Sie sind auf Seite 1von 90

Use pursuant to applicable agreements

PRELIMINARY
Title page

Alcatel-Lucent
Remote Radio Head 2X40W - 900 MHz for GSM and W-CDMA
Maintenance Guide
3MN-01483-0002-REZZA
Issue 0.01 | April 2013

PRELIMINARY

Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
Use pursuant to applicable agreements

Legal notice
PRELIMINARY
Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.

The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright © 2013 Alcatel-Lucent. All rights reserved.
Contains proprietary/trade secret information which is the property of Alcatel-Lucent and must not be made available to, or copied or used by anyone outside
Alcatel-Lucent without its written authorization.
Not to be used or disclosed except in accordance with applicable agreements.
PRELIMINARY

Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
Contents

PRELIMINARY
About this document
Purpose ............................................................................................................................................................................................. xi
xi

Reason for reissue ........................................................................................................................................................................ xi


xi

Intended audience ......................................................................................................................................................................... xi


xi

Supported systems ........................................................................................................................................................................ xi


xi

How to use this document ........................................................................................................................................................ xii


xii

Safety information ...................................................................................................................................................................... xii


xii

Prerequisites .................................................................................................................................................................................. xii


xii

Conventions used ........................................................................................................................................................................ xii


xii

Related information ................................................................................................................................................................... xiii


xiii

Document support ...................................................................................................................................................................... xiv


xiv

Technical support ....................................................................................................................................................................... xiv


xiv

How to order ................................................................................................................................................................................ xiv


xiv

How to comment ........................................................................................................................................................................ xiv


xiv

1 Safety statements

Overview ...................................................................................................................................................................................... 1-1


1-1

Structure of safety statements ............................................................................................................................................... 1-2


1-2

2 Operating principles

Overview ...................................................................................................................................................................................... 2-1


2-1

OAM principles ......................................................................................................................................................................... 2-2


2-2
PRELIMINARY

3 Hardware description

Overview ...................................................................................................................................................................................... 3-1


3-1

RRH 2X40-09 Hardware description ................................................................................................................................ 3-2


3-2
....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary iii
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Contents

....................................................................................................................................................................................................................................
Node B hardware requirements for RRH support ...................................................................................................... 3-11
3-11

4 Preventive maintenance activity

Overview ...................................................................................................................................................................................... 4-1


4-1

Preventive maintenance activity .......................................................................................................................................... 4-2


4-2

5 Corrective maintenance activity

Overview ...................................................................................................................................................................................... 5-1


5-1

Corrective maintenance activity .......................................................................................................................................... 5-2


5-2

6 Power up and power down procedures

Overview ...................................................................................................................................................................................... 6-1


6-1

Powering up the RRH ............................................................................................................................................................ 6-2


6-2

Powering down the RRH ...................................................................................................................................................... 6-4


6-4

7 RRH preventive maintenance procedures

Overview ...................................................................................................................................................................................... 7-1


7-1

Inspecting gaskets ..................................................................................................................................................................... 7-2


7-2

Inspecting connectors .............................................................................................................................................................. 7-4


7-4

Inspecting pole brackets and pole bands .......................................................................................................................... 7-6


7-6

8 RRH corrective maintenance procedure

Overview ...................................................................................................................................................................................... 8-1


8-1

Locating the faulty element ................................................................................................................................................... 8-2


8-2

Replacing the RRH .................................................................................................................................................................. 8-3


8-3

Replacing the SUMx ............................................................................................................................................................... 8-9


8-9

Replacing the optical fiber link ......................................................................................................................................... 8-14


8-14

Replacing the SFP module .................................................................................................................................................. 8-19


8-19
PRELIMINARY

A Product conformance statements

Overview ..................................................................................................................................................................................... A-1


A-1

European regulatory requirement compliance .............................................................................................................. A-2


A-2
....................................................................................................................................................................................................................................
iv Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Contents

PRELIMINARY
....................................................................................................................................................................................................................................
North American regulatory requirement compliance ................................................................................................. A-4
A-4

Compliances for other regions/countries ........................................................................................................................ A-5


A-5

Operating conditions .............................................................................................................................................................. A-6


A-6

Antenna exposure statements .............................................................................................................................................. A-7


A-7

Cable specifications ................................................................................................................................................................ A-8


A-8

Product labeling ........................................................................................................................................................................ A-9


A-9

Index

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary v
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Contents

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
vi Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
List of tables

PRELIMINARY
1 Issue 0.01, April 2013, Reason for reissue .......................................................................................................... xi

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary vii
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY List of tables

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
viii Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
List of figures

PRELIMINARY
3-1 RRH 2X40-09 bulkhead .......................................................................................................................................... 3-2

3-2 SUMx front panel ...................................................................................................................................................... 3-5


3-5

7-1 Pole brackets and pole bands ................................................................................................................................ 7-7

A-1 ......................................................................................................................................................................................... A-9


A-9

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary ix
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY List of figures

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
x Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
About this document
About this document

Purpose
The purpose of this document is to describe the preventive and corrective procedures
applicable to the Alcatel-Lucent Remote Radio Head (RRH) that supports several
technologies:
• 2G (GSM)
• 3G (W-CDMA)
There are different variants of the RRH depending on the operational bandwidth and
depending on the transmitted power.
The RRH described in this document is the RRH 2X40-09. It is one sector 900 MHz radio
module including two 900 MHz transmit paths of up to 40 W each path.

Reason for reissue


The reissue history for issue 0.01 is shown in the following table:

Table 1 Issue 0.01, April 2013, Reason for reissue

Location Change
None First issue as release-independent document (from NN20500-282,
Release: UA08.1)

Intended audience
The audience for this document is Operations and maintenance personnel.

Supported systems
PRELIMINARY

This release-independent document applies to all Alcatel-Lucent W-CDMA system


releases.

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary xi
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY About this document

....................................................................................................................................................................................................................................
How to use this document
No specific recommendation applies regarding the way readers should read this
document.

Safety information
For your safety, this document contains safety statements. Safety statements are given at
points where risks of damage to personnel, equipment, and operation may exist. Failure to
follow the directions in a safety statement may result in serious consequences.

Prerequisites
It is recommended that readers become familiar with the document:
Alcatel-Lucent Remote Radio Head 2X40 W - 900 MHz for GSM and W-CDMA -
Technical Description, 3MN-01483-0001-DEZZA

Conventions used
Vocabulary conventions
For a list of the terms used in this document, see Alcatel-Lucent W-CDMA System -
Terminology, 9YZ-04088-0002-TQZZA.
For convenience, the terms RRH 2 X YY-ZZ or RRH are also used in this publication.
RRH 2X40-09 means this RRH variant:
• Supports two 40 W output power modules
• Operates in the 900 MHz bandwith
Typographical conventions
The following typographical conventions are used in this document:

Appearance Description
Italicized text Emphasized information
graphical user interface text Text that is displayed in a graphical user
interface or in a hardware label.
Document reference, reference number Related document that is referenced in the
document
PRELIMINARY

....................................................................................................................................................................................................................................
xii Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
About this document

PRELIMINARY
....................................................................................................................................................................................................................................
Related information
For information on subjects related to the content of this document, refer to the
documents listed in the following table:

Refer to this document At this location For more information on


Alcatel-Lucent W-CDMA http://support.alcatel-lucent. Terms used in Alcatel-Lucent
System - Terminology, com. 9300 W-CDMA documents.
9YZ-04088-0002-TQZZA
Alcatel-Lucent 9326 digital http://support.alcatel-lucent. Alcatel-Lucent 9326 digital 2U
2U Node B V2 - Technical com. Node B V2 :
Description, • Basic characteristics
3MN-00482-0003-DEZZA
• Hardware description
Alcatel-Lucent 9926 Base http://support.alcatel-lucent. Alcatel-Lucent 9926 Base Band
Band Unit Node B for com. Unit Node B
W-CDMA - Technical • Basic characteristics
Description,
• Hardware description
3MN-01792-0001-DEZZA
Alcatel-Lucent 9396 digital http://support.alcatel-lucent. The Alcatel-Lucent 9396 digital
2U Node B, Technical com. 2U Node B :
Description, • Basic characteristics
3MN-00514-0005-DEZZA
• Hardware description
Alcatel-Lucent 9353 http://support.alcatel-lucent. How to perform commands
Wireless Management com. available in the 9353 Wireless
System - User Guide, Management System (WMS)
9YZ-04088-0014-PCZZA Graphical User Interface (GUI).
Alcatel-Lucent 93xx Node B http://support.alcatel-lucent. How to perform the Node B
– Commissioning and Fault com. installation, commissioning and
Management User Manual: maintenance tasks using the
TIL, NN-20500-019 Node B TIL (Terminal for
Local Installation) tool
Alcatel-Lucent Remote http://support.alcatel-lucent. The Alcatel-Lucent Remote
Radio Head 2X40 W - 900 com. Radio Head 2X40 W- 900 MHz
MHz for GSM and for GSM and LTE:
W-CDMA Technical • Basic characteristics
Description,
• Hardware description
3MN-01483-0001-DEZZA

PRELIMINARY

Configurations
• Operating principals

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary xiii
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY About this document

....................................................................................................................................................................................................................................

