.
Measurement This counter counts when BSC requests for channel (due to
Point assignment) and occupies the channel successfully. The
measurement point is A1, as shown in Figure 100.
Unit Times

C900060005
Definition Number of SDCCH seizure failure for assignment
Description SDCCH channel allocation attempt is activated by the MS
channel request message CHL_REQ. After BSC receives this
message, it attempts to allocate channel for the request.
„ If allocation succeeds but occupation fails, this counter
accumulates.

Confidential and Proprietary Information of ZTE CORPORATION 133


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

„ If the request returns that the transceiver is faulty, this


counter does not change.
„ For failures in other cases, this counter accumulates.
Usage This counter counts the number of SDCCH channel occupation
failures during assignment.
Measurement This counter counts when BSC requests for channel (due to
Point assignment) but fails to occupy the channel. The measurement
point is A1, as shown in Figure 100.
Unit Times

C900060006
Definition Number of SDCCH seizure attempts for handover
Description SDCCH channel allocation attempt is activated by the channel
request message RADIO_APPLY from other channel instances.
After BSC receives this message, it attempts to allocate channel
for the request.
„ If allocation and occupation succeed, C900060006 and
C901250005 accumulate simultaneously.
„ If occupation fails, C900060006 and C900060007
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060006 and
C901250005 accumulate simultaneously.
f If the waiting for resource fails and the failure is due to
transceiver fault, C900060006, C901250005, and
C900060007 do not change.
„ For failures in other cases, C900060006 and C900060007
accumulate simultaneously.
Usage This counter counts the number of SDCCH channel occupation
attempts during handover, including the number of occupation
success (C900060006) and the number of occupation failure
(C900060007).
Measurement BSC completes requesting for channel (due to handover), or BSC
Point receives the internal message of waiting for resource
successfully or waiting for resource failed (C901250005 +
C900060007). The measurement point is B1 as shown in Figure
101 and C1 as shown in Figure 102.

134 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 101 – INTERNAL HANDOVER FLOW (INTRA-CELL HANDOVER)

MS BTS BSC MSC


MEAS_REP
MEAS_RES
B1

CHL_ACT
CHL_ACT_ACK

ASS_CMD B2
ASS_CMD
SABM

UA EST_IND
ASS_COM
ASS_COM

B3 HO_PREFORM

FIGURE 102 – EXTERNAL HANDOVER FLOW

MS BTS BSC MSC


HO_REQ

C1

CHL_ACT
CHL_ACT_ACK
C2 HO_REQ_ACK
HO_ACCESS
HO_DETECT
PHY_INFO
HO_DETECT
SABM
UA
HO_COM
HO_COM

C3 HO_COM

Unit Times

C900060007
Definition Number of SDCCH seizure failure for handover
Description SDCCH channel allocation attempt is activated by the channel
request message RADIO_APPLY from other channel instances.
After BSC receives this message, it attempts to allocate channel
for the request.

Confidential and Proprietary Information of ZTE CORPORATION 135


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

„ If occupation fails, this counter accumulates.


„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Usage This counter counts the number of SDCCH occupation failure.
Measurement BSC requests for channel (due to handover) but fails to occupy
Point the channel, or BSC fails to wait for internal resource. The
measurement point is B1 as shown in Figure 101 and C1 as
shown in Figure 102.
Unit Times

C900060008
Definition Number of SDCCH allocation success for assignment
Description After BSC responds the channel request message to allocate and
occupy SDCCH channel successfully, BSC sends the CHL_ACT
message to BTS to activate this SDCCH. If the SDCCH is
activated successfully (that is, when BSC receives the
CHL_ACT_ACK message from BTS), this counter accumulates.
Usage This counter counts the number of successful SDCCH channel
allocations during assignment.
Measurement This counter counts when BSC receives the CHL_ACT_ACK
Point message from BTS and the cause is assignment. The
measurement point is A2, as shown in Figure 100.
Unit Times

C900060009
Definition Number of SDCCH allocation failure for assignment
Description After BSC responds the channel request message to allocate and
occupy SDCCH channel successfully, BSC sends the CHL_ACT
message to BTS to activate this SDCCH. If channel activation
fails due to receiving channel activation failure message,
incorrect channel activation response message, T9103 being
timeout, channel instance being released or channel being
forcibly released, this counter accumulates.
Usage This counter counts the number of SDCCH channel allocation
failure during assignment.

136 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement BSC activates SDCCH channel due to assignment, but receives


Point channel activation failure message, incorrect channel activation
response message, T9103 being timeout, channel instance being
released, or channel being forcibly released. The measurement
point is A2, as shown in Figure 100.
Unit Times

C900060010
Definition Number of signaling TCH/F seizure attempts for assignment
Description This counter counts the number of TCH/F channel occupation
attempts during assigning signaling channels, including the
number of occupation success (C901260002) and the number of
occupation failure (C900060011).
Usage After BSC receives the channel request, it attempts to allocate
channel for the request.
„ If allocation and occupation succeed, C900060010 and
C901260002 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060010, C901260002, and C900060011 do not change.
„ For other cases, C900060010 and C900060011 accumulate
simultaneously.
Measurement This counter counts when BSC completes requesting for channel
Point (due to assignment and the channel is used as signaling channel)
(C901260002 + C900060011). The measurement point is A1, as
shown in Figure 103.

FIGURE 103 – IMMEDIATE ASSIGNMENT FLOW

MS BTS BSC
CHL_REQ
CHL_RQD
A1
CHL_ACT

CHL_ACT_ACK
A2
IMM_ASS_CMD
IMM_ASS

SABM EST_IND

A3

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 137


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060011
Definition Number of signaling TCH/F seizure failure for assignment
Description This counter counts the number of TCH/F channel occupation
failures during assigning signaling channels.
After BSC receives the channel request, it attempts to allocate
channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to assignment and the channel is
Point used as signaling channel) but fails to occupy the channel, or
BSC fails to wait for internal resource. The measurement point is
A1, as shown in Figure 104.

FIGURE 104 – IMMEDIATE ASSIGNMENT OCCUPATION FAILURE FLOW 1

Unit Times

C900060012
Definition Number of signaling TCH/F seizure attempts for handover
Description This counter counts the number of TCH/F channel occupation
attempts during signaling channel handover, including the
number of occupation success (C901260005) and the number of
occupation failure (C900060013).
After BSC receives the channel request, it attempts to allocate
channel for the request.
„ If allocation and occupation succeed, C900060012 and
C901260005 accumulate simultaneously.
„ If occupation fails, C900060012 and C900060013
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.

138 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

f If the waiting for resource succeeds, C900060012 and


C901260005 accumulate simultaneously.
f If the waiting for resource fails, C900060012 and
C900060013 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060012, C901260005, and C900060013 do not change.
„ For failures in other cases, C900060012 and C900060013
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to handover and the
Point channel is used as signaling channel), or BSC receives the
internal message of waiting for resource successfully or waiting
for resource failed (C901260002 + C900060011). The
measurement point is C1 as shown in Figure 105 and Figure 106
and D1 as shown in Figure 107 and Figure 108.

FIGURE 105 – INTERNAL HANDOVER FLOW (INTRA-CELL HANDOVER, TC IS


INTERNAL)

MS BTS BSC MSC


MEAS_REP
MEAS_RES
C1
Abis,TCU connect
CHL_ACT C2

CHL_ACT_ACK

ASS_CMD C3
ASS_CMD
SABM

UA EST_IND
ASS_COM
ASS_COM

C4 HO_PREFORM

Confidential and Proprietary Information of ZTE CORPORATION 139


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 106 – INTERNAL HANDOVER FLOW (INTRA-CELL HANDOVER,


CHANNEL TYPE CHANGED, TC IS EXTERNAL)

MS BTS BSC iTC MSC


MEAS_REP
MEAS_RES
TCRescr Req

TCRescr Ack

C1
iTC Connect Req

iTC Connect Ack

C2
CHL_ACT
CHL_ACT_ACK

ASS_CMD C3
ASS_CMD
SABM
UA EST_IND
ASS_COM
ASS_COM

C4
HO_PREFORM

FIGURE 107 – EXTERNAL HANDOVER FLOW (TC IS INTERNAL)

140 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 108 – EXTERNAL HANDOVER FLOW (TC IS EXTERNAL )

Unit Times

C900060013
Definition Number of signaling TCH/F seizure failure for handover
Description This counter counts the number of TCH/F channel occupation
failures during signaling channel handover.
After BSC receives the channel request, it attempts to allocate
channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to handover and the channel is
Point used as signaling channel) but fails to occupy the channel, or
BSC fails to wait for internal resource. The measurement point is
C1 as shown in Figure 109 and D1 as shown in Figure 110.

FIGURE 109 – INTRA-BSC HANDOVER OCCUPATION FAILURE FLOW

Confidential and Proprietary Information of ZTE CORPORATION 141


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 110 – INTER-BSC HANDOVER OCCUPATION FAILURE FLOW

BSC MSC
HO_REQ
D
1 (TCH seizure fails, external
handover is not
implemented)

Unit Times

C900060014
Definition Number of signaling TCH/F allocation success for assignment
Description This counter counts the number TCH/F channel being allocated
successfully during signaling channel assignment.
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F channel. If the activation
succeeds (that is, when BSC receives the CHL_ACT_ACK
message from BTS), the counter accumulates.

Measurement The counter increments when BSC receives the CHL_ACT_ACK


Point message from BTS, the cause is due to assignment and the
channel is used as signaling channel. The measurement point is
A2, as shown in Figure 103.
Unit Times

C900060015
Definition Number of signaling TCH/F allocation failure for assignment
Description This counter counts the number of TCH/F channel allocation
failures during signaling channel assignment.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F channel.
If the channel activation fails due to receiving channel activation
failure message, incorrect channel activation response message,
T9103 timeout, channel instance being released or channel
being released forcibly, this counter accumulates.
Measurement BSC activates TCH/F channel due to assignment and uses it as
Point signaling channel, but receives channel activation failure
message, incorrect channel activation response message, T9103
being timeout, channel instance being released, or channel being

142 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

forcibly released. The measurement point is A2, as shown in


Figure 111.

FIGURE 111 – IMMEDIATE ASSIGNMENT ALLOCATION F AILURE FLOW 2

MS BTS BSC
CHL_REQ
CHL_RQD
A1
CHL_ACT

CHL_ACT_NACK

A2

Unit Times

C900060016
Definition Number of signaling TCH/F allocation failure for handover
Description This counter counts the number of TCH/F channel allocation
failures during signaling channel handover.
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F channel.
If the channel activation fails due to receiving channel activation
failure message, incorrect channel activation response message,
T9103 timeout, channel instance being released or channel
being released forcibly, this counter will accumulate.
Measurement BSC activates TCH/F channel due to handover and uses it as
Point signaling channel, but receives channel activation failure
message, incorrect channel activation response message, T9103
being timeout, channel instance being released, or channel being
forcibly released.
The measurement point is C3 as shown in Figure 112 and D3 as
shown in Figure 113.

Confidential and Proprietary Information of ZTE CORPORATION 143


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 112 – INTERNAL HANDOVER FAILURE FLOW 1 (INTRA-CELL


HANDOVER, TC IS INTERNAL)

FIGURE 113 – EXTERNAL HANDOVER FAILURE FLOW 2 (TC IS INTERNAL)

MS BTS BSC MSC


HO_REQ
D1
Abis,TCU connect
CHL_ACT D2

CHL_ACT_NACK
... D3

Unit Times

C900060017
Definition Number of signaling TCH/F assignment success for assignment
Description This counter counts the number of successful assignments of
TCH/F as signaling channel.
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. For immediate
assignment, after the TCH/F activation succeeds, BTS finds the
MS accessed and sends the EST_IND message to BSC, this
counter accumulates when BSC receives the message correctly.
Measurement For immediate assignment, this counter counts when BSC
Point receives the EST_IND message correctly. The measurement
point is A3, as shown in Figure 103.
Unit Times

144 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060018
Definition Number of signaling TCH/F assignment failure for assignment
Description This counter counts the number of failing to assign TCH/F
channel as signaling channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If BSC does not receive
the MS access notification within a certain time, this assignment
fails.
Measurement For immediate assignment, this counter counts when BSC
Point receives incorrect EST_IND message or T3101 is timeout. The
measurement point is A3, as shown in Figure 114

FIGURE 114 – IMMEDIATE ASSIGNMENT FAILURE FLOW 3

MS BTS BSC
CHL_REQ
CHL_RQD
A1
CHL_ACT

CHL_ACT_ACK
IMM_ASS_CM A2
IMM_ASS D

SABM Incorrect EST_IND


message, or T3101
timeout A3

Unit Times

C900060019
Definition Number of voice TCH/F seizure attempts
Description This counter counts the number of TCH/F channel being
attempted to be occupied during voice channel assignment,
including the number of occupation success (C901260021) and
the number of occupation failure (C900060020).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060019 and
C901260021 accumulate simultaneously.
„ If occupation fails, C900060019 and C900060020
accumulate simultaneously.

Confidential and Proprietary Information of ZTE CORPORATION 145


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

„ If the request returns no channel available but queuing or


forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060019 and
C901260021 accumulate simultaneously.
f If the waiting for resource fails, C900060019 and
C900060020 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060019, C901260021, and C900060020 do not change.
„ For failures in other cases, C900060019 and C900060020
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to assignment and
Point the channel is used as voice channel), or BSC receives the
internal message of waiting for resource successfully or waiting
for resource failed (C901260021 + C900060020). The
measurement point is B1, as shown in Figure 115 and Figure
116.

FIGURE 115 – COMMON ASSIGNMENT FLOW (TC IS INTERNAL)

MS BTS BSC MSC


ASS_REQ

B1
Abis,TCU connect
CHL_ACT B2

CHL_ACT_ACK

ASS_CMD B3
ASS_CMD
SABM

UA EST_IND
ASS_COM B4
ASS_COM

B5 ASS_COM

146 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 116 – COMMON ASSIGNMENT FLOW (TC IS EXTERNAL )

Unit Times

C900060020
Definition Number of voice TCH/F seizure failure
Description This counter counts the number of TCH/F channel occupation
failure during voice channel assignment.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to assignment and the channel is
Point used as voice channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is B1,
as shown in Figure 117.

Confidential and Proprietary Information of ZTE CORPORATION 147


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 117 – COMMON ASSIGNMENT FAILURE FLOW 1 (TC IS INTERNAL)

BSC MSC
ASS_REQ
Channel
seizure B1
ASS_FAIL
fails

Unit Times

C900060021
Definition Number of voice TCH/F seizure attempts for handover
Description This counter counts the number of TCH/F channel being
attempted to be occupied during voice channel handover,
including the number of occupation success (C901260024) and
the number of occupation failure (C900060022).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060021 and
C901260024 accumulate simultaneously.
„ If occupation fails, C900060021 and C900060022
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060021 and
C901260024 accumulate simultaneously.
f If the waiting for resource fails, C900060021 and
C900060022 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060021, C901260024, and C900060022 do not change.
„ For failures in other cases, C900060021 and C900060022
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to handover and the
Point channel is used as voice channel), or BSC receives the internal
message of waiting for resource successfully or waiting for
resource failed (C901260024 + C900060022). The measurement
point is C1 as shown in Figure 105 and Figure 106 and D1 as
shown in Figure 107 and Figure 108.
Unit Times

148 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060022
Definition Number of voice TCH/F seizure failure for handover
Description This counter counts the number of TCH/F channel occupation
failure during voice channel handover.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If allocation or occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to handover and the channel is
Point used as voice channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is C1
as shown in Figure 109 and D1 as shown in Figure 110.
Unit Times

C900060023
Definition Number of TCH/F allocation success for assignment (speech
version1)
Description This counter counts the number of TCH/F channel being
allocated successfully during voice channel assignment (speech
version 1).
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If the TCH/F is activated
successfully (that is, when BSC receives the CHL_ACT_ACK
message from BTS), this counter accumulates.
Measurement This counter counts when BSC receives the CHL_ACT_ACK
Point message from BTS, the cause is assignment and the channel is
used as voice channel (speech version 1). The measurement
point is B3, as shown in Figure 115 and Figure 116.
Unit Times

C900060024
Definition

Confidential and Proprietary Information of ZTE CORPORATION 149


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Number of TCH/F allocation failure for assignment (speech


version1)
Description This counter counts the number of TCH/F channel allocation
failure due to channel activation failure during voice channel
assignment (speech version 1).
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If channel activation fails
due to receiving channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released or channel being forcibly
released, this counter accumulates.
Measurement BSC activates TCH/F channel due to assignment and uses the
Point channel as voice channel (speech version 1), but receives
channel activation failure message, incorrect channel activation
response message, T9103 being timeout, channel instance being
released, or channel being forcibly released. The measurement
point is B3, as shown in Figure 118.

FIGURE 118 – COMMON ASSIGNMENT FAILURE FLOW 1 (TC IS INTERNAL)

Unit Times

C900060025
Definition Number of TCH/F allocation success for assignment (speech
version2)
Description This counter counts the number of TCH/F channel being
allocated successfully during voice channel assignment (speech
version 2).
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If the TCH/F is activated
successfully (that is, when BSC receives the CHL_ACT_ACK
message from BTS), this counter accumulates.
Measurement This counter counts when BSC receives the CHL_ACT_ACK
Point message from BTS, the cause is assignment and the channel is

150 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

used as voice channel (speech version 2). The measurement


point is B3, as shown in Figure 115 and Figure 116.
Unit Times

C900060026
Definition Number of TCH/F allocation success for assignment (speech
version3)
Description This counter counts the number of TCH/F channel being
allocated successfully during voice channel assignment (speech
version 3).
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If the TCH/F is activated
successfully (that is, when BSC receives the CHL_ACT_ACK
message from BTS), this counter accumulates.
Measurement This counter counts when BSC receives the CHL_ACT_ACK
Point message from BTS, the cause is assignment and the channel is
used as voice channel (speech version 3). The measurement
point is B3, as shown in Figure 115 and Figure 116.
Unit Times

C900060027
Definition Number of TCH/F allocation failure for assignment (speech
version3)
Description This counter counts the number of TCH/F channel allocation
failure due to channel activation failure during voice channel
assignment (speech version 3).
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If channel activation fails
due to receiving channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released or channel being forcibly
released, this counter accumulates.
Measurement BSC activates TCH/F channel due to assignment and uses the
Point channel as voice channel (speech version 3), but receives
channel activation failure message, incorrect channel activation
response message, T9103 being timeout, channel instance being
released, or channel being forcibly released. The measurement
point is B3, as shown in Figure 118.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 151


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060028
Definition Number of voice TCH/F assignment success
Description This counter counts the number of successful assignments of
TCH/F as voice channel.
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. For assignment from A-
interface, after BSC receives the assignment success message,
the counter accumulates.
Measurement For assignment from A-interface, the counter accumulates when
Point BSC receives the assignment success message. The
measurement point is B5, as shown in Figure 115 and Figure
116.
Unit Times

C900060029
Definition Number of voice TCH/F assignment failure for assignment
Description This counter counts the number of failing to assign TCH/F
channel as voice channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If BSC does not receive
the MS access notification within a certain time, this assignment
fails.
Measurement This counter counts when BSC receives assignment failure
Point message, abnormal message, channel instance being released,
channel instance being released forcibly, or timer timeout
message. The measurement point is B5, as shown in Figure 119.

