Beruflich Dokumente
Kultur Dokumente
Project
Delhi Metro MC1B
Design data
Moment in the direction of Shorter dimension (Top) = 200 x 1.0 = 200.0 kN.M.
Moment in the direction of Shorter dimension (Bott) = 200 x 1.0 = 200.0 kN.M.
The above actual moments should be compared with those calculated from minimum eccentricity
consideration ( see 25.4 of the IS code 456:2000) and greater value is to be taken as the initial
moment for adding the additional moments.
aaa
Project
Delhi Metro MC1B
Pu / fck b D = 0.034
p / fck = 0.023
For x-x axis d'/D ratio = 0.038 Referring chart for d'/D = 0.05
Mu / fck bD2 = 0.045
Mux1 = 2262 kN.m
Mux / Mux1 = 0.78
For Y-Y axis d'/D ratio = 0.059 Referring chart for d'/D = 0.10
Mu / fck bD2 = 0.045
Muy1 = 1479 kN.m
Muy / Muy1 = 0.14
Now, with References to IS 456:2000, Page 71, Clause 39.6 and Clause 39.7.
377606855.xlsx / Short
aaa
Project
Delhi Metro MC1B
377606855.xlsx / Short
et
377606855.xlsx / Short
aaa
Project
Delhi Metro MC1B
Design data
Size of Column bxD = 300 mm x 600 mm
Axial Load on column Pu = 1000 x 1.0 = 1000 kN
Moment in the direction of Larger dimension (Top) M1x = 150 x 1.0 = 150.0 kN.M.
Moment in the direction of Larger dimension (Bott) M2x = 85 x 1.0 = 85.0 kN.M.
Moment in the direction of Shorter dimension (Top) M1Y = 10 x 1.0 = 10.0 kN.M.
Moment in the direction of Shorter dimension (Bott) M2Y = 10 x 1.0 = 10.0 kN.M.
377606855.xlsx / Long
C:\Users\RCS\Downloads\[36966501-C
aaa
Project
Delhi Metro MC1B
The Additional slender moments calculated earlier will now be multiplied by the above value of K ( K<=1)
Max = 0.0 x 1.00 = 0.0 kN.m
May = 78.0 x 1.00 = 78.0 kN.m
The Additional moments due to slenderness effects should be added to the initial moments after
modifying the initial moments as follows (see section 39.7.1 of the code IS 456:2000)
Mux = 0.6 x 150.0 - 0.4 x 85.0 = 56.0 kN.m
but not less than = 0.4* Max (M 1x
& M 2x
) = 60.0 kN.m
Max of the above two = 60.0 kN.m
The above actual moments should be compared with those calculated from minimum eccentricity
consideration ( see 25.4 of the IS code 456:2000) and greater value is to be taken as the initial
moment for adding the additional moments.
377606855.xlsx / Long
aaa
Project
Delhi Metro MC1B
Pu / fck b D = 0.159
p / fck = 0.037
Pu / Puz = 0.28
an = 1.14
For x-x axis d'/D ratio = 0.100 (Design Aid page No 130 )
Mu / fck bD2 = 0.060
Mux1 = 227 kN.m
Mux / Mux1 = 0.66
For Y-Y axis d'/D ratio = 0.200 (Design Aid page No 131)
Mu / fck bD2 = 0.060
Muy1 = 113 kN.m
Muy / Muy1 = 0.90
Now, with References to IS 456:2000, Page 71, Clause 39.6 and Clause 39.7.
Shear Design
Shear force V = 85 kN
Provided tension reinf percentage pt = 1.40 %
Nominal shear stress tv = 5.05 N/mm2
Shear reinf. required for Vus Asv = 3.27 * Sv Asv = Vus * Sv / ( 0.87 * fy * d)
Min. shear reinf. (IS-456, 26.5.1.6) Asv = 0.332 * Sv Asv = 0.4 * b * Sv / ( 0.87 * fy )
377606855.xlsx / Long
aaa
Project
Delhi Metro MC1B
377606855.xlsx / Long
et
377606855.xlsx / Long