Refer to this document At this location For more information on


Alcatel-Lucent BTS NEM http://support.alcatel-lucent. How to use the BTS NEM
User Guide, 3BK 21628 com.
AAAA PCZZA
Alcatel-Lucent Distributed http://support.alcatel-lucent. The Alcatel-Lucent Distributed
BTS Technical Description com. BTS for GSM:
- BTS Document • Basic characteristics
Sub-System Description,
• Hardware description
3BK 21679 AAAA TQZZA
Alcatel-Lucent GSM http://support.alcatel-lucent. How to commission a
Distributed BTS - com. Distributed BTS of an
Commissioning Manual, Alcatel-Lucent BSS.
3BK 17438 3151 RJZZA
Alcatel-Lucent GSM http://support.alcatel-lucent. How to perform GSM
Distributed BTS - com. corrective maintenance tasks
Corrective Maintenance applicable to the BTS and to
Handbook, 3BK 21643 the SUMx.
AAAA PCZZA

Document support
For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at
one of the following telephone numbers:
• 1-888-582-3688 (for the United States)
• 1-317-377-8618 (for all other countries)

Technical support
For technical support, contact your local Alcatel-Lucent customer support team. See the
Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact
information.

How to order
To order Alcatel-Lucent documents, contact your local sales representative or use Online
Customer Support (OLCS) (http://support.alcatel-lucent.com)
PRELIMINARY

How to comment
To comment on this document, go to the Online Comment Form (http://infodoc.alcatel-
lucent.com/comments/) or e-mail your comments to the Comments Hotline
(comments@alcatel-lucent.com).

....................................................................................................................................................................................................................................
xiv Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
1 Safety statements
1

Overview
Purpose
This chapter provides information on the structure of safety statements which may arise
in the course of your work.

Contents

Structure of safety statements 1-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 1-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Safety statements Structure of safety statements

....................................................................................................................................................................................................................................

Structure of safety statements


Overview
This topic describes the components of safety statements that appear in this document.

General structure
Safety statements include the following structural elements:

B C D
CAUTION

MP L E
Lifting hazard E F

SA
Lifting this equipment by yourself can result in injury
due to the size and weight of the equipment.
G
Always use three people or a lifting device to transport
and position this equipment. [ABC123]
H
Item Structure element Purpose
1 Safety alert symbol Indicates the potential for personal injury
(optional)
2 Safety symbol Indicates hazard type (optional)
3 Signal word Indicates the severity of the hazard
4 Hazard type Describes the source of the risk of damage or
injury
5 Safety message Consequences if protective measures fail
6 Avoidance message Protective measures to take to avoid the hazard
7 Identifier The reference ID of the safety statement
(optional)
PRELIMINARY

....................................................................................................................................................................................................................................
1-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Safety statements Structure of safety statements

PRELIMINARY
....................................................................................................................................................................................................................................
Signal words
The signal words identify the hazard severity levels as follows:

Signal word Meaning


DANGER Indicates an extremely hazardous situation which, if not avoided, will
result in death or serious injury.
WARNING Indicates a hazardous situation which, if not avoided, could result in
death or serious injury.
CAUTION Indicates a hazardous situation which, if not avoided, could result in
minor or moderate injury.
NOTICE Indicates a hazardous situation not related to personal injury.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 1-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Safety statements Structure of safety statements

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
1-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
2 Operating principles
2

Overview
Purpose
This chapter provides the RRH 2X40 operating rules according to the configuration
modes.

Contents

OAM principles 2-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 2-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Operating principles OAM principles

....................................................................................................................................................................................................................................

OAM principles
OAM mastership rules
In 2G configuration the Operation and Maintenance Center (OMC 2G) is used as
management system, while in 3G it is the Wireless Management System (WMS 3G).
When RRH is in 2G and 3G mixed mode the 2G system (OMC 2G) is the master, and
RRH acts as a virtual machine for 3G usage. Therefore some actions such as hardware
reset, software upgrade are only managed by the OMC 2G.
This table provides the OAM mastership rules:

Supervison
2G BTS OMC 2G NA
3G BBU NA WMS 3G
RRH 2G PA and TRX OMC 2G NA
Tx path
RRH 3G PA NA WMS 3G
RRH 2G/3G (Rx path, TMA) OMC 2G WMS 3G
RRH full reset OMC 2G NA
RRH virtual reset (resets only NA WMS 3G
one techno)
Inventory
RRH 2G inventory, including OMC 2G NA
TMA
RRH 3G inventory NA WMS 3G
2G BTS inventory including OMC 2G NA
cabinet
3G d2U inventory NA WMS 3G
Software management
RRH software OMC 2G NA
download/activation
RRH software version OMC 2G WMS 3G
reporting
PRELIMINARY

RRH and 3G BBU software NA WMS 3G


compatibility reporting
Power management
RRH 2G PA OMC 2G NA
....................................................................................................................................................................................................................................
2-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Operating principles OAM principles

PRELIMINARY
....................................................................................................................................................................................................................................

RRH 3G PA NA WMS 3G
Frequency management
RRH 2G PA Frequency OMC 2G NA
configuration
RRH 3G PA Frequency NA WMS 3G
configuration

External alarms management


VSWR configuration (*), OMC 2G WMS 3G
RRH Ext alarm configuration
2G Cabinet external alarms OMC 2G NA
configuration
RRH provisioning and Cabling / RRH port mapping
2G OMC 2G NA
3G NA WMS 3G
Switching mode
Switch RRH from 2G mode OMC 2G NA
to 2G+3G mode
Switch RRH from 2G+3G OMC 2G NA
mode to 2G
Switch RRH from 2G+3G OMC 2G NA
mode to 3G
Switch RRH from 3G mode OMC 2G NA
to 2G+3G
Counter support
2G OMC 2G NA
3G NA WMS 3G/NPO
RET ALD according to AISG v2.0
RET control NA WMS 3G
Commissioning
RRH NEM NA
PRELIMINARY

Capacity licensing
3G capacity licensing NA WMS 3G
(frequencies/power) for 3GPA
2G capacity licensing OMC 2G NA

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 2-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Operating principles OAM principles

....................................................................................................................................................................................................................................
(*) Note : Due to the software achitecture in 2G/3G MC-RRH, recovery actions
performed on 3G VSWR part have to be also performed on the 2G part. For more details
refer to document « BTS Alarm Dictionary / BTS Document / Reference Guide Release
B11 / 3BK 21625 AAAA PCZZA Ed.14.

Multi-techno interoperability
This table lists the impacts over the service of some operating actions:

Action Management system Service impact


RRH reset OMC 2G Outage on 2G and 3G
WMS 3G Re-initialisation of 3G SW
only,
No impact on 2G service
SUMx reset OMC 2G No impact on RRH Call IP
SUMx failure service
No impact on 3G service
2G BTS SW replacement OMC 2G SW upgrade with RRH load:
outage of 2G and 3G service
SW upgrade without RRH
load: outage of 2G service, no
outage of 3G service
2G power setting OMC 2G No impact on 3G service
3G power setting WMS 3G No impact on 2G service
2G frequency setting OMC 2G No impact on 3G service
3G frequencies setting WMS 3G No impact on 2G service
PRELIMINARY

....................................................................................................................................................................................................................................
2-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
3 Hardware description
3

Overview
Purpose
This chapter describes:
• The RRH 2X40W bulkhead hardware
• The connectivity
• The LED indicators
• The SUMx

Contents

RRH 2X40-09 Hardware description 3-2


Node B hardware requirements for RRH support 3-11

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 3-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Hardware description RRH 2X40-09 Hardware description

....................................................................................................................................................................................................................................

RRH 2X40-09 Hardware description


Bulkhead description
The following figure shows a view of the RRH 2X40-09 bulkhead.

