Alcatel-Lucent 9326
digital 2U V2 Node B
Maintenance Guide
3MN-00482-0004-REZZA
Issue 0.03 | September 2014

PRELIMINARY

Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
Use pursuant to applicable agreements

Legal notice
PRELIMINARY
Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.

The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright © 2014 Alcatel-Lucent. All rights reserved.
Contains proprietary/trade secret information which is the property of Alcatel-Lucent and must not be made available to, or copied or used by anyone outside
Alcatel-Lucent without its written authorization.
Not to be used or disclosed except in accordance with applicable agreements.
PRELIMINARY

Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
Contents

PRELIMINARY
About this document
Purpose ............................................................................................................................................................................................. xi
xi

What's new ...................................................................................................................................................................................... xi


xi

Intended audience ......................................................................................................................................................................... xi


xi

Supported systems ........................................................................................................................................................................ xi


xi

How to use this document ........................................................................................................................................................ xii


xii

Safety information ...................................................................................................................................................................... xii


xii

Prerequisites .................................................................................................................................................................................. xii


xii

Conventions used ........................................................................................................................................................................ xii


xii

Related information ................................................................................................................................................................... xiii


xiii

Document support ...................................................................................................................................................................... xiii


xiii

Technical support ....................................................................................................................................................................... xiv


xiv

How to order ................................................................................................................................................................................ xiv


xiv

How to comment ........................................................................................................................................................................ xiv


xiv

1 Safety statements

Overview ...................................................................................................................................................................................... 1-1


1-1

Structure of safety statements ............................................................................................................................................... 1-2


1-2

2 Corrective maintenance activity

Overview ...................................................................................................................................................................................... 2-1


2-1

Corrective maintenance activity .......................................................................................................................................... 2-2


2-2
PRELIMINARY

3 9326 d2U V2 hardware presentation

Overview ...................................................................................................................................................................................... 3-1


3-1

9326 d2U V2 hardware presentation ................................................................................................................................. 3-2


3-2
....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary iii
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Contents

....................................................................................................................................................................................................................................
4 9326 d2U V2 power up and power down procedures

Overview ...................................................................................................................................................................................... 4-1


4-1

Powering up a 9326 d2U V2 ................................................................................................................................................ 4-2


4-2

Powering down the 9326 d2U V2 ....................................................................................................................................... 4-4


4-4

5 9326 d2U V2 corrective maintenance procedures

Overview ...................................................................................................................................................................................... 5-1


5-1

Replacing the digital shelf equipment

Overview ...................................................................................................................................................................................... 5-3


5-3

Replacing an iCEM-U ............................................................................................................................................................. 5-4


5-4

Replacing an xCEM-U ............................................................................................................................................................ 5-8


5-8

Replacing an eCEM-U ......................................................................................................................................................... 5-12


5-12

Replacing the iCCM-U ......................................................................................................................................................... 5-16


5-16

Replacing the xCCM-U ....................................................................................................................................................... 5-22


5-22

Replacing the eCCM-U ........................................................................................................................................................ 5-29


5-29

Replacing an optical transceiver ....................................................................................................................................... 5-37


5-37

Replacing the fans tray (48V) ............................................................................................................................................ 5-40


5-40

Replacing the pre-cabled 9326 d2U V2 rack ............................................................................................................... 5-48


5-48

Replacing the optional equipment

Overview ................................................................................................................................................................................... 5-60


5-60

Replacing the External Alarm module ............................................................................................................................ 5-61


5-61

Replacing the enhanced Alarm Module ......................................................................................................................... 5-63


5-63

Replacing the LPPCM module .......................................................................................................................................... 5-66


5-66

Replacing the MLP box ....................................................................................................................................................... 5-69


5-69
PRELIMINARY

A Product conformance statements

Overview ..................................................................................................................................................................................... A-1


A-1

European regulatory requirement compliance .............................................................................................................. A-2


A-2

....................................................................................................................................................................................................................................
iv Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Contents

PRELIMINARY
....................................................................................................................................................................................................................................
North American regulatory requirement compliance ................................................................................................. A-4
A-4

Compliances for other regions/countries ........................................................................................................................ A-8


A-8

Operating conditions .............................................................................................................................................................. A-9


A-9

Cable specifications .............................................................................................................................................................. A-10


A-10

Product labeling ..................................................................................................................................................................... A-11


A-11

B Reference

Reissue history .......................................................................................................................................................................... B-1


B-1

Index

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary v
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Contents

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
vi Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
List of tables

PRELIMINARY
1 Document changes (Issue 0.03, September 2014) ........................................................................................... xi

2 Generic terms ............................................................................................................................................................... xii


xii

B-1 Issue 0.02, March 2013, Reason for reissue ................................................................................................... B-1

B-2 Issue 0.01, March 2013, Reason for reissue ................................................................................................... B-1

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary vii
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY List of tables

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
viii Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
List of figures

PRELIMINARY
3-1 9326 d2U V2 view with iCCM-U ....................................................................................................................... 3-2

3-2 9326 d2U V2 view with xCCM-U-4E1 ............................................................................................................. 3-3

3-3 9326 d2U V2 view with eCCM-U-GE .............................................................................................................. 3-3

3-4 Front view of the 9326 d2U V2 with LPPCM and External Alarm module ........................................ 3-4

3-5 Front view of the 9326 d2U V2 with LPPCM and enhanced Alarm Module ..................................... 3-4

3-6 Front view of the 9326 d2U V2 with MLP box and enhanced Alarm Module ................................... 3-5

5-1 iCEM-U front panel .................................................................................................................................................. 5-4


5-4

5-2 xCEM-U front panel ................................................................................................................................................. 5-8


5-8

5-3 eCEM-U front panel ............................................................................................................................................... 5-12


5-12

5-4 iCCM-U board front panel ................................................................................................................................... 5-16

5-5 xCCM-U-4E1 configuration front panel ........................................................................................................ 5-22

5-6 xCCM-U-GE configuration front panel .......................................................................................................... 5-23

5-7 eCCM-U-4E1 configuration front panel ......................................................................................................... 5-29

5-8 eCCM-U-GE configuration front panel .......................................................................................................... 5-29

5-9 Location of the DIP switch on the eCCM-U ................................................................................................. 5-33

5-10 DIP switch settings on the eCCM-U ................................................................................................................ 5-33

5-11 Location of optical connectors in the 9326 d2U V2 ................................................................................... 5-38

5-12 Inserting an SFP transceiver in the iCCM-U ................................................................................................ 5-39

5-13 Fans tray view (48V) ............................................................................................................................................. 5-40

5-14 Extracting the fans tray ......................................................................................................................................... 5-42


PRELIMINARY

5-15 Fans tray ..................................................................................................................................................................... 5-42


5-42

5-16 Location of the management sticker ................................................................................................................ 5-50

5-17 Front panel of the External Alarm module .................................................................................................... 5-61

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary ix
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY List of figures

....................................................................................................................................................................................................................................
5-18 Front panel of the enhanced Alarm Module .................................................................................................. 5-63

5-19 LPPCM module front panel ................................................................................................................................ 5-66

5-20 Front panel of the MLP box ................................................................................................................................ 5-69


PRELIMINARY

....................................................................................................................................................................................................................................
x Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
About this document
About this document

Purpose
The purpose of this document is to provide information to enable suitably trained
personnel to perform maintenance tasks on the 9326 d2U V2.

What's new
The major changes introduced in this issue of the document are described in the following
paragraphs. Changes introduced in prior issues of the document are shown in Appendix
B, “Reference”.
Document changes from the previous software release
The document changes from LR13.3.W are shown in Table 1, “Document changes (Issue
0.03, September 2014)” (p. xi):

Table 1 Document changes (Issue 0.03, September 2014)

Feature/enhancement Description Location


Feature/enhancement
None None None
Document changes
Old document reference Updated new document Global
updates reference

Intended audience
The audience for this document is Operations and maintenance personnel and those who
want to know the principles of 9326 d2U V2 maintenance.
PRELIMINARY

Supported systems
This document applies to all Alcatel-Lucent W-CDMA system releases.

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary xi
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY About this document

....................................................................................................................................................................................................................................
How to use this document
No specific recommendation applies regarding the way readers should read this
document.

Safety information
For your safety, this document contains safety statements. Safety statements are given at
points where risks of damage to personnel, equipment, and operation may exist. Failure to
follow the directions in a safety statement may result in serious consequences.

Prerequisites
It is recommended that readers become familiar with the following documents:
• Alcatel-Lucent 9326 digital 2U V2 Node B - Technical Description,
3MN-00482-0003-DEZZA
• Alcatel-Lucent 9100 and 93xx Node B - Commissioning and Fault Management User
Manual: TIL, 9YZ-05870-0090-PCZZA

Conventions used
Vocabulary conventions
For a list of terms used in this document, see Alcatel-Lucent W-CDMA System -
Terminology, 3MN-01111-0001-TQZZA.
This document uses some terms generically.

Table 2 Generic terms

Generic term Used for


eAM eAMi or eAMo

Typographical conventions
The following typographical conventions are used in this document:

Appearance Description
Italicized text Emphasized information
graphical user interface text Text that is displayed in a graphical user interface or
in a hardware label
PRELIMINARY

Document reference, reference number Related document that is referenced in the document

....................................................................................................................................................................................................................................
xii Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
About this document

PRELIMINARY
....................................................................................................................................................................................................................................
Related information
For information on subjects related to the content of this document, refer to the
documents listed in the following table:

Refer to this document At this location For more information on


Alcatel-Lucent W-CDMA http://support.alcatel-lucent. Terms used in Alcatel-Lucent
System - Terminology, com. W-CDMA documents.
3MN-01111-0001-TQZZA
Alcatel-Lucent 9326 digital http://support.alcatel-lucent. The Alcatel-Lucent 9326
2U V2 Node B - Technical com. digital 2U V2 Node B:
Description, • Basic characteristics
3MN-00482-0003-DEZZA
• Hardware description
Alcatel-Lucent 9353 http://support.alcatel-lucent. Alarm descriptions and
Wireless Management com. maintenance actions required
System - Node B Alarms for Alcatel-Lucent Node Bs.
Reference Guide,
9YZ-05870-0060-UFZZA
Alcatel-Lucent 9353 http://support.alcatel-lucent. How to perform commands
Wireless Management com. available in the 9353 Wireless
System - User Guide, Management System (WMS)
9YZ-05870-0014-PCZZA Graphical User Interface
(GUI).
Alcatel-Lucent 9100 and http://support.alcatel-lucent. How to perform the Node B
93xx Node B - com. installation, commissioning
Commissioning and Fault and maintenance tasks using
Management User Manual: the Node B TIL (Terminal for
TIL, 9YZ-05870-0090- Local Installation) tool.
PCZZA
Alcatel-Lucent W-CDMA http://support.alcatel-lucent. Safety guidelines and the
System - Safety Guide, com. catalog of hazard statements
9YZ-05870-0007-TQZZA that appear in the
Alcatel-Lucent W-CDMA
customer documents.

