TS&L Tasks Preliminary Plan Tasks

Preliminary Data Collection Preliminary Data Collection


l Project Prospectus l Wetland and Shoreland Permit Plans

l Location Map l Final Line and Grade

l Assign Bridge Number l ROW Purchase Plans

l Develop Scope of Work l Draft POW and TCP

l Submit Environmental Green Sheet l Preliminary Geotechnical Report

l Boring Request

l Traffic Forecast

l Paint Condition Evaluation

l Bridge Deck Evaluation

l Accident Study Request

l Survey Request

l Pavement Evaluation Request

l Utility Verification Request

l ITS Initial Review Request

l ROW Abstract Request

l Final Hydraulic Study

l Grades & Alignments

Plan & Elevation Drawing(s) Front Sheet Plan


l Proposed Alignment and Stations l Project Titles

l Alignment Data l Location Map

l Roadway Width l Approval Signature Box

l Intersection Stations & Angles l Traffic Data

l Span Lengths l Project Layout with bridge number

l Angles between Bents & Centerline

l Existing Structures

l Right-of-Way lines

l Detours / Temporary Diversion

l Utilities Preliminary General Plan and Elevation


l North Arrow l Design Loads, Materials and Specifications

l Bridge Width Dimensions l Hydraulic Data

l Contours l Summary of Prelim. Bridge Quantities Table

l Design Loads, Materials & Spec. l Bridge General Plan

l Type of Bridge Rail m


Oriented with over-road upstation to the
l Expansion & Fixed joints right and centerline at horizontal, if possib
l Typical Bridge Section m Proposed Alignment and Stations
l Existing Ground Line m Alignment Data

l High Water, O.H.W., Scour Elevations m Intersection Stations and Angles

l Proposed Ground Line m Begin and End Bridge Stations & FG Ele

TS&L Tasks - Cont. m Expansion and Fixed Joints


Plan & Elevation Drawing(s) Cont. m Traffic Arrows
l End Slope & Protection m Span Lengths and Numbers
l Hydraulic Data m Angles between Bents and Centerline
l Grade Lines m Proposed Utilities
l Typical Bent Section Preliminary Plan Tasks Cont.
l Roadway Clearances Prelim. General Plan and Elevation Cont.
l
Railroad Final and Construction Clearance m Right-of-way Lines

l Guardrail Transitions m North Arrow

l Foundation Types m
Proposed Slopes and Limits of Toe of
l Datum Elevation Slopes
m Proposed Channel Protection
m Stream Name and Flow Arrow

m Proposed Drainage

m Label Point of Min. Vertical Clearance

m
Outline of Bridge, Approach Slab, Piers, a
TS&L Estimate Wingwalls
l Title Block w/ project name, number, m Working Line/ Construction Line
location, bridge number, & date m Proposed Bridge and Approach Rail
l Based on construction costs m Label Roadways

l Account for tall abutments using m Dimension Out to Out of Bridge Width

projected quantities m Dimension Rail to Rail and Coping Width

l Include contingencies m Length of approach slab

l Bridge Elevation
m Proposed Bridge Projected from Plan

TS&L Narrative Report m Proposed Channel Protection

l General Background: m OHW and 100 yr Flood Call-out w/ Elev

m Project Development & justification m Proposed Bridge and Approach Rail

m Right-of- way restrictions

m Permits and restrictions

m Utility conflicts or restrictions

m Railroad Clearances & restrictions

l Geometry and Layout: Preliminary Site Plan and Profile


m Roadway Width, ADT, Grades & l
Profiles of upper and lower roadways or railroad
Alignment (exceptions as
necessary) l
Typical approach cross sections for upper and/or low
m Sidewalks, bridge rails & roadways and channel
protective screening m Excavation and Fill Limits
l Hydraulics: m Item numbers

m Waterway openings, High water & m Elevations

Scour elevations, and Clearances


m Embankment or bent protection l Bridge Site Plan
m Floodway information, when m
Oriented with over road upstation to the
appropriate right and centerline at horizontal, if possib
m Deck not shown. Show channel or roadw
l Foundations:
below deck
m Piling, drilled shafts, spread m
Outline of Proposed Substructures,
footings Footings, Approach Slab, Wingwalls
m Fills, surcharges m Outline of Existing Bridge
mSettlement m Proposed Alignment and Stations
m Lateral Earth, Seismic loads m Alignment Data
m Liquefaction Potential m Intersection Stations and Angles

