Sie sind auf Seite 1von 7

Environmental Audits

2016 January: Delta petrol stations for Galana oil limited (8No.): Environmental audit was carried
out for Delta petrol stations in Nairobi and Mt. Kenya regions in accordance with the
Environment Impact Assessment and Audit Regulations 2003; and also, appraised
Proponent’s facility regarding their current EHS management practices so as to identify
strengths and the gaps (needs) in order to meet world class standards.

2015 December: Gulf Energy consumer sites (2No.): Initial Environmental audit was carried out for
consumer sites at Mombasa and Mlolongo in accordance with the Environment Impact
Assessment and Audit Regulations 2003; and also, appraised Proponent’s facility regarding
their current EHS management practices so as to identify strengths and the gaps (needs) in
order to meet world class standards.

2015 October: Gulf Energy petrol stations (20No.): Environmental audit was carried out in
accordance with the Environment Impact Assessment and Audit Regulations 2003; and
also, appraised Proponent’s facility regarding their current EHS management practices so as
to identify strengths and the gaps (needs) in order to meet world class standards.

2015 August: New city petrol station, Mombasa- Occupation Health and safety audit, Environmental
Audit for Petrol station in Kilifi County. The Audit was carried out in accordance with the
OSHA 2007, Environment Impact Assessment and Audit Regulations 2003; and also,
appraised Proponent’s facility regarding their current EHS management practices so as to
identify strengths and the gaps (needs) in order to meet world class standards

2015 March: KenolKobil Company Ltd- Occupation Health and safety audit, Environmental Audit
and Fire Audit for LPG depot, Nairobi. The Audit was carried out in accordance with the
OSHA 2007, Environment Impact Assessment and Audit Regulations 2003; and also,
appraised Proponent’s facility regarding their current EHS management practices so as to
identify strengths and the gaps (needs) in order to meet world class standards.

2015 March: KenolKobil Company Ltd- Occupation Health and safety audit, Environmental Audit
and Fire Audit for Mombasa Refueling Service (MRS), Mombasa. The Audit was carried out
in accordance with the OSHA 2007, Environment Impact Assessment and Audit Regulations
2003; and also, appraised Proponent’s facility regarding their current EHS management
practices so as to identify strengths and the gaps (needs) in order to meet world class
standards.

2015 February: Gulf Energy Company Ltd: Environmental Audit, Air quality assessment and Noise
level assessment for Nairobi Depot. The Audit was carried out in accordance with the
OSHA 2007, Environment Impact Assessment and Audit Regulations 2003; and also,
appraised Proponent’s facility regarding their current EHS management practices so as to
identify strengths and the gaps (needs) in order to meet world class standards.

2015 Jan: Gulf Energy Company Ltd: Environmental Audit, Air quality assessment and Noise level
assessment for Mombasa Terminal. The Audit was carried out in accordance with the OSHA
2007, Environment Impact Assessment and Audit Regulations 2003; and also, appraised
Proponent’s facility regarding their current EHS management practices so as to identify
strengths and the gaps (needs) in order to meet world class standards.

2015, Jan: Oriel limited, Nairobi: Occupation Health and safety audit, Plant examination,
Environmental Audit and Risk assessment. The assignment was carried out in accordance
with the OSHA, 2007, Environment Impact Assessment and Audit Regulations 2003; and
also, appraised Proponent’s facility regarding their current EHS management practices so
as to identify strengths and the gaps (needs) in order to meet world class standards.

2014 June: KenolKobil Company Ltd- Occupation Health and safety audit, Environmental Audit
and Fire Audit for Mombasa Refueling service (MRS) depot. The Audit was carried out in
accordance with the OSHA 2007, Environment Impact Assessment and Audit Regulations
2003; and also, appraised Proponent’s facility regarding their current EHS management
practices so as to identify strengths and the gaps (needs) in order to meet world class
standards.

2014, May: Oriel limited, Nairobi: Occupation Health and safety audit, Environmental Audit. The
assignment was carried out in accordance with the OSHA, 2007, Environment Impact
Assessment and Audit Regulations 2003; and also, appraised Proponent’s facility
regarding their current EHS management practices so as to identify strengths and the gaps
(needs) in order to meet world class standards.

2014 May: KenolKobil Company Ltd- Occupation Health and safety audit, Environmental Audit and
Fire Audit for thirteen (13) petrol stations in Mt. Kenya region. The Audit was carried out
in accordance with the OSHA 2007, Environment Impact Assessment and Audit
Regulations 2003; and also, appraised Proponent’s facility regarding their current EHS
management practices so as to identify strengths and the gaps (needs) in order to meet
world class standards.