Figure 3-1 RRH 2X40-09 bulkhead

Connector description
This topic gives an overview of the connectors located on the RRH bulkhead and on the
SUMx front pannel.
PRELIMINARY

....................................................................................................................................................................................................................................
3-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Hardware description RRH 2X40-09 Hardware description

PRELIMINARY
....................................................................................................................................................................................................................................
The external interfaces are located at the bottom side of the RRH housing.

Interface Connector
DC power input For DC power connection:
• Cable composed of two 6 mm² cores (10
AWG), blue (–48 V DC), black (0 V)
On unit side:
• Tyco connector type, three pin circular
female for DC connection
Ground Adapted ground cable
RETA The RRH is equipped with an interface for
controlling a RET antenna.
All physical and electrical specifications of
this interface concerned are compatible with
the AISG standard.
Interface between RRH and RETA (AISG
connector):
• Protocol: RS-485
• Circular connector: female, eight pins,
IEC 60 130-9, IP 67
• DC power specification: + 14 V DC
nominal
Antenna connections 7/16 female connectors for the connection
with the main or diversity antenna
External alarms Circular 12 pin connector for the connection of
two external customer alarms (two external
alarm pairs)
Ethernet interface One RJ-45 Ethernet port for local terminal
connection

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 3-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Hardware description RRH 2X40-09 Hardware description

....................................................................................................................................................................................................................................

Interface Connector
1
Optical interfaces Two optical ports: one master, one slave2
The SFP optical transceivers are Single Mode
(SM) or Multi Mode (MM) 3.
SFP optical transceiver SM:
• RRH (slave port) to SUMx: SFP 1310 nm
• RRH (master port) to RRH (daisy chain):
SFP 1550 nm
SFP optical transceiver Multi Mode (MM):
• RRH (slave port) to SUMx: SFP 850 nm
• RRH (master port) to RRH (daisy chain):
SFP 850 nm
The SFP optical transceivers are equipped with
LC connectors.

Notes:
1. The optical interfaces support SFP transceivers which can be installed on field without
opening the RRH.
2. The RRH master port is used in daisy chain mode to connect the second RRH.
3. The optical mode (SM or MM) is given by the distance between the Node B and the RRH.

LED description
There is only one green-red bi-colored LED on the RRH. The BBU or the SUMx gets the
LED status periodically and reports it to the management system.
The following table lists the LED indicator states and the associated meaning.

LED status RRH state


OFF Power not applied
GREEN Powered and RRH is transmitting
BLINKING GREEN Powered, all OK but RF transmitting disabled
RED Major hardware failure
YELLOW CPRI link failure
BLINKING YELLOW Initial power on and firmware download in
PRELIMINARY

progress

....................................................................................................................................................................................................................................
3-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Hardware description RRH 2X40-09 Hardware description

PRELIMINARY
....................................................................................................................................................................................................................................
SUMx front panel
The following figure shows a view of the SUMx front panel.

Figure 3-2 SUMx front panel

PRELIMINARY

The connection is located at the left side of the subrack front panel.

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 3-5
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Hardware description RRH 2X40-09 Hardware description

....................................................................................................................................................................................................................................
It provides connection possibility for external interfaces as:
• Power supply
• Ground
• E1
• External alarms
This table describes the connector used for the interface located on the SUMx front panel:

Interface Connector
Ground Provides ground interface for the complete
subrack.
Power supply Provides power supply interface for all
subrack components.
Transmission interface, E1 PORT 1/2 Provides 2 Abis Interfaces.
9-pin Sub-D female
The connector is pre-equipped for both 75
ohm and 120 ohm impedance cables. The
impedance is selected by the type of cable
connector used.
Two more Abis Interfaces are possible with a
piggy-back board.
HSE 1/2 RJ-45 Ethernet connector
Provides two High Speed Ethernet interfaces
for future use.
HSO1, HSO2, HSO3 SFP connector
High speed optical interfaces for Remote
Radio Head connection.
OPT1, OPT2 SFP connector
Optical interfaces for future use
BTS Connection Area 37-pin Sub-D female
Provides the following digital interfaces:
• XBCB
• XRT
• XGPS, XGPS CLKX
PRELIMINARY

• CLK1
• Abis relay control

....................................................................................................................................................................................................................................
3-6 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Hardware description RRH 2X40-09 Hardware description

PRELIMINARY
....................................................................................................................................................................................................................................

Interface Connector
BTS Terminal To connect a computer terminal.
Provides V.24 asynchronous serial interface
for local maintenance and configuration
purposes
Presence of a terminal automatically detected
External alarms Provides eight interfaces to connect eight
external alarms (adapted to the customer
requirements)
Test 9-pin Sub-D male
Provides remote access
GPS SMB male
Provides a synchronization output from an
optional on-board GPS receiver
TRANS1 RJ-45
Provides traffic connection to the IP network
MMI-ETH RJ-45
Used for connection with PC NEM
For local maintenance and configuration
purposes
AUX1 RJ-45
Connection for auxiliary equipment

There are eight LEDs on the SUMx front panel, which provide a visual indication of the
operational status of the SUMx module. The following table describes each LED and
defines the associated operational states.
SUMx LED description

LED Color Status Description


P1 Yellow Abis link 1 state
ON Abis link 1
configured and ok
Blinking Failure detected on
PRELIMINARY

Abis link 1
OFF Abis link 1 not
configured (not used)
P2 Yellow Abis link 2 state
....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 3-7
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Hardware description RRH 2X40-09 Hardware description

....................................................................................................................................................................................................................................

LED Color Status Description


ON Abis link 2
configured and ok
Blinking Failure detected on
Abis link 2
OFF Abis link 2 not
configured (not used)
P3 Yellow Abis link 3 state
ON Abis link 3
configured and ok
Blinking Failure detected on
Abis link 1
OFF Abis link 3 not
configured (not used)
P4 Yellow Abis link 4 state
ON Abis link 4
configured and ok
Blinking Failure detected on
Abis link 4
OFF Abis link 4 not
configured (not used)
OP Yellow Operational status
ON Module in
operational status
Short blinking Mismatch between
SW running on the
board and SW
version set by the
management system
Blinking Transient state to
reach operational
state
Fast blinking State of the module
unknown
PRELIMINARY

OFF Module is not in


operational status
OMTr Yellow Status of the O&M transmission link

....................................................................................................................................................................................................................................
3-8 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Hardware description RRH 2X40-09 Hardware description

PRELIMINARY
....................................................................................................................................................................................................................................

LED Color Status Description


ON OML connection
established
Blinking Transient state
corresponding to the
OML connection
establishment
Fast blinking Searching of the
OML on the Abis
(Scanning mode)
OFF OML disconnected,
no ongoing attempt to
establish the OML
connection
ON Green Power status
ON SUMx powered ON
OFF SUMx powered OFF
FAULT Red Alarm status
ON Fatal alarm on
SUMX or on any
SBL inside the BTS
Blinking Non fatal alarm on
SUMX or on any
SBL inside the BTS
Short blinking OCXO warm up
OFF No alarm

The backplane is a multi-layer PCB. It distributes the – 48/ – 60 V DC, to power the
subrack equipment, and the digital signals to the SUMx module.
On the rear side of the back panel there is a Ribbon Cable C 64 M (DIN 41612)
connector. It is used to interconnect the subracks and the SUMx 19”poste for future
applications.
The Abis Interface is the digital interface to the BSC. The SUMx provides four G.703
Abis interfaces.
PRELIMINARY

They support the following communications links:


• TCH, which carries speech and/or data
• OML, which uses a LAPD protocol

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 3-9
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Hardware description RRH 2X40-09 Hardware description

....................................................................................................................................................................................................................................
• RSL, which carries signaling data for the telecommunications functions
• Q1 Link, which carries transmission management data
PRELIMINARY

....................................................................................................................................................................................................................................
3-10 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Hardware description Node B hardware requirements for RRH support

PRELIMINARY
....................................................................................................................................................................................................................................

Node B hardware requirements for RRH support


Requirement
The following Node Bs are programmed to support RRH.

Parameter 2G 3G 2G/3G
BBU SUMX 19” Most relevant d2U Most relevant d2U
versions and versions and
modules: x and e modules: x and e
modules modules
SUMX 19”
RRH MC-RRH 2X40-09 MC-RRH 2X40-09 RRH 2X40-09
supporting 2G only supporting 3G only supporting 2G and
mode mode 3G mixed mode

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 3-11
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Hardware description Node B hardware requirements for RRH support

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
3-12 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
4 4reventive maintenance
P
activity

Overview
Purpose
This chapter describes the preventive maintenance activity applicable to the RRH
2X40W.

