Sie sind auf Seite 1von 7

H=L/16 (If simply supported ) H= = 0 B=H/1.

5
16

H=L/18.5 (if one end continuous) H= 0 = 0


18.5
B=H/2
H=L/21 (if both ends continuous) H= = 0
21

H=L/8 (if cantilever) H= = 0


8

Input the following


Wc= Weight of Concrete = 0 KN/m^3 LOADINGS Dead Load (DD)
B= Base of rebar = 0 m DL1=Wc(B)(H) DL1= 0
H= Height of rebar = 0 m
T= Thickness of beam = 0 m DL2=Wc(T)(S) DL2= 0
S= Short beam = 0 m
FF=Finish floor = 0 Kpa DL3=(FF+CL)(S) DL3= 0
FL= Floor Live Load = 0 Kpa
CL= Ceiling Load = 0 Kpa Live Load (LL)
f`c = 0 mPa LL=FL(S) LL= 0
Fy = 0 mPa

LOAD COMBINATION

TO FIND WHICH IS GOVERN NOTE: ALWAYS USE THE HIGHEST VALUE

1.4DL 1.4 0 = 0

1.2DL+1.6LL 1.2 0 + 1.6 0 = 0


DESIGN
d (effective depth)
Input the following d=h-(Cc + s + dr/2 ) = 0
DIAM OF REBAR (dr) = 0 mm
|Mmax| = 0 Kn/m R=str factor
h=hieght of beam = 0 mm R=Mmax/∂bd^2 = 0
Cc= Concrete cover = 0 mm 0.9
s= Stirrups = 0 mm
b=base of beam = 0 mm

value of w= ??
R=wf`c(1-0.59w) a
b
c
value of ᵽ=??
ᵽ=wf`c/FY = #DIV/0!
0
Asc= Area Computed
Amin= Area minimum Asc = ᵽbd = #DIV/0! 0 0
Aact= Area actual
Amax= Area maximum As= pdr^2/4 = 3.14 0
n= Number of rebar 4
As=Area of rebar
n= Asc/As = #DIV/0! =
0

Note: In Amin always use the value with blue color an input in cell "K65"
Amin = 1.4 0 0 = #DIV/0!
0

Amin = 0 0 0 = #DIV/0!
0 IF THE REQUIRED CON

Aact = #DIV/0! 0 = #DIV/0!

Amax = 0.85 0 0.003 0 0


0 0.003 + 0.004

Amax = #DIV/0! 0.4285714286 0 0

Amax = #DIV/0!

Condition 1 : ⱷMn > |Mmax|


C = T
If the ⱷMn > |Mmax| the design is GOOD
C = 0.85 f'c a b

If the ⱷMn < |Mmax| the design is not GOOD T = Act FY


redesign again
0.85 f'c a b =
0.85 0 a
Condition 2 : ∑s > 0.002
∑s > 0.005 a =

If the ∑s > 0.002 and ∑s > 0.005


use ⱷ =0.9 a=Ḇc

If the ∑s < 0.002 and ∑s < 0.005 #DIV/0! =


or
If the ∑s < 0.002 and ∑s > 0.005 vice versa c =
use ⱷ= 0.65

Input the value of "ⱷ" in cell 'D121"

∑s = 0.003 0 + #DIV/0!
#DIV/0!

∑s = #DIV/0!

Mn = ⱷ Aact Fy ( d - a/2 )

ⱷMn = 0.9 #DIV/0! 0 0- #DIV/0!

ⱷMn = #DIV/0!

Compare the ⱷMn and |Mmax| then analyze the CONDITION 1


B= 0 = 0 NOTE: Always estimate
1.5 the values of H & B

B= = 0
2

0 0 = 0

0 0 = 0

0 0 = 0
TOTAL DL = 0

0 = 0
TOTAL LL = 0

- 0 0 0= 0

0 = #DIV/0!
0 0

= 0 w = #DIV/0! note: always use


= 0 w = #DIV/0! the lowest value
= #DIV/0!
0 ᵽ = #DIV/0!
0

= #DIV/0!

= 0

#DIV/0! = #DIV/0! pcs

Condition: Amin < Aact < Amax


Amin Aact Amax
< #DIV/0! < #DIV/0!

IF THE REQUIRED CONDITION IS NOT MEET REPEAT THE DESIGN FROM THE START

indicate the value of Ḇ and input in cell "D76"


Ḇ f'c

0.85 17 mPa to 28mPa

0.65 > or = 55mPa

Ḇ=0.85- (0.05/7)(f'c - 28 if 18 mPa to 54 mPa

Aact FY
0 = #DIV/0! 0

#DIV/0! mm

0 c

#DIV/0! mm
Loadings
Input the following
Wc= Weight of Concrete = 0 KN/m^3
B= Base of rebar = 0 m
H= Height of rebar = 0 m
T= Thickness of beam = 0 m
S= Short beam = 0 m
FF + CL = 0 Kpa
FL= Floor Live Load = 0 Kpa
CL= Ceiling Load = 0 Kpa
f`c = 0 mPa
Fy = 0 mPa

Das könnte Ihnen auch gefallen