l Structure Features (discussion items): m Begin and End Bridge Stations & FG Ele

m Span length & span arrangements m Expansion and Fixed Joints

TS&L Tasks - Cont. m Traffic Arrows


TS&L Narrative Report Cont. m Angles between Bents and Centerline
m Type of superstructure m Proposed Utilities
m Type of bents & location m Right-of-way Lines/ Easements

m Alternate structure types m North Arrow

considered and estimated costs m Proposed Slopes

m Phase construction & detour m Proposed Channel Protection

requirements. m Stream Name and Flow Arrow

l Design Concepts (decision/ Preliminary Plan Tasks Cont.


assumptions): Prelim. Site Plan and Profile Cont.
m Building a new bridge vs. widening m
O.H.W., T.O.B., Shoreland, and 500 yr.
existing one Scour Line
m Use a bridge vs. culvert m Proposed Drainage
m Foundation support assumptions m Existing Detail

m Assumed foundation m Existing Contours

bearing capacity loads m Detour bridge/ Temporary Diversion

m Seismic load assumptions m Proposed Approach Rail

l Environmental Assessment m Limits of all toe of slopes

Considerations (applies to many


bridge replacements): l Bridge Profile
m Project timing and chronology m Grade/ Vertical Curvature/ Profile Grade

m In-Water Work Period m


Profile of Bridge, Substructures and
m Environmental concerns Approach Slabs
m Invasive species m Approximate Existing Ground Line
m Alignment and size of the new m Approximate Existing Bottom of Channel
bridge in relation to the existing m Datum Elevation Line

(e.g., no. of spans, length) m


Slopes of embankments, type and thickn
m Type of new deck and construction of slope protection
methods m Berm location. elevation and width
m Proposed treatment of the runoff m Finished and Existing Grade Elevations
m Number & sizes of bents/footings m Railroad/ Cross Road

added for new bridge w/in OHWM m High Water, O.H.W., Scour Elevations

and the wetted channel. Discuss m Minimum Vertical Clearances

construction of new footings, bents m


Bottom of Footing, Piles, and/or Drilled
& piles. m Shafts Elevations
m Type of water diversion methods m Foundation Types
used during construction m Vertical Curve Data
(e.g., cofferdam) m Track dimensions, centerline and ditches
m If a detour bridge is required, railroad is involved
how many bents & types of m
Length of each span measured along pro
grade line
Length of each span measured along pro
temporary supports that may be grade line
within the OHWM and wetted m Expansion and Fixed Bearing Locations
channel. Discuss the construction m
Begin, End and Pier Bridge Stations & FG
& removal methods that might be Elevations
used.
m Extent and duration of in-water

work (e.g., heavy machinery in


wetted channel)
m Amount or extent of fill or rip-rap

Preliminary Boring Log


l Boring Logs

m Label Bottom of Footing and Water Level

l Boring Notes

l Boring Layout Plan and Locations

m Proposed Alignment and Stations

m Alignment Data

m North Arrow

m Outline of Existing Bridge

m Existing Detail

m
Outline of Proposed Bridge Substructure
Footings and Wingwalls
m Boring Location Symbols and Label

Abutment and Pier Developed View


l Developed abutment, wingwalls, and

pier elevations and sections


Preliminary Plan Tasks - Cont.
Abut. and Pier Developed View Cont.
m Proposed Ground

m Existing Ground

m Outline of new and existing substructures

m Excavation and Backfill Limits

m Elevations

m Structural Fill
m Wingwall Lengths
m Weepers
m Section of each substructure

m Footing dimensions

m Phase Construction Location

m Working Line/ Construction Line Location

m Piles/ Drilled Shafts

m Existing and Proposed Utilities

Deck Section (Looking Up station)