152 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 119 – COMMON ASSIGNMENT FAILURE FLOW 4 (TC IS INTERNAL)

MS BTS BSC MSC


ASS_REQ

B1
Abis,TCU connect
CHL_ACT B2

CHL_ACT_ACK

ASS_CMD B3
ASS_CMD
SABM

UA EST_IND
ASS_FAIL B4
ASS_FAIL

B5 ASS_FAIL

Unit Times

C900060030
Definition Number of data TCH/F seizure attempts for assignment
Description This counter counts the number of TCH/F channel being
attempted to be occupied during data channel assignment,
including the number of occupation success (C901260070) and
the number of occupation failure (C900060031).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060030 and
C901260070 accumulate simultaneously.
„ If occupation fails, C900060030 and C900060031
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060030 and
C901260070 accumulate simultaneously.
f If the waiting for resource fails, C900060030 and
C900060031 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060030, C901260070, and C900060031 do not change.
„ For failures in other cases, C900060030 and C900060031
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to assignment and
Point the channel is used as data channel), or BSC receives the

Confidential and Proprietary Information of ZTE CORPORATION 153


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

internal message of waiting for resource successfully or waiting


for resource failed (C901260070 + C900060031). The
measurement point is B1, as shown in Figure 115 and Figure
116.
Unit Times

C900060031
Definition Number of data TCH/F seizure failure for assignment
Description This counter counts the number of TCH/F channel occupation
failure during data channel assignment.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to assignment and the channel is
Point used as data channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is B1,
as shown in Figure 117.
Unit Times

C900060032
Definition Number of data TCH/F seizure attempts for handover
Description This counter counts the number of TCH/F channel being
attempted to be occupied during data channel handover,
including the number of occupation success (C901260073) and
the number of occupation failure (C900060033).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060032 and
C901260073 accumulate simultaneously.
„ If occupation fails, C900060032 and C900060033
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.

154 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

f If the waiting for resource succeeds, C900060032 and


C901260073 accumulate simultaneously.
f If the waiting for resource fails, C900060032 and
C900060033 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060032, C901260073, and C900060033 do not change.
„ For failures in other cases, C900060032 and C900060033
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to handover and the
Point channel is used as data channel), or BSC receives the internal
message of waiting for resource successfully or waiting for
resource failed (C901260073 + C900060033). The measurement
point is C1 as shown in Figure 105 and Figure 106 and D1 as
shown in Figure 107 and Figure 108.
Unit Times

C900060033
Definition Number of data TCH/F seizure failure for handover
Description This counter counts the number of TCH/F channel occupation
failure during data channel handover.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to handover and the channel is
Point used as data channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is C1
as shown in Figure 109 and D1 as shown in Figure 110.
Unit Times

C900060034
Definition Number of data TCH/F allocation success for assignment
Description This counter counts the number of TCH/F channel being
allocated successfully during data channel assignment.

Confidential and Proprietary Information of ZTE CORPORATION 155


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

After BSC responds the channel request message to allocate and


occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If the TCH/F is activated
successfully (that is, when BSC receives the CHL_ACT_ACK
message from BTS), this counter accumulates.
Measurement This counter counts when BSC receives the CHL_ACT_ACK
Point message from BTS, the cause is assignment and the channel is
used as data channel. The measurement point is B3, as shown in
Figure 115 and Figure 116.
Unit Times

C900060035
Definition Number of data TCH/F allocation failure for assignment
Description This counter counts the number of TCH/F channel allocation
failure due to channel activation failure during data channel
assignment.
After BSC responds the channel request message to allocate and
occupy TCH/F channel successfully, if connection succeeds, BSC
sends the CHL_ACT message to BTS to activate this TCH/F. If
channel activation fails due to receiving channel activation
failure message, incorrect channel activation response message,
T9103 being timeout, channel instance being released or
channel being forcibly released, this counter accumulates.
Measurement BSC activates TCH/F channel due to assignment and uses the
Point channel as data channel, but receives channel activation failure
message, incorrect channel activation response message, T9103
being timeout, channel instance being released, or channel being
forcibly released. The measurement point is B3, as shown in
Figure 118.
Unit Times

C900060036
Definition Number of data TCH/F assignment success
Description This counter counts the number of successful assignments of
TCH/F as data channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. For assignment from A-
interface, after BSC receives the assignment success message,
the counter accumulates.
Measurement For assignment from A-interface, the counter accumulates when
Point BSC receives the assignment success message. The

156 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

measurement point is B5, as shown in Figure 115 and Figure


116.
Unit Times

C900060037
Definition Number of data TCH/F assignment failure
Description This counter counts the number of failing to assign TCH/F
channel as data channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If BSC does not receive
the MS access notification within a certain time, this assignment
fails.
Measurement This counter counts when BSC receives assignment failure
Point message, abnormal message, channel instance being released,
channel instance being released forcibly, or timer timeout
message. The measurement point is B5, as shown in Figure 119.
Unit Times

C900060038
Definition Number of signaling TCH/H seizure attempts for assignment
Description This counter counts the number of TCH/H channel being
attempted to be occupied during signaling channel assignment,
including the number of occupation success (C901270002) and
the number of occupation failure (C900060039).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060038 and
C901270002 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060038, C901270002, and C900060039 do not change.
„ For other cases, C900060038 and C900060039 accumulate
simultaneously.
Measurement This counter counts when BSC completes requesting for channel
Point (due to assignment and the channel is used as signaling channel)
(C901270002 + C900060039). The measurement point is A1, as
shown in Figure 103.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 157


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060039
Definition Number of signaling TCH/H seizure failure for assignment
Description This counter counts the number of TCH/H channel occupation
failure during signaling channel assignment.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to assignment and the channel is
Point used as signaling channel) but fails to occupy the channel, or
BSC fails to wait for internal resource. The measurement point is
A1, as shown in Figure 104.
Unit Times

C900060040
Definition Number of signaling TCH/H seizure attempts for handover
Description This counter counts the number of TCH/H channel being
attempted to be occupied during signaling channel handover,
including the number of occupation success (C901270005) and
the number of occupation failure (C900060041).
After BSC receives the channel request, it attempts to allocate
channel for the request.
„ If allocation and occupation succeed, C900060040 and
C901270005 accumulate simultaneously.
„ If occupation fails, C900060040 and C900060041
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060040 and
C901270005 accumulate simultaneously.
f If the waiting for resource fails, C900060040 and
C900060041 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060040, C901270005, and C900060041 do not change.
„ For failures in other cases, C900060040 and C900060041
accumulate simultaneously.

158 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement BSC completes requesting for channel (due to handover and the
Point channel is used as signaling channel), or BSC receives the
internal message of waiting for resource successfully or waiting
for resource failed (C901270005 + C900060041). The
measurement point is C1 as shown in Figure 105 and Figure 106
and D1 as shown in Figure 107 and Figure 108.
Unit Times

C900060041
Definition Number of signaling TCH/H seizure failure for handover
Description This counter counts the number of TCH/H channel occupation
failures during signaling channel handover.
After BSC receives the channel request, it attempts to allocate
channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to handover and the channel is
Point used as signaling channel) but fails to occupy the channel, or
BSC fails to wait for internal resource. The measurement point is
C1 as shown in Figure 109 and D1 as shown in Figure 110.
Unit Times

C900060042
Definition Number of voice TCH/H seizure attempts for assignment
Description This counter counts the number of TCH/H channel being
attempted to be occupied during voice channel assignment,
including the number of occupation success (C901270021) and
the number of occupation failure (C900060043).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060042 and
C901270021 accumulate simultaneously.
„ If occupation fails, C900060042 and C900060043
accumulate simultaneously.

Confidential and Proprietary Information of ZTE CORPORATION 159


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

„ If the request returns no channel available but queuing or


forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060042 and
C901270021 accumulate simultaneously.
f If the waiting for resource fails, C900060042 and
C900060043 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060042, C901270021, and C900060043 do not change.
„ For failures in other cases, C900060042 and C900060043
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to assignment and
Point the channel is used as voice channel), or BSC receives the
internal message of waiting for resource successfully or waiting
for resource failed (C901270021 + C900060043). The
measurement point is B1, as shown in Figure 115 and Figure
116.
Unit Times

C900060043
Definition Number of voice TCH/H seizure failure for assignment
Description This counter counts the number of TCH/H channel occupation
failure during voice channel assignment.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to assignment and the channel is
Point used as voice channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is B1,
as shown in Figure 117.
Unit Times

C900060044
Definition Number of voice TCH/H seizure attempts for handover

160 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Description This counter counts the number of TCH/H channel being


attempted to be occupied during voice channel handover,
including the number of occupation success (C901270024) and
the number of occupation failure (C900060045).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060044 and
C901270024 accumulate simultaneously.
„ If occupation fails, C900060044 and C900060045
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060044 and
C901270024 accumulate simultaneously.
f If the waiting for resource fails, C900060044 and
C900060045 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060044, C901270024, and C900060045 do not change.
„ For failures in other cases, C900060044 and C900060045
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to handover and the
Point channel is used as voice channel), or BSC receives the internal
message of waiting for resource successfully or waiting for
resource failed (C901270024 + C900060045). The measurement
point is C1 as shown in Figure 105 and Figure 106 and D1 as
shown in Figure 107 and Figure 108.
Unit Times

C900060045
Definition Number of voice TCH/H seizure failure for handover
Description This counter counts the number of TCH/H channel occupation
failure during voice channel handover.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If allocation or occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.

Confidential and Proprietary Information of ZTE CORPORATION 161


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement BSC requests for channel (due to handover and the channel is
Point used as voice channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is C1
as shown in Figure 109 and D1 as shown in Figure 110.
Unit Times

C900060046
Definition Number of data TCH/H seizure attempts for assignment
Description This counter counts the number of TCH/H channel being
attempted to be occupied during data channel assignment,
including the number of occupation success (C901270070) and
the number of occupation failure (C900060047).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060046 and
C901270070 accumulate simultaneously.
„ If occupation fails, C900060046 and C900060047
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060046 and
C901270070 accumulate simultaneously.
f If the waiting for resource fails, C900060046 and
C900060047 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060046, C901270070, and C900060047 do not change.
„ For failures in other cases, C900060046 and C900060047
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to assignment and
Point the channel is used as data channel), or BSC receives the
internal message of waiting for resource successfully or waiting
for resource failed (C901270070 + C900060047). The
measurement point is B1, as shown in Figure 115 and Figure
116.
Unit Times

C900060047
Definition Number of data TCH/H seizure failure for assignment
Description This counter counts the number of TCH/H channel occupation
failure during data channel assignment.

162 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

After BSC receives the channel request message, it attempts to


allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to assignment and the channel is
Point used as data channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is B1,
as shown in Figure 117.
Unit Times

C900060048
Definition Number of data TCH/H seizure attempts for handover
Description This counter counts the number of TCH/H channel being
attempted to be occupied during data channel handover,
including the number of occupation success (C901270073) and
the number of occupation failure (C900060049).
After BSC receives the channel request massage, it attempts to
allocate channel for the request.
„ If allocation and occupation succeed, C900060048 and
C901270073 accumulate simultaneously.
„ If occupation fails, C900060048 and C900060049
accumulate simultaneously.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource.
f If the waiting for resource succeeds, C900060048 and
C901270073 accumulate simultaneously.
f If the waiting for resource fails, C900060048 and
C900060049 accumulate simultaneously.
„ If the request returns that the transceiver is faulty,
C900060048, C901270073, and C900060049 do not change.
„ For failures in other cases, C900060048 and C900060049
accumulate simultaneously.
Measurement BSC completes requesting for channel (due to handover and the
Point channel is used as data channel), or BSC receives the internal
message of waiting for resource successfully or waiting for
resource failed (C901270073 + C900060049). The measurement

Confidential and Proprietary Information of ZTE CORPORATION 163


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

point is C1 as shown in Figure 105 and Figure 106 and D1 as


shown in Figure 107 and Figure 108.
Unit Times

C900060049
Definition Number of data TCH/H seizure failure for handover
Description This counter counts the number of TCH/H channel occupation
failure during data channel handover.
After BSC receives the channel request message, it attempts to
allocate channel for the request.
„ If occupation fails, this counter accumulates.
„ If the request returns no channel available but queuing or
forced release is possible, enter the state of waiting for
resource. If the waiting for resource fails, this counter
accumulates.
„ If the request returns that the transceiver is faulty, this
counter does not change.
„ For failures in other cases, this counter accumulates.
Measurement BSC requests for channel (due to handover and the channel is
Point used as data channel) but fails to occupy the channel, or BSC
fails to wait for internal resource. The measurement point is C1
as shown in Figure 109 and D1 as shown in Figure 110.
Unit Times

C900060050
Definition Number of SAPI3 link establishment requests on SDCCH (MO-SM)
Description This counter counts the number of short message link
establishments of mobile originating call on SDCCH. On SDCCH,
BSC receives the EST_IND message sent by BTS. If the layer-3
information in this message is SAPI = 3, this counter increments.
Usage This counter is used to find out the frequency of SAPI 3 link
establishment on SDCCH.
Measurement This counter counts when BSC receives the EST_IND message
Point (SAPI = 3) from BTS. The measurement point is B1, as shown in
Figure 120.

164 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 120 – IDLE-STATE MO SHORT MESSAGE FLOW

Unit Times

C900060051
Definition Number of SAPI3 link establishment requests on SDCCH (MT-SM)
Description This counter counts the number of short message link
establishments of mobile terminating call on SDCCH. On SDCCH,
if BSC receives the DTAP_IND message (SAPI = 3) sent by MSC
and the short message link between BSC and MS is not
established, BSC initiates the link establishment flow, this
counter increments.
Usage This counter is used to find out the frequency of SAPI 3 link
establishment request on SDCCH.
Measurement This counter counts when BSC sends the EST_REQ message
Point (SAPI = 3) to BTS and the short message link is not established
between BSC and MS. The measurement point is D1, as shown
in Figure 121.

Confidential and Proprietary Information of ZTE CORPORATION 165


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 121 – IDLE-STATE MT SHORT MESSAGE FLOW

MS BTS BSC MSC

Paging
Paging Cmd
Paging Request
Chan Request
Chan Required
Chan Activation
Chan Act ACK
Imm Ass Cmd(Imm Ass)
Imm Ass
SABM(Paging Resp)
Est Ind ( Paging Resp)
CR (Paging Resp )
UA
CC (Authentication Req)

Authentication And Encryption

From SC
CP_ DATA(RP_ DATA)
Est Req (SAPI=3)
SABM(SAPI=3)
UA D1
Est Conf ( SAPI=3)
D2
CP_DATA(RP_ DATA)
D3
CP_ ACK
D4
CP_ DATA(RP_ ACK) To SC

D5
CP_ ACK
D6
Clear Cmd
Data Req (Chan Release)
Chan Release Clear Cmp
Deact SACCH
DISC
Release Ind
RF Chan Release
RF Chan Release ACK

Unit Times

C900060052
Definition Number of SDCCH drops due to handover failure
Description This counter counts the number of call drops due to handover
failure on SDCCH. Call drop occurs after MS requests for SDCCH
successfully. If the problem is due to handover failure, this
counter increments.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.
T3107 indicates the duration from sending the intra-cell
handover command ASSIGN_CMD to receiving the assignment
completion message ASSIGN_COM. T3103 indicates the duration
from sending the inter-cell handover command HOINTER_CMD

166 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

to receiving the assignment completion message HOINTER_COM.


The external handover timer indicates the duration from sending
the inter-cell external handover command to receiving the
handover completion message.
Usage This counter is used to find out the frequency of call drop due to
handover failure on SDCCH.
Measurement SDCCH is activated after BSC initiates the handover flow. After
Point that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.

FIGURE 122 – CALL DROP DUE TO T3107 TIMEOUT DURING INTRA-CELL


HANDOVER

„ If RANCS is in the status of RADIO_APPLY and sends the


inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.

Confidential and Proprietary Information of ZTE CORPORATION 167


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 123 – CALL DROP DUE TO T3103 TIMEOUT DURING INTER-CELL


HANDOVER

„ If RANCS is in the status of RADIO_APPLY and sends the


external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments.
Unit Times

C900060053
Definition Number of SDCCH drops
Description This counter counts the number of call drops on SDCCH channel
due to radio link failure, LAPD link break, or handover failure.
Call drop occurs after MS requests for TCH/H channel
successfully. The counter increments if call drop is due to the
above causes.
Usage This counter is used to find out the frequency of call drop on
SDCCH channel due to radio link failure, LAPD link break, or
handover failure.
Measurement This counter increments when call drop occurs on SDCCH
Point channel due to radio link failure, LAPD link failure, or handover
failure.
Unit Times

C900060054
Definition Number of TCH/F drops
Description This counter counts the number of call drops on TCH/F channel
due to radio link failure, LAPD link break, or handover failure.
Call drop occurs after MS requests for TCH/H channel

168 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

successfully. The counter increments if call drop is due to the


above causes.

Usage This counter is used to find out the frequency of call drop on
TCH/F channel due to radio link failure, LAPD link break, or
handover failure.
Measurement The counter increments when call drop occurs on TCH/F channel
Point due to radio link failure, LAPD link failure, or handover failure.
Unit Times

C900060055
Definition Number of TCH/H drops
Description This counter counts the number of call drops on TCH/H channel
due to radio link failure, LAPD link break, or handover failure.
Call drop occurs after MS requests for TCH/H channel
successfully. The counter increments if call drop is due to the
above causes.
Usage This counter is used to find out the frequency of call drop on
TCH/H channel due to radio link failure, LAPD link break, or
handover failure.
Measurement The counter increments when call drop occurs on TCH/H channel
Point due to radio link failure, LAPD link failure, or handover failure.
Unit Times

C900060056
Definition Average number of idle TCH/F with interference band 1
Description This counter counts the number of idle TCH/Fs with interference
band 1 in the carrier.
Usage This counter is used to find out the number of idle TCH/Fs with
interference band 1.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060057
Definition Average number of idle TCH/F with interference band 2
Description This counter counts the number of idle TCH/Fs with interference
band 2 in the carrier.

Confidential and Proprietary Information of ZTE CORPORATION 169


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Usage This counter is used to find out the number of idle TCH/Fs with
interference band 2.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060058
Definition Average number of idle TCH/F with interference band 3
Description This counter counts the number of idle TCH/Fs with interference
band 3 in the carrier.
Usage This counter is used to find out the number of idle TCH/Fs with
interference band 3.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060059
Definition Average number of idle TCH/F with interference band 4
Description This counter counts the number of idle TCH/Fs with interference
band 4 in the carrier.
Usage This counter is used to find out the number of idle TCH/Fs with
interference band 4.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060060
Definition Average number of idle TCH/F with interference band 5
Description This counter counts the number of idle TCH/Fs with interference
band 5 in the carrier.
Usage This counter is used to find out the number of idle TCH/Fs with
interference band 5.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

170 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060061
Definition Average number of idle TCH/H with interference band 1
Description This counter counts the number of idle TCH/Hs with interference
band 1 in the carrier.
Usage This counter is used to find out the number of idle TCH/Hs with
interference band 1.

Measurement This counter counts when querying the database periodically.