Document support
PRELIMINARY

For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at
the following telephone numbers.
From United States
• If you are using a landline, a cellular phone or VoIP, dial this number: 1-888-582-3688

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary xiii
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY About this document

....................................................................................................................................................................................................................................
From other countries
• If you are using a cellular phone or VoIP, dial this number: +1-630-224-2485
• If you are using a landline (phone without a plus [+] character), replace the plus sign
with your country's exit code. Dial this number: Exit code for the country of origin:
1-630-224-2485. See the country-specific exit codes listed here.
These numbers apply for document support only. Please see the section “Technical
support” for details about product hardware, software, and technical support.

Technical support
For technical support, contact your local Alcatel-Lucent customer support team. See the
Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact
information.

How to order
To order Alcatel-Lucent documents, contact your local sales representative or use Online
Customer Support (OLCS) (http://support.alcatel-lucent.com)

How to comment
To comment on this document, go to the Online Comment Form (http://infodoc.alcatel-
lucent.com/comments/) or e-mail your comments to the Comments Hotline
(comments@alcatel-lucent.com).
PRELIMINARY

....................................................................................................................................................................................................................................
xiv Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
1 Safety statements
1

Overview
Purpose
This chapter provides information on the structure of safety statements which may arise
in the course of your work.

Contents

Structure of safety statements 1-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 1-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Safety statements Structure of safety statements

....................................................................................................................................................................................................................................

Structure of safety statements


Overview
This topic describes the components of safety statements that appear in this document.

General structure
Safety statements include the following structural elements:

CAUTION

MP L E
Lifting hazard

SA
Lifting this equipment by yourself can result in injury
due to the size and weight of the equipment.
Always use three people or a lifting device to transport
and position this equipment. [ABC123]

Item Structure element Purpose


1 Safety alert symbol Indicates the potential for personal injury
(optional)
2 Safety symbol Indicates hazard type (optional)
3 Signal word Indicates the severity of the hazard
4 Hazard type Describes the source of the risk of damage or
injury
5 Safety message Consequences if protective measures fail
6 Avoidance message Protective measures to take to avoid the hazard
7 Identifier The reference ID of the safety statement
(optional)
PRELIMINARY

....................................................................................................................................................................................................................................
1-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Safety statements Structure of safety statements

PRELIMINARY
....................................................................................................................................................................................................................................
Signal words
The signal words identify the hazard severity levels as follows:

Signal word Meaning


DANGER Indicates an extremely hazardous situation which, if not avoided, will
result in death or serious injury.
WARNING Indicates a hazardous situation which, if not avoided, could result in
death or serious injury.
CAUTION Indicates a hazardous situation which, if not avoided, could result in
minor or moderate injury.
NOTICE Indicates a hazardous situation not related to personal injury.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 1-3
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Safety statements Structure of safety statements

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
1-4 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
2 2 orrective maintenance
C
activity

Overview
Purpose
This chapter describes the corrective maintenance activity applicable to the 9326 d2U V2
shelf.

Contents

Corrective maintenance activity 2-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 2-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................

Corrective maintenance activity


Corrective maintenance
The network maintenance is based on the supervision of the network, by using the OAM
graphical interface. For more information, refer to Alcatel-Lucent 9353 Wireless
Management System - User Guide, 9YZ-04088-0014-PCZZA.
It is also based on the identification and replacement of faulty items of equipment, using
the alarms.
The process is divided into the following two steps:
• Locating and identifying the faulty items of equipment, by using the information
provided in Alcatel-Lucent 9353 Wireless Management System - Node B Alarms
Reference Guide for 9311, 9312, 9322, 9326, 9332 Node B, 9YZ-04088-0060-UFZZA
• Replacing the faulty items of equipment, by using the replacement procedures given
in this document
Note: The iModules replacement procedures described in this guide are based on the
following assumptions:
• Your 9326 d2U V2 is equipped with the following digital modules:
– One iCCM-U upgraded with the specific adapter board and front panel (iCCM-U
V2)
– One e/xCEM-U (mandatory) and possibly up to two additional e/xCEMs-U
– Possibly up to two iCEMs-U upgraded with the specific adapter boards and front
panels (iCEMs-U V2)
• As spare parts, you ordered iCEMs-U V2 and iCCMs-U V2 modules (order codes:
3JR08057AA and 3JR08056AA).

Replacing the digital shelf equipment

Procedure Order Code Impact on service


“Replacing an iCEM-U” 3JR08057AA Loss of capacity or service
(p. 5-4) interruption (depending on the
number of CEMs in the digital
shelf)
“Replacing an xCEM-U” 300986049 Loss of capacity or service
(p. 5-8) interruption (depending on the
PRELIMINARY

number of CEMs in the digital


shelf)

....................................................................................................................................................................................................................................
2-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Corrective maintenance activity Corrective maintenance activity

PRELIMINARY
....................................................................................................................................................................................................................................

Procedure Order Code Impact on service


“Replacing an eCEM-U” 3JR20059DA Loss of capacity or service
(p. 5-12) interruption (depending on the
number of CEMs in the digital
shelf)
“Replacing the iCCM-U” 3JR08056AA Service interruption
(p. 5-16)
“Replacing the xCCM-U” 3JR20038AA Service interruption
(p. 5-22) (xCCM-U-4E1)
3JR20038AD
(xCCM-U-GE)
“Replacing the eCCM-U” 3JR20073AB Service interruption
(p. 5-29) (eCCM-U-4E1)
3JR20073BB (eCCM-U-GE)
“Replacing an optical Single-Mode (SM) SFP to Service interruption on the Remote
transceiver” (p. 5-37) radio device: 300976305 Radio device associated with the
Multi-Mode (MM) SFP to optical transceiver being replaced
radio device: 300976297
Single-Mode (SM) SFP on Loss of capacity or service
GE MDA: 3HE00028AA interruption on the Iub interface
(RoHS 5/6) or 3HE00028CA
(RoHS 6/6)
Multi-Mode (MM) SFP on
GE MDA: 3HE00027AA
(RoHS 5/6) or 3HE00027CA
(RoHS 6/6)
“Replacing the fans tray 3JR08021AC Service interruption
(48V)” (p. 5-40)
“Replacing the pre-cabled 3JR08067AB Service interruption
9326 d2U V2 rack”
(p. 5-48)

Replacing the optional equipment


PRELIMINARY

Procedure Order Code Impact on service


“Replacing the LPPCM NTBY14BF Service interruption
module” (p. 5-66)

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 2-3
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................

Procedure Order Code Impact on service


“Replacing the MLP box” 3JR08832AE Service interruption
(p. 5-69)
“Replacing the External NTA507AF None
Alarm module” (p. 5-61)
“Replacing the enhanced Indoor: 109736348 None
Alarm Module” (p. 5-63) Outdoor: 109735266

Description of a replacement procedure


A replacement procedure is divided into the following parts:
• The title
• The main body with the following information:
– The intervention time
– The tools required
– The impact of the procedure, if necessary
– The step-by-step actions of the procedure
One or more figures are provided to help you execute the actions. They show the FRU
schematically and its location in the cabinet.

Intervention restrictions
There may be a lapse of time between the identification of the alarm at the Access OAM
Graphic User Interface (GUI) and the time you arrive at the site.
You must be synchronized with the access network controller or system administrator (by
telephone) before an on-site intervention, in the following cases:
• Isolating procedures
• Completion of an on-site intervention
• Return to service procedure

General personnel safety instructions


The personnel must obey the safety instructions specific to the installation site:
• Rules concerning the premises (see instructions posted on site or in the building)
PRELIMINARY

• Rules linked to general personnel safety instructions


The personnel working on the cabinet must be authorized to work according to security
standards.

....................................................................................................................................................................................................................................
2-4 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Corrective maintenance activity Corrective maintenance activity

PRELIMINARY
....................................................................................................................................................................................................................................
Equipment safety instructions
The 9326 d2U V2 normally operates when the external temperature is between –5°C and
+65°C.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 2-5
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
2-6 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
3 3326 d2U V2 hardware
9
presentation

Overview
Purpose
This chapter contains an overview of the hardware of the 9326 d2U V2.
More information about the 9326 d2U V2 components can be found in Alcatel-Lucent
9326 digital 2U Node B, Technical Description, 3MN-00482-0003-DEZZA.

Contents

9326 d2U V2 hardware presentation 3-2

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 3-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 hardware presentation 9326 d2U V2 hardware presentation

....................................................................................................................................................................................................................................

9326 d2U V2 hardware presentation


Description
The 9326 d2U V2 is built around the following components:
• A mechanical enclosure, compatible with standard 19-inch rack installation
• A digital shelf including the digital modules (iCCM-U/xCCM-U/eCCM-U,
iCEM-U/xCEM-U/eCEM-U) and the associated digital backplane
• A fans tray (including one RUC and two fans) located on the right hand side of the
digital shelf
In addition, the 9326 d2U V2 can be equipped with the following two components:
• An external alarm module or an enhanced Alarm Module
• A lightning protection module (LPPCM or MLP box)

9326 d2U V2 with iCCM-U


The following figure shows a front view of the 9326 d2U V2 equipped with iCCM-U.
Note: There is no possible mixity of iCCM-U and eCEM-U modules.

Figure 3-1 9326 d2U V2 view with iCCM-U

9326 d2U V2 with xCCM-U


The following figure shows a front view of the 9326 d2U V2 equipped with xCCM-U.
PRELIMINARY

....................................................................................................................................................................................................................................
3-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 hardware presentation 9326 d2U V2 hardware presentation

PRELIMINARY
....................................................................................................................................................................................................................................

Figure 3-2 9326 d2U V2 view with xCCM-U-4E1

9326 d2U V2 with eCCM-U


The following figure shows a front view of the 9326 d2U V2 equipped with eCCM-U.
Note: There is no possible mixity of eCCM-U and iCEM-U modules.

Figure 3-3 9326 d2U V2 view with eCCM-U-GE

9326 d2U V2 with optional equipment


The following figure shows the LPPCM and External Alarm Module optional modules
mounted on top and bottom of the 9326 d2U V2 shelf.
PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 3-3
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 hardware presentation 9326 d2U V2 hardware presentation

....................................................................................................................................................................................................................................

Figure 3-4 Front view of the 9326 d2U V2 with LPPCM and External Alarm module

The following figure shows the LPPCM and enhanced Alarm Module optional modules
mounted on top and bottom of the 9326 d2U V2 shelf.

Figure 3-5 Front view of the 9326 d2U V2 with LPPCM and enhanced Alarm Module

LPPCM

Internal alarm bus GND

PCM In PCM Out PCM Out OUT IN


Alcatel.Lucent Alcatel.Lucent Alcatel.Lucent Alcatel.Lucent
eCCM-U eCEM-U eCEM-U eCEM-U

ALARM/INT

DEBUG ICU DEBUG BBU


POWER SWITCH

DEBUG ICU DEBUG BBU


FANS TRAY

DEBUG ICU DEBUG BBU


+
FILTER

TX RX TX RX TX RX TX RX TX RX TX RX IN
4
-

GPS-RF
3
OUT
2
1
CMA SYNC MDA PCM
RST GPS OPTIC 1 OPTIC 2 OPTIC 3 OPTIC 4 OPTIC 5 OPTIC 6 ALARM REF PORT 1 PORT 2 PCM E1/T1 MDA

XXXXXX
XXXXXX
eAMi
XXXXXX
XXXXXXXXXXXX XXXXXX
SN XXXXXXXXXX
XXXXXX XXXXXXXXXXXX
XXXXXX
STAT FRAME ALARMS CTRL PWR ALM 1-4 5-8 9-12 13-16 17-20 21-24 25-28 29-32 EXT ALARMS

enhanced Alarm Module


PRELIMINARY

The following figure shows the MLP box and enhanced Alarm Module optional modules
mounted on top and bottom of the 9326 d2U V2 shelf.
....................................................................................................................................................................................................................................
3-4 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 hardware presentation 9326 d2U V2 hardware presentation

PRELIMINARY
....................................................................................................................................................................................................................................

