BUILDING MAINTENANCE
(SEMESTER PATTERN)
UNDER
By
Government of India
Central Staff Training and Research Institute
Directorate General of Employment & Training
Ministry of Labour & Employment
EN -81, Sector-V, Salt Lake City,
Kolkata-700091
1
List of Members of trade committee meeting for the trade of BUILDING MAINTENANCE
held on 18-10-2011,at Advanced Training Institute Kolkata.
2
List of members attended the Workshop to finalize the syllabi of existing CTS into Semester Pattern
held from 6th to 10th May’2013 at CSTARI, Kolkata.
3
GENERAL INFORMATION
4. Power Norms : 2. 5 Kw
4
Syllabus for the Trade of
“BUILDING MAINTENANCE” under C.T.S.
(Semester Code No. BUM-01)
FIRST SEMESTER
5
4-8 To construct Floors of Method of using concrete Free hand Decimal addition,
various types of an area for repair work and sketching of subtraction,
of 1.00mx1.00m. concrete grouting. simple solids such multiplication and
To repair a given as cubes, division,
defective floor. Causes of defects in rectangular conversion
Maintenance of hurt tiles. Brick, cement concrete, blocks, of decimal to
terrazzo and Mosaic, cylinders and the common fractions
marble and stone floors views of these and vice-versa site
and their remedial objects when problems.
measures. viewed Conversion of
perpendicular to metric system
Repair of old floors. their surface or
Methods of cleaning, axes.
cutting and polishing of
mosaic, terrazzo and
Marble floors/granite
(Materials and tools
required).
Knowledge regarding
roof and lintel and
Chemical treatment.
9 Surface Finishing Tools required for Preparation of free Metric system-
To plaster a given brick Plastering. hand sketches in metric weights and
surface of area 1mx1m Methods of cement and plan and elevation measurements
To repair a defective lime plastering. 4 ½ ft. wall straight units-conversion
plaster surface. Plinth Preparation of surface for and junction. factors-problem.
6
Protection. plastering.
To do pointing on old Application of plaster Preparation of Ratio and
brick masonry work. coats. free proportion
hand sketches of – problems on
Curing of plaster. rattrap bond, the above such as
diagonal-bond, finding out
Defects in plaster work herring bond quantities
and their preparations. basket bond and of material for
other ornamental various mixes of
Repair of defective panels. mortar-concrete.
plaster. Repair of damp
surface of wall / ceiling.
To replace broken
glazed tiles. The students
should be encouraged to Knowledge of timber
affect repair work in the different type of fitting,
institution building under knowledge of other type
the guidance of the of doors and windows
teacher; quality of work and different types of
should be the main joints.
objective.
14 Painting of Iron and Methods of painting new -do- -do-
steel Works steel work.
Practice of painting on Methods of repairing and
different steel structures painting old iron steel
and other surfaces of work.
plasters.
7
15 False ceiling wall Tools and materials Drawing, Problems on
panelling and wall required for false ceiling architectural perimeter and
papering. wall panelling and mouldings, such areas of polygons
False ceiling wall and wallpapering. as such as
wallpapering & Process for placing ovalocaveto, pentagonhexagon-
construction and wallpaper method of wall torus, octagon.
repairing. panelling and false Scotia cyma recta,
ceiling with different and cyma reverse.
Mode of Measurement. materials in old and new
walls. Knowledge of
false ceiling
16 to Damp Proofing. Surface of dampness. Construction of Volume and
17 Construction of course for Effect of dampness. ellipse by surface-areas of
damp proofing. Precautions to be taken to different simple geometrical
prevent dampness. methods. solids as cubes and
Methods of damp prisms.
proofing basements,
ground floors, plinth and
walls. Special damp
proofing arrangement in
bathroom W.C.and
kitchen. Damp proofing
for flat and pitched roofs
and windowsills.
Methods for laying damp
proof course in existing
buildings. Knowledge,
reason and subsequent
remedial measure.
Knowledge required to
different type of damp
proofing material
bonding agents.
18 to Varnishing and Tool required for
19 polishing varnishing and polishing -- --
Practice on varnishing coats.
and polishing coats in Process of varnishing and
different methods. polishing-preparation of
surface, knotting and
priming-Application of
varnish coats.
Methods of polishing on
metal surfaces.
20 Glazing Work Replacement and
Practice on cutting and cleaning of glazing work. -- --
fixing glasses and Tools required.
replacement. Methods of cutting glass
and fixing glass as
desired.Materials
required for cleaning old
glass panes and method
of cleaning.
8
21 Vitrified tiled work. Method of cleaning of
Practice on method of china clay glazed tiles -- --
cleaning of china clay. and materials required for
cleaning.
22 Anti termite Treatment Method of Anti termite
in Building. Treatment for walls. Anti
Practice on application. termite Treatment for
wood work in Building.
9
LIST OF TOOLS AND EQUIPMENT FOR 16 TRAINEES + 0NE
FOR THE TRADE OF “BUILDING MAINTENANCE” UNDER C.T.S .
11