Contents

Preventive maintenance activity 4-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 4-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Preventive maintenance activity Preventive maintenance activity

....................................................................................................................................................................................................................................

Preventive maintenance activity


Preventive maintenance
The preventive maintenance is used to periodically test the items of equipment that do not
directly trigger any alarm at the OMC. However, the execution of preventive maintenance
procedures can trigger alarms at the OMC.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
These procedures must be performed according to the following schedules.
It is possible to group some of the procedures, which reduces the intervention time. The
intervention time indicated corresponds to the intervention time for each item of
equipment.
Note: In certain environments, these procedures may be required more frequently:
• Environmental conditions and service door opening-closing frequency may impact
the service door gasket ageing.
• Systems located in high seismic areas may require anchor bolts and mounting
hardware to be tightened periodically especially for field installed items.
• Connectors may require periodic cleaning in dirty and high humidity areas.

Preventive maintenance schedule for RRH equipment

Procedure Periodic- Test


ity duration
(approx.)
“Inspecting gaskets” (p. 7-2) Every site Five
visit or at minutes
least once
a year
“Inspecting connectors” (p. 7-4) Every two 10 minutes
years
“Inspecting pole brackets and pole bands” (p. 7-6) Every two 10 minutes
years or
earthquake
PRELIMINARY

....................................................................................................................................................................................................................................
4-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Preventive maintenance activity Preventive maintenance activity

PRELIMINARY
....................................................................................................................................................................................................................................
Preliminary checks before performing preventive maintenance procedures

WARNING
Personal injury hazard
The personnel working on the cabinet must be authorized to work according to the
applicable safety standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.

Description of a preventive maintenance procedure


A preventive maintenance procedure is divided into the following parts:
• Title
• Main body with following information:
– Intervention time
– Tools required
– Step-by-step actions
– One or more figures to help you execute the actions

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 4-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Preventive maintenance activity Preventive maintenance activity

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
4-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
5 5 orrective maintenance
C
activity

Overview
Purpose
This chapter describes the corrective maintenance activity applicable to the RRH 2x40W.

Contents

Corrective maintenance activity 5-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 5-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................

Corrective maintenance activity


Corrective maintenance
The network maintenance is based on the supervision of the network, by using the OAM
graphical interface.
For more information, see
• Alcatel-Lucent 9353 Management System - User Guide, 9YZ-04088-0014-PCZZA
• Alcatel-Lucent Distributed BTS/9100 BTS/9110 Micro BTS Corrective Maintenance
Handbook
• Alcatel-Lucent 9353 Management System - Node B Alarms Reference Guide,
NN-20500-018
It is also based on the identification and replacement of faulty items of equipment, using
the alarms.
The process consists of two steps:
1. Locating and identifying the faulty items of equipment.
2. Replacing the faulty items of equipment following the replacement procedure detailed
in this document and in the document: Alcatel-Lucent Distributed BTS/9100 BTS/9110
Micro BTS Corrective Maintenance Handbook

Replacing the faulty items of equipment


In the case of the RRH 2X40W , no separate module replacement exists. The whole RRH
2X40W must be replaced.
The following table indicates the orderable item (code) for each module or item to be
replaced.

Procedure Orderable items Order Code Provisioning rule


“Replacing the RRH” RRH 2X40W 3BK 28624 AAAx. Pre-integrated cabinet
(p. 8-3) OD with solar shield
Alcatel-Lucent SUMx 19” 3BK 27656 AA
Distributed BTS/9100
BTS/9110 Micro BTS
Corrective
Maintenance Handbook
“Replacing the SUMx”
PRELIMINARY

(p. 8-9)

....................................................................................................................................................................................................................................
5-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Corrective maintenance activity Corrective maintenance activity

PRELIMINARY
....................................................................................................................................................................................................................................

Procedure Orderable items Order Code Provisioning rule


Alcatel-Lucent Optical Fiber Link tbc Two per RRH
Distributed BTS/9100
BTS/9110 Micro BTS
Corrective
Maintenance Handbook
“Replacing the optical
fiber link” (p. 8-14)
Alcatel-Lucent SFP Optical tbc One per RRH
Distributed BTS/9100 Transceiver Connection to the
BTS/9110 Micro BTS digital unit on slave
Corrective port
Maintenance Handbook
“Replacing the SFP
module” (p. 8-19)

For optional orderable items, see the following documents:


• RRH 2X40-900 MHz Model Offer Provisioning Guide, UMT/PFO/APP/to be defined

Description of a replacement procedure


A replacement procedure is divided into the following parts:
• The title
• The main body with the following information:
– The intervention time
– The tools required
– The impact of the procedure, if necessary
– The step-by-step actions of the procedure
One or more figures are provided to help you execute the actions. They show the FRU
(Field Replaceable Unit) schematically and where it is located in the cabinet.

Intervention restrictions
There may be a lapse of time between the identification of the alarm at the Access OAM
Graphic User Interface (GUI) and the time you arrive at the site.
You must be synchronized with the access network controller or system administrator (by
PRELIMINARY

telephone) before an on-site intervention, in the following cases:


• Isolating procedures
• Completion of an on-site intervention
• Return to service procedure
....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 5-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................
General personnel safety instructions
The personnel must obey the safety instructions specific to the installation site:
• Rules concerning the premises (see instructions posted on site or in the building)
• Rules linked to general personnel safety instructions
The personnel working on the cabinet must be authorized to work according to security
standards.

Equipment safety instructions


The RRH 2X40W normally operates when the external temperature is between –40°C and
+50°C.
PRELIMINARY

....................................................................................................................................................................................................................................
5-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
6 6ower up and power down
P
procedures

Overview
Purpose
This chapter describes how to power up and power down the RRH 2X40W.

Contents

Powering up the RRH 6-2


Powering down the RRH 6-4

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 6-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Power up and power down procedures Powering up the RRH

....................................................................................................................................................................................................................................

Powering up the RRH


Before you begin
Before powering up the RRH 2X40W, ensure that the safety instructions are followed.
It is essential that:
• The protective earth is connected to the equipment earth terminal.
• The electrical power to the equipment is disconnected from the site power panel.
Check the fuse ratings at the site power panel. Refer to SPP-68 Specification for
Alcatel-Lucent Multi-Standard Distributed BTS Solution site preparation document for
details.
Important!
Service door
Do not open the service door on site.

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.

Procedure
Perform the following procedure to power up the RRH 2X40W.
...................................................................................................................................................................................................

1 At the site DC power panel, put the site circuit breaker of the SUMx board on the ON
position.
...................................................................................................................................................................................................

2 On the SUMx board, check that the power LED switches on.
...................................................................................................................................................................................................
PRELIMINARY

3 At the site DC power panel, put the site circuit breaker of the RRH 2X40W on the ON
position.

....................................................................................................................................................................................................................................
6-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Power up and power down procedures Powering up the RRH

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

4 On the RRH 2X40W, check that the power LED switches on.
E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 6-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Power up and power down procedures Powering down the RRH

....................................................................................................................................................................................................................................

Powering down the RRH


Before you begin
Before powering down the RRH 2X40W, ensure that the safety instructions are followed.
Important!
Service door
Do not open the service door on site.

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.

Procedure
Perform the following procedure to power down the RRH 2X40W.
...................................................................................................................................................................................................

1 If the BTS is supported by SSC, put the circuit breaker of the battery on the OFF
position.
...................................................................................................................................................................................................

2 At the site power panel, put the site circuit breaker of the RRH 2X40W on the OFF
position.
...................................................................................................................................................................................................

3 On the RRH 2X40W, check that the power LED switches off.
...................................................................................................................................................................................................

4 In the cabinet hosting the SUMX 19”, put the site circuit breaker of the SUMx board on
the OFF position.
...................................................................................................................................................................................................
PRELIMINARY

5 On the SUMx board, check that the power LED switches off.
E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
6-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Power up and power down procedures Powering down the RRH

PRELIMINARY
....................................................................................................................................................................................................................................

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 6-5
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Power up and power down procedures Powering down the RRH

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
6-6 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
7 7 RH preventive
R
maintenance procedures

Overview
Purpose
This chapter contains the preventive maintenance procedures applicable to the RRH
2X40W.