Figure 3-6 Front view of the 9326 d2U V2 with MLP box and enhanced Alarm
Module

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 3-5
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 hardware presentation 9326 d2U V2 hardware presentation

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
3-6 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
4 4326 d2U V2 power up and
9
power down procedures

Overview
Purpose
This chapter describes how to power up and power down the 9326 d2U V2.

Contents

Powering up a 9326 d2U V2 4-2


Powering down the 9326 d2U V2 4-4

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 4-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 power up and power down procedures Powering up a 9326 d2U V2

....................................................................................................................................................................................................................................

Powering up a 9326 d2U V2


Purpose
Perform the following procedure to power up a 9326 d2U V2.

Initial check
On the RUC module, check that the power switch is in the "O" position.

Procedure
...................................................................................................................................................................................................

1 At the operator DC power supply, put the site circuit breaker of the 9326 d2U V2 in the
"ON" position.
...................................................................................................................................................................................................

2 On the RUC module, put the power switch in the "1" position.
...................................................................................................................................................................................................

3 Check that the fans are starting up.


...................................................................................................................................................................................................

4 Check the LED status as described in the following table.

If the Then check that...


CCM
module
is...
iCCM-U • The green LED is ON.
or
• The red LED is OFF.
xCCM-U

eCCM-U • The CMA LED 3 is green.


• The CMA LED 4 is OFF.
PRELIMINARY

....................................................................................................................................................................................................................................
4-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 power up and power down procedures Powering up a 9326 d2U V2

PRELIMINARY
....................................................................................................................................................................................................................................

If the Then check that...


CEM
module
type is...
iCEM-U • The green LED is ON.
or
• The red LED is OFF.
xCEM-U

eCEM-U • The first LED (from top) is OFF.


• The second LED (from top) is
green.

E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 4-3
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 power up and power down procedures Powering down the 9326 d2U V2

....................................................................................................................................................................................................................................

Powering down the 9326 d2U V2


Purpose
Perform the following procedure to power down the 9326 d2U V2.

Procedure
...................................................................................................................................................................................................

1 Preliminary operation: make sure that the "BTSEquipment" object is "locked".


...................................................................................................................................................................................................

2 On the RUC module, put the power switch to the "O" position.
...................................................................................................................................................................................................

3 Check that all LEDs on the iCCM-U/xCCM-U/eCCM-U and on each iCEM-U/xCEM-


U/eCEM-U are OFF.
...................................................................................................................................................................................................

4 Check that the fans are stopping down.


...................................................................................................................................................................................................

5 At the operator DC power supply, put the site circuit breaker of the 9326 d2U V2 in the
"OFF" position.
E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
4-4 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
5 5326 d2U V2 corrective
9
maintenance procedures

Overview
Purpose
This chapter contains the replacement procedures applicable to the 9326 d2U V2 shelf.
Note:
1. For detailed information on PSU maintenance, refer to the documentation provided
within the PSU cabinet.
2. For detailed information on Alcatel-Lucent 9100 Multi-Standard Base Station
maintenance, refer to the documentation related to the Alcatel-Lucent 9100
Multi-Standard Base Station cabinets.

Contents

Replacing the digital shelf equipment 5-3


Replacing an iCEM-U 5-4
Replacing an xCEM-U 5-8
Replacing an eCEM-U 5-12
Replacing the iCCM-U 5-16
Replacing the xCCM-U 5-22
Replacing the eCCM-U 5-29
Replacing an optical transceiver 5-37
Replacing the fans tray (48V) 5-40
Replacing the pre-cabled 9326 d2U V2 rack 5-48
PRELIMINARY

Replacing the optional equipment 5-60


Replacing the External Alarm module 5-61
Replacing the enhanced Alarm Module 5-63
Replacing the LPPCM module 5-66
...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Overview

....................................................................................................................................................................................................................................

Replacing the MLP box 5-69


PRELIMINARY

....................................................................................................................................................................................................................................
5-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Overview

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing the digital shelf equipment

Overview
Purpose
This section contains procedures to users to perform corrective maintenance tasks on the
digital shelf equipment of the 9326 d2U V2.

Contents

Replacing an iCEM-U 5-4


Replacing an xCEM-U 5-8
Replacing an eCEM-U 5-12
Replacing the iCCM-U 5-16
Replacing the xCCM-U 5-22
Replacing the eCCM-U 5-29
Replacing an optical transceiver 5-37
Replacing the fans tray (48V) 5-40
Replacing the pre-cabled 9326 d2U V2 rack 5-48

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-3
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an iCEM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing an iCEM-U
Purpose
Carry out the following procedure to replace an iCEM-U.

Intervention time
15 minutes

Tools required
Screwdrivers
Extraction tool

Figure 5-1 iCEM-U front panel

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.
PRELIMINARY

....................................................................................................................................................................................................................................
5-4 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an iCEM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of capacity or a loss of service
(depending on the number of CEMs housed in the 9326 d2U V2 rack).

Procedure
...................................................................................................................................................................................................

1 Locate the faulty iCEM-U in the 9326 d2U V2 rack: its red triangular LED is ON.

...................................................................................................................................................................................................

2 Lock the faulty cem object at the WMS by Set Administrative State.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

3 Undo and remove the upper hook (if present and if the defective iCEM-U is in slot 4).

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-5
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an iCEM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

4 Loosen the two screws on the defective iCEM-U front panel.


...................................................................................................................................................................................................

5 Using the extraction tool, pull the defective iCEM-U out of the shelf.
...................................................................................................................................................................................................

6
If... Then...
The defective iCEM-U is replaced with a new Check the release of the new iCEM-U.
iCEM-U.
PRELIMINARY

The defective iCEM-U is replaced with an Proceed with step 6 of the procedure
xCEM-U. “Replacing an xCEM-U” (p. 5-8).
The defective iCEM-U is replaced with an Proceed with step 6 of the procedure
eCEM-U. “Replacing an eCEM-U” (p. 5-12).

....................................................................................................................................................................................................................................
5-6 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an iCEM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

7 Insert the new iCEM-U into the 9326 d2U V2 shelf, in the same slot as the defective
iCEM-U.

...................................................................................................................................................................................................

8 Tighten the two screws on the iCEM-U front panel.


...................................................................................................................................................................................................

9 Put the hook back in place and secure it.


...................................................................................................................................................................................................

10 From the WMS, unlock the cem object previously locked on step 2.
...................................................................................................................................................................................................

11 Check the state of the LEDs. They should go on, then take the following state:
red triangular LED OFF and green rectangular LED ON.
PRELIMINARY

E...................................................................................................................................................................................................
N D O F S T E P S

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-7
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an xCEM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing an xCEM-U
Purpose
Carry out the following procedure to replace an xCEM-U.

Intervention time
Ten minutes

Tools required
Screwdriver
Extraction tool

Figure 5-2 xCEM-U front panel

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.
PRELIMINARY

....................................................................................................................................................................................................................................
5-8 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an xCEM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of capacity or a loss of service
(depending on the number of CEMs housed in the 9326 d2U V2 rack).

Procedure
...................................................................................................................................................................................................

1 Locate the faulty xCEM-U in the 9326 d2U V2 rack: its red LED is ON.

...................................................................................................................................................................................................

2 Lock the faulty cem object at the WMS by Set Administrative State.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

3 Undo and remove the upper hook (if present and if the defective xCEM-U is in slot 4).

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-9
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an xCEM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

4 Loosen the two screws on the xCEM-U front panel.


...................................................................................................................................................................................................

5 Using the extraction tool, pull the defective xCEM-U out of the shelf.
...................................................................................................................................................................................................

6
If... Then...
The defective xCEM-U is replaced with a new Check the release of the new xCEM-U.
xCEM-U.
PRELIMINARY

The defective xCEM-U is replaced with an Proceed with step 6 of the procedure
eCCM-U. “Replacing an eCEM-U” (p. 5-12).

....................................................................................................................................................................................................................................
5-10 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an xCEM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

7 Insert the new xCEM-U into the 9326 d2U V2 rack, in the same slot as the defective
xCEM-U.
...................................................................................................................................................................................................

8 Tighten the two screws on the xCEM-U front panel.


...................................................................................................................................................................................................

9 Put the hook back in place and secure it.


...................................................................................................................................................................................................

10 From the WMS, unlock the cem object previously locked on step 2.
...................................................................................................................................................................................................

11 Check the state of the LEDs. They should go on, then take the following state:
• Red LED OFF
• Green LED ON

E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-11
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an eCEM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing an eCEM-U
Carry out the following procedure to replace an eCEM-U.

Intervention time
Ten minutes

Tools required
Screwdriver
Extraction tool

Figure 5-3 eCEM-U front panel

NOTICE
ESD hazard
Wear the antistatic bracelet when performing the maintenance procedure described
below.

NOTICE
Service-disruption hazard
This procedure causes a loss of capacity or a loss of service (depending on the number of
PRELIMINARY

CEMs housed in the digital shelf of the 9326 d2U V2).

....................................................................................................................................................................................................................................
5-12 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an eCEM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
When inserting an e-CEM-u board, the neighboring xCEM-u board reboots. When this
xCEM-u board reboots, the assigned sector or frequency loses its traffic
To avoid this traffic loss, the cell or sector associated with the xCEM-u must be locked.

Procedure
...................................................................................................................................................................................................

1 Locate the faulty eCEM-U in the 9326 d2U V2:


• First LED (from top) is red.
• Second LED (from top) is OFF.

...................................................................................................................................................................................................

2 Lock the faulty cem object at the WMS by Set Administrative State.
If there is an xCEM-u board adjacent to the eCEM_u board, lock the associated object in
the WMS as well.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

3 Undo and remove the upper hook (if present and if the defective eCEM-U is in slot 4).

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-13
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an eCEM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

4 Loosen the two screws on the eCEM-U front panel.


...................................................................................................................................................................................................

5 Using the extraction tool, pull the defective eCEM-U out of the shelf.
...................................................................................................................................................................................................

6 Check the release of the new eCEM-U.


...................................................................................................................................................................................................

7 Insert the new eCEM-U into the digital shelf of the 9326 d2U V2, in the same slot as the
defective eCEM-U.
PRELIMINARY

...................................................................................................................................................................................................

8 Tighten the two screws on the eCEM-U front panel.

....................................................................................................................................................................................................................................
5-14 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an eCEM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

9 Put the hook back in place and secure it.


...................................................................................................................................................................................................

10 From the WMS, unlock the cem object(s) previously locked in step 2.
...................................................................................................................................................................................................

11 Check the state of the LEDs. They should go on, then take the following state:
• First LED (from top) is OFF.
• Second LED (from top) is green.