Point

Unit Times

C900060062
Definition Average number of idle TCH/H with interference band 2
Description This counter counts the number of idle TCH/Hs with interference
band 2 in the carrier.
Usage This counter is used to find out the number of idle TCH/Hs with
interference band 2.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060063
Definition Average number of idle TCH/H with interference band 3
Description This counter counts the number of idle TCH/Hs with interference
band 3 in the carrier.
Usage This counter is used to find out the number of idle TCH/Hs with
interference band 3.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060064
Definition Average number of idle TCH/H with interference band 4
Description

Confidential and Proprietary Information of ZTE CORPORATION 171


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

This counter counts the number of idle TCH/Hs with interference


band 4 in the carrier.
Usage This counter is used to find out the number of idle TCH/Hs with
interference band 4.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060065
Definition Average number of idle TCH/H with interference band 5
Description This counter counts the number of idle TCH/Hs with interference
band 5 in the carrier.
Usage This counter is used to find out the number of idle TCH/Hs with
interference band 5.
Measurement This counter counts when querying the database periodically.
Point

Unit Times

C900060066
Definition Number of samples with UL RQ = 0
Description This counter counts the number of samples with Uplink (UL)
Receiving Quality (RQ) = 0. After BSC receives the
measurement report or preprocessing measurement report, if
the UL RQ = 0, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 0.
Measurement The counter increments if UL RQ = 0 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060067
Definition Number of samples with UL RQ = 1
Description This counter counts the number of samples with UL RQ = 1.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 1, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 1.

172 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement The counter increments if UL RQ = 1 in the measurement report


Point or preprocessing measurement report that BSC receives.
Unit Times

C900060068
Definition Number of samples with UL RQ = 2
Description This counter counts the number of samples with UL RQ = 2.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 2, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 2.
Measurement The counter increments if UL RQ = 2 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060069
Definition Number of samples with UL RQ = 3
Description This counter counts the number of samples with UL RQ = 3.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 3, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 3.
Measurement The counter increments if UL RQ = 3 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060070
Definition Number of samples with UL RQ = 4
Description This counter counts the number of samples with UL RQ = 4.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 4, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 4.
Measurement The counter increments if UL RQ = 4 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 173


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060071
Definition Number of samples with UL RQ = 5
Description This counter counts the number of samples with UL RQ = 5.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 5, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 5.
Measurement The counter increments if UL RQ = 5 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060072
Definition Number of samples with UL RQ = 6
Description This counter counts the number of samples with UL RQ = 6.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 6, the counter increments.

Usage This counter is used to count the number of samples with UL RQ


= 6.
Measurement The counter increments if UL RQ = 6 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060073
Definition Number of samples with UL RQ = 7
Description This counter counts the number of samples with UL RQ = 7.
After BSC receives the measurement report or preprocessing
measurement report, if the UL RQ = 7, the counter increments.
Usage This counter is used to count the number of samples with UL RQ
= 7.
Measurement The counter increments if UL RQ = 7 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060074
Definition Number of samples with DL RQ = 0

174 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Description This counter counts the number of samples with Downlink (DL)
RQ = 0. After BSC receives the measurement report or
preprocessing measurement report, if the DL RQ = 0, the
counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 0.
Measurement The counter increments if DL RQ = 0 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060075
Definition Number of samples with DL RQ = 1
Description This counter counts the number of samples with DL RQ = 1.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 1, the counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 1.
Measurement The counter increments if DL RQ = 1 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060076
Definition Number of samples with DL RQ = 2
Description This counter counts the number of samples with DL RQ = 2.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 2, the counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 2.
Measurement The counter increments if DL RQ = 2 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060077
Definition Number of samples with DL RQ = 3
Description This counter counts the number of samples with DL RQ = 3.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 3, the counter increments.
Usage

Confidential and Proprietary Information of ZTE CORPORATION 175


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

This counter is used to count the number of samples with DL RQ


= 3.
Measurement The counter increments if DL RQ = 3 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060078
Definition Number of samples with DL RQ = 4
Description This counter counts the number of samples with DL RQ = 4.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 4, the counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 4.
Measurement The counter increments if DL RQ = 4 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060079
Definition Number of samples with DL RQ = 5
Description This counter counts the number of samples with DL RQ = 5.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 5, the counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 5.
Measurement The counter increments if DL RQ = 5 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060080
Definition Number of samples with DL RQ = 6
Description This counter counts the number of samples with DL RQ = 6.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 6, the counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 6.
Measurement The counter increments if DL RQ = 6 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

176 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060081
Definition Number of samples with DL RQ = 7
Description This counter counts the number of samples with DL RQ = 7.
After BSC receives the measurement report or preprocessing
measurement report, if the DL RQ = 7, the counter increments.
Usage This counter is used to count the number of samples with DL RQ
= 7.
Measurement The counter increments if DL RQ = 7 in the measurement report
Point or preprocessing measurement report that BSC receives.
Unit Times

C900060082
Definition Number of TCH/F handover attempts due to UL strength
Description This counter counts the number of handover attempts due to UL
receiving strength too low on TCH/F channel.
Usage This counter is used to find out the frequency of handover due to
UL receiving strength on TCH/F channel. If the counter’s value is
too large, it indicates poor UL level on TCH/F channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to UL strength, this counter increments. The
measurement point is A, as shown in Figure 124.

FIGURE 124 – HANDOVER DECISION

Unit Times

C900060083
Definition Number of TCH/F handover attempts due to DL strength
Description This counter counts the number of times of handover attempts
due to DL receiving strength too low on TCH/F channel.
Usage This counter is used to find out the frequency of handover due to
DL receiving strength on TCH/F channel. If the counter’s value is
too large, it indicates poor DL level on TCH/F channel.

Confidential and Proprietary Information of ZTE CORPORATION 177


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement BSC performs handover decision after receiving measurement


Point report on TCH/F channel. If handover decision succeeds and the
handover is due to DL strength, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060084
Definition Number of TCH/F handover attempts due to UL quality
Description This counter counts the number of handover attempts due to UL
quality too poor on TCH/F channel.
Usage This counter is used to find out the frequency of handover due to
UL quality on TCH/F channel. If the counter’s value is too large,
it indicates poor UL quality on TCH/F channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to UL quality, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060085
Definition Number of TCH/F handover attempts due to DL quality
Description This counter counts the number of handover attempts due to DL
quality too poor on TCH/F channel.

Usage This counter is used to find out the frequency of handover due to
DL quality on TCH/F channel. If the counter’s value is too large,
it indicates poor DL quality on TCH/F channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to DL quality, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060086
Definition Number of TCH/F handover attempts due to UL interference
Description This counter counts the number of handover attempts due to UL
interference too large on TCH/F channel.
Usage

178 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

This counter is used to find out the frequency of handover due to


UL interference on TCH/F channel. If the counter’s value is too
large, it indicates large UL interference on TCH/F channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to UL interference, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060087
Definition Number of TCH/F handover attempts due to DL interference
Description This counter counts the number of handover attempts due to DL
interference too large on TCH/F channel.
Usage This counter is used to find out the frequency of handover due to
DL interference on TCH/F channel. If the counter’s value is too
large, it indicates large DL interference on TCH/F channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to DL interference, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060088
Definition Number of TCH/F handover attempts due to good C/I
Description This counter counts the number of MS handover attempts due to
too large C/I ratio on TCH/F channel. The handover only occurs
during sub-cell configuration; when C/I algorithm is adopted, MS
performs handover from external circle to internal circle.
Usage This counter is used to find out the frequency of MS handover
due to too large C/I ratio on TCH/F channel. If the counter’s
value is too large, it indicates that, after MS accesses the
external circle, MS performs handover to the internal circle many
times due to good C/I ratio and the internal circle absorbs the
traffic.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to too large C/I ratio, this counter increments.
The measurement point is A, as shown in Figure 124.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 179


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060089
Definition Number of TCH/F handover attempts due to bad C/I
Description This counter counts the number of MS handover attempts due to
too low C/I ratio on TCH/F channel. The handover only occurs
during sub-cell configuration; when C/I algorithm is adopted, MS
performs handover from internal circle to external circle.
Usage This counter is used to find out the frequency of MS handover
due to too low C/I ratio on TCH/F channel. If the counter’s value
is too large, it indicates that, when MS calls within the internal
circle, MS performs handover to the external circle many times
due to poor C/I ratio. Interference within the internal circle is big,
and C/I ratio of the internal circle can be improved by adjusting
the carrier power.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to too low C/I ratio, this counter increments.
The measurement point is A, as shown in Figure 124.
Unit Times

C900060090
Definition Number of TCH/F handover attempts due to PBGT
Description This counter counts the number of MS handover attempts due to
PBGT value on TCH/F channel. If PBGT value is larger than zero,
it indicates the adjacent cell has better radio environment than
the current cell. If the number of times that PBGT value is larger
than zero reaches the threshold, PBGT handover occurs.
Usage This counter is used to find out the frequency of MS handover
due to PBGT value on TCH/F channel. If the counter’s value is
too large, it indicates that signal on TCH/F channel within the
current cell is poorer than that in the adjacent cell.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to PBGT value, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060091
Definition Number of TCH/F handover attempts due to large TA
Description This counter counts the number of MS handover attempts due to
too large TA on TCH/F channel. Increasing TA indicates that MS

180 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

is moving away from the current cell. When the distance reaches
a certain value, handover will occur due to too large TA.
Usage This counter is used to find out the frequency of MS handover
due to too large TA on TCH/F channel. The counter’s value
reflects the mobility of subscribers in the current cell to a certain
extent.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to too large TA, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060092
Definition Number of TCH/F handover attempts due to other reasons
Description This counter counts the number of handover attempts due to
any other reason beyond the handover reasons mentioned
previously.
Usage This counter is used to find out the frequency of handover due to
any other reason.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/F channel. If handover decision succeeds and the
handover is due to any other reason beyond the handover
reasons mentioned previously, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060093
Definition Number of BSC-controlled inter-cell outgoing handover
Description This counter counts the number of intra-BSC inter-cell handover-
out executions. The execution here means the radio resource of
target cell has been successfully requested, and system returns
the message of radio resource available.
Usage This counter is used to find out the frequency of intra-BSC inter-
cell outgoing handover execution. It is one of the parameters
that evaluate radio environment, and it reflects the handover
situation.
Measurement During the handover process, if the target cell requests for
Point channel successfully, it sends the message of radio resource
available back to the source cell. The source cell performs
judgment after receiving the message. If the request is due to
intra-BSC inter-cell handover, this counter increments. The
measurement point is A, as shown in Figure 125.

Confidential and Proprietary Information of ZTE CORPORATION 181


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 125 – BSC-CONTROLLED INTER-CELL OUTGOING HANDOVER


EXECUTION

MS BTS(Src) BTS(Target) BSC MSC


MEAS_RES
MEAS_RES

CHL_ACT
CHL_ACT_ACK

HO_CMD A
HO_CMD
HO_ACCESS
HO DETECT
Phy Info
SABM EST_IND
UA
HO_COM
HO_COM

HO_PERFORM

Unit Times

C900060094
Definition Number of BSC-controlled inter-cell outgoing handover success
Description This counter counts the number of successful intra-BSC inter-cell
outgoing handovers.
Usage This counter is used to find out the frequency of successful intra-
BSC inter-cell outgoing handover. It is one of the parameters
that evaluate the handover situation.
Measurement During the handover process, when the source cell receives the
Point handover completion message from the target cell, it indicates
that MS has accessed the target channel and handover succeeds.
In this case, this counter increments. The measurement point is
A, as shown in Figure 126.

182 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 126 – BSC-CONTROLLED INTER-CELL OUTGOING HANDOVER


SUCCESS

MS BTS(Src) BTS(Target) BSC MSC


MEAS_RES
MEAS_RES

CHL_ACT
CHL_ACT_ACK

HO_CMD
HO_CMD
HO_ACCESS
HO DETECT
Phy Info
SABM EST_IND
UA
HO_COM
HO_COM

A HO_PERFORM

Unit Times

C900060095
Definition Number of MSC-controlled outgoing handover
Description This counter counts the number of MSC-controlled inter-BSC
outgoing handover executions.
Usage This counter is used to find out the frequency of MSC-controlled
inter-BSC outgoing handover execution, and it reflects the
handover situation.
Measurement BSC performs handover decision after receiving MS
Point measurement report. If the handover decision indicates inter-cell
handover and the currently attempted cell is a cell under
another BSC, the source BSC sends the handover request
message A_HO_RQD to MSC to trigger inter-BSC handover. If
the source BSC receives the handover command returned from
MSC, the counter increments. The measurement point is A, as
shown in Figure 127.

FIGURE 127 – MSC-CONTROLLED OUTGOING HANDOVER EXECUTION

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 183


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060096
Definition Number of MSC-controlled outgoing handover success
Description This counter counts the number of successful MSC-controlled
inter-BSC outgoing handovers.
Usage This counter is used to find out the frequency of successful MSC-
controlled inter-BSC outgoing handover, and it reflects the
handover situation.
Measurement BSC performs handover decision after receiving MS
Point measurement report. If the handover decision indicates inter-cell
handover and the currently attempted cell is a cell under
another BSC, the source BSC sends the handover request
message A_HO_RQD to MSC to trigger inter-BSC handover. If
MS successfully accesses the target cell, the source cell receives
the release command issued by MSC. In this case, this counter
increments. The measurement point is A, as shown in Figure 128.

FIGURE 128 – MSC-CONTROLLED OUTGOING HANDOVER SUCCESS

Unit Times

C900060097
Definition Number of BSC-controlled inter-cell incoming handover
Description This counter counts the number of BSC-controlled inter-cell
incoming handover executions.
Usage This counter is used to find out the frequency of BSC-controlled
inter-cell incoming handover execution. It is one of the
parameters that evaluate radio environment, and it reflects the
handover situation.
Measurement If channel activation succeeds in the target cell within BSC and
Point the request is due to inter-cell handover, the counter increments.
The measurement point is A, as shown in Figure 129.

184 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 129 – BSC-CONTROLLED INTER-CELL INCOMING HANDOVER


EXECUTION

Unit Times

C900060098
Definition Number of BSC-controlled inter-cell incoming handover success
Description This counter counts the number of successful BSC-controlled
inter-cell incoming handovers.
Usage This counter shows the frequency of successful BSC-controlled
inter-cell incoming handover, and it reflects the handover
situation.
Measurement When the target cell within BSC receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover, the counter increments. The measurement
point is A, as shown in Figure 130.

FIGURE 130 – BSC-CONTROLLED INTER-CELL INCOMING HANDOVER


SUCCESS

BSC BTS

HO_ CMD

Unit Times

C900060099
Definition Number of MSC-controlled incoming handover
Description This counter counts the number of MSC-controlled inter-BSC
incoming handover executions.
Usage This counter is used to find out the frequency of MSC-controlled
inter-BSC incoming handover executions. It is one of the

Confidential and Proprietary Information of ZTE CORPORATION 185


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

parameters that evaluate radio environment, and it reflects the


handover situation.
Measurement After the target cell receives the handover request message
Point issued by MSC, the counter increments if the channel is
allocated and activated successfully. The measurement point is A,
as shown in Figure 131.

FIGURE 131 – MSC-CONTROLLED INCOMING HANDOVER EXECUTION

Unit Times

C900060100
Definition Number of MSC-controlled incoming handover due to forced
release
Description During MSC-controlled inter-BSC incoming handover process,
the counter counts the number of forced release executions due
to no available radio resource in the target cell.
Usage This counter is used to find out the frequency of forced release
executions during MSC-controlled inter-BSC incoming handover
process. It reflects the handover situation.
Measurement The target cell receives the radio channel request message. If
Point the request is due to MSC-controlled inter-BSC incoming
handover and the target cell has no available radio channels,
forced release is attempted. If the target cell receives the
message of resource available returned by the forced release
instance, the counter increments. The measurement point is A,
as shown in Figure 132.

186 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 132 – FORCED RELEASE EXECUTION

Unit Times

C900060101
Definition Number of MSC-controlled incoming handover due to queue
Description During MSC-controlled inter-BSC incoming handover process,
the counter counts the number of queuing executions due to no
available radio resource in the target cell.
Usage This counter is used to find out the frequency of queuing
executions during MSC-controlled inter-BSC incoming handover
process, and it reflects the handover situation.
Measurement The target cell receives the radio channel request message. If
Point the request is due to MSC-controlled inter-BSC incoming
handover and the target cell has no available radio channels, the
target instance is added to the waiting queue. When the target
cell receives the message of resource available, the counter
increments. The measurement point is A, as shown in Figure 133.

FIGURE 133 – QUEUING EXECUTION

Unit Times

C900060102
Definition Number of MSC-controlled incoming handover success

Confidential and Proprietary Information of ZTE CORPORATION 187


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description This counter counts the number of successful MSC-controlled


inter-BSC incoming handovers.
Usage This counter is used to find out the frequency of successful MSC-
controlled inter-BSC incoming handover, and it reflects the
handover situation.
Measurement When the target cell receives the handover completion message,
Point if the request is due to MSC-controlled inter-BSC incoming
handover, the counter increments. The measurement point is A,
as shown in Figure 134.

FIGURE 134 – MSC-CONTROLLED INCOMING HANDOVER SUCCESS

Unit Times

C900060103
Definition Number of incoming handover from undefined layer (GSM900)
to current layer(GSM1800)
Description This counter counts the number of incoming handover
executions from the undefined layer cell (GSM900) to the target
cell (GSM1800) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the undefined layer cell (GSM900) to
target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM1800) within BSC receives the channel
Point activation response message, if the request is due to BSC-
controlled inter-cell handover and the source cell (GSM900) is
the undefined layer cell, the counter increments. The
measurement point is A, as shown in Figure 129.
Unit Times

C900060104
Definition Number of incoming handover success from undefined
layer(GSM900) to current layer (GSM1800)
Description This counter counts the number of successful incoming handover
from the undefined layer cell (GSM900) to the target cell
(GSM1800) during BSC-controlled inter-cell handover.

188 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Usage This counter is used to find out the frequency of successful


incoming handover from the undefined layer cell (GSM900) to
the target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM1800) within BSC receives the
Point handover completion message, if the request is due to BSC-
controlled inter-cell handover and the source cell (GSM900) is
the undefined layer cell, the counter increments. The
measurement point is A, as shown in Figure 130.
Unit Times

C900060105
Definition Number of incoming handover from undefined layer (GSM1800)
to current layer (GSM900)
Description This counter counts the number of incoming handover
executions from the undefined layer cell (GSM1800) to the
target cell (GSM900) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the undefined layer cell (GSM1800) to
target cell (GSM900). It reflects the handover situation.
Measurement When the target cell (GSM900) within BSC receives the channel
Point activation response message, if the request is due to BSC-
controlled inter-cell handover and the source cell (GSM1800) is
the undefined layer cell, the counter increments. The
measurement point is A, as shown in Figure 129.
Unit Times

C900060106
Definition Number of incoming handover success from undefined
layer(GSM1800) to current layer(GSM900)
Description This counter counts the number of successful incoming handover
from the undefined layer cell (GSM1800) to the target cell
(GSM900) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of successful
incoming handover from the undefined layer cell (GSM1800) to
the target cell (GSM900). It reflects the handover situation.
Measurement When the target cell (GSM900) within BSC receives the
Point handover completion message, if the request is due to BSC-
controlled inter-cell handover and the source cell (GSM1800) is
the undefined layer cell, the counter increments. The
measurement point is A, as shown in Figure 130.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 189


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060107
Definition Number of incoming handover from the same layer GSM900 to
GSM1800
Description This counter counts the number of incoming handover
executions from the cell (GSM900) to the target cell (GSM1800)
in the same layer during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the cell (GSM900) to the target cell
(GSM1800) in the same layer. It reflects the handover situation.
Measurement When the target cell (GSM1800) receives the channel activation
Point response message, if the request is due to BSC-controlled inter-
cell handover and the source cell (GSM900) is in the same layer,
the counter increments. The measurement point is A, as shown
in Figure 129.
Unit Times

C900060108
Definition Number of incoming handover success from the same layer
GSM900 to GSM1800
Description This counter counts the number of successful incoming
handovers from the cell (GSM900) to the target cell (GSM1800)
in the same layer during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of successful
incoming handover from the cell (GSM900) to the target cell
(GSM1800) in the same layer. It reflects the handover situation.
Measurement When the target cell (GSM1800) receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover and the source cell (GSM900) is in the same
layer, the counter increments. The measurement point is A, as
shown in Figure 130.
Unit Times

C900060109
Definition Number of incoming handover from GSM900 to GSM1800 from
the upper layer
Description This counter counts the number of incoming handover
executions from the upper layer cell (GSM900) to the target cell
(GSM1800) during BSC-controlled inter-cell handover.
Usage

190 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

This counter is used to find out the frequency of incoming


handover executions from the upper layer cell (GSM900) to the
target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM1800) receives the channel activation
Point response message, if the request is due to BSC-controlled inter-
cell handover and the source cell (GSM900) is in the upper layer,
the counter increments. The measurement point is A, as shown
in Figure 129.
Unit Times

C900060110
Definition Number of incoming handover success from GSM900 to
GSM1800 in the upper layer
Description This counter counts the number of successful incoming
handovers from the upper layer cell (GSM900) to the target cell
(GSM1800) during BSC-controlled inter-cell handover.

