Beruflich Dokumente
Kultur Dokumente
KSO AMYTHAS-ARKONIN-REKADAYA
TURBINE NO # 2
2. Manual
Operation and
Maintenance
Equipment Had
been Done.
#1).
DESCRIPTION TARGET
1. 1. Closed
Cover
KSO AMYTHAS-ARKONIN-REKADAYA
3. Certificate 3. Installed
Had been Pipe Line
done. from TG 1
Thru Lube
4. Calibration Tank,
Equipments Condenser
and Tools. 1 and
Had been Master
done. Steam
Valves.
5. Manual
Instruction 4. Installed AC
from Aciter and
Fabricator. Pipe Lines.
Had been
done. 5. Flushing
Pipe Lines.
6. SOP.
6. Air Test
7. Safety Manual Line.
Procedure.
7. Water Test
8. Final Line.
Inspected
Before 8. Test Welded
assembled In Pipe
and enclosed Lines.
upper casing.
9. Individual
Test.
10.Manual
Operation
Had been
done.
11.Operator
Experience
and
Excellent..
KSO AMYTHAS-ARKONIN-REKADAYA