Contents

Inspecting gaskets 7-2


Inspecting connectors 7-4
Inspecting pole brackets and pole bands 7-6

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 7-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH preventive maintenance procedures Inspecting gaskets

....................................................................................................................................................................................................................................

Inspecting gaskets
Before you begin
The cabinet gaskets are located on the body and on the service door of the RRH 2X40W.
The RRH 2X40W does not operate when their body gasket is damaged or unstuck. Only
the gasket on the service door needs an inspection.
Carry out the following procedure to inspect the gasket on the RRH 2X40W service door.
Note: The RRH 2X40W remains supplied with the mains power supply.
Intervention time: five minutes
Tools required: none

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.

NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.
PRELIMINARY

Important! Service door


Do not open the service door.

....................................................................................................................................................................................................................................
7-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH preventive maintenance procedures Inspecting gaskets

PRELIMINARY
....................................................................................................................................................................................................................................
Procedure
...................................................................................................................................................................................................

1 <Optional> If a connection box is pre-assembled to the RRH 2X40W or the mounting kit,
open the tamper-resistant access panel to access the service door.
Perform a visual test behind the service door.
Check that:
• The gasket does not move.
• The gasket is not unstuck.
• The compression is correct.
...................................................................................................................................................................................................

2 <Optional> If a connection box is pre-assembled to the RRH 2X40W or the mounting kit,
close the tamper-resistant access panel.
E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 7-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH preventive maintenance procedures Inspecting connectors

....................................................................................................................................................................................................................................

Inspecting connectors
Before you begin
Intervention time: 10 minutes
Tools required: adjustable wrench

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.

NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.

Procedure
Carry out the following procedure to inspect the connector seals on an RRH 2X40W
bulkhead.
...................................................................................................................................................................................................
PRELIMINARY

1 Check the bulkhead connectors visually.


Note: If a connection box is pre-assembled to the RRH 2X40W or the mounting kit,
open the tamper-resistant access panel to check the bulkhead connectors.

....................................................................................................................................................................................................................................
7-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH preventive maintenance procedures Inspecting connectors

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

2 Check that connectors are well tightened.


Result: If they move, tighten them with the adjustable wrench.
...................................................................................................................................................................................................

3 <Optional> If a connection box is pre-assembled to the RRH 2X40W or the mounting kit,
close the tamper-resistant access panel.
E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 7-5
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH preventive maintenance procedures Inspecting pole brackets and pole bands

....................................................................................................................................................................................................................................

Inspecting pole brackets and pole bands


Before you begin
The RRH 2X40W can be installed in an outdoor environment using an installation kit to
install the MC-RRH unit on pole or on wall.
Intervention time: 10 minutes
Tools required:
• 17-mm (11/16") socket with ratchet
• 14-mm (9/16") open-end wrench

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.

NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.
PRELIMINARY

Procedure
Carry out the following procedure to check the pole brackets and pole bands of the RRH
2X40W.

....................................................................................................................................................................................................................................
7-6 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH preventive maintenance procedures Inspecting pole brackets and pole bands

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

1 Perform a visual test.


Check that:
• The pole brackets are well tightened to the wall bracket. If not, proceed toStep 2.
• The pole bands are well tightened around the pole. If not, proceed to Step 2.

Figure 7-1 Pole brackets and pole bands

...................................................................................................................................................................................................

2 Tighten the pole brackets and/or the pole bands.


Note: Use the 17-mm socket to tighten the pole brackets (tightening torque: 32.2
N.m).
Use the 14-mm open-end wrench to tighten the pole bands.
E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 7-7
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH preventive maintenance procedures Inspecting pole brackets and pole bands

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
7-8 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
8 8 RH corrective
R
maintenance procedure

Overview
Purpose
This chapter describes the corrective maintenance procedure applicable to the RRH
2X40W.

Contents

Locating the faulty element 8-2


Replacing the RRH 8-3
Replacing the SUMx 8-9
Replacing the optical fiber link 8-14
Replacing the SFP module 8-19

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Locating the faulty element

....................................................................................................................................................................................................................................

Locating the faulty element


Purpose
Carry out the following procedure to determine whether it is the 2G or 3G side which is
in failure in case of alarm detected on the 3G side (MC-RRH).

Procedure
Alarm detected on 3G side
...................................................................................................................................................................................................

1 Contact 2G maintenance team


...................................................................................................................................................................................................

2
They are updating the Then
SUMX board
Yes • Wait till the end of the update load
• Check with 2G maintenance team that the MC-RRH is
configured in 3G
• Go to Step 5
No • MC-RRH configured in 3G go to Step 3
• MC-RRH not configured in 3G go to Step 4

...................................................................................................................................................................................................

3 Carry out the replacement MC-RRH procedure


...................................................................................................................................................................................................

4 Ask the 2G maintenance team to configure MC-RRH in 3G


...................................................................................................................................................................................................

5 Check there is no alarm and that the system is working correctly


E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
8-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the RRH

PRELIMINARY
....................................................................................................................................................................................................................................

Replacing the RRH


Before you begin
The replacement procedure of the RRH 2X40W described below is based on the
following assumptions:
• The RRH kit was delivered with a solar shield, a handle, a connection box, and two
RF lightning protectors.
• To replace the RRH main body, you ordered the spare part: RRH 2X40W
pre-integrated cabinet 3BK 28624 AAA
Note: For details, see “Replacing the faulty items of equipment” (p. 5-2).
Note: The RRH 2X40W remains supplied with the mains power supply.
Intervention time:
• 115 minutes
Hardware Tools:

Item Reference
Utility PC (BTS LMT) DES 002
Basic toolkit OUT 001
A small flathead screwdriver
A BTS NEM1
An RS-232 asynchronous communication link
cable
Ethernet cable

Note: 1 BTS NEM is a software tool installed on a PC/laptop


Refer to BTS NEM User Guide for information on how to use the BTS NEM.

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
PRELIMINARY

IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA


No.10) may install or service the installation.

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the RRH

....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.

Procedure
Carry out the following procedure to replace an RRH 2X40.
...................................................................................................................................................................................................

1 Open the front door of the rack where the SUMX 19” is installed.
...................................................................................................................................................................................................

2 Connect the BTS NEM to the MMI/MMI-ETH port on the SUMX 19”.
...................................................................................................................................................................................................

3 From the BTS NEM Online Mode menu, follow the menu path:
Configuration →Hardware Settings→Begin HW Modification.
...................................................................................................................................................................................................

4 If Then
The RRH is the last of the sector. Use the BTS NEM to disable BTS_TE.
Enter three minutes in the WTC field to ensure
an orderly shutdown of the BTS.
Wait three minutes before continuing.
Disable the corresponding Remote Access
(RA).
PRELIMINARY

This is not the last RRH of the sector. Set the parameter SBLs Other Than BTS_TEL
to disable for the impacted RRH.

....................................................................................................................................................................................................................................
8-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the RRH

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

5 Preliminary operations:
• Shut down the RRH 2X40, see the procedure “Powering down the RRH ” (p. 6-4).
• Remove the solar shield, using the T25 TORX security drive, and store it in a safe
location.
• Disconnect all external cables from the bulkhead in the following order:
– Power cable
– Optical fiber cable
– Antenna cables
– Ground cable
Note: If a connection box is pre-assembled to the RRH 2X40W or the mounting kit,
open the tamper-resistant access panel to disconnect all external cables from the RRH
2X40W bulkhead.
• Remove the two RF lightning protectors from the 7/16 female RF connectors (on top
of the main body) and store them in a safe location.
...................................................................................................................................................................................................

6 Loosen the screws securing the module.


...................................................................................................................................................................................................

7 Remove the defective RRH 2X40W:


• Unscrew the four bolts from the mounting kit.
• Remove the RRH 2X40W from the mounting kit.
...................................................................................................................................................................................................

8 From the Online Mode menu bar, select:


• Configuration → Hardware Settings → Remove HW
• Remove the modules associated with the replaced RRH 2X40W.
...................................................................................................................................................................................................

9 Close the Remove Harware window.


...................................................................................................................................................................................................

10 Before sending the defective RRH 2X40W to the repair center, store the connection box,
the solar shield and the RF lightning protectors, since these items will be reused for the
installation of the new RRH 2X40W.
PRELIMINARY

Note: Only the main body of the faulty RRH 2X40W is to be sent to the repair center.
...................................................................................................................................................................................................