Usage This counter is used to find out the frequency of successful


incoming handover from the upper layer cell (GSM900) to the
target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM1800) receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover and the source cell (GSM900) is in the upper
layer, the counter increments. The measurement point is A, as
shown in Figure 130.
Unit Times

C900060111
Definition Number of incoming handover from GSM900 to GSM1800 in the
lower layer
Description This counter counts the number of incoming handover
executions from the lower layer cell (GSM900) to the target cell
(GSM1800) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the lower layer cell (GSM900) to the
target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM1800) receives the channel activation
Point response message, if the request is due to BSC-controlled inter-
cell handover and the source cell (GSM900) is in the lower layer,
the counter increments. The measurement point is A, as shown
in Figure 129.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 191


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060112
Definition Number of incoming handover success from GSM900 to
GSM1800 in the lower layer
Description This counter counts the number of successful incoming
handovers from the lower layer cell (GSM900) to the target cell
(GSM1800) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of successful
incoming handover from the lower layer cell (GSM900) to the
target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM1800) receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover and the source cell (GSM900) is in the lower
layer, the counter increments. The measurement point is A, as
shown in Figure 130.
Unit Times

C900060113
Definition Number of incoming handover from GSM1800 to GSM900 from
the same layer
Description This counter counts the number of incoming handover
executions from the cell (GSM1800) to the target cell (GSM900)
in the same layer during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the cell (GSM1800) to the target cell
(GSM900) in the same layer. It reflects the handover situation.
Measurement When the target cell (GSM900) receives the channel activation
Point response message, if the request is due to BSC-controlled inter-
cell handover and the source cell (GSM1800) is in the same
layer, the counter increments. The measurement point is A, as
shown in Figure 129.
Unit Times

C900060114
Definition Number of incoming handover success from GSM1800 to
GSM900 from the same layer
Description This counter counts the number of successful incoming
handovers from the cell (GSM1800) to the target cell (GSM900)
in the same layer during BSC-controlled inter-cell handover.
Usage

192 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

This counter is used to find out the frequency of successful


incoming handover from the cell (GSM1800) to the target cell
(GSM900) in the same layer. It reflects the handover situation.
Measurement When the target cell (GSM900) receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover and the source cell (GSM1800) is in the same
layer, the counter increments. The measurement point is A, as
shown in Figure 130.
Unit Times

C900060115
Definition Number of incoming handover from GSM1800 to GSM900 from
the upper layer
Description This counter counts the number of incoming handover
executions from the upper layer cell (GSM1800) to the target
cell (GSM900) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the upper layer cell (GSM1800) to the
target cell (GSM900). It reflects the handover situation.
Measurement When the target cell (GSM900) receives the channel activation
Point response message, if the request is due to BSC-controlled inter-
cell handover and the source cell (GSM1800) is in the upper
layer, the counter increments. The measurement point is A, as
shown in Figure 129.
Unit Times

C900060116
Definition Number of incoming handover success from GSM1800 to
GSM900 from the upper layer
Description This counter counts the number of successful incoming
handovers from the upper layer cell (GSM1800) to the target cell
(GSM900) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of successful
incoming handover from the upper layer cell (GSM1800) to the
target cell (GSM900). It reflects the handover situation.
Measurement When the target cell (GSM900) receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover and the source cell (GSM1800) is in the
upper layer, the counter increments. The measurement point is
A, as shown in Figure 130.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 193


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060117
Definition Number of incoming handover from GSM1800 to GSM900 from
the lower layer
Description This counter counts the number of incoming handover
executions from the lower layer cell (GSM1800) to the target cell
(GSM1800) during BSC-controlled inter-cell handover.
Usage This counter is used to find out the frequency of incoming
handover executions from the lower layer cell (GSM1800) to the
target cell (GSM1800). It reflects the handover situation.
Measurement When the target cell (GSM900) receives the channel activation
Point response message, if the request is due to BSC-controlled inter-
cell handover and the source cell (GSM1800) is in the lower
layer, the counter increments. The measurement point is A, as
shown in Figure 129.
Unit Times

C900060118
Definition Number of incoming handover success from GSM1800 to
GSM900 from the lower layer
Description This counter counts the number of successful incoming
handovers from the lower layer cell (GSM1800) to the target cell
(GSM900) during BSC-controlled inter-cell handover.

Usage This counter is used to find out the frequency of successful


incoming handover from the lower layer cell (GSM1800) to the
target cell (GSM900). It reflects the handover situation.
Measurement When the target cell (GSM900) receives the handover
Point completion message, if the request is due to BSC-controlled
inter-cell handover and the source cell (GSM1800) is in the
lower layer, the counter increments. The measurement point is A,
as shown in Figure 130.
Unit Times

C900060119
Definition Number of Intra-cell handover
Description This counter counts the number of intra-cell handover
executions which is initiated by MS in the source cell. Here, the
execution means that radio resource is requested successfully
and the message of resource available is returned.

194 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Usage This counter is used to find out the frequency of MS-initiated


intra-cell handover execution. It is one of the parameters that
evaluate radio environment. It reflects the handover situation.
Measurement During the handover process, if the target channel request
Point succeeds, the message of radio resource available is returned to
BSC. BSC then performs judgment after receiving the message.
If the request is due to intra-cell handover, this counter
increments. The measurement point is A, as shown in Figure 135.

FIGURE 135 – INTRA-CELL HANDOVER EXECUTION

Unit Times

C900060120
Definition Number of Intra-cell handover success
Description This counter counts the number of successful intra-cell
handovers which are initiated by MS in the source cell.
Usage This counter is used to find out the frequency of successful intra-
cell handover. It is one of the parameters that evaluate
handover.
Measurement During the intra-cell handover process, if the source instance
Point receives the handover completion message returned by the
target instance, it indicates MS accesses the target channel and
handover succeeds. In this case, this counter increments. The
measurement point is A, as shown in Figure 136.

FIGURE 136 – INTRA-CELL HANDOVER SUCCESS

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 195


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060121
Definition Maximum number of busy TCH/H
Description This counter counts the maximum number of occupied TCH/Hs
in a cell during a measurement period.
The system records the TCH/Hs occupied in the cell. If a TCH/H
is successfully occupied, the number of occupied TCH/Hs
increases by 1; if a TCH/H is released, the number of occupied
TCH/Hs decreases by 1. After a TCH/H is occupied, before a
TCH/H is released, or when the system reports the periodical
measurement data, if this counter’s value is less than the
number of actual occupied TCH/Hs, this counter’s value will be
replaced by the actual number of occupied TCH/Hs.
In consideration of the TCH/H channel occupation situation in
the last measurement period, the number of occupied TCH/Hs is
updated before the release of a TCH/H.
Usage This counter is used to find out the maximum number of
occupied TCH/Hs in a cell during a measurement period. The
counter’s value reflects the instantaneous occupation and the
heaviest traffic of TCH/H.
Measurement The counter counts at the following three time points:
Point
„ After the TCH/H is occupied successfully, if the maximum
number of busy TCH/Hs exceeds the counter’s recorded
value;
„ Before the TCH/H is released, if the maximum number of
busy TCH/Hs exceeds the counter’s recorded value;
„ When the system reports the periodical measurement data, if
the maximum number of busy TCH/Hs exceeds the counter’s
recorded value.
The measurement point is A, as shown in Figure 137.

FIGURE 137 – REPORTING MEASUREMENT DAT A

BSC OMCR

Measurement Data

Unit Times

196 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060122
Definition Average number of available SDCCH
Description This counter counts the number of SDCCHs which can be
assigned normally, including idle SDCCH and occupied SDCCH.
Usage This counter is used to find out the number of available SDCCHs
in the current cell.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060123
Definition Average number of unavailable SDCCH
Description This counter counts the number of SDCCHs that can not be
assigned normally, including those SDCCHs blocked due to
various reasons.
Usage This counter is used to find out the number of unavailable
SDCCHs to facilitate troubleshooting.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060124
Definition SDCCH busy time
Description This counter counts the busy time of SDCCHs, which reflects the
traffic volume of SDCCH.

Usage This counter is used to find out the busy level and the average
occupation time of the signaling channel. It can be used as a
reference for judging whether to increase the number of SDCCHs.
Measurement The counter counts at the following three time points:
Point
„ When an SDCCH is acquired successfully, this counter
calculates time and accumulates.
„ When an SDCCH is released, this counter calculates time and
accumulates.
„ When the system reports the periodical measurement data,
this counter calculates time and accumulates.

Confidential and Proprietary Information of ZTE CORPORATION 197


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

The measurement point is A, as shown in Figure 137.


„ The measurement formula is as follows:
„ Measurement value = (Current time – Last measurement
time point) × Number of MSs that are occupying the
channels
„ The reported measurement value is accumulated by each
measurement value. After each accumulation, the last
measurement time point is updated to the current time. If an
SDCCH is acquired successfully, Number of MSs that are
occupying the channels increases by 1; if an SDCCH is
released, Number of MSs that are occupying the
channels decreases by 1.
Unit Second

C900060125
Definition Average number of available radio channel
Description This counter counts the number of radio channel which can be
assigned normally, including idle radio channel and occupied
radio channel.
Usage This counter is used to find out the number of available radio
channel in the current cell. It helps understand the current
resource usage situation of the cell.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060126
Definition Average number of unavailable radio channel
Description This counter counts the number of radio channels that can not
be assigned normally, including those radio channels blocked
due to various reasons.

Usage This counter is used to find out the number of unavailable radio
channels in the current cell. It helps understand the current
resource usage situation of the cell.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

198 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060127
Definition TCH/H busy time
Description This counter counts the busy time of TCH/Hs, which reflects the
traffic volume of TCH/H.
Usage This counter is used to find out the busy level and the average
occupation time of TCH/H. It can be used as a reference for
judging whether to increase the number of TCH/Hs.
Measurement The counter counts at the following three time points:
Point
„ When a TCH/H is acquired successfully, this counter
calculates time and accumulates.
„ When a TCH/H is released, this counter calculates time and
accumulates.
„ When the system reports the periodical measurement data,
this counter calculates time and accumulates.
The measurement point is A, as shown in Figure 137.
„ The measurement formula is as follows:
„ Measurement value = (Current time – Last measurement
time point) × Number of MSs that are occupying the
channels
„ The reported measurement value is accumulated by each
measurement value. After each accumulation, the last
measurement time point is updated to the current time. If a
TCH/H is acquired successfully, Number of MSs that are
occupying the channels increases by 1; if a TCH/H is
released, Number of MSs that are occupying the
channels decreases by 1.
Unit Second

C900060128
Definition Maximum number of busy TCH/F
Description This counter counts the maximum number of occupied TCH/Fs in
a cell during a measurement period.
The system records the TCH/Fs occupied in the cell. If a TCH/F is
successfully occupied, the number of occupied TCH/Fs increases
by 1; if a TCH/F is released, the number of occupied TCH/Hs
decreases by 1. After a TCH/F is occupied, before a TCH/F is
released, or when the system reports the periodical
measurement data, if this counter’s value is less than the
number of actual occupied TCH/Fs, this counter’s value will be
replaced by the actual number of occupied TCH/Fs.

Confidential and Proprietary Information of ZTE CORPORATION 199


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

In consideration of the TCH/F channel occupation situation in the


last measurement period, the number of occupied TCH/Fs is
updated before the release of a TCH/F.
Usage This counter is used to find out the maximum number of
occupied TCH/Fs in a cell during a measurement period. The
counter’s value reflects the instantaneous occupation and the
heaviest traffic of TCH/F.
Measurement The counter counts at the following three time points:
Point
„ After the TCH/F is occupied successfully, if the maximum
number of busy TCH/Fs exceeds the counter’s recorded value;
„ Before the TCH/F is released, if the maximum number of
busy TCH/Hs exceeds the counter’s recorded value;
„ When the system reports the periodical measurement data, if
the maximum number of busy TCH/Fs exceeds the counter’s
recorded value.
The measurement point is A, as shown in Figure 137.
Unit Times

C900060129
Definition TCH/F busy time
Description This counter counts the busy time of TCH/Fs, which reflects the
traffic volume of TCH/F.
Usage This counter is used to find out the busy level and the average
occupation time of TCH/F. It can be used as a reference for
judging whether to increase the number of TCH/Fs.
Measurement The counter counts at the following three time points:
Point
„ When a TCH/F is acquired successfully, this counter
calculates time and accumulates.
„ When a TCH/F is released, this counter calculates time and
accumulates.
„ When the system reports the periodical measurement data,
this counter calculates time and accumulates.
The measurement point is A, as shown in Figure 137.
„ The measurement formula is as follows:
„ Measurement value = (Current time – Last measurement
time point) × Number of MSs that are occupying the
channels
„ The reported measurement value is accumulated by each
measurement value. After each accumulation, the last
measurement time point is updated to the current time. If a
TCH/F is acquired successfully, Number of MSs that are
occupying the channels increases by 1; if a TCH/F is

200 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

released, Number of MSs that are occupying the


channels decreases by 1.
Unit Second

C900060130
Definition Number of healthy TRXs
Description This counter counts the number of the TRXs that can be used
normally.
Usage This counter is used to find out the number of available TRXs
and resource usage in the current cell to facilitate
troubleshooting.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060131
Definition Number of CM service requests of MOC
Description This counter counts the number of accesses due to CM SERVICE
REQ of MOC. After BSC receives the EST_IND message, if the
access cause in the layer-3 information in this message is “CM
SERVICE REQ”, this counter increments.
Usage This counter is used to find out the frequency of the access due
to CM SERVICE REQ of MOC.
Measurement This counter counts when BSC receives the EST_IND message.
Point The measurement point is A4, as shown in Figure 99.
Unit Times

C900060132
Definition Number of SAPI3 link establishment success on SDCCH (MT-SM)
Description This counter counts the number of successful short message link
establishment of mobile terminating call on SDCCH. On SDCCH,
if BSC receives the EST_CONF message sent by BTS after BSC
initiates the short message link establishment flow, it indicates
this link establishment succeeds, and the counter increments.
Usage This counter is used to find out the frequency of successful SAPI
3 link establishments on SDCCH.

Confidential and Proprietary Information of ZTE CORPORATION 201


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement This counter counts when BSC receives the EST_CONF message
Point (SAPI = 3) from BTS. The measurement point is D2, as shown in
Figure 121.
Unit
Times

C900060133
Definition Number of available defined SDCCH
Description iBSC supports dynamic conversion of SDCCH and TCH. This
counter counts the number of available SDCCH configured by
OMCR in the current cell.
Usage This counter is used to find out the number of available SDCCH
in the current cell to facilitate eliminating fault in the cell.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060134
Definition Number of available defined TCH/F
Description iBSC supports the function of full dynamic radio channel. This
counter counts the number of available TCH/F configured by
OMCR in the current cell.
Usage This counter is used to find out the number of available TCH/F in
the current cell to facilitate eliminating fault in the cell.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060135
Definition Number of signaling TCH/H assignment failure
Description This counter counts the number of failing to assign TCH/H
channel as a signaling channel.
Usage After BSC responds to the channel request message to allocate
and occupy TCH/H successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. If BSC does not receive
the MS access notification within a certain time, this assignment
fails.

202 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement For immediate assignment, this counter counts when BSC


Point receives incorrect EST_IND message or T3101 is timeout. The
measurement point is A3, as shown in Figure 103.
Unit Times

C900060136
Definition Number of MOC access attempts
Description This counter counts the number of channel requests due to
Mobile Originated Call (MOC). When MS sends the CHL_REQ
message through BTS to BSC to request for radio channel, if TA
does not exceed the cell range and the access cause is ‘MOC’,
this counter increments.
Usage This counter is used to find out the frequency of channel
requests due to the access cause ‘MOC’.
Measurement This counter counts when MS requests for channel from BSC and
Point TA does not exceed the cell range. The measurement point is A1,
as shown in Figure 99.
Unit Times

C900060137
Definition Number of wireless access due to paging responses
Description This counter counts the number of accesses due to paging
responses. After BSC receives the EST_IND message, if the
access cause in the layer-3 information in this message is
‘paging responses’, this counter increments.
Usage This counter is used to find out the frequency of the access due
to paging responses.
Measurement This counter counts when BSC receives the EST_IND message.
Point The measurement point is A4, as shown in Figure 99.
Unit Times

C900060138
Definition Number of TCH/F allocation failure due to BTS connection failure
for assignment (speech version1)
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure when assigning voice
channel (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM

Confidential and Proprietary Information of ZTE CORPORATION 203


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

connection request to BTS. If BTS connection fails due to


receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.

FIGURE 138 – COMMON ASSIGNMENT FLOW 3 (TC IS INTERNAL)

Unit Times

C900060139
Definition Number of TCH/F allocation failure due to BIU connection failure
for assignment (speech version1)
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure when assigning voice
channel (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during BIU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060140
Definition Number of TCH/F allocation failure due to TCU connection failure
for assignment (speech version1)

204 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Description This counter counts the number of failing to allocate TCH/F


channel due to TCU connection failure when assigning voice
channel (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during TCU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060141
Definition Number of TCH/F allocation failure due to channel activation
failure for assignment (speech version2)
Description This counter counts the number of TCH/F channel allocation
failure due to channel activation failure when assigning speech
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/F. If the channel activation
fails due to receiving channel activation failure message,
incorrect channel activation response message, T9103 timeout,
channel instance being released or channel being released
forcibly, this counter accumulates.
Measurement BSC activates TCH/F as voice channel (using speech version 2)
Point for assignment, but the problem such as receiving channel
activation failure message, incorrect channel activation response
message, T9103 timeout, channel instance being released, or
channel being forcibly released occurs. The measurement point
is B3, as shown in Figure 118.
Unit Times

C900060142
Definition Number of TCH/F allocation failure due to BTS connection failure
for assignment (speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure when assigning voice
channel (using speech version 2).

Confidential and Proprietary Information of ZTE CORPORATION 205


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

After BSC responds to the channel request message to allocate


and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060143
Definition Number of TCH/F allocation failure due to BIU connection failure
for assignment (speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure when assigning voice
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during BIU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060144
Definition Number of TCH/F allocation failure due to TCU connection failure
for assignment (speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure when assigning voice
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.

