Sie sind auf Seite 1von 1

MATERIALES PARA LAS ESTRUCTURAS EN CONCRETO

CUBIERTA
CUBIERTA EL
PUERTO
MATERIAL UNIDAD LIBANO TOTAL
CARREÑO
CANTIDAD CANTIDAD
CEMENTO BULTO 794 794 1588
ARENA M3 65 65 130
TRITURADO M3 92 92 184
PIEDRA M3 21 21 42
VARILLA 3/8" (6m) UND 52 52 104
VARILLA 1/2" (6m) UND 96 96 192
VARILLA 5/8" (6m) UND 288 288 576
VARILLA 3/4" (6m) UND 216 216 432
FLEJE EN S (1,35m) UND 112 112 224
FLEJE 30 x 20 (3/8") UND 354 354 708
FLEJES 50 x 50 (3/8") UND 32 32 64
FLEJES 50 x 51 (3/8") UND 8 8 16
FLEJES 50 x 52 (3/8") UND 8 8 16
FLEJES 50 x 53 (3/8") UND 8 8 16
FLEJES 50 x 54 (3/8") UND 8 8 16
FLEJES 50 x 55 (3/8") UND 8 8 16
FLEJES 50 x 56 (3/8") UND 8 8 16
FLEJES 50 x (59 - 97 ) UND 160 160 320
FLEJES 50 x (1,0 - 1,1 ) UND 80 80 160
FLEJE EN C (0.50m) UND 1440 1440 2880
FLEJE EN C (0.50m) UND 32 32 64
FLEJE EN C (0.50-0.57) UND 48 48 96
FLEJE EN C (0.59-0.97) UND 200 200 400
FLEJE EN C (1.0-1.1) UND 80 80 160
FLEJE 20 x 50 (3/8") UND 258 258 516
ANGULO 3" x 1/4" UND 64 64 128
ANGULO 2" x 3/16" UND 19 19 38
ANGULO 1 1/2" x 3/16" UND 60 60 120
ANGULO 2" x 1/4" UND 35 35 70
PLATINA 57x40x1cm UND 16 16 32
PLATINA 85x40x1cm UND 20 20 40
PERFIL PHR 30 X 8 UND 154 154 308
PINTURA ANTICORROSIVA GRIS GALON 10 10 20
PINTURA ESMALTE BLANCA GALON 7 7 14
PINTURA ESMALTE AZUL REY GALON 5 5 10
TEJA ARQUITECTONICA (6m) UND 132 132 264
CABALLETE ARQUITECTONICO(3m) UND 12 12 24

Das könnte Ihnen auch gefallen