m Bridge, lane, shoulder, and curb width

m Cross Slope in Percent

m Superelevation Rate

m Centerline of Construction/ Working Line

m Proposed Bridge Rail

m Limits of Sealer

m Conduits/ Utilities on Bridges

m Girder Type, Number and Spacing

m Closure Pour

m Phase Construction

m Temporary Barrier Locations

m Overlay Type and Depth

m Deck Depth

m Curb Reveal

m Outside Curb Depth

m Item Numbers

Preliminary Estimate
l Title Block w/ project name, number,

location, bridge number, & date


l Based on preliminary quantities

and construction costs


l Include contingencies
Final Plan Tasks
Final Plan Data Collection
and Shoreland Permit Plans l Wetland and Shoreland Permits

e and Grade l Special Provisions

chase Plans l PS&E Checklist

l Supplemental Specification

ry Geotechnical Report l Final ROW Purchase Plans

l Final POW and TCP

l EPA-NPDES Requirements

l Supplemental Project Information Sheet

l Director's Data Sheet

l EPA ID Number (for painting)

l Utilities Certificate

l ROW Certificate

l Scour Analysis Report

l Fill out Bridge Flat Card

l Fill out Bridge Particulars on Data Base

Front Sheet Plan


l Project Titles

l Location Map

Signature Box l Approval Signature Box

l Signatures of FHWA, Front Office Obtained

ayout with bridge number l PE Stamp and Signature

l Traffic Data

l Project Layout with bridge number

al Plan and Elevation General Plan and Elevation


oads, Materials and Specifications l Summary of Bridge Quantities Table

l Hydraulic Data

of Prelim. Bridge Quantities Table


eneral Plan l Bridge General Plan
Oriented with over-road upstation to the m
Oriented with over road upstation to the right
right and centerline at horizontal, if possible and centerline at horizontal, if possible
Proposed Alignment and Stations m Proposed Alignment and Stations
Alignment Data m Alignment Data

Intersection Stations and Angles m Intersection Stations and & Angles

Begin and End Bridge Stations & FG Elev m Begin and End Bridge Stations & FG Elev

Expansion and Fixed Joints m Expansion and Fixed Joints


Traffic Arrows m Traffic Arrows
Span Lengths and Numbers
Angles between Bents and Centerline
Proposed Utilities
n Tasks Cont. Final Plan Tasks Cont.
an and Elevation Cont. General Plan and Elevation Cont.
Right-of-way Lines m Span Lengths

North Arrow m Angles between Bents and Centerline

m Proposed Utilities
Proposed Slopes and Limits of Toe of
Slopes m Right-of-way Lines

Proposed Channel Protection m North Arrow

Stream Name and Flow Arrow m


Proposed Slopes and Limits of Toe of Slopes
Proposed Drainage
Label Point of Min. Vertical Clearance m Proposed Channel Protection
m Stream Name and Flow Arrow
Outline of Bridge, Approach Slab, Piers, and
Wingwalls m Proposed Drainage

Working Line/ Construction Line m Label Point of Min. Vertical Clearance

Proposed Bridge and Approach Rail m


Outline of Bridge, Approach Slab, Piers, and
Label Roadways Wingwalls
Dimension Out to Out of Bridge Width m Working Line/ Construction Line
Dimension Rail to Rail and Coping Width m Proposed Bridge and Approach Rail
Length of approach slab m Label Roadways

m Dimension Out to Out of Bridge Width

m Dimension Rail to Rail and Coping Width

Proposed Bridge Projected from Plan m Length of approach slab

Proposed Channel Protection


OHW and 100 yr Flood Call-out w/ Elev l Bridge Elevation
Proposed Bridge and Approach Rail m Proposed Bridge Projected from Plan

m Proposed Channel Protection

m OHW and 100 yr Flood Call-out w/ Elev

m Proposed Bridge and Approach Rail

lan and Profile Project Notes


l Project Note Sheet
f upper and lower roadways or railroad

pproach cross sections for upper and/or lower Site Plan and Profile
and channel l
Profiles of upper and lower roadways or railroad
Excavation and Fill Limits
Item numbers
Elevations l Bridge Site Plan

m
Oriented with over road upstation to the right
and centerline at horizontal, if possible
m Deck not shown. Show channel or roadway
Oriented with over road upstation to the below deck
right and centerline at horizontal, if possible m
Outline of Proposed Substructures, Footings,
Deck not shown. Show channel or roadway Approach Slab, Wingwalls
below deck
Outline of Proposed Substructures, m Outline of Existing Bridge
Footings, Approach Slab, Wingwalls m Proposed Alignment and Stations