2014, Jan: Occupation Health and safety audit, Environmental Audit and effluent test analysis of
Kobil Haillesassie petrol station, Mombasa. The Audit was carried out in accordance with the
OSHA, 2007, Environment Impact Assessment and Audit Regulations 2003; and also,
appraised Proponent’s facility regarding their current EHS management practices so as to
identify strengths and the gaps (needs) in order to meet world class standards.

2013, September: Gulf Energy Company Ltd: Environmental Audit, Air quality assessment and Noise
level assessment for Nairobi Depot. The Audit was carried out in accordance with the
OSHA 2007, Environment Impact Assessment and Audit Regulations 2003; and also,
appraised Proponent’s facility regarding their current EHS management practices so as to
identify strengths and the gaps (needs) in order to meet world class standards.

2013, September: Gulf Energy Company Ltd: Environmental Audit, Air quality assessment and Noise
level assessment for Mombasa Terminal. The Audit was carried out in accordance with the
OSHA 2007, Environment Impact Assessment and Audit Regulations 2003; and also,
appraised Proponent’s facility regarding their current EHS management practices so as to
identify strengths and the gaps (needs) in order to meet world class standards.

May 2013: Environmental Audit and Air quality test for Fastenergy stations. The stations are:
1. Banana fastenergy petrol station
2. Ngong road petrol station

May 2013: Base oil disposal Kenya. Done an environmental for a yard for used oil
April 2013: Environmental and safety Audit for KenolKobil facilities. The facilities are:
1. Nairobi Joint Depot (NJD)
2. LPG Plant, Nairobi
3. Mombasa Refueling Services (MRS)
4. Sagana depot
5. Eldoret depot
6. Kisumu depot
7. Makutano depot
Environmental Impact Assessment (EIA)
2015 August -October -NATIONAL IRRIGATION BOARD: Environmental Impact Assessment for
the proposed Kavunyalalo Irrigation scheme in Kilifi County: The EIA study was carried out
to identify and evaluate the impacts of the proposed project on the environment. Proposed
mitigation measures to appropriately address the identified impacts will be made. A
comprehensive Environment Management plan was also developed as a guide to the
proponent during the implementation of the project

2015 April – August - NATIONAL IRRIGATION BOARD: Environmental Impact Assessment for
the proposed Rwabura Irrigation project in Kiambu County: The EIA study was carried out to
identify and evaluate the impacts of the proposed project on the environment. Proposed
mitigation measures to appropriately address the identified impacts were made. A
comprehensive Environment Management plan was also developed as a guide to the
proponent during the implementation of the project

2015 April - May - KENOLKOBIL CO. LTD: Environmental Impact Assessment for the proposed
One storey Building in South B, Nairobi County: The EIA study was carried out to identify
and evaluate the impacts of the proposed project on the environment. Proposed mitigation
measures to appropriately address the identified impacts were made. A comprehensive
Environment Management plan was also developed as a guide to the proponent during the
implementation of the project

2015 April - May –KENOLKOBIL CO. LTD: Environmental Impact Assessment for the proposed
One storey Building in Lang’ata, Nairobi County: The EIA study was carried out to identify
and evaluate the impacts of the proposed project on the environment. Proposed mitigation
measures to appropriately address the identified impacts were made. A comprehensive
Environment Management plan was also developed as a guide to the proponent during the
implementation of the project

2014 Jan-May: EIA for the proposed LPG plant and oil depot for East Africa Spectre Ltd in
Embakasi, Nairobi. The proposed project involved construction of an LPG plant that will be
in unison with the environment void of any conflict with the neighborhood. In order to
achieve these goals, the EIA study was conducted to identify and evaluate the impacts of the
proposed LPG Plant on the environment. Proposed mitigation measures to appropriately
address the identified impacts. A comprehensive Environment Management plan was also
developed as a guide to the proponent during the implementation of the project.
2013 May to 2014 May - JIANGXI ZHONGMEI ENGINEERING CONSTRUCTION CO. LTD:
Environmental awareness campaign along Londiani-Fortenan-Muhoroni road. The main aim
of the project was community trainings and raise awareness on environmental conservation
so as to improve vegetation cover, soil erosion control, river bank protection among others.