206 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during TCU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060145
Definition Number of TCH/F allocation failure due to BTS connection failure
for assignment (speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060146
Definition Number of TCH/F allocation failure due to BIU connection failure
for assignment (speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during BIU
connection process. The measurement point is B2, as shown in
Figure 138.

Confidential and Proprietary Information of ZTE CORPORATION 207


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Unit Times

C900060147
Definition Number of TCH/F allocation failure due to TCU connection failure
for assignment (speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during TCU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060148
Definition Number of TCH/F allocation failure due to BTS connection failure
for assignment (speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure when assigning data
channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

208 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060149
Definition Number of data TCH/F allocation failure due to BIU connection
failure for assignment
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure when assigning data
channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but receives connection failure
Point message, incorrect connection response message or timer
timeout during BIU connection process. The measurement point
is B2, as shown in Figure 138.
Unit Times

C900060150
Definition Number of data TCH/F allocation failure due to TCU connection
failure for assignment
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure when assigning data
channel.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for assignment, but receiving connection failure
Point message, incorrect connection response message or timer
timeout during TCU connection process. The measurement point
is B2, as shown in Figure 138.
Unit Times

C900060151
Definition Number of voice TCH/H drops due to handover failure
Description This counter counts the number of call drops due to handover
failure on TCH/H voice channel. Call drop occurs after MS

Confidential and Proprietary Information of ZTE CORPORATION 209


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

requests for TCH/H voice channel successfully. If the problem is


due to handover failure, the counter increments.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.
Usage This counter is used to find out the frequency of call drop due to
handover failure on TCH/H voice channel.
Measurement TCH/H voice channel is activated after BSC initiates the
Point handover flow. After that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.
„ If RANCS is in the status of RADIO_APPLY and sends the
inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.
„ If RANCS is in the status of RADIO_APPLY and sends the
external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments. The measurement point is A1, as shown in
Figure 145.
Unit Times

C900060152
Definition Number of Abis interface paging command messages
Description This counter counts the number of paging command messages
from A-interface. These messages are part of Abis interface
messages sent from BSC.
Usage This counter is used to find out the frequency of transmitting
paging command messages at Abis interface. These messages
are from A-interface.
Measurement When BSC sends ABIS_INTER_PAGING_CMD message to BTS,
Point this counter increments. The measurement point is A, as shown
in Figure 139.

210 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 139 – MEASUREMENT POINT OF NUMBER OF ABIS INTERFACE


MESSAGES SENT TO BTS FROM BSC

Unit Times

C900060153
Definition Number of Abis CS paging messages
Description This counter counts the number of CS paging command
messages from Gb interface. These messages are part of Abis
interface messages sent from BSC.

Usage This counter is used to find out the frequency of transmitting CS


paging command messages at Abis interface. These messages
are from Gb interface.
Measurement When BSC sends ABIS_INTER_CSPAGING_CMD message to BTS,
Point this counter increments. The measurement point is A, as shown
in Figure 139.
Unit Times

C900060154
Definition Number of Abis PS paging messages
Description This counter counts the number of PS paging command
messages from Gb interface. These messages are part of Abis
interface messages sent from BSC.
Usage This counter is used to find out the frequency of transmitting PS
paging command messages at Abis interface. These messages
are from Gb interface.
Measurement When BSC sends ABIS_INTER_PSPAGING_CMD message to BTS,
Point this counter increments. The measurement point is A, as shown
in Figure 139.
Unit Times

C900060155
Definition Number of available defined TCH/H

Confidential and Proprietary Information of ZTE CORPORATION 211


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description iBSC supports the function of full dynamic radio channel. This
counter counts the number of available TCH/H channel
configured by OMCR in the current cell.
Usage This counter is used to find out the number of available TCH/H
channel in the current cell to eliminate the fault in the cell.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060156
Definition Number of TCH/F allocation failure due to channel activation
failure for handover(speech version1)
Description This counter counts the number of failing to allocate TCH/F
channel due to channel activation failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/F. If channel activation fails due to
receiving channel activation failure message, incorrect channel
activation response message, T9103 being timeout, channel
instance being released or channel being forcibly released, this
counter accumulates.
Measurement BSC activates TCH/F channel as voice channel due to handover,
Point but receives channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released. The measurement point is C3 as shown in Figure 112
and D3 as shown in Figure 113.
Unit Times

C900060157
Definition Number of TCH/F allocation failure due to BTS connection failure
for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM

212 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

connection response message, or timer timeout, this counter


accumulates.
Measurement BSC uses TCH/F channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.

FIGURE 140 – INTERNAL HANDOVER FAILURE FLOW 2 (INTRA-CELL


HANDOVER, TC IS INTERNAL)

FIGURE 141 – EXTERNAL HANDOVER FAILURE FLOW 3 (TC IS INTERNAL)

Unit Times

C900060158
Definition Number of TCH/F allocation failure due to BIU connection failure
for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.

Confidential and Proprietary Information of ZTE CORPORATION 213


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060159
Definition Number of TCH/F allocation failure due to TCU connection failure
for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060160
Definition Number of TCH/F allocation failure due to channel activation
failure for handover(speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to channel activation failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/F. If channel activation fails due to
receiving channel activation failure message, incorrect channel
activation response message, T9103 being timeout, channel
instance being released or channel being forcibly released, this
counter accumulates.
Measurement BSC activates TCH/F channel as voice channel due to handover,
Point but receives channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released. The measurement point is C3 as shown in Figure 112
and D3 as shown in Figure 113.

214 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Unit Times

C900060161
Definition Number of TCH/F allocation failure due to BTS connection failure
for handover (speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.
Unit Times

C900060162
Definition Number of TCH/F allocation failure due to BIU connection failure
for handover (speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060163
Definition

Confidential and Proprietary Information of ZTE CORPORATION 215


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Number of TCH/F allocation failure due to TCU connection failure


for handover (speech version2)
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060164
Definition Number of TCH/F allocation failure due to channel activation
failure for handover(speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to channel activation failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/F. If channel activation fails due to
receiving channel activation failure message, incorrect channel
activation response message, T9103 being timeout, channel
instance being released or channel being forcibly released, this
counter accumulates.
Measurement BSC activates TCH/F channel as voice channel due to handover,
Point but receives channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released. The measurement point is C3 as shown in Figure 112
and D3 as shown in Figure 113.
Unit Times

C900060165
Definition Number of TCH/F allocation failure due to BTS connection failure
for handover (speech version3)
Description

216 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

This counter counts the number of failing to allocate TCH/F


channel due to BTS connection failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.
Unit Times

C900060166
Definition Number of TCH/F allocation failure due to BIU connection failure
for handover (speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060167
Definition Number of TCH/F allocation failure due to TCU connection failure
for handover (speech version3)
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to

Confidential and Proprietary Information of ZTE CORPORATION 217


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

receiving TCU connection failure message, incorrect TCU


connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060168
Definition Number of Voice TCH/F handover success
Description This counter counts the number of successful TCH/F channel
handover during voice channel handover.
When BSC detects the successful handover message sent by MS
on newly-allocated TCH/F channel, this counter accumulates.
The ASS_COM message indicates successful intra-cell handover,
and the HO_COM message indicates successful inter-cell
handover and external handover.
For intra-cell handover and inter-cell handover, the counter
accumulates on source instances. For external handover, the
counter accumulates on target instances because the source
instance is not under this BSC.
Measurement The counter counts when BSC receives the ASS_COM/HO_COM
Point message. The measurement point is C4 as shown in Figure 105
and Figure 106 and D4 as shown in Figure 107 and Figure 108.
Unit Times

C900060169
Definition Number of data TCH/F allocation failure due to channel
activation failure for handover
Description This counter counts the number of failing to allocate TCH/F
channel due to channel activation failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/F. If the channel activation fails due
to receiving channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released, this counter accumulates.
Measurement BSC activates TCH/F as data channel for handover, but receives
Point channel activation failure message, incorrect channel activation

218 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

response message, T9103 being timeout, channel instance being


released, or channel being forcibly released. The measurement
point is C3 as shown in Figure 112 and D3 as shown in Figure
113.
Unit Times

C900060170
Definition Number of TCH/F allocation failure due to BTS connection failure
for handover
Description This counter counts the number of failing to allocate TCH/F
channel due to BTS connection failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.
Unit Times

C900060171
Definition Number of TCH/F allocation failure due to BIU connection failure
for handover
Description This counter counts the number of failing to allocate TCH/F
channel due to BIU connection failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 219


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060172
Definition Number of TCH/F allocation failure due to TCU connection failure
for handover
Description This counter counts the number of failing to allocate TCH/F
channel due to TCU connection failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/F channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/F for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060173
Definition Number of data TCH/F handover success
Description This counter counts the number of successful TCH/F channel
handover during data channel handover.
When BSC detects the successful handover message sent by MS
on newly-allocated TCH/F channel, this counter accumulates.
The ASS_COM message indicates successful intra-cell handover,
and the HO_COM message indicates successful inter-cell
handover and external handover.
For intra-cell handover and inter-cell handover, the counter
accumulates on source instances. For external handover, the
counter accumulates on target instances because the source
instance is not under this BSC.
Measurement The counter counts when BSC receives the ASS_COM/HO_COM
Point message. The measurement point is C4 as shown in Figure 105
and Figure 106 and D4 as shown in Figure 107 and Figure 108.
Unit Times

C900060174
Definition Number of signaling TCH/H allocation failure for assignment
Description This counter counts the number of TCH/H channel allocation
failures during signaling channel assignment.

220 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

After BSC responds to the channel request message to allocate


and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H channel.
If the channel activation fails due to receiving channel activation
failure message, incorrect channel activation response message,
T9103 timeout, channel instance being released or channel
being released forcibly, this counter accumulates.
Measurement BSC activates TCH/H channel due to assignment and uses it as
Point signaling channel, but receives channel activation failure
message, incorrect channel activation response message, T9103
being timeout, channel instance being released, or channel being
forcibly released. The measurement point is A2, as shown in
Figure 111.
Unit Times

C900060175
Definition Number of TCH/H allocation failure due to channel activation
failure for assignment (speech version1)
Description This counter counts the number of TCH/H channel allocation
failure due to channel activation failure when assigning voice
channel (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. If the channel activation
fails due to receiving channel activation failure message,
incorrect channel activation response message, T9103 timeout,
channel instance being released or channel being released
forcibly, this counter accumulates.
Measurement BSC activates TCH/H as voice channel (using speech version 1)
Point for assignment, but the problem such as receiving channel
activation failure message, incorrect channel activation response
message, T9103 timeout, channel instance being released, or
channel being forcibly released occurs. The measurement point
is B3, as shown in Figure 118.
Unit Times

C900060176
Definition Number of TCH/H allocation failure due to BTS connection failure
for assignment (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure when assigning voice
channel (using speech version 1).

Confidential and Proprietary Information of ZTE CORPORATION 221


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

After BSC responds to the channel request message to allocate


and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060177
Definition Number of TCH/H allocation failure due to BIU connection failure
for assignment (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to BIU connection failure when assigning voice
channel (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during BIU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060178
Definition Number of TCH/H allocation failure due to TCU connection failure
for assignment (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure when assigning voice
channel (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.

222 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during TCU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060179
Definition Number of TCH/H allocation failure due to channel activation
failure for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to channel activation failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/H. If channel activation fails due to
receiving channel activation failure message, incorrect channel
activation response message, T9103 being timeout, channel
instance being released or channel being forcibly released, this
counter accumulates.
Measurement BSC activates TCH/H channel as voice channel due to handover,
Point but receives channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released. The measurement point is C3 as shown in Figure 112
and D3 as shown in Figure 113.
Unit Times

C900060180
Definition Number of TCH/H allocation failure due to BTS connection failure
for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The

Confidential and Proprietary Information of ZTE CORPORATION 223


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

measurement point is C2 as shown in Figure 140 and D2 as


shown in Figure 141.
Unit Times

C900060181
Definition Number of TCH/H allocation failure due to BIU connection failure
for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to BIU connection failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060182
Definition Number of TCH/H allocation failure due to TCU connection failure
for handover (speech version1)
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure during voice channel
handover (using speech version 1).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

224 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060183
Definition Number of TCH/H allocation failure due to channel activation
failure for assignment (speech version2)
Description This counter counts the number of TCH/H channel allocation
failure due to channel activation failure when assigning voice
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. If the channel activation
fails due to receiving channel activation failure message,
incorrect channel activation response message, T9103 timeout,
channel instance being released or channel being released
forcibly, this counter accumulates.
Measurement BSC activates TCH/H as voice channel (using speech version 2)
Point for assignment, but the problem such as receiving channel
activation failure message, incorrect channel activation response
message, T9103 timeout, channel instance being released, or
channel being forcibly released occurs. The measurement point
is B3, as shown in Figure 118.
Unit Times

C900060184
Definition Number of TCH/H allocation failure due to BTS connection failure
for assignment (speech version2)
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure when assigning voice
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 225


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060185
Definition Number of TCH/H allocation failure due to BIU connection failure
for assignment (speech version2)

Description This counter counts the number of failing to allocate TCH/H


channel due to BIU connection failure when assigning voice
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during BIU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060186
Definition Number of TCH/H allocation failure due to TCU connection failure
for assignment (speech version2)
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure when assigning voice
channel (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during TCU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060187
Definition

226 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Number of TCH/H allocation failure due to channel activation


failure for handover (speech version2)
Description This counter counts the number of failing to allocate TCH/H
channel due to channel activation failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/H. If channel activation fails due to
receiving channel activation failure message, incorrect channel
activation response message, T9103 being timeout, channel
instance being released or channel being forcibly released, this
counter accumulates.
Measurement BSC activates TCH/H channel as voice channel due to handover,
Point but receives channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released. The measurement point is C3 as shown in Figure 112
and D3 as shown in Figure 113.
Unit Times

C900060188
Definition Number of TCH/H allocation failure due to BTS connection failure
for handover (speech version2)
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.
Unit Times

C900060189
Definition Number of TCH/H allocation failure due to BIU connection failure
for handover (speech version2)

Confidential and Proprietary Information of ZTE CORPORATION 227


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description This counter counts the number of failing to allocate TCH/H


channel due to BIU connection failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060190
Definition Number of TCH/H allocation failure due to TCU connection failure
for handover (speech version2)
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure during voice channel
handover (using speech version 2).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060191
Definition Number of TCH/H allocation failure due to channel activation
failure for assignment (speech version3)
Description This counter counts the number of TCH/H channel allocation
failure due to channel activation failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. If the channel activation
fails due to receiving channel activation failure message,

228 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

incorrect channel activation response message, T9103 timeout,


channel instance being released or channel being released
forcibly, this counter accumulates.
Measurement BSC activates TCH/H as voice channel (using speech version 3)
Point for assignment, but the problem such as receiving channel
activation failure message, incorrect channel activation response
message, T9103 timeout, channel instance being released, or
channel being forcibly released occurs. The measurement point
is B3, as shown in Figure 118.
Unit Times

C900060192
Definition Number of TCH/H allocation failure due to BTS connection failure
for assignment (speech version3)

Description This counter counts the number of failing to allocate TCH/H


channel due to BTS connection failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060193
Definition Number of TCH/H allocation failure due to BIU connection failure
for assignment (speech version3)
Description This counter counts the number of failing to allocate TCH/H
channel due to BIU connection failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message, or timer timeout, this counter
accumulates.

Confidential and Proprietary Information of ZTE CORPORATION 229


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during BIU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060194
Definition Number of TCH/H allocation failure due to TCU connection failure
for assignment (speech version3)
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure when assigning voice
channel (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message, or timer timeout occurs during TCU
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060195
Definition Number of TCH/H allocation failure due to channel activation
failure for handover (speech version3)
Description This counter counts the number of failing to allocate TCH/H
channel due to channel activation failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/H. If channel activation fails due to
receiving channel activation failure message, incorrect channel
activation response message, T9103 being timeout, channel
instance being released or channel being forcibly released, this
counter accumulates.
Measurement BSC activates TCH/H channel as voice channel due to handover,
Point but receives channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly

230 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

released. The measurement point is C3 as shown in Figure 112


and D3 as shown in Figure 113.
Unit Times

C900060196
Definition Number of TCH/H allocation failure due to BTS connection failure
for handover (speech version3)
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.
Unit Times

C900060197
Definition Number of TCH/H allocation failure due to BIU connection failure
for handover (speech version3)
Description This counter counts the number of failing to allocate TCH/H
channel due to BIU connection failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 231


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060198
Definition Number of TCH/H allocation failure due to TCU connection failure
for handover (speech version3)
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure during voice channel
handover (using speech version 3).
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060199
Definition Number of Voice TCH/H assignment success
Description This counter counts the number of successful assignments of
TCH/H as voice channel.
After BSC responds the channel request message to allocate and
occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. For assignment from A-
interface, after BSC receives the assignment success message,
the counter accumulates.
Measurement For assignment from A-interface, the counter accumulates when
Point BSC receives the assignment success message. The
measurement point is B5, as shown in Figure 115 and Figure
116.
Unit Times

C900060200
Definition Number of Voice TCH/H assignment failure
Description This counter counts the number of failing to assign TCH/H
channel as voice channel.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. If BSC does not receive

232 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

the MS access notification within a certain time, this assignment


fails.
Measurement This counter counts when BSC receives assignment failure
Point message, abnormal message, channel instance being released,
channel instance being released forcibly, or timer timeout
message. The measurement point is B5, as shown in Figure 119.
Unit Times

C900060201
Definition Number of Voice TCH/H handover success
Description This counter counts the number of successful TCH/H channel
handover during voice channel handover.
When BSC detects the successful handover message sent by MS
on newly-allocated TCH/F channel, this counter accumulates.
The ASS_COM message indicates successful intra-cell handover,
and the HO_COM message indicates successful inter-cell
handover and external handover.
For intra-cell handover and inter-cell handover, the counter
accumulates on source instances. For external handover, the
counter accumulates on target instances because the source
instance is not under this BSC.
Measurement The counter counts when BSC receives the ASS_COM/HO_COM
Point message. The measurement point is C4 as shown in Figure 105
and Figure 106 and D4 as shown in Figure 107 and Figure 108.
Unit Times

C900060202
Definition Number of data TCH/H allocation failure due to channel
activation failure for assignment
Description This counter counts the number of TCH/H channel allocation
failure due to channel activation failure during data channel
assignment.
After BSC responds the channel request message to allocate and
occupy TCH/H channel successfully, if connection succeeds, BSC
sends the CHL_ACT message to BTS to activate this TCH/H. If
channel activation fails due to receiving channel activation
failure message, incorrect channel activation response message,
T9103 being timeout, channel instance being released or
channel being forcibly released, this counter accumulates.
Measurement BSC activates TCH/H channel due to assignment and uses the
Point channel as data channel, but receives channel activation failure
message, incorrect channel activation response message, T9103
being timeout, channel instance being released, or channel being

Confidential and Proprietary Information of ZTE CORPORATION 233


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

forcibly released. The measurement point is B3, as shown in


Figure 118.
Unit Times

C900060203
Definition Number of data TCH/H allocation failure due to BTS connection
failure for assignment
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure when assigning data
channel.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but the problem such as
Point receiving connection failure message, incorrect connection
response message or timer timeout occurs during CMM
connection process. The measurement point is B2, as shown in
Figure 138.
Unit Times

C900060204
Definition Number of data TCH/H allocation failure due to BIU connection
failure for assignment