Outline of Existing Bridge m Alignment Data


Proposed Alignment and Stations m Intersection Stations and & Angles
Alignment Data m Begin and End Bridge Stations & FG Elev
Intersection Stations and Angles m Expansion and Fixed Joints

Begin and End Bridge Stations & FG Elev m Traffic Arrows

Expansion and Fixed Joints m Angles between Bents and Centerline

Traffic Arrows m Proposed Utilities


Angles between Bents and Centerline m Right-of-way Lines/ Easements
Proposed Utilities m North Arrow
Right-of-way Lines/ Easements m Proposed Slopes

North Arrow m Proposed Channel Protection

Proposed Slopes m Stream Name and Flow Arrow

Proposed Channel Protection


Stream Name and Flow Arrow
n Tasks Cont. Final Plan Tasks Cont.
nd Profile Cont. Site Plan and Profile Cont.
O.H.W., T.O.B., Shoreland, and 500 yr. m
O.H.W., T.O.B., Shoreland, and 500 yr. Scour
Scour Line Line
Proposed Drainage m Proposed Drainage
Existing Detail m Existing Detail

Existing Contours m Existing Contours

Detour bridge/ Temporary Diversion m Detour bridge/ Temporary Diversion

Proposed Approach Rail m Proposed Approach Rail

Limits of all toe of slopes m Limits of all toe of slopes

l Bridge Profile
Grade/ Vertical Curvature/ Profile Grade m Grade/ Vertical Curvature/ Profile Grade

Profile of Bridge, Substructures and m


Profile of Bridge, Substructures and Approach
Approach Slabs Slabs
Approximate Existing Ground Line m Approximate Existing Ground Line
Approximate Existing Bottom of Channel m Approximate Existing Bottom of Channel
Datum Elevation Line m Datum Elevation Line

Slopes of embankments, type and thickness m


Slopes of embankments, type and thickness
of slope protection of slope protection
Berm location. elevation and width m Berm location. elevation and width
Finished and Existing Grade Elevations m Finished and Existing Grade Elevations
Railroad/ Cross Road m Railroad/ Cross Road

High Water, O.H.W., Scour Elevations m High Water, O.H.W., Scour Elevations

Minimum Vertical Clearances m Minimum Vertical Clearances

Bottom of Footing, Piles, and/or Drilled m


Bottom of Footing, Piles, and/or Drilled Shafts
Shafts Elevations m Elevations
Foundation Types m Foundation Types
Vertical Curve Data m Vertical Curve Data
Track dimensions, centerline and ditches if m Track dimensions, centerline and ditches if
railroad is involved railroad is involved
Length of each span measured along profile m
Length of each span measured along profile
grade line grade line
Length of each span measured along profile Length of each span measured along profile
grade line grade line
Expansion and Fixed Bearing Locations
Begin, End and Pier Bridge Stations & FG
Elevations Channel Sections and Survey Layout
l
Typical approach cross sections for upper and/or lower
roadways and channel
m Excavation and Fill Limits
m Item numbers

m Elevations

l Survey Layout
m Working Points Labeled

m Working Points Coordinates Table

m Dimension WP to WP

m Angle of Crossing

m North Arrow

m CL Construction

m Expansion and Fixed Bearing Locations

Boring Log
l Boring Logs

Label Bottom of Footing and Water Level m Label Bottom of Footing and Water Level

l Boring Notes

yout Plan and Locations l Boring Layout Plan and Locations

Proposed Alignment and Stations m Proposed Alignment and Stations

Alignment Data
North Arrow
Outline of Existing Bridge
Existing Detail
Outline of Proposed Bridge Substructures,
Footings and Wingwalls
Boring Location Symbols and Label

r Developed View
d abutment, wingwalls, and
ations and sections
n Tasks - Cont. Final Plan Tasks - Cont.
veloped View Cont. Boring Log Cont.
Proposed Ground m
Detour bridge/ Temporary Diversion Alignment
Existing Ground
Outline of new and existing substructures m North Arrow
Excavation and Backfill Limits m Outline of Existing Bridge Substructure
Elevations m Existing Detail