2013 September, - Environmental Impact Assessment for the proposed kings petrol station,
Mombasa. The EIA study was conducted to identify and evaluate the impacts of the
proposed petrol station on the environment. Proposed mitigation measures to appropriately
address the identified impacts were made. A comprehensive Environment Management plan
was also developed as a guide to the proponent during the implementation of the project

2013 August, -Environmental Impact Assessment for the proposed Supreme petrol station, Kilifi.
The EIA study was conducted to identify and evaluate the impacts of the proposed petrol
station on the environment. Proposed mitigation measures to appropriately address the
identified impacts were made. A comprehensive Environment Management plan was also
developed as a guide to the proponent during the implementation of the project.

2013 Jan-April - ATHI WATER SERVICE BOARD: Environmental Impact Assessment for the
Proposed Thwake Multipurpose Dam Project, Makueni County. The project covered dam
construction, water supply projects covering parts of Kitui, Machakos and Makueni Counties
and possibly to the proposed ICT City at Konza, hydropower generation and irrigation
scheme downstream of the dam. The EIA study was conducted to identify and evaluate the
impacts of the proposed project on the environment. Proposed mitigation measures to
appropriately address the identified impacts were made. A comprehensive Environment
Management plan was also developed as a guide to the proponent during the
implementation of the project.

2013 Jan, - HASHI ENERGY -Environmental Impact Assessment (EIA) for the Proposed LPG Plant
at Nanyuki Town. The proposed project involved construction of an LPG plant that will be
in unison with the environment void of any conflict with the neighborhood. In order to
achieve these goals, the EIA study was conducted to identify and evaluate the impacts of the
proposed LPG Plant on the environment. Proposed mitigation measures to appropriately
address the identified impacts were made. A comprehensive Environment Management plan
was also developed as a guide to the proponent during the implementation of the project.

2011 June -WORLD VISION KENYA -Environmental and Social Impact Assessment Studies of
three borehole drilling sites of World Vision Kenya’s Lorroki Integrated Programme Area,
Samburu District. This study was commissioned by World Vision Kenya-Area Development
Program (WVK-ADP).

2011 May - WORLD VISION KENYA Environmental and Social Impact Assessment Studies of two
water intakes of World Vision Kenya’s Kiambogoko Integrated Programme Area, Naivashsa
District. This study was commissioned by World Vision Kenya-Area Development Program
(WVK-ADP).

2010 December -ICRAF supported Environmental and Social Impact Assessment studies of four
irrigation projects (Mbuye, Nyanza District; Musaza, Kirehe District; Mugesera, Ngoma
District; Masaka, Kicuykiro District) for the Ministry of Agriculture and Animal Resources
(MINAGRI) in Rwanda.

2010 July RURAL ELECTRIFICATION AUTHORITY (REA), -Environmental & Social Impact
Assessment for the proposed construction of an off-grid diesel power generating station in
Faza island in Lamu County, Lokori and Loukitang in Turkana County.

2010.-Lake Victoria South Water Services Board (LVSWSB). -Environmental & Social Impact
Assessment for the proposed expansion of water pipelines and sewerage treatment plant in
Kisii town.

2010 Lake Victoria South Water Services Board (LVSWSB), -Environmental & Social Impact
Assessment for the proposed expansion of water pipelines and sanitation interventions in
Bondo Town.

2010 Kenya Power and Lighting Company Limited -Environmental & Social Impact Assessment
for The proposed construction of 132 kV Olkaria – Narok, Bomet-Sotik, Kisii-Awendo and
Kisii-Sondu Transmission Lines.,

2010 Kenya Power and Lighting Company Limited.-Environmental and Social Impact
Assessment of the renewal of the Juja Road 132/66/11 kV Substation from an Insulated
Switchgear System (ISS) to a Modular Switchgear System (MSS).

2010 Kenya Power and Lighting Company Limited: A study to update the Environmental
and Social Impact Assessment, (ESIA) and develop an Environmental and Social
Management Plan (ESMP) for the 400 kV Mombasa - Nairobi Transmission line.

2010 Ministry of Environment and Mineral Resources -Environmental and Social Impact
Assessment (ESIA) of the proposed abandoned selected quarries in Kayole for Solid
Waste Disposal

2010. -Environmental and Social Impact Assessment Studies of Kathiga Gaceru Irrigation Project
(MoA-SHDP) in Mbeere North District, Kenya.

2010 -Environmental and Social Impact Assessment Studies of Mbogoni Irrigation Project (MoA-
SHDP) in Meru South District, Kenya.

Das könnte Ihnen auch gefallen