TECHNICAL QUERIES

SR # REFERENCE

1 KP- 53 Invitation Letter for General works

KP53-CFU-225 & SRU-311-PS-1800-


2 01(ERECTION)

KP53-CFU-225 & SRU-311-PS-6800-


3 01(MECHANICAL ERECTION)
TECHNICAL QUERIES

KJIC - QUESTIONS
Price Summary and Price List :- The Bidder shall fill, in the
relevant blanks of all tables thereof where a quantity is shown
and considering the following 1- Insert in the columns
productivity (u.m./ hour ) and unit price ( USD/um) for
material supply if any and for installation, the relative value for
each contractual article where the total physical quantities are
listed(i.e. :where physical quantity= 0 you shall not insert any
data as for productivity and the unit price) Please clarify the
above red marked abrivations.

BOM contains lump-sum weight of steel structure, please provide us


in detail like : heavy weight, medimium weight & light weight
structure seperately. It will support us to estimate properly.

BOM contains lump-sum weight of Equipment. Please provide us


weights of all equipment seperately so that we may be able to
prepare correct estimate and assign correct construction equipment
for them.
DATED : 31/12/2015
KT - ANSWER