Outline
• Design criteria
– Electrical consideration

– Mechanical consideration

• Design procedure

• MEA Example

2
Design Criteria
• Environment
– Residential/Business
– Industrial
• Economic
• Engineering
– Contingency for enabling continuity of supply
– Losses should be minimized
– Quality of supply
• Voltage drop within the limit
• Frequency of system interruption

3
Design Factors
• The electrical design involves selection of voltage,
selection of insulators and conductors, voltage
control and selection of protective and control gear

• The mechanical design involves stress and sag


calculation and the design of supports and cross
arms. The supports must be strong enough to
withstand ice, wind loads acting on the supports,
conductors, insulators, cross arms, etc.
4
Operating Voltage
The higher voltage can deliver the more power on the same conductor.
P = V2/R 765 kV
2.5 GW
345 kV
138 kV
500 MW
80 MW

The Lineman’s and Cableman’s handbook


Flashover Voltage

RC-013.pdf (MEA Standard, NGK)


6
Minimum Safety Clearance (Vertical)

3002.pdf (MEA Standard)


Minimum Safety Clearance (Horizontal)

3002.pdf (MEA Standard)


Electrical Consideration
• Conductor Selection (type, size) is selected by
• Current carrying capacity
• Allowable voltage drop (Line regulation)
• Breakdown strength of the conductor
• Line voltage

• 4 types of conductor:-
• AAC – All Aluminum Conductor (MEA)
• AAAC – All Aluminum Alloy Conductor
• ACSR – Aluminum Conductor Steel Reinforce
• ACAR – Aluminum Conductor Aluminum Alloy Reinforce
9
Overhead Line Parameter
• Resistance

• Conductance

• Inductance

• Capacitance

10
Line Transposition
• Line transposition (L/3) for long transmission line
– Keep power line in balance parameter
– Reduce the interference
• Distance between transpositions ~ 10-40 miles

1st transposition 2nd transposition 3rd transposition


(L/3) (L/3) (L/3)

• No transposition in MEA
11
Mechanical Consideration
Basic for selection of pole

• Amount of vertical space required for wires and equipment

• Clearance required above ground or obstructions for wires and equipment

• Sag of conductors

• Depth pole is to be set in the ground

12
Mechanical Consideration
Calculation of Strength of the poles
• Bending Moment (BM)

BM = F×H ----- (kg-m or T-m)

F = Forces acting on pole (kg.)


H = Height or distance from C.G. or Ground (m.)

13
Bending Moment (BM)
A (cm)

• BM on concrete pole
– Wind Force acting on
• Pole (BMP)

m)
h (m
• Conductor (BMC)

H (m)
• Attach equipments
– Eccentric Load
• Conductor or telephone line (BMEC)
• Insulator (BMEI) C (cm)

– Stringing Tension (BMSA)

s (m) 14
B (cm)
Bending Moment (BMC , BMI)
Wind : −
V = 60mph

P = 0.004V 2 − − − lb / ft 2 − − > Pole

P = 0.0025V 2 − − − lb / ft 2 − − > Conductor

1lb / ft 2 ≈ 4.88kg / m 2
Pole : −
Conductors : −
 h 2C + A 
W = P × d × l − − − − − −( kg ) CG = h −   − − − ( m)
C  3 C + A 
BM = W × H − − − − − ( kg − m) ( B − A) h
Ci Ci i C = A+ − − − −(cm)
H
BM = ΣBM − − − − − −( kg − m)
C Ci A p = 0.005( A + C ) h − − − (m 2 )
d = outer − conductor − diameter − − − ( m) W p = PA p − − − − − − − − − (kg )
l = pole − span − − − − − − − − − − − − − ( m)
15
BM p = W p × CG − − − − − −(kg − m)
Bending Moment (BMEC , BMEI , BMSA)
Stringing − Angle : −
Eccentric − load : − α
Conductor BM SA = 2 × T sin × h × n − − − − − − ( kg − m )
2
BM EC = wC × L × l × n − − − − − − − −(kg − m) α = line − angle − − − − − − − − − − − (°)
wC = conductor − weight − − − − − − − (kg ) T = string − tension − − − − − − − − − ( kg )
L = span − length − − − − − − − − − − − (m) h = conductor − height − − − − − − − − ( m )
l = conductor − pole − dis tan ce − − − (m) n = no. − of − conductor
n = no. − of − conductor
Re duce − tension : −
Insulator WL2
BM EI = wI × l × n − − − − − − − − − (kg − m) Tension =
8S
wI = insulator − weight − − − − − − − (kg ) W = conductor − weight − − − − − − − ( kg )
l = insulator − pole − dis tan ce − − − (m) L = span − length − − − − − − − − − − − ( m ) 16
n = no. − of − insulator S = sag − − − − − − − − − − − − − − − − − ( m )
Sag-Tension Calculation
Definition:-
• Sag
• Tension
• Span
• Ruling Span
• Initial Unloaded Tension
• Final Unloaded Tension
17
Sag Factor
• Temperature
• External Forces
– Wind
• Creep Effect
• Elastic Limit