E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-15
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the iCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing the iCCM-U


Purpose
Carry out the following procedure to replace the iCCM-U.

Intervention time
20 minutes

Tools required
Screwdrivers
Extraction tool

Figure 5-4 iCCM-U board front panel

DANGER
Laser hazard
This equipment operates with invisible laser radiation. Laser radiation can cause
considerable injuries to the eyes.
Never look into the end of an exposed fiber or into an open optical connector when the
optical source is switched on. Always observe the laser warning instructions.
PRELIMINARY

....................................................................................................................................................................................................................................
5-16 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the iCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.
Important! The spare iCCM-U software load must be UA05.1.2, otherwise the 9326
d2U V2 can not start.
Important! There will be a loss of service on the Remote Radio device(s) associated
with the iCCM-U being replaced.

Procedure
...................................................................................................................................................................................................

1 Lock all the objects associated with the Remote Radio devices connected to the faulty
iCCM-U at the WMS by Set Administrative State.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).
...................................................................................................................................................................................................

3 Undo and remove the lower hook (if present).

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-17
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the iCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

4 Loosen the two screws on the defective iCCM-U front panel.


...................................................................................................................................................................................................

5 Using the extraction tool, unplug the iCCM-U from its RBP connectors.
...................................................................................................................................................................................................

6 Unplug the optical fiber(s) from the iCCM-U front panel.


...................................................................................................................................................................................................

7 Remove the SFP transceiver(s) from the iCCM-U front panel.


Note: The SFP transceiver(s) will be re-plugged in the new iCCM-U board.
PRELIMINARY

...................................................................................................................................................................................................

8 Unplug the digital cable (connector labeled "ALARM") from the iCCM-U front panel.

....................................................................................................................................................................................................................................
5-18 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the iCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

9 Unplug the E1/T1 cable (connector labeled "PCM E1/T1") from the iCCM-U front panel.
...................................................................................................................................................................................................

10 Using the extraction tool, pull the defective iCCM-U out of the shelf.
...................................................................................................................................................................................................

11
If... Then...
The defective iCCM-U is replaced with a new Check the release of the new iCCM-U.
iCCM-U.
The iCCM-U is replaced with an xCCM-U. Proceed with step 12 of the procedure
“Replacing the xCCM-U” (p. 5-22).
The iCCM-U is replaced with an eCCM-U. Proceed with step 12 of the procedure
“Replacing the eCCM-U” (p. 5-29).

...................................................................................................................................................................................................

12 Insert the new iCCM-U into the slot guides without plugging it on the RBP.
...................................................................................................................................................................................................

13 Reinsert the SFP transceiver(s) through the iCCM-U front panel.


...................................................................................................................................................................................................

14 Reconnect the optical fiber(s) on the iCCM-U front panel.


Important! In case of an iCCM-U equipped with MM SFP transceivers, when
reconnecting the optical fibers on the iCCM-U front panel, put the LC connectors
(L/R) in the same sense as they were before the intervention.
...................................................................................................................................................................................................

15 Reconnect the digital cable on the iCCM-U front panel.


...................................................................................................................................................................................................

16 Insert completely the new iCCM-U into the 9326 d2U V2 rack by plugging it into its RBP
connectors. PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-19
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the iCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

17 Tighten the two screws on the iCCM-U front panel.


...................................................................................................................................................................................................

18 Put the hook back in place and secure it.


...................................................................................................................................................................................................

19 Important! If the iCCM-U software load is not higher than UA05.1.2, the 9326 d2U
V2 can not start.
Power up the 9326 d2U V2.
To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2)
...................................................................................................................................................................................................

20 Reconnect the PCM E1/T1 cable on the iCCM-U front panel.


...................................................................................................................................................................................................

21 Unlock from the WMS the objects previously locked through step 1.
...................................................................................................................................................................................................
PRELIMINARY

22 Check the state of the LEDs and display:


• The x/iCEM(s)-U and iCCM-U corporate LEDs should turn on, then take the
following state:

....................................................................................................................................................................................................................................
5-20 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the iCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
red LED OFF and green LED ON.
• The green PCM LEDs should be ON.
• The display should indicate the PCM synchronization.

E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-21
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing the xCCM-U


Purpose
Carry out the following procedure to replace the xCCM-U.

Intervention time
20 minutes

Tools required
Screwdrivers
Extraction tool

Figure 5-5 xCCM-U-4E1 configuration front panel


PRELIMINARY

....................................................................................................................................................................................................................................
5-22 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
Figure 5-6 xCCM-U-GE configuration front panel

DANGER
Laser hazard
This equipment operates with invisible laser radiation. Laser radiation can cause
considerable injuries to the eyes.
Never look into the end of an exposed fiber or into an open optical connector when the
optical source is switched on. Always observe the laser warning instructions.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.
PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-23
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.
From LR13.1: if BTS daisy-chaining is implemented then service will be lost for all
downstream NodeB as well.

Procedure
...................................................................................................................................................................................................

1 Important! There will be a loss of service on the Remote Radio device(s) associated
with the xCCM-U being replaced.
Lock all the objects associated with the Remote Radio devices connected to the faulty
xCCM-U at the WMS by Set Administrative State.
From LR13.1, if BTS daisy-chaining is implemented, then lock all remote radio devices
with all downstream NodeB as well.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).
...................................................................................................................................................................................................

3 Undo and remove the lower hook (if present).


PRELIMINARY

....................................................................................................................................................................................................................................
5-24 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

4 Loosen the two screws on the defective xCCM-U front panel.


...................................................................................................................................................................................................

5 Using the extraction tool, unplug the xCCM-U from its RBP connectors.
...................................................................................................................................................................................................

6 Unplug the GPS cable (connector labeled “GPS”) from the xCCM-U front panel if used.
...................................................................................................................................................................................................

7 Unplug the optical fiber(s) and remove the SFP transceiver(s) (connector(s) labeled
“OPTIC”) from the xCCM-U front panel.
PRELIMINARY

Note: The SFP transceiver(s) will be re-plugged in the new xCCM-U board.
...................................................................................................................................................................................................

8 Unplug the digital cable (connector labeled "ALARM") from the xCCM-U front panel.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-25
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

9 Unplug the TIL cable (labeled “PORT 1”) from the xCCM-U front panel.
...................................................................................................................................................................................................

10
If... Then...
The xCCM-U hardware configuration is Unplug the two E1/T1 cables (connector
xCCM-U-4E1 labeled “PCM E1/T1” and “MDA”) from the
xCCM-U front panel.
Unplug the Ethernet cable (connector labeled
“PORT 2”) from the xCCM-U front panel if
used.
The xCCM-U hardware configuration is Unplug the E1/T1 cable (connector labeled
xCCM-U-GE “PCM E1/T1”) from the xCCM-U front panel
if used.
Unplug the Gigabit Ethernet cable(s)
(connector labeled “MDA”) from the
xCCM-U front panel.
Remove the SFP transceiver(s) (connector
labeled “MDA”) from the xCCM-U front
panel.
Note: The SFP transceiver(s) will be
re-plugged in the new xCCM-U board.

...................................................................................................................................................................................................

11 Using the extraction tool, pull the defective xCCM-U out of the shelf.
...................................................................................................................................................................................................

12
If... Then...
The defective xCCM-U is replaced by a new Insert the new xCCM-U into the slot guides
xCCM-U. without plugging it on the RBP.
The defective xCCM-U is replaced by an Proceed with step 12 of the procedure
eCCM-U. “Replacing the eCCM-U” (p. 5-29).

...................................................................................................................................................................................................
PRELIMINARY

13 Reconnect the GPS cable (connector labeled “GPS”) on the xCCM-U front panel if used.
...................................................................................................................................................................................................

14 Reinsert the SFP transceiver(s) (connector(s) labeled “OPTIC”) through the xCCM-U
front panel.
....................................................................................................................................................................................................................................
5-26 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

15 Reconnect the optical fiber(s) (connector(s) labeled “OPTIC”) on the xCCM-U front
panel.
Important! In case of an xCCM-U equipped with MM SFP transceivers, when
reconnecting the optical fibers on the xCCM-U front panel, put the LC connectors
(L/R) in the same sense as they were before the intervention.
...................................................................................................................................................................................................

16 Reconnect the digital cable (connector labeled "ALARM") on the xCCM-U front panel.
...................................................................................................................................................................................................

17 Reconnect the TIL cable (labeled “PORT 1”) on the xCCM-U front panel.
...................................................................................................................................................................................................

18
If... Then...
The xCCM-U hardware configuration is Reconnect the two E1/T1 cables (connector
xCCM-U-4E1 labeled “PCM E1/T1” and “MDA”) on the
xCCM-U front panel.
Reconnect the Ethernet cable (connector
labeled “PORT 2”) on the xCCM-U front
panel if used.
The xCCM-U hardware configuration is Reinsert the SFP transceiver(s) (connector(s)
xCCM-U-GE labeled “MDA”) through the xCCM-U front
panel.
Reconnect the Gigabit Ethernet cable(s)
(labeled “MDA”) on the xCCM-U front panel.
Reconnect the E1/T1 cable (labeled “PCM
E1/T1”) on the xCCM-U front panel if used.

...................................................................................................................................................................................................

19 Insert completely the new xCCM-U into the 9326 d2U V2 rack by plugging it into its
RBP connectors.
...................................................................................................................................................................................................

20 Tighten the two screws on the xCCM-U front panel.


PRELIMINARY

...................................................................................................................................................................................................

21 Put the hook back in place and secure it.


...................................................................................................................................................................................................

22 Power up the 9326 d2U V2.


....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-27
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the xCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2)
...................................................................................................................................................................................................

23 Unlock from the WMS the objects previously locked through step 1.
...................................................................................................................................................................................................

24 Check the state of the LEDs and display:


• The e/x/iCEM(s)-U and xCCM-U corporate LEDs should turn on, then take the
following state:
red LED OFF and green LED ON
• The green PCM LEDs should be ON.
• The green MDA LEDs should be ON.
• The green/amber SYNC LEDs should indicate the PCM/MDA synchronization.

E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
5-28 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing the eCCM-U


Purpose
Carry out the following procedure to replace the eCCM-U.

Intervention time
20 minutes

Tools required
Screwdrivers
Extraction tool

Figure 5-7 eCCM-U-4E1 configuration front panel

Figure 5-8 eCCM-U-GE configuration front panel


PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-29
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
DANGER
Laser hazard
This equipment operates with invisible laser radiation. Laser radiation can cause
considerable injuries to the eyes.
Never look into the end of an exposed fiber or into an open optical connector when the
optical source is switched on. Always observe the laser warning instructions.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.
From LR13.1: if BTS daisy-chaining is implemented, then service associated with
downstream NodeBs will also be disrupted.
Important! There will be a loss of service on the Remote Radio device(s) associated
with the eCCM-U being replaced.

Procedure
...................................................................................................................................................................................................

1 Lock all the objects associated with the remote radio devices connected to the faulty
eCCM-U at the WMS by Set Administrative State.
From LR13.1: if BTS daisy-chaining is implemented, then also lock all the objects
associated with remote radio devices connected to downstream NodeBs.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................
PRELIMINARY

2 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).

....................................................................................................................................................................................................................................
5-30 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

3 Undo and remove the lower hook (if present).

...................................................................................................................................................................................................