11 Keep the existing cables and protect connectors with caps near to the existing RRH to be
reused if necessary.

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-5
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the RRH

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

12 Install the new RRH 2X40W:


• Fix the handle to the main body of the new RRH 2X40W.
• Insert the two RF lightning protectors on the 7/16 female RF connectors (on top of the
main body).
• Hang the new RRH 2X40W on the mounting kit.
• Screw the four M10 bolts to the mounting kit.
• Connect all external cables to the RRH 2X40W in the following order:
– Ground cable
– Antenna cables
– Optical fiber cable
– Power cable
Note: If a connection box is pre-assembled to the RRH 2X40W or the mounting kit,
open the tamper-resistant access panel to connect the external cables to the RRH
2X40W bulkhead, then close the tamper-resistant access panel.
• Install the solar shield using the T25 TORX security drive.
...................................................................................................................................................................................................

13 Switch on the RRH 2X40W, see the procedure “Powering up the RRH ” (p. 6-2).
...................................................................................................................................................................................................

14 Check that the new RRH module is displayed on the BTS NEM.
If it is not displayed within three minutes, select Configuration →Reload BTS Data to
refresh the list of modules.
...................................................................................................................................................................................................

15 From the Online Mode menu bar, select:


Configuration → Hardware Settings → End HW Modification
Result: The Configuration window automatically opens.
...................................................................................................................................................................................................

16 Double click on the impacted module.


Result: The Edit RRH Configuration window automatically opens.
...................................................................................................................................................................................................

Enter:
PRELIMINARY

17
• The sector number
• The RRH ID
• The link redundancy

....................................................................................................................................................................................................................................
8-6 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the RRH

PRELIMINARY
....................................................................................................................................................................................................................................
Click on OK.
...................................................................................................................................................................................................

18 Close the RRH Configuration window.


Result: The following message is displayed: Please note that for inserting
Multicarrier the scenario may take up to 115 min.
...................................................................................................................................................................................................

19 Click on OK .
Result: The Multicarrier Settings window automatically opens.
...................................................................................................................................................................................................

20 Fill in the parameter fields for the new RRH.


Result: The End Hardware Modification Confirmation window opens.
...................................................................................................................................................................................................

21 Accept the new configuration.


Result: The Stop Commissioning window opens.
...................................................................................................................................................................................................

22 Select the module to be updated and click on OK.


Result: The Save commissioning report window appears displaying the message Do
you want to save the result into a commissioning report? .
...................................................................................................................................................................................................

23 Select Yes if you want to save the result otherwise select either No or Cancel.
Result: The BTS Monitoring window opens with the following dialog box: Please
check the configuration of BTS! Do you accept this configuration and start HW
audit now? If [yes] wait for completion of HW audit to see final result.
...................................................................................................................................................................................................

24 Click on Yes and wait till the end of the process.


...................................................................................................................................................................................................

25 If the impacted RA SBL is disabled, initialize the RA.


...................................................................................................................................................................................................

26 Init BTS_TEL SBL and ensure that BTS_TEL SBL is IT before continuing to the next step.
PRELIMINARY

...................................................................................................................................................................................................

27 On the BTS NEM select in the menu Remote Inventory.

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-7
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the RRH

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

28 In the Remote Inventory window double click on the line for the new RRH.
The Modify Remote Inventory window opens.
...................................................................................................................................................................................................

29 In the Manufacturing pane, update the remote inventory with the following information:
• Network identity
• Logical site name
• Commissioning (installation) date
...................................................................................................................................................................................................

30 Select the option: Apply RI Changes.


...................................................................................................................................................................................................

31 In the Modify Remote Inventory window click on OK to save the changes.


...................................................................................................................................................................................................

32 Using the BTS NEM, check that there are no remaining alarms and that the RRH 2X40W
is operationnal.
...................................................................................................................................................................................................

33 Stop the BTS NEM.


...................................................................................................................................................................................................

34 Disconnect the BTS NEM.


...................................................................................................................................................................................................

35 Close the front door of the rack.


E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
8-8 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the SUMx

PRELIMINARY
....................................................................................................................................................................................................................................

Replacing the SUMx


Before you begin
The procedure to replace the SUMx consists of four steps:
• Shut down of the BTS.
• Replace the SUMx.
• Replace the cables and update settings.
• Restart the BTS.
To replace the SUMx you ordered the spare part: 3BK 27656 AA.
Intervention time:
• 60 minutes
Tools required:

Item Reference
Utility PC (BTS LMT) DES 002
Basic toolkit OUT 001
A small flathead screwdriver
A BTS NEM1
Extraction tool
An RS-232 asynchronous communication link
cable
Ethernet cable

Note: 1 BTS NEM is a software tool installed on a PC/laptop


Refer to BTS NEM User Guide, 3BK 21628 AAAA PCZZA for information on how
to use the BTS NEM.

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
PRELIMINARY

For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-9
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the SUMx

....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.

Shut down the BTS


Carry out the procedure to shut down the BTS where is located the SUMx.
...................................................................................................................................................................................................

1 Open the front door of the rack where the SUMx is installed.
...................................................................................................................................................................................................

2 Connect the BTS NEM to the MMI/MMI-ETH port on the SUMx.


...................................................................................................................................................................................................

3 Using the BTS NEM, display the following information and write it down for use later in
the procedure:
• All Security Blocks (SBL) states
• All outstanding alarms
• SUMx Q1 address
...................................................................................................................................................................................................

4 Using the BTS NEM, upload the BTS transmission settings.


...................................................................................................................................................................................................

5 Using the BTS NEM, disable the BTS_TELx SBLs for each cell (x = 1 to 3 sectors, as
applicable).
PRELIMINARY

Enter three minutes in the WTC field for each cell to ensure an orderly shutdown of the
BTS.
Note: To perform this action, the Monitor BTS_TEL & BTS_OM must be selected.

....................................................................................................................................................................................................................................
8-10 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the SUMx

PRELIMINARY
....................................................................................................................................................................................................................................
Ensure that all the BTS_TELx SBLs for each cell are OPR before continuing to the next
step.
E...................................................................................................................................................................................................
N D O F S T E P S

Replace the SUMx


Carry out the procedure to replace the SUMx.
...................................................................................................................................................................................................

1 Disconnect the Abis cable on the front panel of the SUMx and the BTS NEM cable.
...................................................................................................................................................................................................

2 Disconnect the optical fiber cables from the HSO01, HSO02 and HSO03 connectors on
SUMx.
...................................................................................................................................................................................................

3 Disconnect the power cable from the SUMx.


...................................................................................................................................................................................................

4 If the SUMx contains a GPS receiver, disconnect the GPS cable on the front panel of the
SUMx.
...................................................................................................................................................................................................

5 Disconnect the ground cable from the SUMx.


...................................................................................................................................................................................................

6 Connect the anti-static wrist strap.


...................................................................................................................................................................................................

7 Loosen the screws securing the SUMx and remove the board.
Note: If the SUMx has a GPS receiver installed, remove the module from the faulty
board and install it on the new board. Refer to the procedure Replace GPS Receiver in
the document Alcatel-Lucent GSM Distributed BTS/9100 BTS/9110 Micro BTS -
Corrective Maintenance Handbook, 3BK 21643 AAAA PCZZA.
...................................................................................................................................................................................................

8 Insert the new SUMx in its position and secure it with the screws.
...................................................................................................................................................................................................
PRELIMINARY

9 Disconnect the anti-static wrist strap.

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-11
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the SUMx

....................................................................................................................................................................................................................................
Replace the cables and update settings
Carry out the procedure to replace the cables and update settings.
...................................................................................................................................................................................................

1 Reconnect the BTS NEM cable to the MMI/MMI-ETH port on the front panel of the
SUMx.
...................................................................................................................................................................................................

2 Reconnect ground and power cable to the SUMx.


Important! Do not reconnect the other cables to the front panel.
...................................................................................................................................................................................................

3 Use the BTS NEM to set the SUMx Q1 address as noted in Step 3.
...................................................................................................................................................................................................

4 Using the BTS NEM, download to the BTS the transmission settings from the file
uploaded in Step 4
...................................................................................................................................................................................................

5 Reconnect the Abis cable to the front panel of the SUMx.


...................................................................................................................................................................................................

6 Reconnect the optical fiber cables to the HSO01, HSO02 and HSO03 connectors on the
SUMx.
...................................................................................................................................................................................................

7 If the SUMx contains a GPS receiver, connect the GPS cable on the front panel of the
SUMx.
E...................................................................................................................................................................................................
N D O F S T E P S

Restart the BTS


Carry out the procedure to restart the BTS.
...................................................................................................................................................................................................