18
Sag and Tension Formula
Tension
2 2 2 2
W L AEW 2 L
T2 + T2 [ AE (
3 2 1
2
+ α A1 (t2 − t1 ) −T 1] − =0
24T1 24

T2 = Tension at t2 (lb.)
T1 = Tension at t1 (lb.)
A = conductor cross section area (in2)
E = final modulus elasticity of conductor (lb./in.2)
α = longitudinal expansion coefficient (/οF)
t1, t2 = temperature of conductor (οF)
W1 = total force on conductor at t1 (lb./ft.)
W2 = total force on conductor at t2 (lb./ft.)
L = span (ft.) 19
Sag-Tension Standard Table

3603.pdf 20
Right of Way kV
69
X (m.)
2.0
Y (m.)
9.0
115 3.0 12.0
230 4.0 20.0
500 6.5 35.0

21
Design Procedure
Planning

Preliminary Survey

Plan and Profile Map

Pole Location

Design and Calculation

List of Material
22
Survey Map (1:1000)

23
GIS Data (1:1000)

22-
12-
12-

12-746

8.5-
12-

8
12-74
12-

กน( าํ
ไปปา
1790/6

12-837
1790/5

12-750
1790/4
1790/3
1790/2 1957
1790/1
1790
บริ ษ ัท
เพิมไ
พศาล\
จั กรกล
จํ ากัด


ชัยนิย
130
20-

อาคาร
2
12-75
8.5-
12-

-
12-
แท ็งก์น
( าํ

989
4

PM-3
12-75
12-

9
ป้ อมยาม

12-83
บริ ษ ัท
ฮิต าชิ ทราน
สปอร
์ต ซิ สเต็ม 12-
(ประเ
ทศไท
ย) จํ ากัด

12-
รถ
12-

ทีจอด
12-

20-
12-10
6
12-75
โรงง
าน

12-

ป้ อมยา

3-5D
1
12-84
12-
SR43
ป้ อมยา
12-10
2 ม
8
12-75
ป้ อมยาม
ักผู ้โดยสาร

12-
20-
ATM
0ทีพ

12-
12-76
12-760821

12-
2
PM-1

12-

12-
12-10
4
12-76

12-
166
12-843

ดรถ

บริ ษ ัท
ทีจอ

มัทสุ ชิตะแ
5
6

12-84
12-76

บตเต
อร์ รี (ประ

้โดยสา

เทศไท
ย) จํากัด
ทีพักผู

บริ ษ ัท
ฮิต าชิ
คอนซู มเมอร
์โปรดัก
ส์ \ (ประเท
ศไทย)
ทีจอดรถ

22-

จํ ากัด
7

12-
12-84

12-
ทีจอด
8

รถ
12-76

-1
912-847
ุ ขุ มวิท

ป้ อมยาม
12-84
ถนนส

โรงง
าน
93/2
ป้ อมยา

ทีจอดร

99/5 บริ ษัท
0

อนาม
12-77

99/4 ัยภัณ
ฑ์จํ ากัด

ป้ อมยา

99/3
99/2 สุ ขา โรงงา

22-

99/1
อง
ทีเก็บข

99
99/6

บริ ษ
ัท อนาม
ัยภัณฑ
8.5- SR4 12- 85 ์จํ ากัด
33-41
2

H
12-77

61/30
7

1
12-10

12-
12-85

61/29

6-
8
61/2

7
61/2
3
12-85

บ่อน
าํ(

6
61/2

8.5-
12-3
5
61/2

61/2
4
57/2 6- 61/2
8 12- 3
4
12-77

12-

P M-181 ซอยส 8.5-


543 8.5- ุ ขุ มวิท
61/6

61/2 //0 12-


(ภาณ
22-

ุวงศ์) 12-
8.5-
13
61/
8
12-10
บ่อน า
(ํ

บ้าน
10-

12- เช่า

6-
ป้ อมยา

99965
12-85

1
61/
P M-12
12-776

8.5-
เช่า
บ้าน

เช่า
บ้าน
7

-
12-85

8.5

12-
9
12-10

บ้าน
พัก
8
12-77

22-

24
Pole Location
• Typical Span of the Pole
– 115kV
• 80 m. Straight
• 40 m. Curve
– 24kV
• 40 m.
• Inspect for the existing location
25
List of Material
Items and Quantities:-
• Distance • Connector
• Pole • Guy
• Cross-arm • Foundation
• Insulator • Pile
• Conductor

26
MEA Overhead Sub-transmission Standard

• Phase Identification • 69kV Lattice Steel Pole and Tower


• Pole Framing • 69kV Structure Guying
• 69kV 1-circuit, 1-conductor structure • 115kV Structure Guying
• 69kV 2-circuit, 1-conductor structure • Conductor and OHGW
• 69kV 1-circuit, 2-conductor structure • Assembly Details
• 69&115kV 1-circuit, 1-conductor • 69&115kV Material used for
structure Construction
• 115kV 1-circuit, 1-conductor • 69kV Steel Cross-arm structure
structure
• 115kV 1-circuit, 2-conductor
structure
• 115kV 2-circuit, 2-conductor
structure
• 69kV 1-circuit, 1-conductor structure
27
Route Plan