Production Schedule

Please include location, time of film, what you are filming and team’s members
including actors

Date: 29th- 4th February


Monday Tuesday Wednes Thursday Friday Saturday Sunday
Organise/plan I will Using the This is the On this I will go to On
my entire create the script in second day I will the Sunday I
idea of my production which I day of be locations will create
short film. I will schedule produced I producing producing where I am the
do this by for my will create the the props filming my contingen-
mind short film. a storyboard. and crew short film cy plan for
mapping Then I will storyboard. I am doing list. I will and take my film.
different produce I will do this this for an do this at photos. This is
characters the script in college extra day college Then when I where I
and creating for my and at due to it and if I return home discuss the
the structure short film. home. This taking a don’t I will fill out back up
of my short This will will be long time complete the location plan if
film. take drawn shot personally it I will do recce. After anything
around by shot to make it at that I will goes
four hours with an home. email my wrong in
to analysis successful actors the film.
complete. about storyboard discussing This will
what’s which will there take me
happening benefit the confirmation one to two
in each film details and hours long.
individual making if they can
shot. process. be me in my
film.
Date: 5th-11th February
Monday Tuesday Wednes Thursday Friday Saturday Sunday
Shooting Shooting Organise Shooting I will create
day day all my day number Foley
number number two footage three. I will sounds for
one for my for my short together film my film on
short film. film. to see if I psychologist this day.
Following Following got Meeting
the story the story everything scene.
board film board film I needed.
the entire the entire
film. film.
Things I will Things I will Things I will I will use a
need: need: need: microphone
Camera Camera Camera on a
Lights Lights Lights camera in
Gels Gels Gels order to get
Dolly Dolly Dolly good
Stabilizer Stabilizer Stabilizer audible
Go pro Go pro Go pro clips which
Tripod Tripod Tripod sound a lot
Microphone Microphone Microphone better.
Two actors Two actors Two actors

Date: 12th-18th February (half term)


Mond Tuesd Wedne Thursda Friday Saturda Sunday
ay ay s y y
Go Re-film Re-film I will be I will be
through scenes parts of making finding the
all the from my my short Foley correct
footage short film film which sounds for music I
recorded which weren’t elements need to
in the weren’t successful of my use for the
previous successfull first time. short film. film and
week. y. downloadi
ng it
Take I will need I will need This will I will either
note on a camera, a camera, take an find this on
scenes micropho micropho entire day YouTube
that ne, dolly, ne, dolly, of work to or buy
weren’t stabilizer, stabilizer, create from
as tripod, tripod, these different
successfu camera camera Foley sound
lly and light and light and sounds. I track
plan with my actors. my actors. will use a companie
actors to So I will So I will camera s.
re-shoot need to need to with a
these hire hire micropho
scenes. equipmen equipmen ne as my
t prior and t prior and equipme
sort out sort out nt.
the times the times
with my with my
actors. actors.

Date: 19th- 25th February


Monday Tuesday Wednes Thursday Friday Saturday Sunday
Editing the Editing Editing Evaluation, Deadline
short film the film the film complete for entire
together. together. together. the entire unit six
This will be This will be thing with
the the full analysis
beginning middle
section of section of
the short the film.
film.
I will edit This will be I will do This should This means
using done on this on take handing in
Adobe’s premier premier around the
Premier pro and pro and three hours finished
pro and will be put it to production
place the done together complete, of the film
clips using the following I will give and all the
together story my script myself four research
using the board and hours and pre-
storyboard and storyline which will production
and script. script. as a give me planning.
guideline. more time
if I go over.