4 Loosen the two screws on the defective eCCM-U front panel.


...................................................................................................................................................................................................

5 Using the extraction tool, unplug the eCCM-U from its RBP connectors.
...................................................................................................................................................................................................

6 Unplug the GPS cable (connector labeled “GPS”) from the eCCM-U front panel if used.
...................................................................................................................................................................................................
PRELIMINARY

7 Unplug the optical fiber(s) and remove the SFP transceiver(s) (connector(s) labeled
“OPTIC”) from the eCCM-U front panel.
Note: The SFP transceiver(s) will be re-plugged in the new eCCM-U board.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-31
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

8 Unplug the digital cable (connector labeled "ALARM") from the eCCM-U front panel.
...................................................................................................................................................................................................

9 Unplug the TIL cable (labeled “PORT 1”) from the eCCM-U front panel.
...................................................................................................................................................................................................

10
If... Then...
The eCCM-U hardware configuration is Unplug the two E1/T1 cables (connector
eCCM-U-4E1 labeled “PCM E1/T1” and “MDA”) from the
eCCM-U front panel.
Unplug the Ethernet cable (connector labeled
“PORT 2”) from the eCCM-U front panel if
used.
The eCCM-U hardware configuration is Unplug the E1/T1 cable (connector labeled
eCCM-U-GE “PCM E1/T1”) from the eCCM-U front panel
if used.
Unplug the Gigabit Ethernet cable(s)
(connector labeled “MDA”) from the eCCM-U
front panel.
Remove the SFP transceiver(s) (connector
labeled “MDA”) from the eCCM-U front
panel.
Note: The SFP transceiver(s) will be
re-plugged in the new eCCM-U board.

...................................................................................................................................................................................................

11 Pull the defective eCCM-U out of the shelf.


...................................................................................................................................................................................................

12 Locate the DIP switch on the new eCCM-U as indicated in the following figure.
PRELIMINARY

....................................................................................................................................................................................................................................
5-32 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Figure 5-9 Location of the DIP switch on the eCCM-U

...................................................................................................................................................................................................

13 Set the DIP switch on the new eCCM-U to the “UMTS” position.
Note: If necessary, set the DIP switch to the right position with help of a screwdriver.

Figure 5-10 DIP switch settings on the eCCM-U

PRELIMINARY

...................................................................................................................................................................................................

14 Insert the new eCCM-U into the slot guides without plugging it on the RBP.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-33
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

15 Reconnect the GPS cable (connector labeled “GPS”) on the eCCM-U front panel if used.
...................................................................................................................................................................................................

16 Reinsert the SFP transceiver(s) (connector(s) labeled “OPTIC”) through the eCCM-U
front panel.
...................................................................................................................................................................................................

17 Reconnect the optical fiber(s) (connector(s) labeled “OPTIC”) on the eCCM-U front
panel.
Important! In case of an eCCM-U equipped with MM SFP transceivers, when
reconnecting the optical fibers on the eCCM-U front panel, put the LC connectors
(L/R) in the same sense as they were before the intervention.
...................................................................................................................................................................................................

18 Reconnect the digital cable (connector labeled "ALARM") on the eCCM-U front panel.
...................................................................................................................................................................................................

19 Reconnect the TIL cable (labeled “PORT 1”) on the eCCM-U front panel.
...................................................................................................................................................................................................

20
If... Then...
The eCCM-U hardware configuration is Reconnect the two E1/T1 cables (connector
eCCM-U-4E1 labeled “PCM E1/T1” and “MDA”) on the
eCCM-U front panel.
Reconnect the Ethernet cable (connector
labeled “PORT 2”) on the eCCM-U front
panel if used.
The eCCM-U hardware configuration is Reinsert the SFP transceiver(s) (connector(s)
eCCM-U-GE labeled “MDA”) through the eCCM-U front
panel.
Reconnect the Gigabit Ethernet cable(s)
(labeled “MDA”) on the eCCM-U front panel.
Reconnect the E1/T1 cable (labeled “PCM
E1/T1”) on the eCCM-U front panel if used.
PRELIMINARY

...................................................................................................................................................................................................

21 Insert completely the new eCCM-U into the 9326 d2U V2 rack by plugging it into its
RBP connectors.

....................................................................................................................................................................................................................................
5-34 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

22
If... Then...
The tri-color CMA LED 2 is green and Push the reset button of the eCCM-U for 5
blinking. seconds.

...................................................................................................................................................................................................

23 Check that the tri-color CMA LED 2 is amber.


...................................................................................................................................................................................................

24 Tighten the two screws on the eCCM-U front panel.


...................................................................................................................................................................................................

25 Put the hook back in place and secure it.


...................................................................................................................................................................................................

26 Power up the 9326 d2U V2.


To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2)
...................................................................................................................................................................................................

27 Unlock from the WMS the objects previously locked through step 1.
...................................................................................................................................................................................................

28 Check the state of the LEDs and display:


• The iCEM-U/xCEM-U/eCEM-U corporate LEDs should have the following state:
– Green LED ON
– Red LED OFF
• The eCCM-U CMA LEDs should have the following state:
– LED 1 (“Activity LED”): green
– LED 2 (“Technology LED”): green
– LED 3 (“Corporate green LED”): green
– LED 4 (“Corporate red LED”): OFF PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-35
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the eCCM-U
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
• The eCCM-U SYNC LEDs should have the following state:
– Green, red or amber according to the synchronization source selected by the 9326
d2U V2.
• The eCCM-U MDA LEDs and PCM LEDS status depends on the Iub interface type
(PCM-based, IP-based or hybrid).

E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
5-36 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an optical transceiver

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing an optical transceiver


Purpose
Carry out the following procedure to replace a defective optical transceiver.

Intervention time
Five minutes

Tools required
None

DANGER
Laser hazard
This equipment operates with invisible laser radiation. Laser radiation can cause
considerable injuries to the eyes.
Never look into the end of an exposed fiber or into an open optical connector when the
optical source is switched on. Always observe the laser warning instructions.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

Procedure
...................................................................................................................................................................................................

1 Locate the faulty SFP transceiver: its two green RX/TX OPTIC LEDs (close to the eight
PCM LEDs on an iCCM-U, built-in LEDs on an e/xCCM-U) are OFF. PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-37
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing an optical transceiver
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Figure 5-11 Location of optical connectors in the 9326 d2U V2

...................................................................................................................................................................................................

2 At the WMS, through Set Administrative State, lock the FDDCell object(s) associated
• With the Remote Radio device connected to the optical transceiver being replaced,
• In case of daisy chaining, with the Remote Radio device(s) located after it, if any.
...................................................................................................................................................................................................

3 Unplug the optical fiber connected to the defective SFP transceiver (optical output labeled
"OPTIC1/2/3" on the iCCM-U front panel, "OPTIC1/2/3/4/5/6" or "MDA" on the
e/xCCM-U front panel).
...................................................................................................................................................................................................

4 Pull the defective SFP transceiver out of the SFP cage with care.
PRELIMINARY

...................................................................................................................................................................................................

5 Check that the new replacing SFP transceiver has the same type as the SFP transceiver
being replaced.Be sure to replace a SM SFP transceiver with a SM SFP transceiver and a
MM SFP transceiver with a MM SFP transceiver.
....................................................................................................................................................................................................................................
5-38 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing an optical transceiver

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

6 Put in place the new SFP transceiver and insert it in the e/x/iCCM-U.

Figure 5-12 Inserting an SFP transceiver in the iCCM-U

...................................................................................................................................................................................................

7 Reconnect the optical fiber.


...................................................................................................................................................................................................

8 Unlock from the WMS the FDDCell object(s) previously locked through step 2.
...................................................................................................................................................................................................

9 Check the state of the two green RX/TX OPTIC LEDs: they should be ON.
E...................................................................................................................................................................................................
N D O F S T E P S PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-39
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing the fans tray (48V)


Purpose
Carry out the following procedure to replace the fans tray when alarmed.

Intervention time
15 minutes

Tools required
One voltmeter
Screwdrivers

Figure 5-13 Fans tray view (48V)

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
PRELIMINARY

Always observe the general ESD instructions.

....................................................................................................................................................................................................................................
5-40 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.

Procedure
...................................................................................................................................................................................................

1 Lock the cem object as well as all the objects associated with the Remote Radio devices
connected to the e/x/iCCM-U at the WMS, by Set Administrative State.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).
...................................................................................................................................................................................................

3 On the DC breaker panel, switch off the circuit breaker of the 9326 d2U V2.
Important! To avoid anyone to switch on this circuit breaker before it is required, it is
recommended to either put a notice board close to the DC breaker panel indicating
that you intentionally have switched it off or manually lock it if possible.
...................................................................................................................................................................................................

4 Using a voltmeter, check that there is no more power at the RUC front panel.
...................................................................................................................................................................................................

5 Unplug the –48 V power cable from the RUC front panel.
...................................................................................................................................................................................................

6 Unplug the Dallas one-wire cables from the connector labeled "ALARM/INT" from the
RUC front panel.
...................................................................................................................................................................................................

7 While pushing the lock of the RUC to the right, use the two handles on the top and the
bottom of the RUC front panel to pull the defective fans tray out of the shelf.
PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-41
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Figure 5-14 Extracting the fans tray

Figure 5-15 Fans tray


PRELIMINARY

....................................................................................................................................................................................................................................
5-42 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

8 Put the new fans tray in place and insert it completely into the 9326 d2U V2.
...................................................................................................................................................................................................

9 Reconnect the two Dallas one-wire cables to the connectors labeled "ALARM/INT" on
the RUC front panel.
...................................................................................................................................................................................................

10 Reconnect the –48 V power cable on the RUC front panel.


...................................................................................................................................................................................................

11 On the DC breaker panel, switch on the circuit breaker of the 9326 d2U V2.
...................................................................................................................................................................................................

12 Power up the new 9326 d2U V2.


To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2)
...................................................................................................................................................................................................

13 Contact the WMS operator to get the NEid of 9326 d2U V2.
Note: The NEid of the Node B is stored on the RUC. When a faulty RUC is replaced,
the new RUC must be reconfigured with the same NEid value.
...................................................................................................................................................................................................

14 Connect the TIL on the iCCM-U/xCCM-U/eCCM-U if not connected yet.


...................................................................................................................................................................................................

15 Launch the TIL.


...................................................................................................................................................................................................

16 Go to the I&C menu.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-43
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

17

...................................................................................................................................................................................................

18 In the Change I&C parameters tabs, choose the BTS tab.


...................................................................................................................................................................................................
PRELIMINARY

19 Fill out the field Serialisation number with the NEid retrieved from the WMS in step 13.

....................................................................................................................................................................................................................................
5-44 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

20 Click Send to iBTS and wait during the operation. At the end of the operation, the
following message is displayed:

...................................................................................................................................................................................................

21 Go to the Tools menu. PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-45
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

22

...................................................................................................................................................................................................

23 In the Confirm the reset window, click OK.


...................................................................................................................................................................................................
PRELIMINARY

24 In the End of Reset window, click OK.


...................................................................................................................................................................................................

25 Exit the TIL.

....................................................................................................................................................................................................................................
5-46 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the fans tray (48V)

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

26 Unlock from the WMS the objects previously locked through step 1.
...................................................................................................................................................................................................