Description This counter counts the number of failing to allocate TCH/H


channel due to BIU connection failure when assigning data
channel.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but receives connection failure
Point message, incorrect connection response message or timer
timeout during BIU connection process. The measurement point
is B2, as shown in Figure 138.
Unit Times

234 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

C900060205
Definition Number of data TCH/H allocation failure due to TCU connection
failure for assignment
Description This counter counts the number of failing to allocate TCH/H
channel due to TCU connection failure when assigning data
channel.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for assignment, but receiving connection failure
Point message, incorrect connection response message or timer
timeout during TCU connection process. The measurement point
is B2, as shown in Figure 138.
Unit Times

C900060206
Definition Number of data TCH/H allocation failure due to channel
activation failure for handover
Description This counter counts the number of failing to allocate TCH/H
channel due to channel activation failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, if the connection
succeeds, BSC sends the channel activation message CHL_ACT
to BTS to activate this TCH/H. If the channel activation fails due
to receiving channel activation failure message, incorrect
channel activation response message, T9103 being timeout,
channel instance being released, or channel being forcibly
released, this counter accumulates.
Measurement BSC activates TCH/H as data channel for handover, but receives
Point channel activation failure message, incorrect channel activation
response message, T9103 being timeout, channel instance being
released, or channel being forcibly released. The measurement
point is C3 as shown in Figure 112 and D3 as shown in Figure
113.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 235


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060207
Definition Number of data TCH/H allocation failure due to BTS connection
failure for handover
Description This counter counts the number of failing to allocate TCH/H
channel due to BTS connection failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CMM
connection request to BTS. If BTS connection fails due to
receiving CMM connection failure message, incorrect CMM
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H channel for handover, but receives connection
Point failure message, incorrect connection response message, or
timer timeout during CMM connection process. The
measurement point is C2 as shown in Figure 140 and D2 as
shown in Figure 141.
Unit Times

C900060208
Definition Number of data TCH/H allocation failure due to BIU connection
failure for handover
Description This counter counts the number of failing to allocate TCH/H
channel due to BIU connection failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the BIU
connection request to BIPB. If BIU connection fails due to
receiving BIU connection failure message, incorrect BIU
connection response message or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during BIU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060209
Definition Number of data TCH/H allocation failure due to TCU connection
failure for handover
Description

236 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

This counter counts the number of failing to allocate TCH/H


channel due to TCU connection failure during data channel
handover.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the TCU
connection request to DRTB. If TCU connection fails due to
receiving TCU connection failure message, incorrect TCU
connection response message, or timer timeout, this counter
accumulates.
Measurement BSC uses TCH/H for handover, but receives connection failure
Point message, incorrect connection response message, or timer
timeout during TCU connection process. The measurement point
is C2 as shown in Figure 140 and D2 as shown in Figure 141.
Unit Times

C900060210
Definition Number of data TCH/H assignment success
Description This counter counts the number of successful assignments of
TCH/H as data channel.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. For assignment from A-
interface, after BSC receives the assignment success message,
the counter accumulates.
Measurement For assignment from A-interface, the counter accumulates when
Point BSC receives the assignment success message. The
measurement point is B5, as shown in Figure 115 and Figure
116.
Unit Times

C900060211
Definition Number of data TCH/H assignment failure
Description This counter counts the number of failing to assign TCH/H
channel as data channel.
After BSC responds to the channel request message to allocate
and occupy TCH/H channel successfully, BSC sends the CHL_ACT
message to BTS to activate this TCH/H. If BSC does not receive
the MS access notification within a certain time, this assignment
fails.
Measurement This counter counts when BSC receives assignment failure
Point message, abnormal message, channel instance being released,
channel instance being released forcibly, or timer timeout
message. The measurement point is B5, as shown in Figure 119.

Confidential and Proprietary Information of ZTE CORPORATION 237


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Unit Times

C900060212
Definition Number of data TCH/H handover success
Description This counter counts the number of successful TCH/H channel
handover during data channel handover.
When BSC detects the successful handover message sent by MS
on newly-allocated TCH/H channel, this counter accumulates.
The ASS_COM message indicates successful intra-cell handover,
and the HO_COM message indicates successful inter-cell
handover and external handover.
For intra-cell handover and inter-cell handover, the counter
accumulates on source instances. For external handover, the
counter accumulates on target instances because the source
instance is not under this BSC.
Measurement The counter counts when BSC receives the ASS_COM/HO_COM
Point message. The measurement point is C4 as shown in Figure 105
and Figure 106 and D4 as shown in Figure 107 and Figure 108.
Unit Times

C900060213
Definition Number of BSC-controlled incoming handover due to forced
release
Description During BSC-controlled inter-cell incoming handover process, the
counter counts the number of forced release executions due to
no available radio resource in the target cell.
Usage This counter is used to find out the frequency of forced release
execution during BSC-controlled inter-cell incoming handover
process. It reflects the status of the handover flow.
Measurement The target cell within BSC receives the radio channel request
Point message. If the request is due to BSC-controlled inter-cell
incoming handover and the target cell has no available radio
channels, forced release is performed. When the target cell
receives the message of resource available returned by the
forced release instance, the counter increments. The
measurement point is A, as shown in Figure 142.

238 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

FIGURE 142 – FORCED RELEASE EXECUTION

Unit Times

C900060214
Definition Number of BSC-controlled incoming handover due to queues
Description During BSC-controlled inter-cell incoming handover process, the
counter counts the number of queuing executions due to no
available radio resource in the target cell.
Usage This counter is used to find out the frequency of queuing
execution during BSC-controlled inter-cell incoming handover
process. It reflects the status of the handover flow.
Measurement The target cell within BSC receives the radio channel request
Point message. If the request is due to BSC-controlled inter-cell
incoming handover and the target cell has no available radio
channels, the target instance is added to the waiting queue.
When the target cell receives the message of resource available,
the counter increments. The measurement point is A, as shown
in Figure 143.

FIGURE 143 – QUEUING EXECUTION

Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 239


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060215
Definition Number of BSC-controlled incoming handover due to forced
handover
Description During BSC-controlled inter-cell incoming handover process, the
counter counts the number of forced handover executions due to
no available radio resource in the target cell.
Usage This counter is used to find out the frequency of forced handover
execution during BSC-controlled inter-cell incoming handover
process. It reflects the status of the handover flow.
Measurement The target cell within BSC receives the radio channel request
Point message. If the request is due to BSC-controlled inter-cell
incoming handover and the target cell has no available radio
channels, the forced handover message is sent to the forced
handover instance and the target instance is added to the
waiting queue. When the target cell receives the message of
resource available, the counter increments. The measurement
point is A, as shown in Figure 144.

FIGURE 144 – FORCED HANDOVER EXECUTION

Unit Times

C900060216
Definition Number of MSC-controlled incoming handover due to forced
handover
Description During MSC-controlled inter-BSC incoming handover process,
the counter counts the number of forced handover executions
due to no available radio resource in the target cell.
Usage This counter is used to find out the frequency of forced handover
executions during MSC-controlled inter-BSC incoming handover
process. It reflects the status of the handover flow.
Measurement The target cell receives the radio channel request message. If
Point the request is due to MSC-controlled inter-BSC incoming
handover and the target cell has no available radio channels, the
forced handover message is sent to the forced handover

240 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

instance and the target instance is added to the waiting queue.


When the target cell receives the message of resource available,
the counter increments. The measurement point is A, as shown
in Figure 144.
Unit Times

C900060217
Definition Number of unavailable defined TCH/H
Description iBSC supports the function of full dynamic radio channel. This
counter counts the number of unavailable TCH/H channel
configured by OMCR in the current cell.
Usage This counter is used to find out the number of unavailable TCH/H
channel in the current cell to facilitate eliminating the fault.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060218
Definition Number of unavailable defined TCH/F
Description iBSC supports the function of full dynamic wireless channel. This
counter counts the number of unavailable TCH/F channel
configured by OMCR in the current cell.
Usage This counter is used to find out the number of unavailable TCH/F
channel in the current cell to facilitate eliminating the fault.
Measurement Query the database when periodic measurement data is reported
Point to get the value of the counter. The measurement point is A, as
shown in Figure 137.
Unit Times

C900060219
Definition Number of signaling TCH/F drops due to handover failure
Description This counter counts the number of call drops due to handover
failure on TCH/F signaling channel. Call drop occurs after MS
requests for TCH/F signaling channel successfully. If the problem
is due to handover failure, the counter increments.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.

Confidential and Proprietary Information of ZTE CORPORATION 241


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Usage This counter is used to find out the frequency of call drop due to
handover failure on TCH/F signaling channel.
Measurement TCH/F signaling channel is activated after BSC initiates the
Point handover flow. After that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.
„ If RANCS is in the status of RADIO_APPLY and sends the
inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.
„ If RANCS is in the status of RADIO_APPLY and sends the
external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments. The measurement point is A1, as shown in
Figure 145.

FIGURE 145 – CALL DROP DUE TO INTER-BSC HANDOVER FAILURE

MS BTS1 BSC1 MSC BSC2 BTS2


Meas Rep
Meas Rep
Ho Req
CR(Ho Req)

CC A2
Chan Act
Chan Act Ack
Ho Req Ack
Ho cmd
Ho Cmd HO Detec
HO Detec
A1 Est Ind
HO Complete

Clear Cmd

Unit Times

C900060220
Definition Number of voice TCH/F drops due to handover failure
Description This counter counts the number of call drops on TCH/F voice
channel due to handover failure. Call drop occurs after MS
requests for TCH/F voice channel successfully. The counter
increments if call drop is due to handover failure.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.
Usage

242 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

This counter is used to find out the frequency of call drop on


TCH/F voice channel due to handover failure.
Measurement TCH/F voice channel is activated after BSC initiates the handover
Point flow. After that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.
„ If RANCS is in the status of RADIO_APPLY and sends the
inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.
„ If RANCS is in the status of RADIO_APPLY and sends the
external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments. The measurement point is A1, as shown in
Figure 145.
Unit Times

C900060221
Definition Number of data TCH/F drops due to handover failure
Description This counter counts the number of call drops on TCH/F data
channel due to handover failure. Call drop occurs after MS
requests for TCH/F data channel successfully. The counter
increments if call drop is due to handover failure.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.
Usage This counter is used to find out the frequency of call drop on
TCH/F data channel due to handover failure.
Measurement TCH/F data channel is activated after BSC initiates the handover
Point flow. After that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.
„ If RANCS is in the status of RADIO_APPLY and sends the
inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.

Confidential and Proprietary Information of ZTE CORPORATION 243


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

„ If RANCS is in the status of RADIO_APPLY and sends the


external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments. The measurement point is A1, as shown in
Figure 145.
Unit Times

C900060222
Definition Number of signaling TCH/H drops due to handover failure
Description This counter counts the number of call drops due to handover
failure on TCH/H signaling channel. Call drop occurs after MS
requests for TCH/H signaling channel successfully. If the
problem is due to handover failure, the counter increments.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.
Usage This counter is used to find out the frequency of call drop due to
handover failure on TCH/H signaling channel.
Measurement TCH/H signaling channel is activated after BSC initiates the
Point handover flow. After that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.
„ If RANCS is in the status of RADIO_APPLY and sends the
inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.
„ If RANCS is in the status of RADIO_APPLY and sends the
external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments. The measurement point is A1, as shown in
Figure 145.
Unit Times

C900060223
Definition Number of data TCH/H drops due to handover failure
Description This counter counts the number of call drops due to handover
failure on TCH/H data channel. Call drop occurs after MS

244 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

requests for TCH/H data channel successfully. If the problem is


due to handover failure, the counter increments.
Presently, reasons for handover failure include T3107 timeout,
T3103 timeout and external handover timer timeout under the
status of ASSIGNING.
Usage This counter is used to find out the frequency of call drop due to
handover failure on TCH/H data channel.
Measurement TCH/H data channel is activated after BSC initiates the handover
Point flow. After that:
„ If RANCS is in the status of RADIO_APPLY and sends the
intra-cell handover command, then T3107 is started. If
RANCS is in the status of ASSIGN and T3107 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 122.
„ If RANCS is in the status of RADIO_APPLY and sends the
inter-cell handover command, then T3103 is started. If
RANCS is in the status of ASSIGN and T3103 is timeout, then
the counter increments. The measurement point is A, as
shown in Figure 123.
„ If RANCS is in the status of RADIO_APPLY and sends the
external handover command, then the external handover
timer is started. If RANCS is in the status of ASSIGN and the
external handover timer is timeout, then the counter
increments. The measurement point is A1, as shown in
Figure 145.
Unit Times

C900060224
Definition Number of TCH/H handover attempts due to UL strength
Description This counter counts the number of handover attempts due to UL
receiving strength too low on TCH/H channel.
Usage This counter is used to find out the frequency of handover due to
UL receiving strength on TCH/H channel. If the counter’s value is
too large, it indicates poor UL level on TCH/H channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to UL strength, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060225
Definition Number of TCH/H handover attempts due to DL strength

Confidential and Proprietary Information of ZTE CORPORATION 245


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Description This counter counts the number of handover attempts due to DL


receiving strength too low on TCH/H channel.
Usage This counter is used to find out the frequency of handover due to
DL receiving strength on TCH/H channel. If the counter’s value is
too large, it indicates poor DL level on TCH/H channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to DL strength, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060226
Definition Number of TCH/H handover attempts due to UL quality
Description This counter counts the number of handover attempts due to UL
quality too poor on TCH/H channel.
Usage This counter is used to find out the frequency of handover due to
UL quality on TCH/H channel. If the counter’s value is too large,
it indicates poor UL quality on TCH/H channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to UL quality, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060227
Definition Number of TCH/H handover attempts due to DL quality
Description This counter counts the number of handover attempts due to DL
quality too poor on TCH/H channel.
Usage This counter is used to find out the frequency of handover due to
DL quality on TCH/H channel. If the counter’s value is too large,
it indicates poor DL quality on TCH/H channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to DL quality, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060228
Definition Number of TCH/H handover attempts due to UL interference

246 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Description This counter counts the number of handover attempts due to UL


interference too large on TCH/H channel.
Usage This counter is used to find out the frequency of handover due to
UL interference on TCH/H channel. If the counter’s value is too
large, it indicates large UL interference on TCH/H channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to UL interference, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060229
Definition Number of TCH/H handover attempts due to DL interference
Description This counter counts the number of handover attempts due to DL
interference too large on TCH/H channel.
Usage This counter is used to find out the frequency of handover due to
DL interference on TCH/H channel. If the counter’s value is too
large, it indicates large DL interference on TCH/H channel.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to DL interference, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060230
Definition Number of TCH/H handover attempts due to good C/I
Description This counter counts the number of MS handover attempts due to
too large C/I ratio on TCH/H channel. The handover only occurs
during sub-cell configuration and when C/I algorithm is adopted;
MS performs handover from external circle to internal circle.
Usage This counter is used to find out the frequency of MS handover
due to too large C/I ratio on TCH/H channel. If the counter’s
value is too large, it indicates that, after MS accesses the
external circle, MS performs handover to the internal circle many
times due to good C/I ratio and the internal circle absorbs the
traffic.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to too large C/I ratio, this counter increments.
The measurement point is A, as shown in Figure 124.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 247


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060231
Definition Number of TCH/H handover attempts due to bad C/I
Description This counter counts the number of MS handover attempts due to
too low C/I ratio on TCH/H channel. The handover only occurs
during sub-cell configuration and when C/I algorithm is adopted;
MS performs handover from internal circle to external circle.
Usage This counter is used to find out the frequency of MS handover
due to too low C/I ratio on TCH/H channel. If the counter’s value
is too large, it indicates that, when MS calls within the internal
circle, MS performs handover to the external circle many times
due to poor C/I ratio. Interference within the internal circle is big,
and C/I ratio of the internal circle can be improved by adjusting
the carrier power.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to too low C/I ratio, this counter increments.
The measurement point is A, as shown in Figure 124.
Unit Times

C900060232
Definition Number of TCH/H handover attempts due to PBGT
Description This counter counts the number of MS handover attempts due to
PBGT value on TCH/H channel. If PBGT value is larger than zero,
it indicates the adjacent cell has better radio environment than
the current cell. If the number of times that PBGT value is larger
than zero reaches the threshold, PBGT handover occurs.
Usage This counter is used to find out the frequency of MS handover
due to PBGT value on TCH/H channel. If the counter’s value is
too large, it indicates that signal on TCH/H channel within the
current cell is poorer than that in the adjacent cell.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to PBGT value, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060233
Definition Number of TCH/H handover attempts due to large TA
Description This counter counts the number of MS handover attempts due to
too large TA on TCH/H channel. Increasing TA indicates that MS

248 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

is moving away from the current cell. When the distance reaches
a certain value, handover will occur due to too large TA.
Usage This counter is used to find out the frequency of MS handover
due to too large TA on TCH/F channel. The counter’s value
reflects the mobility of subscribers in the current cell to a certain
extent.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to too large TA, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060234
Definition Number of TCH/H handover attempts due to other reasons
Description This counter counts the number of handover attempts due to
any other reason beyond the handover reasons mentioned
previously.
Usage This counter is used to find out the frequency of handover due to
any other reason.
Measurement BSC performs handover decision after receiving measurement
Point report on TCH/H channel. If handover decision succeeds and the
handover is due to any other reason beyond the handover
reasons mentioned previously, this counter increments. The
measurement point is A, as shown in Figure 124.
Unit Times

C900060235
Definition Number of signaling TCH/H assignment success
Description This counter counts the number of successfully assigning TCH/H
channel as signaling channel.
After BSC responds the channel request and successfully
allocates and occupies the channel, BSC sends channel
activation message CHL_ACT to activate the TCH/H. For
immediate assignment, after the channel activation succeeds,
BTS receives the MS access message and sends EST_IND to BSC.
The counter increments when BSC receives the message
correctly.
Measurement For immediate assignment, the counter increments when BSC
Point receives the EST_IND message correctly. The measurement
point is A3, as shown in Figure 103.
Unit Times

Confidential and Proprietary Information of ZTE CORPORATION 249


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060236
Definition Number of MOC access success
Description This counter counts the number of Mobile Originated Call (MOC)
MS successfully accesses the channel allocated in the immediate
assignment message. When MS receives IMM_ASS issued by
BSC, MS accesses the corresponding channel successfully. The
counter increments when BSC receives the EST_IND message
from MS.
Usage This counter is used to find out the frequency of successful MS
access due to MOC.
Measurement The counter increments when BSC receives the EST_IND
Point message. The measurement point is A4, as shown in Figure 99.
Unit Times

C900060237
Definition Number of dual band outgoing handover
Description This counter counts the number of MSC-controlled inter-BSC
outgoing handovers that are initiated by MS in the source cell
(the source cell and the target cell are of different frequency
bands).
Usage This counter is used to find out the frequency of MSC-controlled
inter-BSC outgoing handover that is initiated by MS. The source
cell and the target cell are of different frequency bands.
Measurement BSC performs handover decision after receiving the
Point measurement report sent by MS. If the decision indicates that
inter-cell handover is necessary and if the current cell to which
the handover is attempted is a cell under different BSC, then
BSC sends the handover request A_HO_RQD to MSC to trigger
inter-BSC handover. If BSC receives the handover command
returned from MSC and if the source cell and the target cell are
of different frequency bands, then this counter increments. The
measurement point is A, as shown in Figure 127.
Unit Times

C900060238
Definition Number of dual band outgoing handover success
Description This counter counts the number of successful MSC-controlled
inter-BSC outgoing handovers that are initiated by MS in the
source cell (the source cell and the target cell are of different
frequency bands).