Structural Fill m
Outline of Proposed Bridge Substructures,
Footings and Wingwalls
Outline of Proposed Bridge Substructures,
Wingwall Lengths Footings and Wingwalls
m Boring Location Symbols and Label
Section of each substructure
Footing dimensions Footing Masonry
Phase Construction Location m North Arrow
Working Line/ Construction Line Location m Outline of Footing, Abutment and Wingwalls
Piles/ Drilled Shafts m Working Line and CL Construction Line

Existing and Proposed Utilities m Working Points Labeled

m Angle of Crossing

m
All dimensions and angles required to
king Up station) construct the abutment and wingwalls tied to
Bridge, lane, shoulder, and curb width the centerline of bearings and working line
Cross Slope in Percent m Section Location Labels
Superelevation Rate m Sections of Abutment and Wingwalls
Centerline of Construction/ Working Line m Elevations Top and Bottom of Footing

Proposed Bridge Rail m Slope of Wingwall Batter

Limits of Sealer m Footing Steps

Conduits/ Utilities on Bridges m Construction Joints for Phase Construction

Girder Type, Number and Spacing m Piles/ Drilled Shafts

Closure Pour m
Tie the pile spacing to the intersection of the
Phase Construction centerline of bearings and working line
Temporary Barrier Locations m
Show pile batter and location of battered piles
Overlay Type and Depth
Deck Depth
Curb Reveal
Outside Curb Depth Footing Reinforcement
Item Numbers m North Arrow

m Outline of Footing, Abutment and Wingwalls

m Working Line and CL Construction Line

m Working Points Labeled

k w/ project name, number, m Angle of Crossing

bridge number, & date m Section Location Labels

preliminary quantities m Elevation of Top and Bottom of Footing

truction costs m Layout of Reinforcement Steel

ontingencies m Label and Dimension Reinforcing Steel

m Footing Steps

m Construction Joints for Phase Construction

m Identify Mechanical Connections


m Label Lap Splices
m Sections of Abutment and Wingwalls
m Dimension J-bar Height from Top of Footing

Abutment Masonry
l Plan
m North Arrow
m Outline Abutment and Partial Wingwalls
m Working Line and CL Construction Line

m Working Points Labeled

m Angle of Crossing

Final Plan Tasks - Cont.


Abutment Masonry Cont.
m
All dimensions and angles required to
construct the abutment and wingwalls tied to
the centerline of bearings and working line
m Section Location Labels
m Outline of Beam Seats

m Label Beam Numbers

m Location of Utilities in Backwall and Sleeve

m Location of Construction Joints

m Phase Construction Location

m Location of Exp. And Contraction Joints

l Elevation
m Proposed Ground
m Existing Ground

m Outline of New and Existing Abutment

m Elevations

m Structural Fill

m Phase Construction Location

m Working Line/ Construction Line Location

m Piles/ Drilled Shafts

m Existing and Proposed Utilities

m Weepers

m Architectural Treatment

m Location of Construction Joints

m Location of Exp. And Contraction Joints

m Section Location Labels

m Outline of Beam Seats

m Location of Utilities in Backwall and Sleeve

m Footing Steps

m Wash requirements of bridge seat

l Section
m Proposed Ground
m Existing Ground

m Outline of New and Existing Abutment

m Elevations

m Structural Fill

m Piles/ Drilled Shafts


m Existing and Proposed Utilities
m Weepers
m Architectural Treatment

m Location of Construction Joints

m Location of Utilities in Backwall and Sleeve

m
All dimensions required to construct the
abutment
m Partial Approach Slab
m Partial Deck End Section
m Pay Limits for Excavation and Backfill

m
Channel Excavation and Protection Pay
Limits

l Architectural Treatment Details

l Abutment-Wingwall Joint Detail

l Construction Joint Detail

Final Plan Tasks - Cont.