1 Using the BTS NEM, initialize the BTS_TELx SBLs for each cell (x = 1 to 3 sectors, as
applicable).
PRELIMINARY

Ensure that all the BTS_TELx SBLs for each cell are IT before continuing to the next step.
...................................................................................................................................................................................................

2 Using the BTS NEM, display the states of all SBLs and all the outstanding alarms.
Ensure they are the same as those written in Step 3
....................................................................................................................................................................................................................................
8-12 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the SUMx

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

3 Using the BTS NEM, update the remote inventory on the new SUMx with the following
information:
• Commissioning (installation) date
• Network identity
• Logical site name
...................................................................................................................................................................................................

4 Disconnect the BTS NEM.


...................................................................................................................................................................................................

5 Close the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-13
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the optical fiber link

....................................................................................................................................................................................................................................

Replacing the optical fiber link


Before you begin
The optical fiber link is connected to the SUMx from the GNC module and to the RRH
2X40W module from the optical fiber connection area.
The procedure to replace the optical fiber link consists of two steps:
• Remove the optical fiber link
• Replace the optical fiber link
Intervention time:
• 60 minutes
Tools required:

Item Reference
Utility PC (BTS LMT) DES 002
Basic toolkit OUT 001
A small flathead screwdriver
A BTS NEM1
Extraction tool
An RS-232 asynchronous communication link
cable
Ethernet cable

Note: 1 BTS NEM is a software tool installed on a PC/laptop


Refer to BTS NEM User Guide, 3BK 21628 AAAA PCZZA for information on how
to use the BTS NEM.

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
PRELIMINARY

IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA


No.10) may install or service the installation.

....................................................................................................................................................................................................................................
8-14 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the optical fiber link

PRELIMINARY
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.

Remove the optical link


Carry out the procedure to remove the optical link.
...................................................................................................................................................................................................

1 Open the front door of the rack where the SUMx is installed.
...................................................................................................................................................................................................

2 Connect the BTS NEM PC to the MMI/MMI-ETH port on the SUMx.


...................................................................................................................................................................................................

3 Disable the BTS_TEL corresponding to the impacted sector number.


...................................................................................................................................................................................................

4 Disable the RA for the impacted RRH 2X40W module.


...................................................................................................................................................................................................

5 Disconnect the optical fiber cable from the SUMx.


...................................................................................................................................................................................................

6 Identify the connector components.


...................................................................................................................................................................................................

7 Loosen the nut spiral.


PRELIMINARY

...................................................................................................................................................................................................

8 Rotate counter-clockwise the coupling nut until it is detached from the receptacle.
...................................................................................................................................................................................................

9 Unlock and disconnect the cable from the SFP module.


....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-15
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the optical fiber link

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

10 Remove the plug body from the receptacle.


...................................................................................................................................................................................................

11 Remove the nut spiral (included tightening cone) from the plug body.
...................................................................................................................................................................................................

12 Remove from the plug body the sub-assembly:


• Clamp nut
• Clamp split gasket
...................................................................................................................................................................................................

13 Remove the tightening cone from the nut spiral then the connectors from the plug body.
...................................................................................................................................................................................................

14 Open the clamp nut and remove it from the cable and split gasket.
...................................................................................................................................................................................................

15 Remove the tightening cone from the cable.


...................................................................................................................................................................................................

16 Remove the connectors from the nut spiral.


E...................................................................................................................................................................................................
N D O F S T E P S

Install the optical fiber link


Carry out the procedure to install the optical link.
...................................................................................................................................................................................................

1 Run the optical fiber cable to the SUMx.


...................................................................................................................................................................................................

2 Connect the optical fiber cable to the SUMx.


...................................................................................................................................................................................................

3 Run the optical fiber cable to the RRH.


...................................................................................................................................................................................................
PRELIMINARY

4 Identify the optical fiber connector R2CT components.


...................................................................................................................................................................................................

5 Turn and remove the protection cap.

....................................................................................................................................................................................................................................
8-16 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the optical fiber link

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

6 Insert the LC connectors into the nut spiral along the cable assembly.
...................................................................................................................................................................................................

7 Insert the tightening cone and slide it over the cable jacket.
...................................................................................................................................................................................................

8 Place and close over the cable the clamp nut over the clamp split gasket.
...................................................................................................................................................................................................

9 Insert the LC connectors into the plug body and insert the tightening cone into the nut
spiral.
...................................................................................................................................................................................................

10 Insert into the plug body the sub-assembly:


• Clamp nut
• Clamp split gasket
...................................................................................................................................................................................................

11 Begin manually to thread the nut spiral (included tightening cone) onto the plug body.
Important! Do not tighten the nut.
...................................................................................................................................................................................................

12 Insert the plug body into the receptacle.


...................................................................................................................................................................................................

13 Remove the LC protection caps.


...................................................................................................................................................................................................

14 Insert and lock the LC connectors into place.


...................................................................................................................................................................................................

15 Push and Rotate clockwise the coupling nut until secured onto the receptacle.
...................................................................................................................................................................................................

16 Begin to thread manually the nut spiral (2) and then apply torque via 21 mm adapted
wrench to achieve approximately 3.5 N.m torque.
...................................................................................................................................................................................................

17 Label the optical fiber cable on the RRH side.


PRELIMINARY

...................................................................................................................................................................................................

18 For the impacted RRH 2X40W module initialize the RA.

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-17
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the optical fiber link

....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

19 Initialize the BTS_TEL SBL corresponding to the impacted sector number.


...................................................................................................................................................................................................

20 Stop the BTS NEM.


...................................................................................................................................................................................................

21 Disconnect the BTS NEM.


...................................................................................................................................................................................................

22 Close the rack.


E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
8-18 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the SFP module

PRELIMINARY
....................................................................................................................................................................................................................................

Replacing the SFP module


Before you begin
The SFP module is located on the SUMx as part of the GNC module and on the RRH
2X40W module on the optical fiber connection area.
Intervention time:
• 60 minutes
Tools required:

Item Reference
Utility PC (BTS LMT) DES 002
Basic toolkit OUT 001
A small flathead screwdriver
A BTS NEM
Extraction tool
An RS-232 asynchronous communication link
cable
Ethernet cable

Note: Refer to BTS NEM User Guide, 3BK 21628 AAAA PCZZA for information on
how to use the BTS NEM.

WARNING
Electric-shock hazard
Some parts of all electrical installations are energized. Failure to follow safe work
practices and the safety warnings may lead to bodily injury and property damage.
For this reason, only trained and qualified personnel (electrical workers as defined in
IEC 60215 or EN 60215 + A1 or in the National Electrical Code or in ANSI/NFPA
No.10) may install or service the installation.
PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-19
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the SFP module

....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
This procedure will result in service disruption. Notify the OMC administrator of a
service outage before commencing.
Important! The personnel working on the cabinet must be authorized to work
according to the security standards.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD). Hold circuit
packs only at the edges or on the insertion and removal facilities. Always observe the
general ESD instructions.

Replacing the SFP module


Carry out the procedure to replace the SFP module.
...................................................................................................................................................................................................

1 Open the front door of the rack where the SUMx is installed.
...................................................................................................................................................................................................

2 Connect the BTS NEM PC to the MMI/MMI-ETH port on the SUMx.


...................................................................................................................................................................................................

3 Disable the BTS_TEL corresponding to the impacted sector number.


...................................................................................................................................................................................................

4 Disable the RA for the impacted RRH 2X40W module.


...................................................................................................................................................................................................

5 Disconnect the optical fiber cable from the SFP module.


...................................................................................................................................................................................................

6 Remove the SFP module.


...................................................................................................................................................................................................

7 Insert the new SFP module.


PRELIMINARY

...................................................................................................................................................................................................

8 Connect the optical fiber to the module.


...................................................................................................................................................................................................

9 For the impacted RRH 2X40W module, init the RA.


....................................................................................................................................................................................................................................
8-20 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
RRH corrective maintenance procedure Replacing the SFP module

PRELIMINARY
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

10 Initialize the BTS_TEL SBL corresponding to the impacted sector number.


...................................................................................................................................................................................................

11 Stop the BTS NEM.


...................................................................................................................................................................................................

12 Disconnect the BTS NEM.


...................................................................................................................................................................................................

13 Close the front door of the rack.


E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary 8-21
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY RRH corrective maintenance procedure Replacing the SFP module

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
8-22 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
PRELIMINARY
Appendix A: Product
conformance statements

Overview
Purpose
This appendix provides the RRH product conformance statements.