250 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Usage This counter is used to find out the frequency of successful MSC-
controlled inter-BSC outgoing handover that is initiated by MS.
The source cell and the target cell are of different frequency
bands.
Measurement BSC performs handover decision after receiving the
Point measurement report sent by MS. If the decision indicates that
inter-cell handover is necessary and if the current cell to which
the handover is attempted is a cell under different BSC, then
BSC sends the handover request A_HO_RQD to MSC to trigger
inter-BSC handover. If MS accesses the target cell successfully,
the source cell receives the release command issued by MSC, if
the source cell and the target cell are of different frequency
bands, then this counter increments. The measurement point is
A, as shown in Figure 128.
Unit Times

C900060239
Definition Number of dual band incoming handover
Description This counter counts the number of inter-BSC incoming
handovers to the current cell that are initiated by MSC (the
source cell and the target cell are of different frequency bands).
Usage This counter is used to find out the frequency of inter-BSC
incoming handover that is initiated by MSC. The source cell and
the target cell are of different frequency bands.
Measurement After the target cell receives the handover request issued by
Point MSC, if the target cell occupies and activates the channel
successfully and if the source cell and the target cell are of
different frequency bands, then this counter increments. The
measurement point is A, as shown in Figure 131.
Unit Times

C900060240
Definition Number of dual band incoming handover success
Description This counter counts the number of successful MSC-controlled
inter-BSC incoming handovers that are initiated by MS (the
source cell and the target cell are of different frequency bands).
Usage This counter is used to find out the frequency of MSC-controlled
inter-cell handover that is initiated by MS. The source cell and
the target cell are of different frequency bands.
Measurement After the target cell receives the handover completion message,
Point if the request is due to MSC-controlled inter-BSC incoming
handover and if the source cell and the target cell are of

Confidential and Proprietary Information of ZTE CORPORATION 251


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

different frequency bands, then this counter increments. The


measurement point is A, as shown in Figure 134.
Unit Times

C900060241
Definition Number of SDCCH assignment attempts
Description After BSC responds to the channel request to allocate and
activate SDCCH channel successfully, BSC sends the IMM_ASS
message to notify MS to use this channel. After MS receives this
message, it sends SABM frame to BTS on SDCCH. BTS then
sends the EST_IND message to BSC after receiving SABM frame.
„ If BSC receives the correct EST_IND message within
specified time, it indicates that the SDCCH channel
assignment succeeds, C900060241 and C900060242
accumulate simultaneously.
„ If BSC receives the incorrect EST_IND message or T3101 is
timeout, it indicates that the SDCCH channel assignment fails,
C900060241 and C900060243 accumulate simultaneously.
Usage This counter counts the number of SDCCH channel assignment
attempts when BSC sends the IMM_ASS message to notify MS to
use the allocated SDCCH channel. The counter’s value includes
the number of assignment success (C900060242) and the
number of assignment failure (C900060243).
Measurement This counter counts when BSC receives the EST_IND message or
Point the assignment completion message, or when T3101 is timeout
(C900060242 + C900060243). The measurement point is A3, as
shown in Figure 100.
Unit Times

C900060242
Definition Number of SDCCH assignments success

Description After BSC responds to the channel request to allocate and


activate SDCCH channel successfully, BSC sends the IMM_ASS
message to notify MS to use this channel. After MS receives this
message, it sends SABM frame to BTS on SDCCH. BTS then
sends the EST_IND message to BSC after receiving SABM frame.
If BSC receives the correct EST_IND message within specified
time, it indicates that the SDCCH channel assignment succeeds,
then this counter increments.
Usage This counter counts the number of MS successfully accessing
SDCCH channel when BSC sends the IMM_ASS message.

252 Confidential and Proprietary Information of ZTE CORPORATION


Chapter 4 - CS Basic Measurement

Measurement This counter counts when BSC receives the correct EST_IND
Point message or the assignment completion message. The
measurement point is A3, as shown in Figure 100.
Unit Times

C900060243
Definition Number of SDCCH assignment failure
Description After BSC responds to the channel request to allocate and
activate SDCCH channel successfully, BSC sends the IMM_ASS
message to notify MS to use this channel. After MS receives this
message, it sends SABM frame to BTS on SDCCH. BTS then
sends the EST_IND message to BSC after receiving SABM frame.
If BSC receives the incorrect EST_IND message or T3101 is
timeout, it indicates that the SDCCH channel assignment fails,
then this counter increments.
Usage This counter counts the number of MS failing to access SDCCH
channel when BSC sends the IMM_ASS message.
Measurement This counter counts when BSC receives the incorrect EST_IND
Point message or when T3101 is timeout. The measurement point is
A3, as shown in Figure 100.
Unit Times

C900060244
Definition Number of voice TCH/F drops due to radio link failure
Description This counter counts the number of voice TCH/F drops due to
radio link failure. After MS applies for TCH/F voice channel, call
drops. If this problem is caused by radio link failure, then this
counter increments.
Usage This counter is used to learn the call drop frequency caused by
raio link failure on TCH/F voice.
Measurement On TCH/F voice channel, when BSC receives Connection Failure
Point Indication message at Abis interface, this counter counts. The
measurement point is A, as shown in Figure 146.

Confidential and Proprietary Information of ZTE CORPORATION 253


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

FIGURE 146 - CALL DROPS CAUSED BY RADIO LINK FAILURE DURING


ASSIGNMENT

Unit Times

C900060245
Definition Number of voice TCH/H drops due to radio link failure
Description This counter counts the number of voice TCH/H drops due to
radio link failure. After MS applies for TCH/H voice channel, call
drops. If this problem is caused by radio link failure, then this
counter increments.
Usage This counter is used to learn the call drop frequency caused by
raio link failure on TCH/H voice.
Measurement On TCH/H voice channel, when BSC receives Connection Failure
Point Indication message at Abis interface, this counter counts. The
measurement point is A, as shown in Figure 146.
Unit Times

254 Confidential and Proprietary Information of ZTE CORPORATION


Appendix A

Abbreviations

Abbreviation Full Name


A
Abis Abis Interface
AIPP A-Interface Peripheral Processor
AIU A-Interface Unit
AUC Access Unit Controller
B
BCCH Broadcast Channel
BSC Base Station Controller
BTS Base Transceiver Station
BSSAP Base Station Subsystem Application Part
BSSGP Base Station Subsystem GPRS Protocol
BSSMAP Base Station Subsystem Management
Application Part
BTS Base Transceiver Station
BVC BSSGP Virtual Connection
BVCI BSSGP Virtual Connection Identifier
C
CBCH Cell Broadcast Channel
CC Call Control
CCCH Common Control Channel
CCH Control Channel
CS Circuit Switched
D
DRT Dual Rate Transcoder
DTAP Direct Transfer Application Part
E

Confidential and Proprietary Information of ZTE CORPORATION 255


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Abbreviation Full Name


EDRT Enhanced Dual Rate Transcoder
EGSM Extended GSM
F
FACCH Fast Associated Control Channel
FACCH/F Fast Associated Control Channel/Full rate
FACCH/H Fast Associated Control Channel/Half rate
FR Frame Relay
FRP Frame Relay Protocol
FU Frame Unit
G
GGSN Gateway GPRS Support Node
GIU GPRS Interface Unit
GPRS General Packet Radio Service
GSM Global System for Mobile communication
GSN GPRS Support Node
H
HSN Hopping Sequence Number
K
KPI Key Performance Indicator
L
LAPD Link Access Protocol of D-Channel
LLC Logical Link Control
LMT Local Management Terminal
LOC Location update
M
MM Mobility Management
MOC Mobile Originated Call
MS Mobile Station
MSC Mobile Switching Center
MO-SM MS Originated Short Message
MT-SM MS Terminated Short Message
MTC Mobile Terminated Call
MTP Message Transfer Part
N
NC Network Controller
NMS Network Management Signaling

256 Confidential and Proprietary Information of ZTE CORPORATION


Appendix A - Abbreviations

Abbreviation Full Name


NMS Network Management Software
NS Network Service
NSE Network Service Entity
NSEI Network Service Entity Identifier
NSVC Network Service Virtual Circuit
O
OMC Operation Maintenance Center
OMCR Operation Maintenance Center Radio
P
PACCH Packet Associated Control Channel
PAGCH Paging and Access Grant Channel
PBGT Power Budget
PCH Paging Channel
PCU Packet Control Unit
PDU Protocol Data Unit
PDCH Packet Data Channel
PDTCH Packet Data Traffic Channel
PDU Protocol Data Unit
PS Packet Switched
R
RMM Radio Management Module
RQ Receiving Quality
RR Radio Resource
S
SACCH Slow Associated Control Channel
SACCH/F Slow Associated Control Channel/Full rate
SACCH/H Slow Associated Control Channel/Half rate
SAPI Service Access Point Identifier
SCCP Signal Correction Control Part
SDCCH Slow Distributed Control Channel
SGSN Serving GPRS Support Node
SIF Service Information Field
SIO Service Information Octets
SM Short Message
SMM Service Management Module
SMS Short Messages Service

Confidential and Proprietary Information of ZTE CORPORATION 257


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Abbreviation Full Name


SS Supplementary Services
T
TA Time Advance
TCH Traffic Channel
TCH/F Traffic Channel/Full rate
TCH/H Traffic Channel/Half rate
TFO Tandem Free Operation
TIC Trunk Interface Circuit
TRX Transceiver
U
UISF User Interface Support Foundation

258 Confidential and Proprietary Information of ZTE CORPORATION


Appendix B

Figures

Figure 1 – Measurement Point of Number of Requests for


Establishing GPRS Downlink Data TBF before T3192 Overtime 12
Figure 2 – Measurement Point of Number of Established GPRS
Downlink Data TBF Using Existing Resources ........................ 13
Figure 3 – Measurement Point of Number of Requests for
Establishing GPRS Downlink Data TBF on Uplink GPRS TBF
PACCH ............................................................................ 13
Figure 4 – Measurement Point of Number of GPRS DL TBF
Release due to N3105 Overflow .......................................... 14
Figure 5 – Measurement Point of Number of GPRS DL TBF
Release due to other Reasons ............................................ 14
Figure 6 – Measurement Point of Number of GPRS DL TBF
Forcing Release by Control Plane ........................................ 15
Figure 7 - Measurement Point of Number of GPRS DL TBF
Release due to Instance Suspension.................................... 16
Figure 8 – Measurement Point of Number of EGPRS DL TBF
Release due to N3105 Overflow .......................................... 18
Figure 9 – Measurement Point of Number of EGPRS DL TBF
Release due to other Reasons ............................................ 18
Figure 10 – Measurement Point of Number of EGPRS DL TBF
Forcing Release by Control Plane ........................................ 19
Figure 11 - Measurement Point of Number of EGPRS DL TBF
Release due to Instance Suspension.................................... 20
Figure 12 - Measurement Point of Number of GPRS UL Data TBF
Establishment Success on PACCH ....................................... 22
Figure 13 - Measurement Point of Number of GPRS UL TBF
Release due to N3101 Overflow .......................................... 22
Figure 14 - Measurement Point of Number of GPRS UL TBF
Release due to N3103 Overflow .......................................... 23
Figure 15 - Measurement Point of Number of GPRS UL TBF
Forcing Release by Control Plane ........................................ 23

Confidential and Proprietary Information of ZTE CORPORATION 259


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Figure 16 - Measurement Point of Number of GPRS UL TBF


Release due to Instance Suspension.................................... 24
Figure 17 – UL TBF Flow of 1-Step Access ............................ 25
Figure 18 - UL TBF Flow of 2-Step Access ............................ 26
Figure 19 - Measurement Point of Number of EGPRS UL TBF
Establishment Success on PACCH ....................................... 27
Figure 20 - Measurement Point of Number of EGPRS DL LLC
Frames ........................................................................... 34
Figure 21 - Measurement Point of Number of Discarded EGPRS
DL LLC Frames due to Buffer Overflow................................. 34
Figure 22 - Measurement Point of Number of Discarded EGPRS
DL LLC Frames due to Life Time Expiration........................... 35
Figure 23 - Measurement Point of Number of Discarded EGPRS
DL LLC Frames due to other Reasons .................................. 35
Figure 24 - Measurement Point of Number of DL Signaling LLC
Frames ........................................................................... 36
Figure 25 - Measurement Point of Number of Discarded EGPRS
DL Signaling LLC Frames due to Buffer Overflow ................... 36
Figure 26 - Measurement Point of Number of Discarded EGPRS
DL Signaling LLC Frames due to Life Time Expiration ............. 37
Figure 27 - Measurement Point of Number of Discarded EGPRS
DL Signaling LLC Frames due to other Reasons ..................... 38
Figure 28 - Measurement Point of Total Bytes of Effective Upper
Layer Protocol Data Sent on DL PDCH ................................. 39
Figure 29 - Measurement Point of Total Bytes of Effective Upper
Layer Protocol Data Received on UL PDCH............................ 39
Figure 30 - Measurement Point of Bytes of LLC Frame on GPRS
UL Data TBF .................................................................... 40
Figure 31 - Measurement Point of Duration of GPRS UL Data TBF
..................................................................................... 40
Figure 32 - Measurement Point of Bytes of LLC Frame on GPRS
DL Data TBF .................................................................... 41
Figure 33 - Measurement Point of Duration of GPRS DL Data TBF
..................................................................................... 41
Figure 34 - Measurement Point of Number of Effective Data
Blocks Received on GPRS UL TBF ........................................ 42
Figure 35 - Measurement Point of Number of NACK Blocks
Received on GPRS UL TBF.................................................. 43
Figure 36 - Measurement Point of Number of Effective Data
Blocks Sent on GPRS DL TBF.............................................. 43
Figure 37 - Measurement Point of Number of NACK Blocks Sent
on GPRS DL TBF............................................................... 44

260 Confidential and Proprietary Information of ZTE CORPORATION


Appendix B - Figures

Figure 38 - Measurement Point of Bytes of LLC Frame on EGPRS


UL Data TBF .................................................................... 45
Figure 39 - Measurement Point of Duration of EGPRS UL data
TBF ................................................................................ 45
Figure 40 - Measurement Point of Bytes of LLC Frame on EGPRS
DL Data TBF .................................................................... 46
Figure 41 - Measurement Point of Duration of EGPRS DL Data
TBF ................................................................................ 46
Figure 42 - Measurement Point of Number of Effective Data
Blocks Received on EGPRS UL TBF ...................................... 47
Figure 43 - Measurement Point of Number of NACK Blocks
Received on EGPRS UL TBF ................................................ 47
Figure 44 - Measurement Point of Number of Effective Data
Blocks Sent on EGPRS DL TBF ............................................ 48
Figure 45 - Measurement Point of Number of NACK Blocks Sent
on EGPRS DL TBF ............................................................. 49
Figure 46 - Measurement Point of Number of GPRS DL LLC
Frames ........................................................................... 49
Figure 47 - Measurement Point of Number of Discarded GPRS DL
LLC Frames due to Buffer Overflow ..................................... 50
Figure 48 - Measurement Point of Number of Discarded GPRS DL
LLC Frames due to Life Time Expiration ............................... 50
Figure 49 - Measurement Point of Number of Discarded GPRS DL
LLC Frames due to other Reasons ....................................... 51
Figure 50 - Measurement Point of Number of DL Dummy Control
Blocks on PACCH .............................................................. 52
Figure 51 - Measurement Point of Number of UL Dummy Control
Blocks on PACCH .............................................................. 52
Figure 52 - Measurement Point of Number of DL RLC Blocks on
PACCH (Excluding Dummy Block) ....................................... 53
Figure 53 - Measurement Point of Number of DL RLC Pending
Blocks on PDTCH .............................................................. 53
Figure 54 - Measurement Point of Number of DL RLC NACK
Blocks on PDTCH .............................................................. 55
Figure 55 – Measurement Point of Number of DL RLC New Blocks
on PDTCH........................................................................ 56
Figure 56 - Measurement Point of Number of UL RLC Blocks
Excluding Dummy Blocks on PACCH .................................... 58
Figure 57 - Measurement Point of Number of UL RLC Pending
Blocks on PDTCH .............................................................. 58
Figure 58 - Measurement Point of Number of UL RLC NACK
Blocks on PDTCH .............................................................. 60
Figure 59 – Measurement Point of Number of UL RLC New Blocks
on PDTCH........................................................................ 62

Confidential and Proprietary Information of ZTE CORPORATION 261


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Figure 60 - Measurement Point of Allocation Failures after


Receiving DL TBF Establishment Request ............................. 64
Figure 61 - Measurement Point of Allocation Failures after
Receiving DL TBF Assignment Message ................................ 65
Figure 62 - Measurement Point of Number of GPRS DL TBF
Resource Reallocation Requests due to UL TBF Establishment . 65
Figure 63 - Measurement Point of Number of GPRS DL TBF
Resource Reallocation Failure due to UL TBF Establishment .... 66
Figure 64 - Measurement Point of Number of GPRS DL TBF
Resource Reallocation Requests due to LLC Transmission ....... 67
Figure 65 - Measurement Point of Number of GPRS DL TBF
Resource Reallocation Failure due to LLC Transmission .......... 67
Figure 66 - Measurement Point of Allocation Failures after
Receiving CCCH Request ................................................... 71
Figure 67 - Measurement Point of Allocation Failures after
Receiving PCCCH Request.................................................. 71
Figure 68 - Measurement Point of Allocation Failures (DL GPRS
TBF Exists) ...................................................................... 72
Figure 69 - Measurement Point of Number of GPRS UL TBF
Resource Reallocation Requests due to DL TBF Establishment . 72
Figure 70 - Measurement Point of Number of GPRS UL TBF
Resource Reallocation Requests for Resource Request ........... 74
Figure 71 – Failing to Request for Resource from Database..... 75
Figure 72 – Measurement Point of Number of EGPRS Uplink TBF
Establishment Channel Allocation Failures ............................ 76
Figure 73 –Measurement Point of Number of GPRS DL TBF
Establishment Requests before T3192 Expiration .................. 81
Figure 74 –Measurement Point of GPRS DL TBF Establishment
Using Existing DL TBF Resource.......................................... 81
Figure 75 –Measurement Point of Number of GPRS DL TBF
Establishment Requests on PACCH...................................... 82
Figure 76 –Measurement Point of Number of GPRS DL TBF
Establishment Requests on CCCH/PCCCH............................. 83
Figure 77 –Measurement Point of Number of EGPRS DL TBF
Establishment Requests before T3192 Expiration .................. 84
Figure 78 –Measurement Point of Number of EGPRS DL TBF
Establishment Using Existing DL TBF Resource ..................... 84
Figure 79 –Measurement Point of Number of GPRS DL TBF
Establishment Requests on PACCH...................................... 85
Figure 80 – Normal CCCH/PCCCH DL TBF Establishment Process
..................................................................................... 86
Figure 81 – Measurement Point of Number of GPRS DL Signaling
TBF Release due to N3105 Overflow.................................... 87