27 Check the state of the LEDs and display:


• The iCEM-U/xCEM-U/eCEM-U corporate LEDs should turn on, then take the
following state: red LED OFF and green LED ON.
• For an x/eCCM-U:
– The corporate LEDs should turn on, then take the following state: red LED OFF
and green LED ON.
– The green PCM/MDA LEDs should be ON.
– The SYNC status LEDs should indicate the PCM/MDA synchronization
(green/amber).
– The green built-in RX/TX OPTIC LEDs should be ON.
• For an iCCM-U:
– The corporate LEDs should turn on, then take the following state: red LED OFF
and green LED ON.
– The green PCM LEDs should be ON.
– The green RX/TX OPTIC LEDs should be ON.
– The SYNC display should indicate the PCM synchronization.

E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-47
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Replacing the pre-cabled 9326 d2U V2 rack


Purpose
Carry out the following procedure to replace the 9326 d2U V2 rack.

Intervention time
40 minutes

Tools required
Screwdrivers
Extraction tool

DANGER
Laser hazard
This equipment operates with invisible laser radiation. Laser radiation can cause
considerable injuries to the eyes.
Never look into the end of an exposed fiber or into an open optical connector when the
optical source is switched on. Always observe the laser warning instructions.

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.

Procedure
...................................................................................................................................................................................................
PRELIMINARY

1 Lock the cem object as well as all the objects associated with the Remote Radio devices
connected to the iCCM-U/xCCM-U/eCCM-U at the WMS, by Set Administrative State.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
....................................................................................................................................................................................................................................
5-48 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).
...................................................................................................................................................................................................

3 Unplug the –48 V DC power cable from the RUC front panel.
...................................................................................................................................................................................................

4 Unplug the ground cable from the ground stud of the shelf.

...................................................................................................................................................................................................

5 Remove the management sticker located on the lug, on the right hand side of the 9326
d2U V2 shelf.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-49
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

Figure 5-16 Location of the management sticker

This removable sticker contains a 6-digit Network IDentifier (NeID) that is used at 9326
d2U V2 connection to the WMS. This sticker must be stored in a safe location since it
will be reused on the new 9326 d2U V2 rack.
...................................................................................................................................................................................................

6 Undo and remove the upper and lower hooks (if present).
PRELIMINARY

....................................................................................................................................................................................................................................
5-50 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

7 Using the extraction tool, pull the iCEM-U/xCEM-U/eCEM-U out of the shelf.
...................................................................................................................................................................................................

8 Unplug cables from the iCCM-U/xCCM-U/eCCM-U:


• Unplug the optical fiber(s) from the iCCM-U/xCCM-U/eCCM-U front panel.
• Unplug the digital cable (connector labeled "ALARM") from the iCCM-U/xCCM-
U/eCCM-U front panel.
• For an iCCM-U:
– Unplug the E1/T1 cable (connector labeled "PCM E1/T1") from the iCCM-U
front panel.
PRELIMINARY

– Unplug the GPS synchronization cable (connector labeled "GPS SYNC") from the
iCCM-U front panel if used.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-51
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
– Unplug the TIL connection cable (connector labeled "PORT 2") from the iCCM-U
front panel.
– Unplug the Ethernet connection cable (connector labeled "PORT 1") from the
iCCM-U front panel if used.
• For an x/eCCM-U:
– Unplug the PCM E1/T1 cable (connector labeled "PCM E1/T1") and the MDA
cable (connector labeled "MDA") from the x/eCCM-U front panel.
– Unplug the GPS synchronization cable (connector labeled "GPS") from the
x/eCCM-U front panel if used.
– Unplug the TIL connection cable (connector labeled "PORT 1") from the
x/eCCM-U front panel.
– Unplug the Ethernet connection cable (connector labeled "PORT 2") from the
x/eCCM-U front panel if used.
...................................................................................................................................................................................................

9 Loosen the two screws on the iCCM-U/xCCM-U/eCCM-U front panel.


...................................................................................................................................................................................................

10 Using the extraction tool, pull the iCCM-U/xCCM-U/eCCM-U out of the shelf.
...................................................................................................................................................................................................

11 Unplug all cables from the RUC front panel.


...................................................................................................................................................................................................

12 Loosen the two screws on the RUC front panel.


...................................................................................................................................................................................................

13 Using the extraction tool, pull the RUC out of the shelf.
...................................................................................................................................................................................................

14 Remove the defective 9326 d2U V2 shelf.


...................................................................................................................................................................................................

15 Put the new 9326 d2U V2 rack in place.


...................................................................................................................................................................................................

16 Fix the NeID sticker on the right hand side of the RUC, on the lug of the new 9326 d2U
V2 rack.
...................................................................................................................................................................................................
PRELIMINARY

17 Reinsert the iCEM-U/xCEM-U/eCEM-U in the new digital shelf.

....................................................................................................................................................................................................................................
5-52 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

18 Reinsert the iCCM-U/xCCM-U/eCCM-U in the new digital shelf without plugging it on


the RBP.
...................................................................................................................................................................................................

19 Reinsert the RUC in the new digital shelf.


...................................................................................................................................................................................................

20 Reconnect the ground cable to the ground stud of the rack.


...................................................................................................................................................................................................

21 Reconnect the –48 V DC power cable to the RUC front panel.


...................................................................................................................................................................................................

22 Reconnect all cables and fibers disconnected in steps 8 and 11.


...................................................................................................................................................................................................

23 Insert completely the iCCM-U/xCCM-U/eCCM-U into the digital shelf by plugging it


into its RBP connectors.
...................................................................................................................................................................................................

24 Tighten the two screws on the iCCM-U/xCCM-U/eCCM-U, iCEM-U/xCEM-U/eCEM-U


and RUC front panels.
...................................................................................................................................................................................................

25 Put the two hooks in place and secure them.


...................................................................................................................................................................................................

26 Power up the new 9326 d2U V2.


To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2)
...................................................................................................................................................................................................

27 Unlock from the WMS the objects previously locked through step 1.
...................................................................................................................................................................................................

28 Connect the TIL on the 9326 d2U V2 (on "PORT2" of the iCCM-U, on "PORT1" of the
x/eCCM-U) to modify the pre-cabled rack inventory parameters.
...................................................................................................................................................................................................

29 Launch the TIL.


PRELIMINARY

...................................................................................................................................................................................................

30 Go to the I&C menu.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-53
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

31 Choose Change I&C parameters.

...................................................................................................................................................................................................

32 In the Change I&C parameters tabs, choose the BTS tab.


...................................................................................................................................................................................................
PRELIMINARY

33 In the Fallback to previous I&C data field, choose Deactivate.

....................................................................................................................................................................................................................................
5-54 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

34 The Serialisation number, Manufacturing Date, and Hardware Release fields are
linked with the defective 9326 d2U V2 rack. This information must be updated.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-55
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

35 Using the information printed on the pre-cabled rack labels present on the left hand side
of the 9326 d2U V2 spare, fill out the following fields:
• Serialisation number
• Manufacturing Date
• Hardware Release

Click Send to iBTS.


...................................................................................................................................................................................................

36 In the Flip/Flop Mechanism window, click Yes.


PRELIMINARY

...................................................................................................................................................................................................

37 In the Change I&C parameters Info window, click OK.

....................................................................................................................................................................................................................................
5-56 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

38 Wait during the operation.

...................................................................................................................................................................................................

39 At the end of the operation, the following message is displayed:

...................................................................................................................................................................................................

40 Go to the Tools menu.


...................................................................................................................................................................................................

41 Choose iBTS reset, then Reset in connected mode.


PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-57
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................

...................................................................................................................................................................................................

42 In the Confirm the reset window, click OK.


...................................................................................................................................................................................................

43 In the End of Reset window, click OK.


...................................................................................................................................................................................................
PRELIMINARY

44 Exit the TIL.


...................................................................................................................................................................................................

45 Disconnect the TIL from the 9326 d2U V2.

....................................................................................................................................................................................................................................
5-58 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the pre-cabled 9326 d2U V2 rack

PRELIMINARY
Replacing the digital shelf equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

46 Modify “neid” of the “BTSEquipment” object at the OMC.


Note: “neid” value is equal to the serialization number at the TIL.
...................................................................................................................................................................................................

47 Check the state of BTSEquipment OAM Link at the WMS is recovered.


...................................................................................................................................................................................................

48 Check the state of the LEDs and display:


• The iCEM-U/xCEM-U/eCEM-U and iCCM-U/xCCM-U/eCCM-U corporate LEDs
should turn on, then take the following state: red LED OFF and green LED ON.
• For an e/xCCM-U:
– The green PCM/MDA LEDs should be ON.
– The SYNC status LEDs should indicate the PCM/MDA synchronization
(green/amber).
– The green built-in RX/TX OPTIC LEDs should be ON.
• For an iCCM-U:
– The green PCM LEDs should be ON.
– The green RX/TX OPTIC LEDs should be ON.
– The SYNC display should indicate the PCM synchronization.

E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-59
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Reissue history
Replacing the optional equipment
....................................................................................................................................................................................................................................

Replacing the optional equipment

Overview
Purpose
This section contains procedures to users to perform corrective maintenance tasks on the
optional equipment of the 9326 d2U V2.

Contents

Replacing the External Alarm module 5-61


Replacing the enhanced Alarm Module 5-63
Replacing the LPPCM module 5-66
Replacing the MLP box 5-69
PRELIMINARY

....................................................................................................................................................................................................................................
5-60 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the External Alarm module

PRELIMINARY
Replacing the optional equipment
....................................................................................................................................................................................................................................

Replacing the External Alarm module


Purpose
Perform the following procedure to replace the External Alarm module.

Intervention time
10 minutes

Tools required
• A Screwdriver
• A wrench for hexagonal head (M6 nut)

Figure 5-17 Front panel of the External Alarm module

NOTICE
ESD hazard
Wear the antistatic bracelet when performing the maintenance procedure described
below:
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

Procedure
...................................................................................................................................................................................................
PRELIMINARY

1 Open the Node B door(s).


...................................................................................................................................................................................................

2 Locate the External Alarm module, just below the 9326 d2U V2 shelf.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-61
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the External Alarm module
Replacing the optional equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

3 On the External Alarm module, unplug the following cables from the front panel
connectors:
• The two external alarm cables on “ALARM 1” and “ALARM 2” connectors
• The alarm cable that connects the alarm module to the lightning protection module (if
exists)
• The private alarm bus cable that is plugged to the front panel of the RUC module
• The ground cable with the wrench for hexagonal head
...................................................................................................................................................................................................

4 Loosen the four front panel screws.


...................................................................................................................................................................................................

5 Remove the defective External Alarm module.


...................................................................................................................................................................................................

6 Insert the new External Alarm module.


...................................................................................................................................................................................................

7 Tighten the four front panel screws.


...................................................................................................................................................................................................

8 Reconnect all the unplugged cables.


...................................................................................................................................................................................................

9 Close the Node B door(s) .


E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
5-62 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the enhanced Alarm Module

PRELIMINARY
Replacing the optional equipment
....................................................................................................................................................................................................................................