Abutment Masonry Cont.
l Anchor Bolt Layout Detail

m Outline of pedestal

m Outline of masonry plate

m Centerline of bearings

m Centerline of beam

m
All dimensions necessary to set the anchor
bolts tied to the centerline of bearings and the
centerline of beam

Abutment Reinforcement
m North Arrow

m Outline of Abutment

m Working Line and CL Construction Line

m Working Points Labeled

m Angle of Crossing

m Section Location Labels

m Layout of Reinforcement Steel

m Label and Dimension Reinforcing Steel

m Footing Steps

m Phase Construction Locations Labeled

m Identify Mechanical Connections

m Label Lap Splices

m Sections of Abutment and Wingwalls


m
Horizontal Sections at Abutment, Backwall
and Corner Sections
m Dimension J-bar Height from Top of Footing

Wingwall Masonry
l Elevation

m Proposed Ground
m Existing Ground
m Outline of New and Existing Wingwalls

m Elevations

m Structural Fill

m Phase Construction Location

m Piles/ Drilled Shafts

m Existing and Proposed Utilities

m Weepers

m Architectural Treatment

m Location of Construction Joints

m Location of Exp. And Contraction Joints

m Section Location Labels

m Footing Steps

m Wingwall Length

m Outline of Approach Slab Behind Wingwall

l Section
m Proposed Ground
m Existing Ground

m Outline of New and Existing Wingwall

m Elevations

m Structural Fill

m Piles/ Drilled Shafts

m Existing and Proposed Utilities

Final Plan Tasks - Cont.


Wingwall Masonry Cont.
m Weepers

m Architectural Treatment

m
All dimensions required to construct the
wingwall
m Approach Slab
m Pay Limits for Excavation and Backfill

m
Channel Excavation and Protection Pay
Limits

l Architectural Treatment Details


Wingwall Reinforcement
m Outline of Wingwall

m Working Line and CL Construction Line

m Working Points Labeled

m Section Location Labels

m Layout of Reinforcement Steel

m Label and Dimension Reinforcing Steel

m Footing Steps

m Phase Construction Locations Labeled

m Identify Mechanical Connections

m Label Lap Splices

m Sections of Wingwalls

m Dimension J-bar Height from Top of Footing

Pier Masonry
l Plan

m North Arrow
m Outline Pier

m Working Line and CL Construction Line

m Working Points Labeled

m Angle of Crossing

m
All dimensions and angles required to
construct the pier tied to the centerline of
bearings and working line
m Outline of Beam Seats
m Label Beam Numbers

m Location of Construction Joints

m Phase Construction Location

l Elevation
m Proposed Ground
m Existing Ground
m Outline of New and Existing Pier

m Elevations

m Structural Fill

m Phase Construction Location

m Piles/ Drilled Shafts

m Existing and Proposed Utilities

m Architectural Treatment

m Location of Construction Joints

m Location of Exp. And Contraction Joints

m Section Location Labels

m Footing Steps
m Cofferdams
Final Plan Tasks - Cont.
Pier Masonry Cont.
m Piles/ Drilled Shafts
m Tremie Seal

m Wash requirements of bridge seat

l Section
m Proposed Ground
m Existing Ground
m Outline of New and Existing Pier

m Elevations

m Structural Fill

m Piles/ Drilled Shafts

m Existing and Proposed Utilities

m Architectural Treatment

m Cofferdams

m Piles/ Drilled Shafts

m Tremie Seal

m Vent Elevation

m Bottom of Tremie Seal Elevation

m Wash requirements of bridge seat

l Section of Pier Armor

l Anchor Bolt Layout Detail


m Outline of pedestal

m Outline of masonry plate

m Centerline of bearings

m Centerline of beam

m
All dimensions necessary to set the anchor
bolts tied to the centerline of bearings and the
centerline of beam
Pier Reinforcement
m Outline of Pier

m Working Line and CL Construction Line

m Working Points Labeled

m Section Location Labels

m Layout of Reinforcement Steel

m Label and Dimension Reinforcing Steel

m Footing Steps

m Phase Construction Locations Labeled

m Identify Mechanical Connections

m Label Lap Splices

m Section of Pier
m Dimension J-bar Height from Top of Footing

l Typical Tie Bar Detail

l Seismic Reinforcing Details

Bridge Bearings
l Bearing Assembly Plan and Sections

m Sole and masonry plate details


m
Elastomeric internal plate size and number of
elastomer layers
Indicate each bearing location and number
m req'd

Final Plan Tasks - Cont.