262 Confidential and Proprietary Information of ZTE CORPORATION


Appendix B - Figures

Figure 82 – Measurement Point of Number of GPRS DL TBF


Release due to other Reasons ............................................ 87
Figure 83 – Measurement Point of Number of GPRS DL TBF
Forcing Release by Control Plane ........................................ 88
Figure 84 - Measurement Point of Number of GPRS DL TBF
Release due to Instance Suspension.................................... 89
Figure 85 – Measurement Point of Number of EGPRS DL
Signaling TBF Release due to N3105 Overflow ...................... 90
Figure 86 – Measurement Point of Number of EGPRS DL TBF
Release due to other Reasons ............................................ 91
Figure 87 – Measurement Point of Number of EGPRS DL TBF
Forcing Release by Control Plane ........................................ 91
Figure 88 - Measurement Point of Number of Number of EGPRS
DL TBF Release due to Instance Suspension ......................... 92
Figure 89 – Measurement Point on Number of GPRS UL TBF
Reestablishments in Released State (1) ............................... 93
Figure 90 - Measurement Point on Number of GPRS UL TBF
Reestablishments in Released State (2) ............................... 93
Figure 91 - Measurement Point of GPRS UL TBF Establishments
with Existing UL Resource .................................................. 94
Figure 92 – Measurement Point of Number of Requests for
Establishing UL GPRS TBF on PACCH ................................... 95
Figure 93 – Measurement Point on Number of EGPRS UL TBF
Reestablishments in Released State (1) ............................... 96
Figure 94 - Measurement Point on Number of EGPRS UL TBF
Reestablishments in Released State (2) ............................... 96
Figure 95 - Measurement Point of EGPRS UL TBF Establishments
with Existing UL Resource .................................................. 97
Figure 96 – Measurement Point of Number of Requests for
Establishing UL EGPRS TBF on PACCH ................................. 97
Figure 97 – Measurement Point of Number of EGPRS UL TBF
Establishment Requests on CCCH/PCCCH............................. 98
Figure 98 - Measurement Point of Number of GPRS UL TBF
Establishment Requests on CCCH/PCCCH............................. 99
Figure 99 – Radio Access Flow.......................................... 131
Figure 100 – Immediate Assignment Flow .......................... 133
Figure 101 – Internal Handover Flow (Intra-Cell Handover) .. 135
Figure 102 – External Handover Flow ................................ 135
Figure 103 – Immediate Assignment Flow .......................... 137
Figure 104 – Immediate Assignment Occupation Failure Flow 1
................................................................................... 138
Figure 105 – Internal Handover Flow (Intra-Cell Handover, TC Is
Internal) ....................................................................... 139

Confidential and Proprietary Information of ZTE CORPORATION 263


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

Figure 106 – Internal Handover Flow (Intra-Cell Handover,


Channel Type Changed, TC is External) ............................. 140
Figure 107 – External Handover Flow (TC is Internal) .......... 140
Figure 108 – External Handover Flow (TC Is External) ......... 141
Figure 109 – Intra-BSC Handover Occupation Failure Flow ... 141
Figure 110 – Inter-BSC Handover Occupation Failure Flow ... 142
Figure 111 – Immediate Assignment Allocation Failure Flow 2143
Figure 112 – Internal Handover Failure Flow 1 (Intra-Cell
Handover, TC is Internal) ................................................ 144
Figure 113 – External Handover Failure Flow 2 (TC Is Internal)
................................................................................... 144
Figure 114 – Immediate Assignment Failure Flow 3 ............. 145
Figure 115 – Common Assignment Flow (TC Is Internal) ...... 146
Figure 116 – Common Assignment Flow (TC Is External)...... 147
Figure 117 – Common Assignment Failure Flow 1 (TC Is Internal)
................................................................................... 148
Figure 118 – Common Assignment Failure Flow 1 (TC Is Internal)
................................................................................... 150
Figure 119 – Common Assignment Failure Flow 4 (TC Is Internal)
................................................................................... 153
Figure 120 – Idle-State MO Short Message Flow ................. 165
Figure 121 – Idle-State MT Short Message Flow .................. 166
Figure 122 – Call Drop due to T3107 Timeout during Intra-Cell
Handover ...................................................................... 167
Figure 123 – Call Drop due to T3103 Timeout during Inter-Cell
Handover ...................................................................... 168
Figure 124 – Handover Decision ....................................... 177
Figure 125 – BSC-Controlled Inter-Cell Outgoing Handover
Execution ...................................................................... 182
Figure 126 – BSC-Controlled Inter-Cell Outgoing Handover
Success ........................................................................ 183
Figure 127 – MSC-Controlled Outgoing Handover Execution.. 183
Figure 128 – MSC-Controlled Outgoing Handover Success .... 184
Figure 129 – BSC-Controlled Inter-Cell Incoming Handover
Execution ...................................................................... 185
Figure 130 – BSC-Controlled Inter-Cell Incoming Handover
Success ........................................................................ 185
Figure 131 – MSC-Controlled Incoming Handover Execution . 186
Figure 132 – Forced Release Execution .............................. 187
Figure 133 – Queuing Execution ....................................... 187

264 Confidential and Proprietary Information of ZTE CORPORATION


Appendix B - Figures

Figure 134 – MSC-Controlled Incoming Handover Success .... 188


Figure 135 – Intra-Cell Handover Execution ....................... 195
Figure 136 – Intra-Cell Handover Success .......................... 195
Figure 137 – Reporting Measurement Data......................... 196
Figure 138 – Common Assignment Flow 3 (TC is Internal) .... 204
Figure 139 – Measurement Point of Number of Abis Interface
Messages Sent to BTS from BSC ....................................... 211
Figure 140 – Internal Handover Failure Flow 2 (Intra-Cell
Handover, TC Is Internal) ................................................ 213
Figure 141 – External Handover Failure Flow 3 (TC Is Internal)
................................................................................... 213
Figure 142 – Forced Release Execution .............................. 239
Figure 143 – Queuing Execution ....................................... 239
Figure 144 – Forced Handover Execution ........................... 240
Figure 145 – Call Drop due to Inter-BSC Handover Failure.... 242
Figure 146 - Call drops caused by radio link failure during
assignment.................................................................... 254

Confidential and Proprietary Information of ZTE CORPORATION 265


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

This page is intentionally blank.

266 Confidential and Proprietary Information of ZTE CORPORATION


Tables

Table 1 – Manual Summary ..................................................i


Table 2 - Typographical Conventions .................................... iii
Table 3 - Mouse Operation Conventions ................................ iv
Table 4 – Usage Explanation of the Hazardous Substances in
ZXG10 iBSC (V6.20) ........................................................... v
Table 5 – PS Basic Measurement (BSC) Counters ....................1
Table 6 - PS Basic Measurement (Cell) Counters .....................3
Table 7 – CPU Load Measurement Counters........................ 119
Table 8 – CS Basic Measurement Counters ......................... 121

Confidential and Proprietary Information of ZTE CORPORATION 267


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

This page is intentionally blank.

268 Confidential and Proprietary Information of ZTE CORPORATION


Index

C900030001 ........................1 C900040049 ...................... 34


C900030002 ........................2 C900040050 ...................... 35
C900040001 ...................... 12 C900040051 ...................... 35
C900040002 ...................... 13 C900040052 ...................... 36
C900040003 ...................... 14 C900040053 ...................... 37
C900040004 ...................... 15 C900040054 ...................... 37
C900040005 ...................... 15 C900040055 ...................... 38
C900040006 ...................... 16 C900040056 ...................... 38
C900040007 ...................... 16 C900040057 ...................... 39
C900040008 ...................... 17 C900040058 ...................... 39
C900040009 ...................... 17 C900040059 ...................... 40
C900040010 ...................... 17 C900040060 ...................... 40
C900040011 ...................... 18 C900040061 ...................... 41
C900040012 ...................... 19 C900040062 ...................... 42
C900040013 ...................... 19 C900040063 ...................... 42
C900040014 ...................... 20 C900040064 ...................... 43
C900040015 ...................... 20 C900040065 ...................... 44
C900040016 ...................... 21 C900040066 ...................... 44
C900040017 ...................... 21 C900040067 ...................... 45
C900040018 ...................... 21 C900040068 ...................... 45
C900040019 ...................... 21 C900040069 ...................... 46
C900040020 ...................... 22 C900040070 ...................... 46
C900040021 ...................... 22 C900040071 ...................... 47
C900040022 ...................... 23 C900040072 ...................... 48
C900040023 ...................... 24 C900040073 ...................... 48
C900040024 ...................... 24 C900040074 ...................... 49
C900040025 ...................... 24 C900040075 ...................... 50
C900040026 ...................... 26 C900040076 ...................... 50
C900040027 ...................... 27 C900040077 ...................... 51
C900040028 ...................... 27 C900040078 ...................... 51
C900040029 ...................... 27 C900040079 ...................... 52
C900040030 ...................... 28 C900040080 ...................... 52
C900040031 ...................... 28 C900040081 ...................... 53
C900040032 ...................... 28 C900040082 ...................... 53
C900040033 ...................... 29 C900040083 ...................... 54
C900040034 ...................... 29 C900040084 ...................... 54
C900040035 ...................... 29 C900040085 ...................... 54
C900040036 ...................... 30 C900040086 ...................... 55
C900040037 ...................... 30 C900040087 ...................... 55
C900040038 ...................... 30 C900040088 ...................... 56
C900040039 ...................... 31 C900040089 ...................... 56
C900040040 ...................... 31 C900040090 ...................... 56
C900040041 ...................... 31 C900040091 ...................... 57
C900040042 ...................... 32 C900040092 ...................... 57
C900040043 ...................... 32 C900040093 ...................... 58
C900040044 ...................... 32 C900040094 ...................... 58
C900040045 ...................... 33 C900040095 ...................... 59
C900040046 ...................... 33 C900040096 ...................... 59
C900040047 ...................... 33 C900040097 ...................... 59
C900040048 ...................... 34 C900040098 ...................... 60

Confidential and Proprietary Information of ZTE CORPORATION 269


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900040099 ...................... 60 C900040159....................... 92


C900040100 ...................... 60 C900040160....................... 94
C900040101 ...................... 61 C900040161....................... 94
C900040102 ...................... 61 C900040162....................... 95
C900040103 ...................... 62 C900040163....................... 95
C900040104 ...................... 62 C900040164....................... 96
C900040105 ...................... 62 C900040165....................... 97
C900040106 ...................... 63 C900040166....................... 97
C900040107 ...................... 63 C900040167....................... 98
C900040108 ...................... 63 C900040168....................... 98
C900040109 ...................... 64 C900040169....................... 99
C900040110 ...................... 65 C900040170....................... 99
C900040111 ...................... 65 C900040171....................... 99
C900040112 ...................... 66 C900040172..................... 100
C900040113 ...................... 67 C900040173..................... 100
C900040114 ...................... 67 C900040174..................... 100
C900040115 ...................... 68 C900040175..................... 101
C900040116 ...................... 68 C900040176..................... 101
C900040117 ...................... 69 C900040177..................... 101
C900040118 ...................... 69 C900040178..................... 102
C900040119 ...................... 70 C900040179..................... 102
C900040120 ...................... 70 C900040180..................... 102
C900040121 ...................... 71 C900040181..................... 103
C900040122 ...................... 72 C900040182..................... 103
C900040123 ...................... 72 C900040183..................... 103
C900040124 ...................... 73 C900040184..................... 104
C900040125 ...................... 73 C900040185..................... 104
C900040126 ...................... 74 C900040186..................... 104
C900040127 ...................... 74 C900040187..................... 105
C900040128 ...................... 75 C900040188..................... 105
C900040129 ...................... 75 C900040189..................... 105
C900040130 ...................... 76 C900040190..................... 106
C900040131 ...................... 76 C900040191..................... 106
C900040132 ...................... 77 C900040192..................... 107
C900040133 ...................... 77 C900040193..................... 107
C900040134 ...................... 78 C900040194..................... 107
C900040135 ...................... 78 C900040195..................... 108
C900040136 ...................... 78 C900040196..................... 108
C900040137 ...................... 79 C900040197..................... 108
C900040138 ...................... 79 C900040198..................... 109
C900040139 ...................... 79 C900040199..................... 109
C900040140 ...................... 80 C900040200..................... 109
C900040141 ...................... 80 C900040201..................... 110
C900040142 ...................... 81 C900040202..................... 110
C900040143 ...................... 82 C900040203..................... 110
C900040144 ...................... 82 C900040204..................... 111
C900040145 ...................... 83 C900040205..................... 111
C900040146 ...................... 84 C900040206..................... 111
C900040147 ...................... 85 C900040207..................... 112
C900040148 ...................... 85 C900040208..................... 112
C900040149 ...................... 86 C900040209..................... 112
C900040150 ...................... 87 C900040210..................... 113
C900040151 ...................... 88 C900040211..................... 113
C900040152 ...................... 88 C900040212..................... 113
C900040153 ...................... 89 C900040213..................... 114
C900040154 ...................... 89 C900040214..................... 114
C900040155 ...................... 90 C900040215..................... 114
C900040156 ...................... 91 C900040216..................... 115
C900040157 ...................... 91 C900040217..................... 115
C900040158 ...................... 92 C900040218..................... 115

270 Confidential and Proprietary Information of ZTE CORPORATION


Index

C900040219 .................... 116 C900060052 .................... 166


C900040220 .................... 116 C900060053 .................... 168
C900040221 .................... 116 C900060054 .................... 168
C900040222 .................... 117 C900060055 .................... 169
C900040223 .................... 117 C900060056 .................... 169
C900040224 .................... 117 C900060057 .................... 169
C900040225 .................... 118 C900060058 .................... 170
C900050001 .................... 119 C900060059 .................... 170
C900050002 .................... 120 C900060060 .................... 170
C900060001 .................... 131 C900060061 .................... 171
C900060002 .................... 131 C900060062 .................... 171
C900060003 .................... 132 C900060063 .................... 171
C900060004 .................... 133 C900060064 .................... 171
C900060005 .................... 133 C900060065 .................... 172
C900060006 .................... 134 C900060066 .................... 172
C900060007 .................... 135 C900060067 .................... 172
C900060008 .................... 136 C900060068 .................... 173
C900060009 .................... 136 C900060069 .................... 173
C900060010 .................... 137 C900060070 .................... 173
C900060011 .................... 138 C900060071 .................... 174
C900060012 .................... 138 C900060072 .................... 174
C900060013 .................... 141 C900060073 .................... 174
C900060014 .................... 142 C900060074 .................... 174
C900060015 .................... 142 C900060075 .................... 175
C900060016 .................... 143 C900060076 .................... 175
C900060017 .................... 144 C900060077 .................... 175
C900060018 .................... 145 C900060078 .................... 176
C900060019 .................... 145 C900060079 .................... 176
C900060020 .................... 147 C900060080 .................... 176
C900060021 .................... 148 C900060081 .................... 177
C900060022 .................... 149 C900060082 .................... 177
C900060023 .................... 149 C900060083 .................... 177
C900060024 .................... 149 C900060084 .................... 178
C900060025 .................... 150 C900060085 .................... 178
C900060026 .................... 151 C900060086 .................... 178
C900060027 .................... 151 C900060087 .................... 179
C900060028 .................... 152 C900060088 .................... 179
C900060029 .................... 152 C900060089 .................... 180
C900060030 .................... 153 C900060090 .................... 180
C900060031 .................... 154 C900060091 .................... 180
C900060032 .................... 154 C900060092 .................... 181
C900060033 .................... 155 C900060093 .................... 181
C900060034 .................... 155 C900060094 .................... 182
C900060035 .................... 156 C900060095 .................... 183
C900060036 .................... 156 C900060096 .................... 184
C900060037 .................... 157 C900060097 .................... 184
C900060038 .................... 157 C900060098 .................... 185
C900060039 .................... 158 C900060099 .................... 185
C900060040 .................... 158 C900060100 .................... 186
C900060041 .................... 159 C900060101 .................... 187
C900060042 .................... 159 C900060102 .................... 187
C900060043 .................... 160 C900060103 .................... 188
C900060044 .................... 160 C900060104 .................... 188
C900060045 .................... 161 C900060105 .................... 189
C900060046 .................... 162 C900060106 .................... 189
C900060047 .................... 162 C900060107 .................... 190
C900060048 .................... 163 C900060108 .................... 190
C900060049 .................... 164 C900060109 .................... 190
C900060050 .................... 164 C900060110 .................... 191
C900060051 .................... 165 C900060111 .................... 191

Confidential and Proprietary Information of ZTE CORPORATION 271


ZXG10 iBSC (V6.20) Base Station Controller Performance Counter Manual- Volume I

C900060112 .....................192 C900060172..................... 220


C900060113 .....................192 C900060173..................... 220
C900060114 .....................192 C900060174..................... 220
C900060115 .....................193 C900060175..................... 221
C900060116 .....................193 C900060176..................... 221
C900060117 .....................194 C900060177..................... 222
C900060118 .....................194 C900060178..................... 222
C900060119 .....................194 C900060179..................... 223
C900060120 .....................195 C900060180..................... 223
C900060121 .....................196 C900060181..................... 224
C900060122 .....................197 C900060182..................... 224
C900060123 .....................197 C900060183..................... 225
C900060124 .....................197 C900060184..................... 225
C900060125 .....................198 C900060185..................... 226
C900060126 .....................198 C900060186..................... 226
C900060127 .....................199 C900060187..................... 226
C900060128 .....................199 C900060188..................... 227
C900060129 .....................200 C900060189..................... 227
C900060130 .....................201 C900060190..................... 228
C900060131 .....................201 C900060191..................... 228
C900060132 .....................201 C900060192..................... 229
C900060133 .....................202 C900060193..................... 229
C900060134 .....................202 C900060194..................... 230
C900060135 .....................202 C900060195..................... 230
C900060136 .....................203 C900060196..................... 231
C900060137 .....................203 C900060197..................... 231
C900060138 .....................203 C900060198..................... 232
C900060139 .....................204 C900060199..................... 232
C900060140 .....................204 C900060200..................... 232
C900060141 .....................205 C900060201..................... 233
C900060142 .....................205 C900060202..................... 233
C900060143 .....................206 C900060203..................... 234
C900060144 .....................206 C900060204..................... 234
C900060145 .....................207 C900060205..................... 235
C900060146 .....................207 C900060206..................... 235
C900060147 .....................208 C900060207..................... 236
C900060148 .....................208 C900060208..................... 236
C900060149 .....................209 C900060209..................... 236
C900060150 .....................209 C900060210..................... 237
C900060151 .....................209 C900060211..................... 237
C900060152 .....................210 C900060212..................... 238
C900060153 .....................211 C900060213..................... 238
C900060154 .....................211 C900060214..................... 239
C900060155 .....................211 C900060215..................... 240
C900060156 .....................212 C900060216..................... 240
C900060157 .....................212 C900060217..................... 241
C900060158 .....................213 C900060218..................... 241
C900060159 .....................214 C900060219..................... 241
C900060160 .....................214 C900060220..................... 242
C900060161 .....................215 C900060221..................... 243
C900060162 .....................215 C900060222..................... 244
C900060163 .....................215 C900060223..................... 244
C900060164 .....................216 C900060224..................... 245
C900060165 .....................216 C900060225..................... 245
C900060166 .....................217 C900060226..................... 246
C900060167 .....................217 C900060227..................... 246
C900060168 .....................218 C900060228..................... 246
C900060169 .....................218 C900060229..................... 247
C900060170 .....................219 C900060230..................... 247
C900060171 .....................219 C900060231..................... 248

272 Confidential and Proprietary Information of ZTE CORPORATION


Index

C900060232 .................... 248 C900060239 .................... 251


C900060233 .................... 248 C900060240 .................... 251
C900060234 .................... 249 C900060241 .................... 252
C900060235 .................... 249 C900060242 .................... 252
C900060236 .................... 250 C900060243 .................... 253
C900060237 .................... 250 C900060244 .................... 253
C900060238 .................... 250 C900060245 .................... 254

Confidential and Proprietary Information of ZTE CORPORATION 273

Das könnte Ihnen auch gefallen