Replacing the enhanced Alarm Module


Purpose
Perform the following procedure to replace the enhanced Alarm Module.

Intervention time
10 minutes

Tools required
• A screwdriver
• A wrench for hexagonal head (M5 nut)

Figure 5-18 Front panel of the enhanced Alarm Module

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-63
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the enhanced Alarm Module
Replacing the optional equipment
....................................................................................................................................................................................................................................
NOTICE
ESD hazard
Wear the antistatic bracelet when performing the maintenance procedure described
below.
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

Procedure
...................................................................................................................................................................................................

1 Open the Node B door(s), if any.


...................................................................................................................................................................................................

2 Locate the enhanced Alarm Module, just below the 9326 d2U V2 shelf.
...................................................................................................................................................................................................

3 On the enhanced Alarm Module, unplug the following cables from the front panel
connectors:
• The cable that is plugged to the front panel of the RUC module (plugged in the
connector labeled "CTRL")
• The two external alarm cables with four RJ45 plugs on each that are plugged to the
eight external alarm connectors (plugged in the connectors labeled "1-4", "5-8"
,"9-12" ,"13-16" ,"17-20" ,"21-24" ,"25-28" and "29-32").
• The ground cable with the wrench for hexagonal head
...................................................................................................................................................................................................

4 Loosen the four front panel screws.


...................................................................................................................................................................................................

5 Remove the defective enhanced Alarm Module.


...................................................................................................................................................................................................

6 Insert the new enhanced Alarm Module.


...................................................................................................................................................................................................

7 Tighten the four front panel screws.


PRELIMINARY

...................................................................................................................................................................................................

8 Reconnect all the cables.

....................................................................................................................................................................................................................................
5-64 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the enhanced Alarm Module

PRELIMINARY
Replacing the optional equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

9 Close the Node B door(s), if any.


E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-65
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the LPPCM module
Replacing the optional equipment
....................................................................................................................................................................................................................................

Replacing the LPPCM module


Purpose
Carry out the following procedure to replace the LPPCM module.

Intervention time
15 minutes

Tools required
• A screwdriver
• A wrench for hexagonal head (M6 nut)

Figure 5-19 LPPCM module front panel

NOTICE
ESD hazard
Wear the antistatic bracelet when performing the maintenance procedure described
below.
Electronic components can be destroyed by electrostatic discharge (ESD).
PRELIMINARY

Hold circuit packs only at the edges or on the insertion and removal facilities.
Always observe the general ESD instructions.

....................................................................................................................................................................................................................................
5-66 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the LPPCM module

PRELIMINARY
Replacing the optional equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.
Important! There will be a loss of service on the Remote Radio device(s) and on the
dropped BTS in case of BTS daisy chaining through the NodeB

Procedure
...................................................................................................................................................................................................

1 Open the Node B door(s).


...................................................................................................................................................................................................

2 Lock all the objects associated with the remote radio device(s) and the dropped BTS
connected to the 9326 d2U V2 at the WMS, by Set Administrative State.
For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User
Guide, 9YZ-04088-0014-PCZZA.
...................................................................................................................................................................................................

3 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).
...................................................................................................................................................................................................

4 Locate the LPPCM module, just above the 9326 d2U V2 shelf.
...................................................................................................................................................................................................

5 Unplug the cables from the LPPCM front panel:


• The "PCM Out" cable that is plugged to the
• The "IN internal alarm bus" cable that is plugged to the External Alarm module
• The PCM cable ("PCM In") that is plugged to the customer DDF
• The ground cable with the wrench for hexagonal head
...................................................................................................................................................................................................

6 Loosen the two front panel screws.


...................................................................................................................................................................................................

7 Remove the defective LPPCM module.


PRELIMINARY

...................................................................................................................................................................................................

8 Insert the new LPPCM module.


...................................................................................................................................................................................................

9 Tighten the two front panel screws.


....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-67
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the LPPCM module
Replacing the optional equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

10 Reconnect the four cables.


...................................................................................................................................................................................................

11 Power up the 9326 d2U V2.


To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2).
...................................................................................................................................................................................................

12 Unlock from the WMS the objects previously locked through Step 2.
...................................................................................................................................................................................................

13 Close the Node B door(s).


E...................................................................................................................................................................................................
N D O F S T E P S
PRELIMINARY

....................................................................................................................................................................................................................................
5-68 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the MLP box

PRELIMINARY
Replacing the optional equipment
....................................................................................................................................................................................................................................

Replacing the MLP box


Purpose
Carry out the following procedure to replace the MLP box.

Intervention time
15 minutes

Tools required
• Screwdriver
• Wrench for hexagonal head (M6 nut)

Figure 5-20 Front panel of the MLP box

NOTICE
ESD hazard
Electronic components can be destroyed by electrostatic discharge (ESD).
Hold circuit packs only at the edges or on the insertion and removal facilities.
PRELIMINARY

Always observe the general ESD instructions.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-69
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the MLP box
Replacing the optional equipment
....................................................................................................................................................................................................................................
NOTICE
Service-disruption hazard
Following the procedure below will result in a loss of service.

Procedure
...................................................................................................................................................................................................

1 Open the door(s) of the Node B.


...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.


To do this, follow the procedure “Powering down the 9326 d2U V2” (p. 4-4).
...................................................................................................................................................................................................

3 Locate the MLP box, just above the 9326 d2U V2 shelf.
...................................................................................................................................................................................................

4 Unplug the cables from the MLP box front panel:


• The "Power Out" cable, if used
• The "Power In" cable, if used
• The "PCM Out" cable that is plugged to the iCCM-U/xCCM-U/eCCM-U
• The "Alarm In" alarm bus cable that is plugged to the External Alarm module
• The "PCM In" cable
• The "FE/GE Out" cable, if used
• The "FE/GE In" cable, if used
• The ground cable
...................................................................................................................................................................................................

5 Loosen the two front panel screws.


...................................................................................................................................................................................................

6 Remove the defective MLP box.


...................................................................................................................................................................................................

7 Insert the new MLP box.


...................................................................................................................................................................................................
PRELIMINARY

8 Tighten the two front panel screws.


...................................................................................................................................................................................................

9 Reconnect all the cables.

....................................................................................................................................................................................................................................
5-70 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
9326 d2U V2 corrective maintenance procedures Replacing the MLP box

PRELIMINARY
Replacing the optional equipment
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................

10 Power up the 9326 d2U V2.


To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 4-2).
...................................................................................................................................................................................................

11 Close the door(s) of the Node B.


E...................................................................................................................................................................................................
N D O F S T E P S

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary 5-71
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY 9326 d2U V2 corrective maintenance procedures Replacing the MLP box

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
5-72 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
Appendix A: Product
conformance statements

Overview
Purpose
This appendix provides the 9326 d2U V2 product conformance statements.

Contents

European regulatory requirement compliance A-2


North American regulatory requirement compliance A-4
Compliances for other regions/countries A-8
Operating conditions A-9
Cable specifications A-10
Product labeling A-11

PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary A-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Product conformance statements European regulatory requirement compliance

....................................................................................................................................................................................................................................

European regulatory requirement compliance


Overview
The 9326 d2U V2 (without MLP box) falls under the Directive of the European
Parliament and of the Council of December 15th 2004 on the approximation of the laws
of the Member States relating to electromagnetic compatibility 2004/108/EC.
This directive covers essential requirements in the field of:
• Electromagnetic compatibility (EMC) protection requirements contained in Directive
2004/108/EC.
This equipment generates, uses, and can radiate radio frequency energy. If not
installed and used in accordance with the instruction manual, it can interfere with
radio communications. However, there is no guarantee that interferences do not occur
in a particular installation. If this equipment does cause harmful interference to radio
or television reception, which can be determined by turning the equipment off and on.
The user is encouraged to correct any interference problems.
EMC requirements have been selected to ensure an adequate level of compatibility for
apparatus in residential, commercial, and light industrial environments. Compatibility
levels, however, do not cover extreme cases that can occur in any location, but that
have a low probability of occurrence. In particular, they may not cover cases where a
source of interference that is producing repeated transient or continuous phenomena is
permanently present. This could include, for example, a radar or broadcast site in the
near vicinity. In these cases, it may be necessary to limit the source of interference,
and/or apply special protection to the interfered part.
Note: For operation or maintenance inside Alcatel-Lucent systems, the operator must
always wear the antistatic wrist strap to maintain the integrity of the product.
• Effective use of the Radio spectrum allocated to terrestrial/space radio communication
and orbital resources to avoid interference. The routes and standards used to
demonstrate compliance with these requirements are outlined in the following
paragraphs.
– Node B EMC
Compliance with essential EMC requirements was demonstrated using ETSI EN
300 386.
– Node B safety
Compliance with essential safety requirements was demonstrated using
PRELIMINARY

EN60950-1 and EN60215 standards as well as IEC 60950-1 and IEC 60215.

....................................................................................................................................................................................................................................
A-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Product conformance statements European regulatory requirement compliance

PRELIMINARY
....................................................................................................................................................................................................................................
European Union Environmental Directives (EUED)
The 9326 d2U V2 is manufactured according to the following two European Union
Environmental Directives:
• Restriction of Hazardous Substances (RoHS), 2002/95/EC.
The RoHS directive restricts the use of lead, mercury, cadmium, hexavalent
chromium, poly-brominated biphenyls (PBB) and poly-brominated diphenyl ethers
(PBDE) in electrical and electronic products. This directive applies to all electrical
and electronic products placed on the European Union (EU) and European Economic
Area (EEA) markets after July 1, 2006, with certain exemptions, including an
exemption for lead solder in network infrastructure equipment.
• Waste of Electrical and Electronic Equipment (WEEE), 2002/96/EC.
The WEEE directive mandates the necessary treatment of such equipment when it
enters end-of-life. It specifically identifies requirements for recycling, reuse, and
disposal.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary A-3
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Product conformance statements North American regulatory requirement compliance

....................................................................................................................................................................................................................................

North American regulatory requirement compliance


Overview
The 9326 d2U V2 has been qualified according to North American market requirements.
This equipment has been tested and found to comply with the limits for a Class A digital
device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide
reasonable protection against harmful interference when the equipment is operated in a
commercial environment. This equipment generates, uses, and can radiate radio frequency
energy and, if not installed and used in accordance with the instruction manual, may
cause harmful interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference in which case the user will be
required to correct the interference at his own expense.

CAUTION
RF hazard
This is a class A product. In a domestic environment this product may cause radio
interference in which case the user may be required to take adequate measures.

Node B safety
The 9326 d2U V2 complies with UL60950-1 and CAN/CSA C22.2 No. 60950-1 Safety
Standards.
The CSA mark is applied on the 9326 d2U V2 and demonstrates compliance with both
US and Canadian Standards.

Node B EMC
The 9326 d2U V2 complies with 47CFR Part 15 class A for EMC emission limits.
This Class A digital apparatus complies with Canadian ICES-003.

