This document outlines the job hazard analysis for a project involving the supply and installation of air conditioning units and electrical works from January 4-20, 2018. It identifies six major activities - chipping works and drilling, installation of hangers and supports, pipings and insulation, electrical works, welding works, and installation of indoor and outdoor units. For each activity, it lists potential risks such as physical injury, dropping hazards, fire hazards and damage to equipment, and the corresponding control measures to ensure safety. The control measures include using proper tools and protective equipment, assigning qualified personnel, providing barriers and clean up, and designating a safety officer.
This document outlines the job hazard analysis for a project involving the supply and installation of air conditioning units and electrical works from January 4-20, 2018. It identifies six major activities - chipping works and drilling, installation of hangers and supports, pipings and insulation, electrical works, welding works, and installation of indoor and outdoor units. For each activity, it lists potential risks such as physical injury, dropping hazards, fire hazards and damage to equipment, and the corresponding control measures to ensure safety. The control measures include using proper tools and protective equipment, assigning qualified personnel, providing barriers and clean up, and designating a safety officer.
This document outlines the job hazard analysis for a project involving the supply and installation of air conditioning units and electrical works from January 4-20, 2018. It identifies six major activities - chipping works and drilling, installation of hangers and supports, pipings and insulation, electrical works, welding works, and installation of indoor and outdoor units. For each activity, it lists potential risks such as physical injury, dropping hazards, fire hazards and damage to equipment, and the corresponding control measures to ensure safety. The control measures include using proper tools and protective equipment, assigning qualified personnel, providing barriers and clean up, and designating a safety officer.
LOCATION : BPO 2 / CIRCUIT ( PLDT SERVER ROOM) DURATION : JAN 4 2018 TO JAN 20, 2018 JOB HAZARD ANALYSIS Item Activity Risk Control Measures 1. Use the right tool Physical injury 2. Wear proper protective equipment 3. Only qualified/skilled personnel should conduct the activity 4. Assign Safety Officer 1.0 CHIPPING WORKS & DRILLING WORKS 1. Provide protective barrier 2. Orient the personnel to avoid monkey playing Damage to existing Wall 3. Provide vaccum cleaner 4. General Cleaning after the activity 5. Assign Safety Officer
1. Use the right tool
2. Wear proper protective equipment Physical injury 3. Only qualified/skilled personnel should conduct the activity 4. Assign Safety Officer 1. Only qualified personnel should conduct the activity. Dropping Hazard 2. Wear proper protective equipment 2.0 Installation of HANGERS & SUPPORTS 3. Assign Safety Officer 1. Provide protective barrier 2. Orient the personnel to avoid monkey playing 3. Provide vaccum cleaner Damage to existing Equipment 4. General Cleaning after the activity
5. Assign Safety Officer
1. Use the right tool
2. Wear proper protective equipment Physical injury 3. Only qualified/skilled personnel should conduct the activity 4. Assign Safety Officer
1. Only qualified personnel should conduct the activity.
Dropping Hazard 2. Wear proper protective equipment 3. Assign Safety Officer 1. Provide protective barrier 3.0 PIPINGS AND INSULATION 2. Orient the personnel to avoid monkey playing 3. Provide vaccum cleaner Damage to existing Equipment 4. General Cleaning after the activity
5. Assign Safety Officer
1. Provide Fire Extinguisher 2. Use the right tools/equipment 3. Wear proper protective equipment Fire Hazard 4. Ensure all connections are properly secured 5. Assign Safety Officer
1. Use the right tool
2. Wear proper protective equipment Physical injury 3. Only qualified/skilled personnel should conduct the activity 4. Assign Safety Officer 1. Only qualified personnel should conduct the activity. Dropping Hazard 2. Wear proper protective equipment 3. Assign Safety Officer Electrical Works of Aircon - Roughing -ins 1. Provide protective barrier 4.0 - Wiring - ins 2. Orient the personnel to avoid monkey playing - Termination 3. Provide vaccum cleaner Damage to existing Equipment 4. General Cleaning after the activity
5. Assign Safety Officer
1. Provide Fire Extinguisher 2. Use the right tools/equipment 3. Wear proper protective equipment Fire Hazard 4. Ensure all connections are properly secured 5. Assign Safety Officer 1. Use the right tool 2. Wear proper protective equipment Physical injury (eyes, body, arms) 3. Only qualified/skilled personnel should conduct the activity 4. Assign Safety Officer 1. Only qualified personnel should conduct the activity. Dropping Hazard 2. Wear proper protective equipment 3. Assign Safety Officer 1. Provide protective barrier 5.0 WELDING WORKS 2. Orient the personnel to avoid monkey playing 3. Provide vaccum cleaner Damage to existing Equipment 4. General Cleaning after the activity 5. Assign Safety Officer 1. Provide Fire Extinguisher 2. Use the right tools/equipment 3. Wear proper protective equipment Fire Hazard 4. Ensure all connections are properly secured 5. Assign Safety Officer/ Fire watcher
1. Use the right tool
Physical injury 2. Wear proper protective equipment 3. Only qualified/skilled personnel should conduct the activity 4. Assign Safety Officer 1. Only qualified personnel should conduct the activity. Dropping Hazard 2. Wear proper protective equipment 3. Assign Safety Officer 1. Provide protective barrier INSTALLATION OF OUTDOOR AND 2. Orient the personnel to avoid monkey playing 6.0 INDOOR UNIT 3. Provide vaccum cleaner Damage to existing Equipment 4. General Cleaning after the activity
5. Assign Safety Officer
1. Provide Fire Extinguisher 2. Use the right tools/equipment 3. Wear proper protective equipment Fire Hazard 4. Ensure all connections are properly secured 5. Assign Safety Officer