Contents

European regulatory requirement compliance A-2


North American regulatory requirement compliance A-4
Compliances for other regions/countries A-5
Operating conditions A-6
Antenna exposure statements A-7
Cable specifications A-8
Product labeling A-9

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary A-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Product conformance statements European regulatory requirement compliance

....................................................................................................................................................................................................................................

European regulatory requirement compliance


Radio and Telecom Terminal Equipment
The RRH falls under the requirements of the Radio and Telecom Terminal Equipment
(RTTE) European directive 1999/5/EEC.
The RTTE directive covers requirements in the following areas:
• Protection of the Health and Safety of users and all other persons, including objectives
with respect to safety requirements contained in the Low Voltage Directive
(73/23/EEC)
Electromagnetic compatibility (EMC) protection requirements contained in Directive
89/336/EEC.
This equipment generates, uses, and can radiate radio frequency energy. If not
installed and used in accordance with the instruction manual, it can interfere with
radio communications. However, there is no guarantee that interferences do not occur
in a particular installation. If this equipment does cause harmful interference to radio
or television reception, which can be determined by turning the equipment off and on.
The user is encouraged to correct any interference problems. EMC requirements have
been selected to ensure an adequate level of compatibility for apparatus in residential,
commercial, and light industrial environments. Compatibility levels, however, do not
cover extreme cases that can occur in any location, but that have a low probability of
occurrence. In particular, they may not cover cases where a source of interference that
is producing repeated transient or continuous phenomena is permanently present. This
could include, for example, a radar or broadcast site in the near vicinity. In these
cases, it may be necessary to limit the source of interference, and/or apply special
protection to the interfered part.
Note: For operation or maintenance inside Alcatel-Lucent systems, the operator must
always wear the antistatic wrist strap to maintain the integrity of the product.
• Effective use of the Radio spectrum allocated to terrestrial/space radio communication
and orbital resources to avoid interference. The routes and standards used to
demonstrate compliance with these requirements are outlined in the following
paragraphs:
– Node B EMC
Compliance with essential EMC requirements was demonstrated using E301489-1
& -23.
– Node B radio compliance
Compliance with the requirements of effective use of the radio spectrum was
demonstrated using E301908-1 & -3.
– Node B safety
PRELIMINARY

Compliance with essential safety requirements was demonstrated using E 60950.


– Node B health protection
Compliance with essential health requirements was demonstrated using E50385.

....................................................................................................................................................................................................................................
A-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Product conformance statements European regulatory requirement compliance

PRELIMINARY
....................................................................................................................................................................................................................................
European Union Environmental Directives (EUED)
The RRH60 is manufactured according to the following two European Union
Environmental Directives:
• Restriction of Hazardous Substances (RoHS), 2002/95/EC
The RoHS directive restricts the use of lead, mercury, cadmium, hexavalent
chromium, poly-brominated biphenyls (PBB) and poly-brominated diphenyl ethers
(PBDE) in electrical and electronic products. This directive applies to all electrical
and electronic products placed on the European Union (EU) and European Economic
Area (EEA) markets after July 1, 2006, with certain exemptions, including an
exemption for lead solder in network infrastructure equipment.
• Waste of Electrical and Electronic Equipment (WEEE), 2002/96/EC
The WEEE directive mandates the necessary treatment of such equipment when it
enters end-of-life. It specifically identifies requirements for recycling, reuse, and
disposal.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary A-3
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Product conformance statements North American regulatory requirement compliance

....................................................................................................................................................................................................................................

North American regulatory requirement compliance


Product safety conformance
The Alcatel-Lucent Remote Radio Head is Safety Certified ITE by CSA International.
This Certification is marked on the equipment main nameplate label. Should the local
Authority Having Jurisdiction (AHJ) require prior or additional verification of this
Certification, a Product Certificate of Compliance can be obtained from the specific
Certification Body by the Business/Product Unit Applicant for the product or by
contacting:
Technical Support Services, within the United States: +1 630 224 4762, prompt 2
Any modifications to this equipment are not permitted without review and official written
authorization from the specific Certification Body. Unauthorized changes may violate the
Product Safety Certification. Modifications or changes authorized by official CN/CNN
are assumed to have received prior approval from this Lab.
PRELIMINARY

....................................................................................................................................................................................................................................
A-4 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Product conformance statements Compliances for other regions/countries

PRELIMINARY
....................................................................................................................................................................................................................................

Compliances for other regions/countries


Compliances for other regions/countries
It is impossible to list all the applicable approvals/compliances as they depend on the
markets and products concerned.
Note: For more information, contact your local Alcatel-Lucent representative.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary A-5
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Product conformance statements Operating conditions

....................................................................................................................................................................................................................................

Operating conditions
Operating conditions
The product compliance standards mentioned above are based on the following operating
conditions:
• Doors must be closed and/or covers must be in place.
• External cables must be of the same type as specified by Alcatel-Lucent.
• The mechanical and electrical characteristics of the product must not be modified in
any way.
Any changes or modifications made to the product without written approval from
Alcatel-Lucent releases Alcatel-Lucent from responsibility regarding standards
compliance.
PRELIMINARY

....................................................................................................................................................................................................................................
A-6 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Product conformance statements Antenna exposure statements

PRELIMINARY
....................................................................................................................................................................................................................................

Antenna exposure statements


Antenna exposure statements
Antenna installations for the Alcatel-Lucent Remote Radio Head shall be performed in
accordance with all applicable manufacturer's recommendations, and national laws and
regulations. To ensure correct antenna installation, the antenna installer shall perform all
necessary calculations and/or field measurements to evaluate compliance with applicable
national laws or regulations regarding exposure to electromagnetic fields. The supplier of
radio equipment, the supplier of antenna equipment and the integrator and builder of the
site must provide sufficient information so that the limits of the exclusion zones can be
determined. Any changes to the antenna or other equipment in the transmit path may
require re-evaluation of the exposures to electromagnetic fields.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary A-7
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Product conformance statements Cable specifications

....................................................................................................................................................................................................................................

Cable specifications
Cable specifications
Compliance with these standards was verified using cables as specified by
Alcatel-Lucent. The continuing compliance of the product relies upon use of the correct
cabling scheme as well as use of identical type cables as specified by Alcatel-Lucent.
Refer to the installation guides for details on cable specifications.
PRELIMINARY

....................................................................................................................................................................................................................................
A-8 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Product conformance statements Product labeling

PRELIMINARY
....................................................................................................................................................................................................................................

Product labeling
Product labeling
The product label can be located on the inside or the outside of the product, provided that
the operation and/or maintenance personnel have the information when working on the
product.

Node B labeling for European countries


To indicate compliance with the European RTTE Directive, the RRH60 bears the
following label in a visible location:

Figure A-1

• Manufacturers name
• Equipment designation
• Nominal voltage operating range and maximum rated current

Labelling for other regions / countries


Labeling for other regions and countries is performed as appropriate and required by the
local regulatory framework.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary A-9
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Product conformance statements Product labeling

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
A-10 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013
Index

PRELIMINARY
B bulkhead, 3-2 powering down, 6-4
............................................................. powering up

C connectors, 3-2 RRH, 6-2

procedure, 7-4 preventive

............................................................. maintenance, 4-2


procedure, 8-3
G gaskets
connectors, 7-4
inspecting, 7-2
procedures, 5-2, 8-9, 8-14, 8-19
.............................................................
.............................................................
I inspecting
R requirement, 3-11
gaskets, 7-2
rules, 2-2
pole bands, 7-6
.............................................................
pole brackets, 7-6
interoperability, 2-2 S Safety statements, 1-1, 1-2

............................................................. SFP module, 8-19

M maintenance

preventive, 4-2
.............................................................

O OAM, 2-2

optical fiber, 8-14


orderable items, 5-2
.............................................................
PRELIMINARY

P pole bands

inspecting, 7-6
pole brackets
inspecting, 7-6
....................................................................................................................................................................................................................................
Alcatel-Lucent RRH 2X40W Alcatel-Lucent – Proprietary IN-1
3MN-01483-0002-REZZA Use pursuant to applicable agreements
Issue 0.01 April 2013
PRELIMINARY Index

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
IN-2 Alcatel-Lucent – Proprietary Alcatel-Lucent RRH 2X40W
Use pursuant to applicable agreements 3MN-01483-0002-REZZA
Issue 0.01 April 2013

Das könnte Ihnen auch gefallen