Node B interconnection compliance


The 9326 d2U V2 complies with Industry Canada IC-CS03 Part II requirements and
meets the applicable Industry Canada technical specifications.
On the core controller printed circuit board is a label that contains a product identifier in
the following format:
PRELIMINARY

• IC: 6933C-ICCMU for iCCM-U module


• IC: 6933C-XCCMU for xCCM-U module
• IC: 6933C-ECCMU for eCCM-U module

....................................................................................................................................................................................................................................
A-4 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Product conformance statements North American regulatory requirement compliance

PRELIMINARY
....................................................................................................................................................................................................................................
The 9326 d2U V2 complies with 47 CFR Part 68 of the FCC rules and the requirements
adopted by the ACTA.
On the core controller printed circuit board is a label that contains a product identifier in
the following format:
• US: U3EXDNANICCMU for iCCM-U module
• US: U3EXDNANXCCMU for xCCM-U module
• US: U3EXDNANECCMU for eCCM-U module
If requested, the following information must be provided to the telephone company:
• ACTA Registered Number: U3E
• Facility Interface Code (FIC): 04DU9.BN, 04DU9.DN, 04DU9.1KN, and
04DU9.1SN
• Service Order Code (SOC): 6.0P
A FCC part 68 and ACTA compliant cable is provided with the Node B equipment, with
no connector at network interface side. The Node B equipment operates with a 1.544
Mbps digital channel. See Installation Instructions for details.
If the Node B equipment causes harm to the phone network, the telephone company will
notify you in advance that temporary discontinuance of service may be required. But if
advance notice is not practical, the telephone company will notify the customer as soon as
possible. Also, you will be advised of your right to file a complaint with the FCC if you
believe it is necessary.
The telephone company may make changes to its facilities, equipment, operations or
procedures that could affect the operation of the equipment. If this happens the telephone
company will provide advance notice so you can make the necessary modifications to
maintain uninterrupted services.
If trouble is experienced with this equipment 9326 d2U V2, for repair or warranty
information, please contact:
Hernan R. Noguchi Global
Product Compliance Laboratory (GPCL)
Alcatel-Lucent
Phone: 1-732-332-6002 101
Crawfords Corner Road Building
11C, Room 165 Holmdel NJ 07733-3030
PRELIMINARY

If the equipment is causing harm to the telephone network, the telephone company may
request that you disconnect the equipment until the problem is resolved.
All repairs should be handled by authorized Alcatel-Lucent Service Personnel.

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary A-5
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Product conformance statements North American regulatory requirement compliance

....................................................................................................................................................................................................................................
Node B data equipment
The following table shows which jacks are associated with which modes of operation.

Operation Mode USOC Jack


Programmable & Test RJ45S

Node B systems
Facility Interface Codes (FIC), Services Order Codes (SOC), USOC Jack Codes, and
Ringer Equivalence Number (REN) are shown in the table below for each port where
applicable.

Port FIC SOC USOC Jack REN


iCCM-U T1 04DU9.BN 6.0P N/A N/A
Board
iCCM-U T1 04DU9.DN 6.0P N/A N/A
Board
iCCM-U T1 04DU9.1KN 6.0P N/A N/A
Board
iCCM-U T1 04DU9.1SN 6.0P N/A N/A
Board
xCCM-U T1 04DU9.BN 6.0P N/A N/A
Board1
xCCM-U T1 04DU9.DN 6.0P N/A N/A
Board1
xCCM-U T1 04DU9.1KN 6.0P N/A N/A
Board1
xCCM-U T1 04DU9.1SN 6.0P N/A N/A
Board1
xCCM-U T1 04DU9.BN 6.0P N/A N/A
Board2
xCCM-U T1 04DU9.DN 6.0P N/A N/A
Board2
xCCM-U T1 04DU9.1KN 6.0P N/A N/A
PRELIMINARY

Board2
xCCM-U T1 04DU9.1SN 6.0P N/A N/A
Board2

....................................................................................................................................................................................................................................
A-6 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Product conformance statements North American regulatory requirement compliance

PRELIMINARY
....................................................................................................................................................................................................................................

Port FIC SOC USOC Jack REN


eCCM-U T1 04DU9.BN 6.0P N/A N/A
Board1
eCCM-U T1 04DU9.DN 6.0P N/A N/A
Board1
eCCM-U T1 04DU9.1KN 6.0P N/A N/A
Board1
eCCM-U T1 04DU9.1SN 6.0P N/A N/A
Board1
eCCM-U T1 04DU9.BN 6.0P N/A N/A
Board2
eCCM-U T1 04DU9.DN 6.0P N/A N/A
Board2
eCCM-U T1 04DU9.1KN 6.0P N/A N/A
Board2
eCCM-U T1 04DU9.1SN 6.0P N/A N/A
Board2

Note: 1 equipped with MDA E1/T1 4 PCM


Note: 2 equipped with MDA GE

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary A-7
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Product conformance statements Compliances for other regions/countries

....................................................................................................................................................................................................................................

Compliances for other regions/countries


Overview
It is impossible to list all the applicable approvals/compliances as they depend on the
markets and products concerned.
Note: Contact your local Alcatel-Lucent representative for more information.
PRELIMINARY

....................................................................................................................................................................................................................................
A-8 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Product conformance statements Operating conditions

PRELIMINARY
....................................................................................................................................................................................................................................

Operating conditions
Overview
The product compliance standards mentioned above are based on the following operating
conditions:
• External cables must be of the same type as specified by Alcatel-Lucent.
• No modification of any mechanical or electrical characteristics of the product shall be
made.
Any changes or modifications made to the product without written approval from
Alcatel-Lucent releases Alcatel-Lucent from responsibility regarding standards
compliance.

PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary A-9
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Product conformance statements Cable specifications

....................................................................................................................................................................................................................................

Cable specifications
Overview
Compliance with these standards was verified using cables as specified by
Alcatel-Lucent. The continuing compliance of the product relies upon use of the correct
cabling scheme as well as use of identical type cables as specified by Alcatel-Lucent.
Refer to the installation guides for details on cable specifications.
PRELIMINARY

....................................................................................................................................................................................................................................
A-10 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Product conformance statements Product labeling

PRELIMINARY
....................................................................................................................................................................................................................................

Product labeling
Overview
The label may be located inside or outside the product, provided that the operation and/or
maintenance personnel have the information when working on the product.

Node B labeling for American Countries


To indicate compliance with the CSA and UL Safety requirements, the 9326 d2U V2
bears the following mark in a conspicuous location.

On the main regulatory label, compliance to 47 CFR Part 15 is stated along with:
• Manufacturers name
• Equipment designation
• Nominal voltage operating range and maximum rated current
Compliance to Industry Canada ICES-003 is stated on additional regulatory label.
Compliance to the 47 CFR Part68 and IC CS-03 are stated through additional labels on
the Core Controller Module printed circuit board since certification is performed at
module level (Host Independent submission).

Node B labeling for European Countries


To indicate compliance with the European 2004/108/EC Directive, the 9326 d2U V2
(without MLP box) bears the following label in a visible location:
PRELIMINARY

....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary A-11
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Product conformance statements Product labeling

....................................................................................................................................................................................................................................

• Manufacturers name
• Equipment designation
• Nominal voltage operating range and maximum rated current

Labeling for other regions / countries


Labeling for other regions and countries is performed as appropriate and required by the
local regulatory framework.
PRELIMINARY

....................................................................................................................................................................................................................................
A-12 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
PRELIMINARY
Appendix B: Reference

Reissue history
Purpose
The reissue history of this document is described in the following paragraphs.

Issue 0.02
The reissue history of issue 0.02 Preliminary is shown in the following table:

Table B-1 Issue 0.02, March 2013, Reason for reissue

Location Change
Preliminary release following review

Issue 0.01
The reissue history of issue 0.01 Draft is shown in the following table:

Table B-2 Issue 0.01, March 2013, Reason for reissue

Location Change
All First release as a release-independent
document
“Procedure” (p. 5-24) 100791 BTS daisy chaining through the
“Procedure” (p. 5-30) NodeB
PRELIMINARY

...................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary B-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Reference Reissue history

....................................................................................................................................................................................................................................
PRELIMINARY

....................................................................................................................................................................................................................................
B-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014
Index

PRELIMINARY
Numerics xCCM-U-4E1 front view, 5-22
9326 d2U V2 xCCM-U-GE front view, 5-22
See: description
See: view External Alarm module

................................................................................................ front panel, 5-61


replace, 5-61
D document support, xiii
................................................................................................
................................................................................................
F fans rack
E eCCM-U
See: enhanced Core Controller Module-U (eCCM-U) replace, 5-40

eCEM-U fans tray


See: enhanced Channel Element Module-U
front view, 5-40
(eCEM-U)
................................................................................................
enhanced Alarm Module
I iCCM-U
front view, 5-63
See: integrated Core Controller Module-U (iCCM-U)
replace, 5-63
iCEM-U
enhanced Channel Element Module-U (eCEM-U) See: integrated Channel Element Module-U
front view, 5-12 (iCEM-U)

replace, 5-12 integrated Channel Element Module-U (iCEM-U)

enhanced Core Controller Module-U (eCCM-U) front view, 5-4

eCCM-U-4E1 front view, 5-29 replace, 5-4

eCCM-U-GE front view, 5-29 integrated Core Controller Module-U (iCCM-U)

replace, 5-29 front view, 5-16

eXtended Channel Element Module-U (xCEM-U) replace, 5-16


PRELIMINARY

................................................................................................
front view, 5-8
replace, 5-8 L LPPCM
See: PCM Lightning Protection (LPPCM)
eXtended Core Controller Module-U (xCCM-U)
replace, 5-22
....................................................................................................................................................................................................................................
Alcatel-Lucent 9326 d2U V2 Alcatel-Lucent – Proprietary IN-1
3MN-00482-0004-REZZA Use pursuant to applicable agreements
Issue 0.03 September 2014
PRELIMINARY Index

....................................................................................................................................................................................................................................
................................................................................................ ................................................................................................

M MLP box S Safety statements, 1-1, 1-2


See: Multistandard Lightning Protection (MLP) box
SFP
Multi-standard Lightning Protection (MLP) box See: Small Form-factor Pluggable (SFP)
front panel, 5-69 Small Form-factor Pluggable (SFP)
replace, 5-69 replace, 5-37
................................................................................................ ................................................................................................

P PCM Lightning Protection (LPPCM) X xCCM-U


See: eXtended Core Controller Module-U
front panel, 5-66
(xCCM-U)
replace, 5-66
xCEM-U
phone numbers See: eXtended Channel Element Module-U
(xCEM-U)
for document support, xiii
pre-cabled rack
replace, 5-48
................................................................................................

R replace

enhanced Alarm Module, 5-63


enhanced Core Controller Module-U (eCCM-U),
5-29
eXtended Channel Element Module-U (xCEM-U),
5-8
eXtended Core Controller Module-U (xCCM-U),
5-22
External Alarm module, 5-61
fans rack, 5-40
integrated Channel Element Module-U (iCEM-U),
5-4
integrated Core Controller Module-U (iCCM-U),
5-16
Multi-standard Lightning Protection (MLP) box,
5-69
PCM Lightning Protection (LPPCM), 5-66
PRELIMINARY

pre-cabled rack, 5-48


Small Form-factor Pluggable (SFP), 5-37

....................................................................................................................................................................................................................................
IN-2 Alcatel-Lucent – Proprietary Alcatel-Lucent 9326 d2U V2
Use pursuant to applicable agreements 3MN-00482-0004-REZZA
Issue 0.03 September 2014