Bridge Bearings Cont.
m
All dimensions and angles necessary to
fabricate the steel plates tied to the centerline
of bearings and the centerline of beam
Anchor bolt size and embedment length
m

l Anchor Bolt Detail


l Bridge Bearing Notes

l Steel Keeper Assembly Detail

Superstructure Framing Plan & Details


l Framing Plan

m North Arrow
m Working Line and CL Construction Line
m Layout of Proposed Beams
m Number Beam Lines

m Angle of Crossing
m CL of Bearings
m Working Points Labeled
m
Beam spacing dimensioned and tied to CL
Construction
m K-Frame Spacing

m
Field splice location tied to centerline of
bearing station
m Bearing and Intermediate Stiffeners

m Drip Bars

m Proposed Utilities

m Proposed Utility Support Spacing

m Phase Construction Locations

l Deck Placement Sequence


l Curved girder diaphragm spacing table
Beam Details
l Girder Web Layout

l Girder Elevation & Shear Connector Layout

l Connection Plate and Bearing Stiffener Details

l Shop Splice Flange Transition Detail

l Shop Web Splice Details

l Shear Connector Detail

l Camber Table & Diagram

l Field Splice Details

l Typical K-Frame Detail

l Abutment K-Frame and Drip Bar Detail

l Pier K-Frame Detail

l Flange Width Transition Detail

Typical Deck Section & Details


l Typical Deck Section

m Overall width of structure


m Working Line and CL Construction Line
m Bridge, lane, shoulder, and curb width

m Cross Slope in Percent

m Superelevation Rate

m Proposed Bridge Rail

m Limits of Sealer

m Conduits/ Utilities on Bridge

m Girder Type, Number and Spacing

Final Plan Tasks - Cont.


Typical Deck Section & Details Cont.
m Closure Pour

m Phase Construction

m Temporary Barrier Locations

m Overlay Type and Depth

m Deck Depth

m Curb Reveal

m Outside Curb Depth

m Item Numbers

m Limits of sawcut grooving

m Overhang dimensioned

m Typical Intermediate Bay

m Typical Bay at Piers

m Typical Bay at Abutments

m Sidewalk Width and Slope

l
Table for Elevations at Bottom of Concrete Deck Slab

l Haunch Detail
l Abutment Fixed Joint Detail

Reinforcement Deck Section & Details


l Plan

m North Arrow
m Working Line and CL Construction Line
m Angle of Crossing
m CL of Bearings
m Outline of Concrete Deck
m Outline of Bridge Rail Post Base Plates
m Outline of Deck Haunch

m Layout of Reinforcement Steel

m Label and Dimension Reinforcing Steel

m Phase Construction Locations Labeled

m Identify Mechanical Connections

m Label Lap Splices

m
Section A-A taken transversely through center
of the slab
m Conduits/ Utilities on Bridge
m Utility Pull-out Boxes

l Section A-A
l Section at Abutments

Approach Slabs
l Plan

m North Arrow
m Working Line and CL Construction Line
m Angle of Crossing
m CL of Bearings
m Outline of Approach Slab and Seat
m
Length and width of approach slabs and
sleeper slabs
m Layout of Reinforcement Steel
m Label and Dimension Reinforcing Steel

m Phase Construction Locations Labeled

m Identify Mechanical Connections

m Label Lap Splices

Final Plan Tasks - Cont.


Approach Slabs Cont.
m
Section A-A taken longitudinal through the
slab
m Conduits/ Utilities on Bridge
l Section A-A
m Dimension Length, Thickness, Haunch

m Slope in Percentage

m Sleeper Slab

m Layout of Reinforcement Steel

m Label and Dimension Reinforcing Steel

l Section at Curb

Expansion Joint Details

Rail and Curb Layout

Bridge Rail

Bridge Approach Rail

Reinforcing Schedules

Final Estimate
l Title Block w/ project name, number,

location, bridge number, & date


l Based on construction cost estimate

l Final quantities in estimate are in agreement with


tabulated quantities shown on the plans.

Load Rating Summary (Form 4) and Computations


l Load Rating Summary (Form 4) Completed
l PE Stamp and Signature on Form 4
l
All load ratings shown on the Form 4 are in agreement
with the load rating computations
l
Project name and number indicated on both the load
rating computations and Form 4

Final Plan Tasks - Cont.


Calculation Books - Design
l
Analysis & Design of Bridge Structural Components

l Documentation of Work
m Hand Calculations

m Computer Output

m Detailed Notes

m Quantity Calculations